W912PQ12R0024.doc
DOC document 267 KB Posted
- Attached to
- Renovation Building 27 Stratton ANGB
- Solicitation number
- W912PQ12R0024
About this file
CORRECT SOLICITATION FOR BLDG 27 RENOVATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS FROM BUILDING 27 RENOVATION SITE VISIT.docx | DOCX document | |
| Bldg 27 site visit.pdf | ||
| 2012-03-03 - 22982 - Structural_SIGNED.PDF | ||
| Repair Buildings 27 - Renovation_Final Submission Drawings 03-03-12.pdf | ||
| W912PQ12R0025.doc | DOC document | |
| Repair Buildings 27 - Renovation_Specs 03-03-12.pdf | ||
| Repair Buildings 27 - Renovation_Cost Estimate 03-03-12.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 00010 - Solicitation Contract Form
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Repair/Renovate Comm Bldg 27
FFP
Project #VBDZ132001 - Repair/Renovate Comm,Bldg 27
The Contractor shall provide all material, labor, equipment, and supervision required to renovate bldg. 27 on Stratton Air National Guard Base. All materials and construction methods will adhere to the specifications and drawings as provided by this solicitation package. Drawings titled "Repair Building 27, Renovation" dated February 10, 2012 and specifications titled "Building 27 - Renovation" dated January, 2012 as posted to Federal Business Opportunities located at www.fbo.gov.
MAGNITUDE OF PROJECT: In accordance with FAR 36.204 (e) this project is estimated to be between $500,000 and $1,000,000.
FEDERAL WAGE RATES: The applicable General Decision for the worker classifications required for this project is attached.
PERIOD OF PERFORMANCE: The Period of Performance for this project is 120 calendar days after acknowledgement of the Notice to Proceed.
PAYMENT AND PERFORMANCE BONDS: In accordance with the Miller Act, construction contract awards exceeding $150,000 require Performance bonds (standard form 25) and Payment bonds (standard form 25-a) for 100 percent of the contract price. Bonds are due within 14 calendar days, or at the time of the pre-construction meeting.
FOB: Destination
NSN: Z2AA-00-000-0000
PURCHASE REQUEST NUMBER: F9S3S42065A003
SIGNAL CODE: A
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| POP 30-MAY-2012 TO |
30-SEP-2012
| N/A |
| F9S3S4 - 109 CES RPM-SRM |
2LT JAMES VAN WORMER
1 AIR NATIONAL GUARD ROAD
SCOTIA NY 12302-9752
518-344-2480
FOB: Destination F9S3S4
CLAUSES INCORPORATED BY FULL TEXT
52.236-8 OTHER CONTRACTS (APR 1984)
The Government may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.
(End of clause)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
24 APRIL 2012, 1:00 PM
(c) Participants will meet at--
BUILDING 25, CIVIL ENGINEERING. ALL PERSONNEL INTERESTED IN ATTENDING THIS SITE VISIT MUST SUBMIT A COPY OF THEIR DRIVER’S LICENSE NO LATER THAN 24 HOURS PRIOR TO THE SCHEDULED SITE VISIT. SUBMIT THROUGH OFFICE EMAIL AT 109AW.MSC@ANG.AF.MIL OR FAX AT 518-344-2687. IT IS YOUR RESPONSIBILITY TO VERIFY YOUR LICENSE HAS BEEN RECEIVED BY THIS OFFICE BY CALLING 518-344-2487. LICENSES ARE NOT KEPT ON FILE SO YOU MUST SUBMIT FOR EACH REQUEST TO ACCESS THE FACILITY.
(End of provision) Section 00700 - Contract Clauses
CLAUSES BY REFERENCE
CLAUSES INCORPORATED BY REFERENCE
| 52.202-1 |
| Definitions |
| JAN 2012 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| APR 1984 |
| 52.203-7 |
| Anti-Kickback Procedures |
| OCT 2010 |
| 52.204-7 |
| Central Contractor Registration |
| FEB 2012 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.211-13 |
| Time Extensions |
| SEP 2000 |
| 52.211-18 |
| Variation in Estimated Quantity |
| APR 1984 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-6 |
| Davis Bacon Act |
| JUL 2005 |
| 52.222-7 |
| Withholding of Funds |
| FEB 1988 |
| 52.222-8 |
| Payrolls and Basic Records |
| JUN 2010 |
| 52.222-9 |
| Apprentices and Trainees |
| JUL 2005 |
| 52.222-10 |
| Compliance with Copeland Act Requirements |
| FEB 1988 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| JUL 2005 |
| 52.222-12 |
| Contract Termination-Debarment |
| FEB 1988 |
| 52.222-13 |
| Compliance with Davis-Bacon and Related Act Regulations. |
| FEB 1988 |
| 52.222-14 |
| Disputes Concerning Labor Standards |
| FEB 1988 |
| 52.222-15 |
| Certification of Eligibility |
| FEB 1988 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction |
| FEB 1999 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| SEP 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| FEB 2009 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.229-3 |
| Federal, State And Local Taxes |
| APR 2003 |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts |
| SEP 2002 |
| 52.232-25 |
| Prompt Payment |
| OCT 2008 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.233-1 |
| Disputes |
| JUL 2002 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.236-2 |
| Differing Site Conditions |
| APR 1984 |
| 52.236-5 |
| Material and Workmanship |
| APR 1984 |
| 52.236-6 |
| Superintendence by the Contractor |
| APR 1984 |
| 52.236-7 |
| Permits and Responsibilities |
| NOV 1991 |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements |
| APR 1984 |
| 52.236-10 |
| Operations and Storage Areas |
| APR 1984 |
| 52.236-11 |
| Use and Possession Prior to Completion |
| APR 1984 |
| 52.236-12 |
| Cleaning Up |
| APR 1984 |
| 52.236-15 |
| Schedules for Construction Contracts |
| APR 1984 |
| 52.236-17 |
| Layout of Work |
| APR 1984 |
| 52.236-21 |
| Specifications and Drawings for Construction |
| FEB 1997 |
| 52.236-23 |
| Responsibility of the Architect-Engineer Contractor |
| APR 1984 |
| 52.236-24 |
| Work Oversight in Architect-Engineer Contracts |
| APR 1984 |
| 52.236-26 |
| Preconstruction Conference |
| FEB 1995 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.249-1 |
| Termination For Convenience Of The Government (Fixed Price) (Short Form) |
| APR 1984 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| MAY 2004 |
| 52.249-10 |
| Default (Fixed-Price Construction) |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| MAR 2008 |
| 252.236-7000 |
| Modification Proposals-Price Breakdown |
| DEC 1991 |
| 252.236-7001 |
| Contract Drawings, and Specifications |
| AUG 2000 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| MAR 1998 |
CLAUSES INCORPORATED BY REFERENCE
| 52.228-15 |
| Performance and Payment Bonds--Construction |
| OCT 2010 |
| 52.232-27 |
| Prompt Payment for Construction Contracts |
| OCT 2008 |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work |
| APR 1984 |
| 52.236-13 |
| Accident Prevention |
| NOV 1991 |
| 52.246-21 |
| Warranty of Construction |
| MAR 1994 |
CLAUSES INCORPORATED BY FULL TEXT
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
(a) Definition.
"Small business concern," as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.
(b) Applicability. This clause applies only to--
(1) Contracts that have been totally set aside or reserved for small business concerns; and
(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) General. (1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.
(2) Any award resulting from this solicitation will be made to a small business concern.
(d) Agreement. A small business concern submitting an offer in its own name shall furnish, in performing the contract, only end items manufactured or produced by small business concerns in the United States or its outlying areas. If this procurement is processed under simplified acquisition procedures and the total amount of this contract does not exceed $25,000, a small business concern may furnish the product of any domestic firm. This paragraph does not apply to construction or service contracts.
(End of clause)
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least FIFTEEN (15) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of clause)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.farsite.hill.af.mil
(End of clause)
Section 00800 - Special Contract Requirements
FEDERAL WAGE RATES
General Decision Number: NY120002 04/06/2012 NY2
Superseded General Decision Number: NY20100002
State: New York
Construction Types: Building, Heavy and Highway
Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington
Counties in New York.
BUILDING CONSTRUCTION PROJECTS (For all counties except
COLUMBIA, FULTON & GREENE) (does not include single family homes and apartments up to a including 4 stories), HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 01/06/2012
1 01/27/2012
2 02/10/2012
3 03/09/2012
4 04/06/2012
ASBE0040-002 05/01/2009
Rates Fringes
Asbestos/Insulator Worker
SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 27.14 16.88
HAZARDOUS MATERIAL HANDLER
Duties limited to preparation wetting;
stripping; removal;
scrapping; vacuuming;
bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 17.37 9.95
* BOIL0197-002 01/01/2012
Rates Fringes
BOILERMAKER......................$ 30.00 23.76
BRNY0002-019 06/01/2011
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONE MASONS,
CEMENT MASONS, PLASTERERS,
POINTERS, CAULKERS &
CLEANERS....................$ 26.91 15.78
HEAVY & HIGHWAY
CONSTRUCTION
CEMENT MASONS..............$ 27.87 15.04
MARBLE, TILE & TERRAZZO
FINISHERS...................$ 22.59 13.53
MARBLE, TILE & TERRAZZO
WORKERS.....................$ 28.53 16.03
CARP0279-006 07/01/2011
Rates Fringes
Carpenters:
HEAVY AND HIGHWAY
CONSTRUCTION (COLUMBIA AND
GREENE COUNTIES)
Carpenters, Millwrights, Pile Drivers...............$ 27.77 23.50
CARP0290-003 07/01/2011
Rates Fringes
Carpenters:
SARATOGA COUNTY
HEAVY & HIGHWAY
CONSTRUCTION:...............$ 28.00 15.60
WASHINGTON COUNTY
HEAVY & HIGHWAY
CONSTRUCTION:...............$ 27.55 15.55
PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.
CARP0290-006 07/01/2011
ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND
SCHOHARIE COUNTIES
Rates Fringes
Carpenters:
BUILDING CONSTRUCTION
Carpenters & Soft Floor
Layers.....................$ 27.35 17.05
Piledriver.................$ 27.35 17.05
HEAVY & HIGHWAY
CONSTRUCTION
Carpenters.................$ 27.79 17.55
CARP0290-008 07/01/2009
Rates Fringes
Carpenters:
CARPENTERS..................$ 26.39 14.95
DIVER TENDERS...............$ 25.49 14.95
DIVERS (Dry Day)............$ 25.49 14.95
DIVERS......................$ 60.00 14.95
PILEDRIVERS.................$ 24.49 14.95
ELEC0236-001 06/01/2011
ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);
MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;
WASHINGTON
Rates Fringes
ELECTRICIAN......................$ 32.50 3%+18.07
ELEC0363-004 04/01/2011
GREENE COUNTY (Portion of)
Rates Fringes
ELECTRICIAN......................$ 37.00 23.12
ELEC1249-003 05/02/2011
Rates Fringes
LINE CONSTRUCTION: Lineman
(LIGHTING AND TRAFFIC SIGNAL
Including any and all Fiber
Optic Cable necessary for
Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems)
Flagman.....................$ 25.21 7.5%+25.5
Groundman Truck Driver
(tractor trailer unit)......$ 35.72 7.5%+25.5
Groundman Truck Driver......$ 33.62 7.5%+25.5
Lineman & Technician........$ 42.02 7.5%+25.5
Mechanic....................$ 33.62 7.5%+25.5
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor
Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-004 01/01/2011
Rates Fringes
Line Construction:
Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):
Flagman....................$ 24.79 15.00+6.5%+a
Groundman digging machine operator...................$ 37.19 15.00+6.5%+a
Groundman truck driver
(tractor trailer unit).....$ 35.12 15.00+6.5%+a
Groundman Truck driver.....$ 33.06 15.00+6.5%+a
Lineman and Technician.....$ 41.32 15.00+6.5%+a
Mechanic...................$ 33.06 15.00+6.5%+a
Overhead transmission line work (where other trades are or have been involved):
Flagman....................$ 26.29 15.00+6.5%+a
Groundman digging machine operator...................$ 39.44 15.00+6.5%+a
Groundman truck driver
(tractor trailer unit).....$ 37.25 15.00+6.5%+a
Groundman truck driver.....$ 35.06 15.00+6.5%+a
Lineman and Technician.....$ 43.82 15.00+6.5%+a
Mechanic...................$ 35.06 15.00+6.5%+a
Substation:
Cable Splicer..............$ 45.45 15.00+6.5%+a
Flagman....................$ 24.79 15.00+6.5%+a
Ground man truck driver....$ 33.06 15.00+6.5%+a
Groundman digging machine operator...................$ 37.19 15.00+6.5%+a
Groundman truck driver
(tractor trailer unit).....$ 35.12 15.00+6.5%+a
Lineman & Technician.......$ 41.32 15.00+6.5%+a
Mechanic...................$ 33.06 15.00+6.5%+a
Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation
Cable Splicer..............$ 46.87 15.00+6.5%+a
Flagman....................$ 25.57 15.00+6.5%+a
Groundman Digging Machine
Operator...................$ 38.35 15.00+6.5%+a
Groundman Truck Driver
(tractor-trailer unit).....$ 36.22 15.00+6.5%+a
Groundman Truck Driver.....$ 34.09 15.00+6.5%+a
Lineman & Technician.......$ 42.61 15.00+6.5%+a
Mechanic...................$ 34.09 15.00+6.5%+a
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer/Central
Office Person..............$ 23.07 3.05+3%
Cable splicer..............$ 27.44 4.43 + 3%
Groundman..................$ 13.81 4.43 + 3%
Installer Repairman-
Teledata
Lineman/Tecnician-
Equipment Operator.........$ 26.05 4.43 + 3%
TREE TRIMMER................$ 21.64 7.36+3%
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial
Day, Good Friday, Independence Day, Labor Day, Thanksgiving
Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New
York State, provided the employee works two days before or two days after the holiday.
b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas
Day.
ELEC1249-007 05/03/2011
LINE CONSTRUCTION (LINEMAN) LIGHTING AND TRAFFIC SIGNAL
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD
WEATHER INFORMATION SYSTEMS
COLUMBIA COUNTY
Rates Fringes
LINE CONSTRUCTION: Lineman
Flagman.....................$ 25.21 7.5%+25.5
Groundman Digging Machine
Operator....................$ 37.82 7.5%+25.5
Groundman Truck Driver
(Tractor-trailer unit)......$ 35.72 7.5%+25.5
Groundman Truck Driver......$ 33.62 7.5%+25.5
Lineman and Technician......$ 42.02 7.5%+25.5
Mechanic....................$ 33.62 7.5%+25.5
PAID HOLIDAYS:
a. Memorial Day, New Year's Day, President's Day, Good
Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the
President of the United States and Election Day for the
Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEV0035-001 01/01/2012
ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of
Durham, Greenville, New Baltimore, Coxcsackie and Athens);
MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND
WASHINGTON COUNTIES
Rates Fringes
Elevator Constructor.............$ 40.09 23.535+a+b
FOOTNOTES:
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, and the day after Thanksgiving Day, Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ELEV0138-004 01/01/2012
COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,
GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY
(THE TOWNS OF HUNTER AND CATSKILL)
Rates Fringes
ELEVATOR MECHANIC................$ 50.11 23.535+a+b
FOOTNOTES:
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, the Friday after Thanksgiving Day and Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0106-001 07/01/2011
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 33.79 21.85+a
GROUP 2.....................$ 33.36 21.85+a
GROUP 3.....................$ 32.45 21.85+a
GROUP 4.....................$ 29.88 21.85+a
GROUP 5.....................$ 34.97 21.85+a
GROUP 6.....................$ 33.79 21.85+a
GROUP 7.....................$ 33.79 21.85+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Boom Truck (over 5 tons), Crane, Cherry Picker (over
5 ton capacity), Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane
GROUP 2: Automated Concrete Spreader (CMI), Automatic Fine
Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Belt Placer (CMI type), Black Top Plant (Automated), Boom
Truck (5 tons and under), Cableway, Caisson Auger, Central
Mix Concrete Plant (Automated), Concrete Pump (8" or over), Dredge, Dual Drum Paver, Excavator (All Purpose-Hydraulicly
Operated) (Gradall or similar), Fork Lift (Factory Rated 15
ft. and over), Front End Loader (4 c.y. and over), Head
Tower (Sauerman or equal), Hoist (2 or 3 Drum), Holland
Loader, Mine Hoist, Mucking Machine or Mole, Pavement
Breaker (SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P), Quad 9, Quarry Master (or equivalent), Scraper, Shovel, Side Boom, Slip Form Paver, Tractor Drawn Belt-Type Truck Crane, Truck or Trailer
Mounted Log Chipper (Self-Feeder), Tug Operator (Except
Manned Rented Equipment), Tunnel Shovel
GROUP 3: Asphalt Paver, Backhoe (Tractor Mounted, Rubber
Tired), Bituminous Spreader and Mixer, Blacktop Plant
(Non-Automated), Blast or Rotary Drill (Truck or Tractor
Mounted), Boring Machine, Cage-Hoist, Central Mix Plant
(Non-Automated) and All Concrete Batching Plants, Cherry
Picker (5 Tons Capacity and Under), Compressors (4 or less)
Exceeding 2000 C.F.M. Combined Capacity, Concrete Paver
(over 16S), Concrete Pump (Under 8"), Crusher, Diesel Power
Unit, Drill Rigs (Tractor Mounted), Front End Loader (under
4 c.y.), Hi-Pressure - Boiler (15 lbs. and over), Hoist
(One Drum), Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive, Maintenance
Engineer/Greaseman/ Welder, Mixer (For Stabilized Base
Self-Propelled), Monorail Machine, Plant Engineer, Profiler
(105 H.P. and under), Pug Mill, Pump Crete, Ready Mix
Concrete Plant, Refrigeration Equipment (For Soil
Stabilization), Road Widener, Roller (All Above Subgrade), Sea Mule, Self-contained Ride-on-Rock Drill, excluding
Air-Track Type Drill, Skidder, Tractor with Dozer and/or pusher, Trencher, Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 4: A-Frame Winch Hoist on Truck, Ballast Regulator
(Ride- On), Compressors (4 not to exceed 2000 C.F.M.
Combined Capacity, or 3 or less with more than 1200 C.F.M.
but not to exceed 2000 C.F.M.), Directional Drill Machine
Locator Dust Collectors, Generators, Pumps, Welding
Machines, Light Plants (4 of Any Type Of Combination), Concrete Pavement Spreaders and Finishers, Conveyor, Drill
Core, Drill Well, Electric Pump Used In Conjunction with
Well Point System, Farm Tractor with Accessories, Fine
Grade Machine, Fork Lift (under 15 ft.), Grout Pump, Gunite
Machine, Hammers (Hydraulic-Self-Propelled), Hydra- Spiker
(Ride-On), Hydro-Blaster Water, Post Hole Digger and Post
Driver, Power Sweeper, Roller (Grade and Fill), Scarifier
(Ride-On Spansaw (Ride-On), Skid Steer loader (Bobcat or similar), Submersible Electric Pump (When Used In Lieu Of
Well Point System), Tamper (Ride-On), Tie Extractor
(Ride-On), Tie Handler, Tie Inserter (Ride-On), Tie Spacer
(Ride-On), Tire Repair, Track Liner, Tractor With Towed
Accessories, Vibrator Compactor, Vibro Tamp, Well Point, Aggregate Plant, Boiler (Used In Conjunction With
Production), Cement and Bin Operator, Compressors (3 or less not to Exceed 1200 C.F.M. Combined Capacity), Dust
Collectors, Generators, Pumps, Welding Machines, Light
Plants (3 or less of Any Type or Combination), Concrete or
Mixer (16S and under), Concrete Saw (Self-Propelled), Fireman, Form Tamper, Hydraulic Pump (Jacking System), Light Plants, Mulching Machine, Oiler, Parapet-Concrete or
Pavement Grinder, Power Broom (Towed), Power Heaterman, Revinius Widener, Shell Winder, Steam cleaner, Tractor
GROUP 5: Master Mechanic
GROUP 6: Crane Premium with Boom Length and Jib 150 Ft.- 199
Ft.
GROUP 7: Crane Premium with Boom Length and Jib 200 Ft. and over
Tower Crane Premium .50
Hazmat Work Premium 2.50
Hydrographic .50
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's
Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day and Veteran's Day
ENGI0106-002 07/01/2011
BUILDING
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 33.85 21.60+a
GROUP 2.....................$ 33.41 21.60+a
GROUP 3.....................$ 32.50 21.60+a
GROUP 4.....................$ 29.93 21.60+a
GROUP 5
1..........................$ 34.35 21.60+a
2..........................$ 34.85 21.60+a
GROUP 6.....................$ 34.35 21.60+a
GROUP 7.....................$ 34.50 21.60+a
GROUP 8.....................$ 35.00 21.60+a
Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.
FOOTNOTE:
a. Paid Holidays: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)
GROUP 1: Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)
GROUP 2: Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under)
GROUP 3: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model
CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller
GROUP 4: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack
(belcrete system), seeding, and mulching machines, pumps
GROUP 5: Crane Premiums:
1 over 150'
2 over 200'
GROUP 6: Tower Crane
GROUP 7: Master mechanic (other than nuclear work)
GROUP 8: Master mechanic on nuclear work
IRON0012-011 05/01/2011
ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY
(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);
RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON
COUNTIES:
Rates Fringes
Ironworkers:
Sheeter, Bucker-up..........$ 25.78 17.96
Sheeter.....................$ 27.90 19.24
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone
Derrickmen..................$ 27.65 19.24
IRON0440-007 05/01/2011
FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);
MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.
Johnsville):
Rates Fringes
Ironworkers:
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone
Derrickman..................$ 23.63 22.01
LABO0017-001 06/01/2010
COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
Rates Fringes
Laborers:
COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)
(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY
GROUP 1:...................$ 32.75 17.95+a
GROUP 2:...................$ 36.65 17.95+a
GREENE COUNTY (Township of
Catskill) HEAVY & HIGHWAY:
GROUP 1:...................$ 28.40 17.95+a
GROUP 2:...................$ 32.75 17.95+a
GROUP 3:...................$ 36.65 17.95+a
GROUP 4:...................$ 39.15 17.95+a
TUNNEL, SHAFT & CAISSON
WORK
GROUP 1....................$ 39.15 17.95+a
For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY
(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
HEAVY & HIGHWAY CLASSIFICATIONS
GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required
GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required
For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY
(Township of Catskill)
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas
Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.
GROUP 1: Flagperson, gateperson
GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.
Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.
Ground man on milling machine
GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman
GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman
For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Labor Day, Election Day, Veterans
Day, Thanksgiving Day, Christmas Day
GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and
Powderman;
Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air
LABO0035-001 06/01/2010
FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND
ST. JOHNSVILLE)
Rates Fringes
Laborers Building Construction
Asbestos Removal............$ 21.50 13.44
Blasters, Form Setters, MotorBuggy Operator (Rider
Type)......................$ 20.50 13.44
Hazardous Waste Removal
Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 21.50 13.44
HEAVY & HIGHWAY:
GROUP 1:...................$ 24.30 16.54
GROUP 2:...................$ 24.50 16.54
GROUP 3:...................$ 24.70 16.54
GROUP 4:...................$ 24.90 16.54
Laborers....................$ 20.00 13.44
Pipelayers, Motor Mixers, Motor Buggy Operator
(Walk Behind) Power Lift
(Walk Behind)...............$ 20.15 13.44
Wagon Drill Operator........$ 20.40 13.44
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day and Christmas Day.
GROUP 1: Common Laborers, Flagman, Outboard and Hand boats
GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw
Operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers
GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman
GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters
LABO0157-001 07/01/2009
FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton
Park); SCHENECTADY and SCHOHARIE COUNTIES.
Rates Fringes
LABORER
BUILDING:
GROUP 1....................$ 22.88 13.65
GROUP 2....................$ 24.23 13.65
HEAVY & HIGHWAY:
GROUP 1:...................$ 24.34 14.40+a
GROUP 2:...................$ 24.54 14.40+a
GROUP 3:...................$ 24.74 14.40+a
GROUP 4:...................$ 24.94 14.40+a
GROUP 5:...................$ 26.34 14.40+a
LABORER CLASSIFICATIONS
Group 1: Common Laborers
Group 2: Asbestos and Toxic Materials
Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day
LABORER CLASSIFICATIONS
GROUP 1: Common laborers, flagman, outboard & hand boats
GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking laborers
GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb setters
GROUP 5: Hazardous waste removal
LABO0190-001 01/01/2012
ALBANY; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY
(Townships of Stillwater, Halfmoon, Saratoga)
Rates Fringes
Laborers:
BUILDING:
GROUP 1....................$ 22.86 16.67
GROUP 2....................$ 24.21 16.67
LABORERS CLASSIFICATIONS
GROUP 1: Common Laborers
GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at
$100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply
LABO0190-002 07/01/2011
ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).
GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO
COUNTY (Townships of Stillwater, Halfmoon Saratoga)
Rates Fringes
Laborers:
HEAVY & HIGHWAY:
GROUP 1:...................$ 25.39 16.95
GROUP 2:...................$ 25.39 16.95
GROUP 3:...................$ 25.59 16.95
GROUP 4:...................$ 25.79 16.95
GROUP 5:...................$ 25.99 16.95
FOOTNOTE:
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
LABORERS CLASSIFICATIONS
GROUP 1: Common laborers, flagmen, outboard and hand boats
GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking laborers
GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb setters
GROUP 5: Hazardous waste removal
LABO1000-005 05/01/2009
COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):
Rates Fringes
Laborers:
HEAVY & HIGHWAY
GROUP 1....................$ 24.20 18.75+a
GROUP 2....................$ 27.96 18.75+a
GROUP 3....................$ 28.96 18.75+a
LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;
tool rooms
GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;
Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;
wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2" or under; Nipper; Chucker;
Asphalt Workers
GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);
Laser Beam Operator; Form Setter/Aligners; Blasters
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and
Christmas Day
PAIN0009-005 05/01/2011
Rates Fringes
Painters:
Lead Abatement Workers, Structural Steel
Zone 1.....................$ 27.39 8.53
Zone 2.....................$ 26.04 9.88
Painters, Drywall
Finishers, Spray
Zone 1.....................$ 26.39 8.53
Zone 2.....................$ 26.39 8.53
Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA
ZONE #2 All of WASHINGTON County
PAIN0009-013 07/01/2011
Rates Fringes
GLAZIER..........................$ 23.60 15.54
PAIN0155-002 05/01/2010
COLUMBIA AND GREENE COUNTIES
Rates Fringes
Painters:
Drywall Finisher............$ 27.39 16.31
Lead Abatement Work.........$ 27.39 16.31
Painter/Paperhanger.........$ 27.39 16.31
Spray Rate..................$ 28.39 16.31
PAIN0806-002 10/01/2010
ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,
SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON
Rates Fringes
Painters:
Structural Steel and Bridge.$ 46.25 31.03
PLUM0007-001 05/01/2011
ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;
SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and Waterford)
Rates Fringes
PLUMBER/PIPEFITTER...............$ 33.46 20.95
PLUM0112-019 05/01/2011
Townships of Canajoharie and Minden
Rates Fringes
Plumber and Steamfitter
Northern Zone...............$ 29.90 19.49
PLUM0773-002 05/01/2011
SARATOGA (Remainder of County); WASHINGTON COUNTY:
Rates Fringes
PLUMBER/PIPEFITTER...............$ 30.25 20.53
ROOF0203-003 06/01/2010
SCHOHARIE COUNTY:
Rates Fringes
ROOFER...........................$ 21.20 10.34
ROOF0241-001 06/01/2010
Rates Fringes
ROOFER...........................$ 25.65 10.97
SFNY0669-001 04/01/2011
Rates Fringes
SPRINKLER FITTER.................$ 30.15 18.90
SHEE0083-001 06/01/2011
Rates Fringes
Sheet metal worker...............$ 29.78 20.21+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday.
TEAM0294-002 05/01/2006
BUILDING CONSTRUCTION
Rates Fringes
Truck drivers:
GROUP 1.....................$ 22.27 9.84+a
GROUP 2.....................$ 22.57 9.84+a
FOOTNOTES:
a. One week vacation after 1 year; 2 weeks vacation after 5 years.
TRUCK DRIVERS BUILDING CLASSIFICATIONS
GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site
(including nozzle)
GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers
TEAM0294-003 07/01/2011
Rates Fringes
Truck drivers:
HEAVY & HIGHWAY
GROUP 1....................$ 26.67 15.65+a
GROUP 2....................$ 26.72 15.65+a
GROUP 3....................$ 26.77 15.65+a
GROUP 4....................$ 26.92 15.65+a
GROUP 5....................$ 27.07 15.65+a
TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Pick-ups, panel trucks, flatboy material trucks
(straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman
GROUP 2: Tandems, batch trucks, mechanics
GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck
GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit
GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
LOCAL INSTRUCTIONS
LOCAL INSTRUCTIONS INCORPORATED BY FULL TEXT
109 AW – 0010
WARRANTY
UNLESS OTHERWISE STATED, STANDARD COMMERCIAL WARRANTIES APPLY. PLEASE FURNISH A WRITTEN COPY WITH YOUR DELIVERY.
109 AW – 0020
FEDERAL, STATE AND LOCAL TAXES-GOVERNMENTAL ENTITY
The U.S. Government is exempt from state sales or use taxes and federal excise taxes. This purchase is not subject to New York State Sales. For additional information contact your local, state, or federal taxing authority.
109 AW – 0030
SHIPPING INSTRUCTIONS
Your company is responsible for marking the shipment with the appropriate Delivery/Purchase Order number as well as the delivery information located in block 15 of the contract. The U.S. Government will not be held liable for any delays for delivery or acceptance of your order if you fail to provide the delivery/purchase order and delivery information that is located in block 15 of the contract.
109 AW – 0040
DELIVERY TIMES
The following delivery times are established for contactors:
MONDAY - FRIDAY:
08:00 A.M. EST - 4:00 P.M. EST
No deliveries will be accepted on Federal holidays.
Call in advance to ensure delivery availability.
All vendors shall have a delivery ticket with each delivery. The delivery ticket will ensure prompt processing of payment.
109 AW – 0050
DELIVERY INTENT/NOTIFICATION CLAUSE
DELIVERY INTENT: It is the contractor’s responsibility to notify the 109th Base Supply Receiving a minimum of three (3) days prior to the anticipated date of product delivery. Contractor shall provide:
1) Government purchase order number
2) Delivery Point
3.)
Carrier name and tracking information/estimated delivery date
DELIVERY PARTIAL/COMPLETE: It is the contractor’s responsibility to notify the Contracting Office within seven (7) days after a partial/complete delivery of goods. Contractor shall provide
1) Purchase order number
2) Delivery Point/Service Point
3.)
Name of the person who accepted delivery and actual date of delivery.
4.)
Other information as required by the contracting office
109 AW – 0060
INSTALLATION PASSES/ACCESS TO STRATTON ANG BASE
Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 109 AW Security Forces. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 109th AW Security Forces.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .