A-11 MATOC EXHIBIT E jan 2012 proto sample rev dmp slf.docx
DOCX document 22 KB Posted
- Attached to
- Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W912PQ-12-R-0010
About this file
EXHIBIT E
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Amendment 2.doc | DOC document | |
| RFI Amendment 1.doc | DOC document | |
| Pre-Proposal Sign in Jan-19-2012.pdf | ||
| NY pre proposal slides MATOC.pptx | PPTX presentation | |
| 10-9132-FINAL-DRAWINGS-2010-5-11 - Copy.pdf | ||
| 10-9132-FINAL-PROJECTMANUAL-2010-5-11.pdf | ||
| A-11 MATOC Exhibits A-D F-G jan 2012 chgs slf.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ MATOC RFP W912PQ-12-R-0010
EXHIBIT E PROTOTYPICAL PROJECT
NOTICE OF PROPOSED PROJECT, SOLICITATION
Date: 6 Jan 2012
PROJECT TITLE AND NO.: Construct Environmental Building, #28100009
PROJECT DESCRIPTION: Construct a 7,300 SF Environmental Building #6530, Camp Shelby MS
***SPECIAL NOTE****
The government has no intention in awarding this project. It is simply a prototypical project to determine ability to submit pricing for evaluation. Any and all references to the location as shown as “Camp Shelby, MS” should be disregarded and pricing should be estimated with work being done at 174 Fighter Wing Syracuse New York , 13211
All work shall be in strict accordance with the ( ) Plans/drawings and Specifications dated NA
(X) SOW, Technical provisions & Drawings (Environmental Office Building #6530) dated 1 April 2010 and Basic Contract Master Specifications ( ) SOW (insert title) dated ____________and Basic Contract Master Specifications
MAGNITUDE OF PROJECT: ( ) Less than $25,000; ( ) $25,000-$100,000; ( ) $100,000-$250,000; ( ) $250,000-$500,000; ( X )$500,000 - $1,000,000; ( )$1,000,000 - $5,000,000.
PERFORMANCE PERIOD: 270 Days, after receipt of Notice to Proceed
SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.
PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx
WAGE DETERMINATION: Currently, General Decision Number MS20100159 Modification No. 1 dated 06/04/2010 is applicable to this task order. Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/MS.html However, the current prevailing Wage Determination will be incorporated at time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.
PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.
The Following Provisions/Clauses if marked [X] are applicable to this task order
[ X ] Availability of funds (FAR Clause 52.232-18) Funds are not presently available for this procurement.
[ X ] Contract Clause 52.211-12 LIQUIDATED DAMAGES If applicable , the following amounts will be applicable to this TASK ORDER ($145.98 per day, plus a one-time fixed fee of $165.00 .
[ X ] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.
[ X] 52.204-10 REPORTING: Executive Compensation and First Tier Subcontract Awards (Jul 2010) Is applicable to this order. The following are the codes needed to accomplish the reporting TAS_____57 Agency____3840_________
[ X ] Alternate proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.
[ ] DFARS 252.236-7006 COST LIMITATION (JAN 1997)
(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.
(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.
(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.
(d) Offers may be rejected which—
(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or
(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.
[ ] PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause IS APPLICABLE TO THIS TASK ORDER.
[X ] FAR 52.217-5 Evaluation of Options applies to this solicitation
[ X] FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Item applies to award when option(s) not taken at time of award. The Government reserves the right to award option individual line items at time of basic line item award or after award, but not later than 60 days after initial award. Performance period upon award of options will not be extended.
EXHIBIT E MATOC PROPOSAL FORM
Include this form completed with your proposal
PROJECT NO. #28100009
Construct Environmental Building
PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to construct 7,300 SF Environmental Building #6530 at Camp Shelby, MS, in accordance with the task order requirements for “Construct Environmental Building”. This project is for a Firm Fixed Task Order against the MATOC IDIQ Contract
Item Number Description Quantity Unit Amount
| 0001 | Project #28100009 | ||
| Construct Environmental | |||
| Bldg 6530 | 1 JOB | Lump Sum $______ |
| 0002 OPTION | Communications Cabling & Ductwork | |||
| As specified on Page E101 of the | ||||
| Drawings | 1 JOB | Lump Sum $______ |
| 0003 OPTION | 6’ Tall Chain Link Fence with anti- | |||
| Climber | 1 JOB | Lump Sum $______ |
| 0004 OPTION | 6’ Tall X 24’ Wide Cantilevered | |||
| Equipment Gate | 1 JOB | Lump Sum $______ |
| 0005 OPTION | 6’ Tall X 3’ Wide Walk-Through | |||
| Gate | 1 JOB | Lump Sum $______ |
| 0006 OPTION | Install Direct Digital Control | |||
| System | 1 JOB | Lump Sum $______ |
SIGNATURE: COMPANY NAME
Name and title of person authorized to sign