10-9132-FINAL-DRAWINGS-2010-5-11 - Copy.pdf

PDF 7 MB Posted

Attached to
Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
W912PQ-12-R-0010
Issued by
Department of the Army New York Army National Guard

About this file

DRAWINGS for PROTOTYPICAL PROJECT

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
RFI Amendment 2.doc DOC document
RFI Amendment 1.doc DOC document
Pre-Proposal Sign in Jan-19-2012.pdf PDF
NY pre proposal slides MATOC.pptx PPTX presentation
A-11 MATOC EXHIBIT E jan 2012 proto sample rev dmp slf.docx DOCX document
10-9132-FINAL-PROJECTMANUAL-2010-5-11.pdf PDF
A-11 MATOC Exhibits A-D F-G jan 2012 chgs slf.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHECK VALVE FROM FDC

4"D.I.

TO WET PIPE SPRINKLER SYSTEM

FLOW SWITCH

O.S.&Y VALVE

ELEC. SUPERVISED

SYSTEM DRAIN LINE

SPRINKLER CONTRACTOR CONNECT

TO M.J. FITTING AT 18" AFF, FROM

MECH. CONTRACTORS TERMINATION

POINT

REMOTE ENUNCIATE PANEL LOCATION

SEE ELECTRICAL PLANS AND

SPECIFICATIONS FOR MORE DETAIL

1. COMPLY WITH NFPA STANDARD AND UFC3-600-011 DATED 26 SEPT. 2006 WITH CHANGE 1, 14 JULY

2009. FOR THE INSTALLATION OF SPRINKLER SYSTEM.

2. CENTER CEILING TILE WITH SPRINKLER HEAD.

3. PROVIDE SWING JOINTS ON ALL SPRINKLER DROPS.

4. COMPLY WITH NFPA 13 FOR HANGERS AND THEIR COMPONENTS.

5. COMPLY WITH NFPA 13 FOR DRAINAGE REQUIREMENTS.

6. COMPLY WITH NFPA 14 FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS

7. INSTALL AND OFFSET AS REQUIRED ALL PIPING AND SPRINKLER HEADS BELOW DUCTWORK,

STRUCTURAL BEAMS ETC.

8. SPRINKLERS SHALL BE FOR SIZED ACCORDING TO HAZARD AND BE OF THE QUICK RESPONSE TYPE.

9. SPRINKLER LAYOUT AND SPACING IS FOR GENERAL COMPLIANCE OF BASIC SYSTEM. CONTRACTORS SHOP DRAWING LAYOUT AND HYDRAULIC CALCULATIONS WILL DETERMINE THE FINAL SPRINKLER

SYSTEM.

10. CONTRACTOR TO COORDINATE ALL DESIGNS WITH ARCHITECTURAL SECTIONAL PLANS. ALL AREAS

MUST BE ACCOUNTED FOR IN OVERALL FIRE PROTECTION DESIGN.

11. THE FIRE SPRINKLER CONTRACTOR SHALL HAVE A FIRM CONTRACTUAL AGREEMENT WITH A

REGISTERED FIRE PROTECTION ENGINEER (FPE) OR AN FPE ON STAFF. THE CONTRACTOR SHALL

PROVIDE FPE'S NAME AND COPY OF STAMP AND A COPY OF THE AGREEMENT TO THE

ARCHITECT/ENGINEER AT THE TIME OF THE PRE-CONSTRUCTION MEETING. THE FPE SHALL ASSIST WITH THE SHOP DRAWING DESIGN, REVIEW AND APPROVE ALL SUBMITTALS AND SHALL WITNESS THE FINAL ACCEPTANCE TEST. THE FPE SHALL HAVE OBTAINED PROFESSIONAL REGISTRATION IN THE FIELD OF FIRE PROTECTION AND WORK EXCLUSIVELY IN THIS FIELD. THE FPE WILL BE REQUIRED TO STAMP ALL FIRE SPRINKLER DRAWINGS BEFORE SUBMISSION TO ARCHITECT/ENGINEER FOR FINAL REVIEW. THE

FPE SHALL FORWARD SIX COPIES OF EACH SUBMITTAL WITH REVIEW/APPROVAL COMMENTS AND

ANNOTED TRANSMITTAL SHEET TO THE CONTRACTOR IMMEDIATELY UPON COMPLETION OF HIS

REVIEW/APPROVAL AND AT LEAST 45 CALENDAR DAYS PRIOR TO ACTUAL CONSTRUCTION.

ARCHITECT/ENGINEER SHALL REVIEW FINAL FIRE PROTECTION SUBMITTALS BEFORE CONSTRUCTION

BEGINS.

12. CONTRACTOR SHALL HAVE AUTHORITY HAVING JURISDICTION REVIEW ALL SHOP DRAWINGS AND MAKE

ADJUSTMENTS IN ACCORDANCE WITH HIS/HER REVIEW.

13. FIRE SPRINKLER SHOP DRAWINGS AND SUBMITTALS MUST BE APPROVED BY MISSISSIPPI FIRE

MARSHAL'S OFFICE PRIOR TO INSTALLATION.

FIRE PROTECTION NOTES:

3/16"=1'-0"

FIRE PROTECTION PLAN

N.T.S.

WET PIPE SPRINKLER RISER

EXIST. MANHOLE

TOP ELEV. 295.88'

INVERT 286.29'

INLET INVERT 290.89'

INLET INV. 289.52'

INLET INVERT 286.50'

EXIST. FIRE HYDRANT

CONNECT INTO EXIST.

SANITARY SEWER MANHOLE

GROUT AND SEAL

PENETRATION AS REQUIRED

6"@1% SLOPE

MANHOLE #1

TOP ELEV. ± 298.85'

INLET INVERT 289.52'

OUTLET INVERT 289.42'

FIELD VERIFY TOP ELEV

AND ADJUST AS REQUIRED

6"@1% SLOPE

6"

6"

2" TYPE 'K' COPPER U.G.

SLEEVE W/ARMAFLEX UNDER

AND THRU CONC. SLAB

6"

EXIST 4"

EXIST. 6"

EXIST. 14"

EXIST. 6"

GAS COCK

ELEVATION

EXIST. SOIL OR WASTE PIPING (W.)

HOT WATER PIPING (HW)

SANITARY SEWER

WATER SERVICE

GATE VALVE (G.V.)

COLD WATER PIPING (CW)

SOIL OR WASTE PIPING (W.)

FINISH GRADE CLEANOUT

VENT THRU ROOF

FINISH FLOOR CLEANOUT

EXIST. SANITARY SEWER

VENT PIPING (V.)

CLG.

ELEV.

ABV.

FIN.

FLR.

EXIST.

VTR

FINISH

CEILING

ABOVE

FLOOR

EXISTING

UNION

FIRE WATER SERVICE

BALL VALVE (B.V.)

FINISH WALL CLEANOUT

D.I. DUCTILE IRON

M.J. MECHANICAL JOINT

POUNDS PER SQUARE INCH

OUNCES

PSI

oz

EXIST. GAS SERVICE PIPING

EXIST. WATER SERVICE

FINISH GRADE

CAST IRON COVER

AND FRAME

GROUT

PRECAST CONCRETE

MANHOLE 4'Ø MIN

#4 REBARS 10" O.C.

BOTH WAYS

CONCRETE BASE

GROUT

STEEL

DROP INLET ASSEMBLY WHERE

SHOWN ON PLANS ONLY

2" CONDUIT

FINISH GRADE

POST SET SCREW

ADJUSTABLE POST

CONDUIT WITH ALARM

CONDUCTORS

ELECTRICALLY

SUPERVISED SWITCH

POST INDICATOR

VALVE OPEN

SCALE: 1"=30'-0"

PLUMBING SITE PLAN

N.T.S. N.T.S.

3"TRAP

2"

3"TRAP

3"TRAP

3"

2"

3"

4"

2"

2"TRAP

3"TRAP

3"V.

3"

3"TRAP

4"

4"V 3"TRAP

2"TRAP

3"V 4"

3"4"

2"

3"

6"

6" 2" TYPE 'K' COPPER U.G.

SLEEVE W/ARMAFLEX UNDER

AND THRU CONC. SLAB

6"

MECHANICAL CONTRACTOR PROVIDE FIRE

SERVICE INTO BUILDING. INSTALL TIRE RODS

AND ANCHOR M.J. DUCTILE IRON FITTING 18"

AFF. FOR FIRE PROTECTION CONTRACTOR

2" TYPE 'K ' COPPER U.G. TO

TRAP PRIMER VALVE INSULATE

W/ARMFLEX UNDER AND THRU

CONC. SLAB (TYPICAL)

3"

2"V.

3"TRAP

3"TRAP

3" TRAP

3" 2"V

3/16"=1'-0"

BELOW FLOOR

PLUMBING PLAN

N.T.S.

4"

4"

2" H&CW

4"

2"H&CW

2"

4"

2"H&CW

2"

114"

4"

2V.

4"VTR

2"

3"TRAP

2"

DRYER

VENT

2"

2" H&CW

4"

4"

2"

2"

2"2"

3"VTR

MECHANICAL CONTRACTOR PROVIDE FIRE

SERVICE INTO BUILDING. INSTALL TIRE RODS

AND ANCHOR M.J. DUCTILE IRON FITTING 18"

AFF. FOR FIRE PROTECTION CONTRACTOR

HVAC UNIT (TYP.)

114"

112"

2" CW RUN IN WALL

TO ICE MAKER

2"

2"

114"

2"

2"114"

CHECK VALVE

2"

114"

112" HW DWN

TO TMV

2" HW DWN

TO L-1

114" CW DWN

TO TMV

2" CW DWN

TO L-1

3" TRAP

114" TEMPERED WATER

FROM TMV ADJUST TO

120°F

1"

1"

-102

ÁF

ÁC

0 8

3/16"=1'-0"

PLUMBING PLAN

1/2"=1'-0"

10-9132-CD-G101
10-9132-CD-T101
10-9132-CD-A101
10-9132-CD-A102
10-9132-CD-A103
10-9132-CD-A104
10-9132-CD-A201
10-9132-CD-A301
10-9132-CD-A302
10-9132-CD-A303
10-9132-CD-A304
10-9132-CD-A305
10-9132-CD-A401
10-9132-CD-A402
10-9132-CD-A403
10-9132-CD-A404
10-9132-CD-A501
S1
S2
S3
S4
10014-FINAL-MEP
10014-FINAL-MEP.pdf
10014M-101
10014E-1
10014E-2
10014E-3
10014E-4

File details come from the government source that posted it. Updated .