PN79439-2 SOF TST ANNEX_DRAWINGS_AM-01_2022-08-31.pdf
PDF 3 MB Posted
- Solicitation number
- W912PM22R0012
About this file
This solicitation is for the construction of an Advanced Skills Training Facility Annex and HAZMAT Facilities at Fort Bragg, North Carolina. The contractor shall provide all labor, materials, equipment, and services necessary to construct a single story administrative offices, classrooms, conference room, lounge area, instructional lab classrooms, ADA compliant restrooms for both students and cadre as well as locker rooms and showers, storage and supply space totaling approximately 24,500 square feet. Additional facilities include a separate refabricated Hazardous Material Storage building containing approximately 1,200 square feet of enclosed area and 350 square feet of open storage area. Supporting site work involves site preparation, utilities, lighting, parking, access drives, landscaping and storm drainage. Special construction includes a controlled access area and accessible raised floor system. Sustainability measures complying with LEED Silver will be incorporated. The facilities are to be designed for a minimum 40-year life in accordance with DoD UFC1-200-02 criteria including energy efficiencies and integrated building systems performance.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B
DC
E
KEY PLAN
CG101
G R
A D
IN
G A
N D D
R A
IN
A G
E
P L
A N A
N
60'0 30'
M A
T C
H S
H E
E T I
D C
G
MATCH SHEET ID CG103
STUB OUT (TYP.)
ROOF DRAIN
18" RCP @ 0.30%°
155 LF
24" RCP @ 0.30%
193 LF
18" RCP @ 0.50%
218 LF
C
IV
IL
PLAN FOR CONTINUATION).
ROOF DRAINS (SEE MECHANICAL SITE
CONDENSATE LINES ARE SHOWN ALONG
SLOPED AT 1.00%. STUB OUTS FOR
5. ROOF DRAIN SHALL BE MINIMUM 8" HDPE
CAN BE UTILIZED.
UNDERGROUND ROOD DRAINAGE HEADER
OF THREE (3) DOWNSPOUTS TO EACH
NEAREST ROOF DRAIN. ONLY A MAXIMUM
4. DOWNSPOUTS SHALL BE CONNECTED TO
3. SEE CG501-502 FOR DRAINAGE DETAILS.
AND INFORMATION.
2. SEE CG201-203FOR PIPE PROFILES
AND GENERAL NOTES.
1. SEE SHEET GI003 AND GI004 FOR LEGENDS
NOTES:
268.30
269.00
269.00
268.60
268.15
268.60
268.60
268.60
BC=269.50
TC=270.00
268.60
268.60
268.15
268.45
268.85
268.45
268.85
270.25
BC=270.25
TC=270.75
BC=270.25
TC=270.25
BC=269.50
TC=270.00
BC=270.75
TC=270.75
BC=270.25
TC=270.75
270.35
I.E. OUT=263.34
R=267.40
IN-A7
I.E. OUT=262.37
I.E. IN= 262.87
R=267.4
IN-A6
I.E. OUT=260.50
R=267.0
IN-B8
I.E.=258.91
I.E. IN=259.41
R=267.0
IN-B7
268.15
BC=270.50
TC=271.00
270.25
269 270
C C
O M
P A
N Y
G
S A A
N D
G
S A /R
E N
T A
L
6' PED GATE
CONSTRUCTION LIMITS/LEED BOUNDARY
CONCRETE PAD
4' PED GATE
RACK
BIKE
(2&1)
DUMPSTER
W/ PRIVACY SLATS
SECURITY FENCE
8' HIGH
W/ PRIVACY SLATS
SECURITY FENCE
8' HIGH
CURB (TYP)
FULL HEIGHT
6"
STORAGE (N.I.C.)
RELOCATED
STORAGE (N.I.C.)
RELOCATED
(N.I.C.)
CENTERS
TRAINING
MODULAR
RELOCATED
24,032 SF
FFE: 268.8
TECHNICAL SUPPORT TRAINING ANNEX
STORAGE (N.I.C.)
RELOCATED
ELEVATION=264.93'
FIRE HYDRANT
BOLT OF
ON BONNET
INSCRIBED "X"
#40007 TBM
ELEV.=263.10'
E=1989512.88
N=486902.42
#40005 RB&C
BOX BOTTOM=250.10'
TOP=259.88'
TMH
BOX BOTTOM=252.20'
TOP=261.64'
TMH
TPED
EM (4)
BOX BOTTOM=261.10'
TOP=270.88'
TMH
#113481
EJB
ELEV.=269.00'
E=1989856.26
N=486803.36
#40006 RB&C
ELEV.=259.19'
E=1989493.20
N=486580.32
#40004 RB&C
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RAP
RIP
RAP
RIP
RAP
RIP
RAP
RIP
RAP
RIP
257.39 257.87
258.09
258.21
258.21
258.29
258.30
258.39
258.43
258.56
258.60
258.78258.78 258.80
258.91
258.96
259.04
259.17
259.29
259.38
259.37
259.42 259.43
259.58
259.67
259.71
259.72
T
259.94 259.92
260.15
260.21
260.28
260.29
260.37
260.39
260.49
260.55
260.57
260.60
260.67
260.68
260.70
260.80
260.83
260.86
260.89
260.90
260.95
260.95
260.99
SOIL
261.01
261.05
261.10
261.11
261.14
261.15
261.16
261.17
261.18
261.19
261.26
261.28
261.35
261.39
261.40
261.44
261.46
261.48
261.49
261.49
261.57
261.59
T
261.69
261.71
261.74
CH
LK
261.80
261.82
261.84
261.85
261.85
261.86
261.87
261.92
261.93
261.97
262.00
262.02
262.07
262.16
262.16
262.20
262.24
262.25
262.34
262.34
262.36
C H
L K
S
IL
T
F E
N C
E
S
IL
N C
E
BLDG# X-5984
STATION 10
FIRE AND EMERGENCY SERVICES
262.44
262.43
262.48
BOX BOTTOM=258.16'
INV.=258.18'
TOP=263.78'
DI
262.61
262.61
262.64
EM
ER
G
EN
C Y
AC
C
ES
S
SAT
262.69 262.70
262.71
CANOPY
262.74
262.75
FFE=265.00'
FFE=266.31'
FFE=266.30'
W/3SBW
72" CHLK
GATE
W/3SBW
72" CHLK
BOL
SILT FENCE
BLDG
BOL
BOL
BOL
BOL
BOL
BOL
BOL
BOL
BLDG
BRICK
262.76
CONC
GRAVEL
GRAVEL
BOX BOTTOM=257.70'
INV.OUT=257.03' (E)
INV.IN=257.11' (NE)
TOP=270.46'
STMH
UNIT
AC
262.77
BAR
STOP
262.77
262.78
262.79
262.79
262.80
W
262.84
262.84
262.85
262.85
262.88
262.88
262.93
262.95
262.95
262.96
262.95
262.98
262.98
263.02
263.02
84587
#79125
PPL
263.04
7E 4
#111394
EJB
#110252
EJB
PP
PP
84546
#79148
PPL
84572
#79157
PPL
84553
#79316
PPL
84560
#79276
PPL
FH POLE
CAMERA
EJB
POLE W/SIREN
HOT BOX
WV
TOP=265.32'
EL HH
FH
S
IL
T
F E
N C E
263.18
263.29
263.55
263.83
264.00
264.05
264.10
264.12
264.13
264.13
264.14
264.31
48" CHLK
T
264.40
264.47
264.48
264.50
264.51
264.52
264.53
264.71
264.80
264.81
264.82
264.90
264.92
264.95
SILT FENCE
265.02
265.05
265.12
265.13
265.13
C O
N C
265.18
265.23
265.25
265.26
H H
265.39
265.45
C O
N C
265.50
265.53
265.55
265.54
265.57
265.57
265.61
265.63
265.65
265.69
265.70
265.76
265.88
C H
L K
S
IL
T
F E
N C
E
266.03
266.08
CONC
266.14
266.21
266.24
266.28
266.29
266.29
266.36
266.42
266.43
266.45
266.50
266.51
266.52
266.54
266.58
266.58
266.58
266.63
266.66
R C P
266.74
266.80
266.81
266.82
266.86
266.86
266.92
266.90
266.94
266.99
C H L K
W S B
W
266.98
S
B W
267.04
267.09
267.12
267.21
267.22
267.22
267.25
267.26
267.27
267.25
267.30
267.33
267.40
267.43
267.44
267.46
267.49
P
267.53
267.53
267.63
ASPHALT
ASPHALT
ASPHALT
267.64
267.64
267.67
267.68
267.69
267.71
267.74
BOX BOTTOM=256.74'
TOP PIPE=258.22'
TOP=262.83'
WATER ARV
267.82
267.87
PINE WOODS
267.93
PINE WOODS
WALL
5' CONC
C/O
BOL
BOL
BOL
BOX BOTTOM=257.61'
TOP PIPE=257.65'
TOP=263.08'
SSMH
267.94
267.95
PINE WOODS
268.01
268.02
268.04
268.04
268.05
P V
C
268.08
268.09
268.09
24" RCP
268.15
268.16
268.18
268.19
268.22
268.26
268.27
268.27
268.32
268.32
268.41
268.43
268.44
268.44
268.47
268.50
268.51
268.52
268.54
268.57
268.58
268.63
268.67
268.72
268.76
268.80
268.81
268.81
268.82
268.81
268.83
268.84
268.85
268.86
268.88
268.88
268.96
269.10
269.15
W S B
W
C
LK
269.21
269.22
269.24
P
269.30
269.38
269.40
24" RCP
P
269.46
C
LK
S B
W
269.49
C H
S
B W
72" CHLK W/3SBW
C H
S
B W
C H
S
B W
269.51
269.51
269.52
269.54
269.55
269.65
269.68
269.71
269.67
269.72
269.76
269.84
269.82
269.88
P
269.93
269.95
269.97
269.95
A M
M O
IN
A D
A M
IN
B
V D
A
R E
270.01
270.01
270.02
270.03
270.04
270.05
270.14
270.15
270.15
270.16
270.17
270.18
270.21
270.21
270.23
270.25
270.26
270.26
270.26
270.27
270.27
270.28
270.29
270.30
270.38
270.42
S
270.46
270.47
270.51
270.51
270.52
270.53
270.55
270.56
270.57
270.57
270.69
270.70
270.72
270.76
270.77
270.79
270.80
270.81
270.82
270.87
T
270.88
270.89
270.90
270.91
271.01
271.02
271.04
271.09
271.13
271.14
271.15
271.15
271.20
271.24
271.24
271.24
271.25
271.26
271.28
271.28
271.29
271.31
271.32
271.33
271.35
271.35
271.35
271.35
271.35
271.36
271.38
271.39
271.40
271.41
271.42
271.46
271.47
271.47
271.48
271.49
271.50
271.54
271.61
271.63
271.65
271.66
271.66
271.62
271.67
271.71
271.71
271.73
271.74
271.76
271.79
271.82
271.84
271.85
271.86
271.88
271.92
271.94
271.97
272.07
272.08
272.04
272.22
272.39
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
W
IL
M
IN
G T
O N D
IS
T R
IC
T
D
A R
L
IN
G T
O N A
V E
N U
E
L
R O
B E
R T S
L
R O
B E
R T S
K S
H E
R L
O C
K
S O
F T
E C
H N
IC
A L S
U P
P O
R T T
R A
IN
IN
G A
N N
E X
D
R O
G E
R S
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A p ro j n o
C H I- -A w w w .e x p fe d e ra l.
c o m
T :3
.6
.7
C H
IC
A G
O
IL
S U
IT
E
M
IC
H
IG
A N A
V E
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W P
M
R
S O
L
IC
IT
A T
IO
N N
Y P
N
.2
P N
A U
G
F O
R T B
R A
G G
N C
F Y P
N
.2
R E
A D
Y T
O A
D V
E R
T
IS
E
08/02/2022
BR
XC
G
1.
D
G N
KevinSherlock Cloud
KevinSherlock Text Box
AMENDMENT NO. 002
KevinSherlock Text Box 8/31/2022
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock PolyLine
KevinSherlock Text Box
N
IN
IT
IA
L E
R O
S
IO
N C
O N
T R
O L P
L A
N A
CE101A0
SCALE: 1"=50'
50' 50' 100'
FaB
BaD
TS TEMPORARY STABILIZATION
LEGEND
DRAINAGE BOUNDARIES
ENSURE NO SEDIMENT ENTERS
BEYOND AT TOP OF DITCH TO
CONSTRUCT SEDIMENT FENCE
(HYDROLOGIC SOIL GROUP B)
FACEVILLLE LOAMY SAND
(HYDROLOGIC SOIL GROUP B)
BLANEY LOAMY SAND
MATCHLINE SHEET ID CE101B
FUTURE RIGGING FACILITY SITE
TEMF
FUTURE
(NIC)
CONSTRUCTION ENTRANCE (REF. 2/CE502)
SEDIMENT FENCE OUTLET (REF. 3/CE502)
SEDIMENT FENCE (REF. 1/CE506)
POROUS BAFFLES (REF. 3/CE504)
AREA BECOMES STABILIZED
OUT AND REMOVED AS UPSTREAM
DIVERSIONS CAN BE GRADEDNOTE:
(REF. 1/CE505)
TEMPORARY DIVERSION
IV
IL
T
255 255
T
W
T
H H
96" CHLK W/3SBW
S
P
P
P
A M
IN
A D
A M
IN
V D
A
R E
A M
IN
V D
T
S
T
270.91
T
2 2
(ABANDONED)
TRAIL
MCINTYRE
(ABANDONED)
TRAIL
MCINTYRE
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
W
IL
M
IN
G T
O N D
IS
T R
IC
T
D
A R
L
IN
G T
O N A
V E
N U
E
L
R O
B E
R T S
L
R O
B E
R T S
K S
H E
R L
O C
K
S O
F T
E C
H N
IC
A L S
U P
P O
R T T
R A
IN
IN
G A
N N
E X
D
R O
G E
R S
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A p ro j n o
C H I- -A w w w .e x p fe d e ra l.
c o m
T :3
.6
.7
C H
IC
A G
O
IL
S U
IT
E
M
IC
H
IG
A N A
V E
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W P
M
R
S O
L
IC
IT
A T
IO
N N
P
N
.2
P N
A U
G
F O
R T B
R A
G G
N C
F Y P
N
.2
R E
A D
Y T
O A
D V
E R
T
IS
E
TSTS
RECP
TS
BaD
SKIMMER AND BAFFLES
SEDIMENT BASIN WITH
BAFFLES, TYP.
V=1.73 FPS
D=0.64'
Q(10)=3.64
COVER REQUIRED)
(7-DAY GROUND-
DIVERSION WEST, TYP.
TEMPORARY
TS
FaB
BR
XC
E1
A.
D
G N
KevinSherlock Cloud
KevinSherlock Text Box
AMENDMENT NO. 002
KevinSherlock Text Box 8/31/2022
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock PolyLine
KevinSherlock
IN
IT
IA
L E
R O
S
IO
N C
O N
T R
O L P
L A
N B
CE101B
SCALE: 1"=50'
50' 50' 100'
FaB
BaD
TS TEMPORARY STABILIZATION
LEGEND
TS
TS
TS
TS
TS
TS
TS
MATCHLINE SHEET ID CE101A
(HYDROLOGIC SOIL GROUP B)
FACEVILLLE LOAMY SAND
(HYDROLOGIC SOIL GROUP B)
BLANEY LOAMY SAND
SEDIMENT FENCE (REF. 1/CE506)
CONSTRUCTION ENTRANCE (REF. 2/CE502)
PROPOSED STAGING AREA
DRAINAGE BOUNDARIES
C
IV
IL
URBAN FREEDOM PASS
260 260
T
WV
WV WV
FH FH
WV
(ABANDONED)
D STREET
VAN
VAN
2 2
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
W
IL
M
IN
G T
O N D
IS
T R
IC
T
D
A R
L
IN
G T
O N A
V E
N U
E
L
R O
B E
R T S
L
R O
B E
R T S
K S
H E
R L
O C
K
S O
F T
E C
H N
IC
A L S
U P
P O
R T T
R A
IN
IN
G A
N N
E X
D
R O
G E
R S
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A p ro j n o
C H I- -A w w w .e x p fe d e ra l.
c o m
T :3
.6
.7
C H
IC
A G
O
IL
S U
IT
E
M
IC
H
IG
A N A
V E
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W P
M
R
S O
L
IC
IT
A T
IO
N N
P
N
.2
P N
A U
G
F O
R T B
R A
G G
N C
F Y P
N
.2
R E
A D
Y T
O A
D V
E R
T
IS
E
BR
XC
E1
B.
D
G N
KevinSherlock Cloud
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock Text Box
AMENDMENT NO. 002
KevinSherlock Text Box 8/31/2022
KevinSherlock PolyLine
KevinSherlock
CE102A0
SCALE: 1"=50'
50' 50' 100'
FaB
TS
RECP
BaD
TS
PS PERMANENT STABILIZATION
TEMPORARY STABILIZATION
LEGEND
IN
T
E R
M E
D
IA
T E E
R O
S
IO
N C
O N
T R
O L P
L A
N A
PS
PS
PS
PS
PS
PS
PS
(NIC)
TEMF
FUTURE
FUTURE RIGGING FACILITY SITE
MATCHLINE SHEET ID CE102B
(HYDROLOGIC SOIL GROUP B)
FACEVILLLE LOAMY SAND
(HYDROLOGIC SOIL GROUP B)
BLANEY LOAMY SAND
SEDIMENT FENCE (REF. 1/CE506)
POROUS BAFFLES (REF. 3/CE504)
CONSTRUCTION ENTRANCE (REF. 2/CE502)
PROTECTION (REF. 2/CE506)
HARDWARE CLOTH AND GRAVEL INLET
(REF. 2/CE505)
EROSION CONTROL MATTING
TEMPORARY STABILIZATION
(REF. 2/CE503 AND 1/CE504)
SEDIMENT BASIN W/SKIMMER
PROTECTION (REF. 3/CE503)
BLOCK AND GRAVEL DROP INLET
C
IV
IL
R
CONSTRUCTION LIMITS/LEED BOUNDARY
C O
N S T R
U C T
IO
N
LIM
IT
S
/LE
E D B
O U
N D
A R
Y
CONSTRUCTION LIMITS/LEED BOUNDARY
CONSTRUCTION LIMITS/LEED BOUNDARY
ELEV.=246.5'
BH-3
T
255 255
T
W
T
H H
96" CHLK W/3SBW
S
P
P
P
T
S
T
WSE=271.65'
T
2 2
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
W
IL
M
IN
G T
O N D
IS
T R
IC
T
D
A R
L
IN
G T
O N A
V E
N U
E
L
R O
B E
R T S
L
R O
B E
R T S
K S
H E
R L
O C
K
S O
F T
E C
H N
IC
A L S
U P
P O
R T T
R A
IN
IN
G A
N N
E X
D
R O
G E
R S
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A p ro j n o
C H I- -A w w w .e x p fe d e ra l.
c o m
T :3
.6
.7
C H
IC
A G
O
IL
S U
IT
E
M
IC
H
IG
A N A
V E
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W P
M
R
S O
L
IC
IT
A T
IO
N N
P
N
.2
P N
A U
G
F O
R T B
R A
G G
N C
F Y P
N
.2
R E
A D
Y T
O A
D V
E R
T
IS
E
TSTS
RECP
TS
BaD
SKIMMER AND BAFFLES
SEDIMENT BASIN WITH
BAFFLES, TYP.
V=1.73 FPS
D=0.64'
Q(10)=3.64
COVER REQUIRED)
(7-DAY GROUND-
DIVERSION WEST, TYP.
TEMPORARY
TS
FaB
261 261
267 267
267 267
268 268
268 268
268 268
269 269
269 270
BR
XC
E1
A.
D
G N
KevinSherlock Cloud
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock Text Box
AMENDMENT NO. 002
KevinSherlock Text Box 8/31/2022
KevinSherlock PolyLine
KevinSherlock
CE102B
SCALE: 1"=50'
50' 50' 100'
FaB
TS
RECP
BaD
TS
PS PERMANENT STABILIZATION
TEMPORARY STABILIZATION
LEGEND
DRAINAGE BOUNDARIES
RIP RAP OUTLET PROTECTION
SEDIMENT FENCE (SEE PLATE CE506)
IN
T
E R
M E
D
IA
T E E
R O
S
IO
N C
O N
T R
O L P
L A
N B
MATCHLINE SHEET ID CE102A
(HYDROLOGIC SOIL GROUP B)
FACEVILLLE LOAMY SAND
(HYDROLOGIC SOIL GROUP B)
BLANEY LOAMY SAND
(REF. 2/CE503 AND 1/CE504)
SEDIMENT BASIN W/SKIMMER
POROUS BAFFLES (REF. 3/CE504)
CONSTRUCTION ENTRANCE (REF. 2/CE502)
(REF. 3/CE503)
BLOCK AND GRAVEL DROP INLET PROTECTION
(REF. 4/CE505)
EROSION CONTROL MATTING
TEMPORARY STABILIZATION
J E
D B
U R
G H L
A N
E
C
IV
IL
CONSTRUCTION LIMITS/LEED BOUNDARY
XFMR
260 260
72" CHLK
T
P
WV
WV WV
FH FH
WV
H H
P
72" CHLK
L K
L K
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
W
IL
M
IN
G T
O N D
IS
T R
IC
T
D
A R
L
IN
G T
O N A
V E
N U
E
L
R O
B E
R T S
L
R O
B E
R T S
K S
H E
R L
O C
K
S O
F T
E C
H N
IC
A L S
U P
P O
R T T
R A
IN
IN
G A
N N
E X
D
R O
G E
R S
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A p ro j n o
C H I- -A w w w .e x p fe d e ra l.
c o m
T :3
.6
.7
C H
IC
A G
O
IL
S U
IT
E
M
IC
H
IG
A N A
V E
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W P
M
R
S O
L
IC
IT
A T
IO
N N
P
N
.2
P N
A U
G
F O
R T B
R A
G G
N C
F Y P
N
.2
R E
A D
Y T
O A
D V
E R
T
IS
E
BR
XC
E1
B.
D
G N
KevinSherlock Cloud
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock Text Box
AMENDMENT NO. 002
KevinSherlock Text Box 8/31/2022
KevinSherlock PolyLine
KevinSherlock
NOTE:
SCALE: N.T.S.
REAR VIEW
TOP OF POND EL. 260.00
:1 S
L O P E
TOP OF DAM EL. 260.00EMERGENCY
EL. 259.00
SPILLWAY
PLAN VIEW
ESCDPM REFERENCE 6.65.1
AND STABILIZE IT.
BRING THE AREA TO GRADE,
UNSTABLE SEDIMENT DEPOSITS,
REMOVE ALL BAFFLE MATERIALS AND
HAS BEEN PROPERLY STABILIZED,
AFTER THE CONTRIBUTING DRAINAGE AREA
HALF THE DESIGNED STORAGE DEPTH.
SEDIMENT DEPTH SHOULD NEVER EXCEED
DAMAGING THE BAFFLES DURING CLEANOUT.
ON THE BAFFLES. TAKE CARE TO AVOID
NEXT RAIN AND TO REDUCE PRESSURE
ADEQUATE STORAGE VOLUME FOR THE
WHEN IT REACHES HALF FULL TO PROVIDE
PROMPTLY. REMOVE SEDIMENT DEPOSITS
OR BECOME INEFFECTIVE, REPLACE IT
BAFFLE COLLAPSE, TEAR, DECOMPOSE,
BAFFLES. SHOULD THE FABRIC OF A
BE SURE TO MAINTAIN ACCESS TO THE
REQUIRED REPAIRS IMMEDIATELY.
AND AFTER EACH RAINFALL. MAKE ANY
INSPECT BAFFLES AT LEAST ONCE A WEEK
POROUS BAFFLE MAINTENANCE:
TOP OF BOX=258.00
SEE SHEET CE-503 FOR SEDIMENT BASIN WITH SKIMMER CONSTRUCTION AND MAINTENANCE NOTES
CE504
PAUL CUDNEY PH: 910-391-0829
24 HOUR EMERGENCY CONTACT FOR EROSION CONTROL MAINTENANCE:
2 FAIRCLOTH SKIMMER DETAIL
surface area
25% of basin
2nd Cell
THE BASIN.
8. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS
STAPLES.
TRENCH OR PINNED WITH 8-INCH EROSION CONTROL MATTING
7. THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A
ROPE AND SUPPORT STRUCTURE WITH ZIP TIES, WIRE, OR STAPLES.
TO TEN PERCENT OPENINGS IN THE WEAVE. ATTACH FABRIC TO A
SAWHORSE LEGS FOR ANCHORING. THE FABRIC SHOULD HAVE FIVE
OVER A SAWHORSE OR THE TOP WIRE. HAMMER REBAR INTO THE
6. WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL,
TOP OF THE MEASURE TO PREVENT SAGGING.
5. WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE
LENGTH MAY USE 2 BAFFLES.
AND OUTLET DISCHARGE POINT. BASINS LESS THAN 20 FEET IN
4. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET
SHOULD BE 2 INCHES LOWER THAN THE TOP OF BERMS.
HIGHER THAN THE INVERT OF THE SPILLWAY. TOP OF BAFFLES
BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6 INCHES
A MAXIMUM OF 4 FEET APART, AND INSTALLED UP THE SIDES OF THE
3. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES, SPACED
SEDIMENT TRAP (PRACTICE 6.62, SEDIMENT FENCE).
2. INSTALL POSTS OR SAW HORSES ACROSS THE WIDTH OF THE
AND SIDE TO SIDE.
1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK
POROUS BAFFLES CONSTRUCTION SPECIFICATIONS:
SUPPORT WIRE
STAKE TO
SCALE: N.T.S.
POROUS BAFFELS
CROSS SECTION
TRENCHED INTO BOTTOM AND SIDE
COIR MESH OR SIMILAR, STAPLED OR
OR SIDE
24" INTRO BOTTOM
SUPPORT POST
PREVENT SAGGING
TO WIRE TO
SUPPORT ROPE
SECTION VIEW AT OPENING
COMPACTED
BACKFILLED AND
6"X6" TRENCH,
/8
BURIED IN TRENCH
FENCE AND FABRIC
STEEL POST
basin surface area
35% of
INLET ZONE OUTLET ZONE
area basin surface
15% of surface area
25% of basin
1st Cell
DEVICE GET COVERED OR STUCK IN THE TRAPPED SEDIMENT.
TO PROVIDE SATISFACTORY EFFICIENCY, DO NOT LET THE FLOTATION
OF THE BASIN AT ALL THE TIMES.
EVERY STORM. KEEP THE FLOTATION DEVICE OFF THE FLOOR
INSPECT, CLEAN AND PROPERLY MAINTAIN THE SKIMMER AFTER
FLEXIBLE HOSE
SCHEDULE 40 PVC PIPE
PVC TEE
PVC ELBOW
PVC VENT PIPE
PVC END CAP
PVC ELBOW
PVC END CAP
PVC TEE
ARM ASSEMBLY
UNDERSIDE
HOLES IN
" 2
1PVC PIPE
SURFACE
BOTTOM
SURFACE
WATER
PLAN VIEW
SIDE VIEW
PVC VENT PIPE
CLEANOUT ELEVATION = 255.50
TOP OF FABRIC = 257.00
POROUS BAFFLES
(MAXIMUM 10-YR W.S.E.L. INTERPOLATED)
STORAGE VOLUME EL. 256.22
BOTTOM OF POND EL. 254.00
(MAINTAIN THE CLEANOUT LEVEL AT ALL TIME
LEVEL DURING THE CONSTRUCTION
WITH A MARK INDICATING THE CLEANOUT
INSTALL A STEEL GRADE INDICATOR STAKE INV. EL. 251.50
1.5 CY CONCRETE FOR ANTIFLOTAION (9'X9'X8")
SCALE: N.T.S.
SEDIMENT BASIN (W/SKIMMER)
FAIRCLOTH SKIMMER
S E
D
IM
E N
T B
A S
IN
A
N D B
A F F
E L S
E R
O S
IO
N C
O N
T R
O L D
E T
A
IL
S
260.00
INV. EL. 251.00
C
IV
IL
258.00
259.00
4.00
SKIMMER SIZE 5.00 in
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
W
IL
M
IN
G T
O N D
IS
T R
IC
T
D
A R
L
IN
G T
O N A
V E
N U
E
L
R O
B E
R T S
L
R O
B E
R T S
K S
H E
R L
O C
K
S O
F T
E C
H N
IC
A L S
U P
P O
R T T
R A
IN
IN
G A
N N
E X
D
R O
G E
R S
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A p ro j n o
C H I- -A w w w .e x p fe d e ra l.
c o m
T :3
.6
.7
C H
IC
A G
O
IL
S U
IT
E
M
IC
H
IG
A N A
V E
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W P
M
R
S O
L
IC
IT
A T
IO
N N
P
N
.2
P N
A U
G
F O
R T B
R A
G G
N C
F Y P
N
.2
R E
A D
Y T
O A
D V
E R
T
IS
E
BR
C
XE
4.
D
G N
KevinSherlock Cloud
KevinSherlock Cloud
KevinSherlock Text Box
AMENDMENT NO. 002
KevinSherlock Text Box 8/31/2022
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock PolyLine
KevinSherlock Text Box
KevinSherlock Cloud
KevinSherlock Cloud
KevinSherlock PolyLine
KevinSherlock
| PN79439.2 - AMENDMENT NO. 02 - 31 AUG 2022 |
| DRAWINGS |
| CIVIL |
| CG101 - GRADING AND DRAINAGE PLAN A |
| CE101A - INITIAL EROSION CONTROL PLAN A |
| CE101B - INITIAL EROSION CONTROL PLAN B |
| CE102A - INTERMEDIATE EROSION CONTROL PLAN A |
| CE102B - INTERMEDIATE EROSION CONTROL PLAN B |
| CE504 - EROSION CONTROL DETAILS SEDIMENT BASIN AND BAFFELS |
File details come from the government source that posted it. Updated .