PN79439-2_Drawing_T-100_AM-01_2022-08-31.pdf
PDF 1 MB Posted
- Solicitation number
- W912PM22R0012
About this file
This document contains a site plan and technical specifications for a telecommunications system to support construction of an Advanced Skills Training Facility Annex and HAZMAT Facilities at Fort Bragg, North Carolina. The site plan details the proposed layout for additional parking spaces, fencing, gates and related site improvements. It also provides notes on furnishing and installing new conduits and cabling to connect the new buildings to the existing telecommunications infrastructure at the base. Specifications include installing fiber optic and copper cabling in concrete-encased ducts running approximately 500 feet between an existing manhole and the new buildings. The contractor must coordinate all outside plant telecommunications work with the Fort Bragg Network Enterprise Center to ensure the system is integrated with the base's communications infrastructure.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMMO POINT ROAD
R E
L O
C A
T E
D S
T O
R A
G E
R E
L O
C A
T E
D S
T O
R A
G E
R E
L O
C A
T E
D M
O D
U L A
R T
R A
IN
IN
G C
E N
T E
R S
R E
LO
C A T E D
S T O
R A G
E
T E
C H
N
IC
A L S
U P
P O
R T
T R
A
IN
IN
G
A N
N E
X
F F
.2
H A
Z M
A T
S T
O R
A G
E F
F
.6
R E
L O
C A
T E
D S
T O
R A
G E
R E
L O
C A
T E
D S
T O
R A
G E
R E
L O
C A
T E
D S
T O
R A
G E
R E
L O
C A
T E
D S
T O
R A
G E
R E
L O
C A
T E
D S
T O
R A
G E
C O
N S T R
U C
T
IO
N
LIM
IT
S
/LE
E D
B O
U N
D A R
Y
C O
N S
T R
U C
T
IO
N L
IM
IT
S /L
E E
D B
O U
N D
A R
Y
R
V A
N
V A
N
E X
IS
T
IN
G
' H
IG
H
F E
N C
E S
H A
L L B
E R
E T
R O
F
IT
T E
D W
IT
H
D O
U B
L E
O U
T R
IG
G
E R
A N
D P
R
IV
A C
Y S
L A
T S
A D
D E
D B
E T
W E
E N
P
O
IN
T S
S H
O W
N
C O
N C
R E
T E
P A
D
H E
A D
E R
C U
R B
(T Y
P
' P
E D
G A
T E
B
IK
E R
A C
K
H E
A D
E R
C U
R B
(T Y
P
H E
A D
E R
C U
R B
(T Y
P
H E
A D
E R
C U
R B
(T Y
P
' H
IG
H
S E
C U
R
IT
Y F
E N
C E
W / P
R
IV
A C
Y S
L A
T S
' H
IG
H
S E
C U
R
IT
Y F
E N
C E
W / P
R
IV
A C
Y S
L A
T S
H E
A D
E R
C U
R B
(T Y
P
H E
A D
E R
C U
R B
(T Y
P
S L
ID
E G
A T
E
S P
E E
D T
A B
L E
M O
T O
R C
Y C
L E
P A
R K
IN
G
P O
N D
S E
R V
IC
E
R O
A D
D U
A L
K N
O X
B O
X
C COMPANY 24 GSA AND 12 GSA/RENTAL
C C
O M
P A
N Y
A C
O M
P A
N Y
P
O V
/2 H
A N
D
IC
A P
/1
M O
T O
R C
Y C
L E
S
' P
E D
G A
T E
82' A T F P
D U
M P
S T
E R
(2
C H
IL
L E
R P
A D
' P
E D
G A
T E
H V
A C
P A
D
A COMPANY 134 GSA
E X T E N
T O
F A
D D
IT
IO
N A L P
R O
P O
S E D
P A R
K
IN
G F
O R
S O
M T C (N
.I.C
S
P A
C E
S
' E
A C
H
10 SPACES @ 9' EACH 19 SPACES @ 9' EACH
N
,6
.8
E
,9
,7
.1
N
,5
.7
E
,9
,8
.9
N
,4
.7
E
,9
,5
.3
N
,7
.3
E
,9
,5
.3
N
,5
.7
E
,9
,0
.3
N
,3
.7
E
,9
,0
.3
N
,8
.2
E
,9
,7
.3
N
,7
.1
E
,9
,0
.3
N
,4
.7
E
,9
,0
.3
(T
Y P
.0
(T Y
P
R
R
.0
(T Y
P
24 SPACES @ 9' EACH
.0
.0
R
O W
S O
F
S P
A C
E S
' E A
C H
'R
(T Y
P
'R
(T Y
P
.0
.0
.0
R .0
' C
H A
M F
E R
.0
.0
.0
.0
'R
(T Y
P
S
P
' E
A
.0
.0
S
P
' E
A
.0
.0
S
P
' E
A
.0
S
P
' E
A
.0
.0
'R
(T Y
P
'R
(T Y
P
.0
S T
O P
S T
O P
STOP
STOP
STOPSTOP
CONTRACTOR TO FURNISH AND INSTALL
ONE (1) NEW 2-INCH RNC FROM THE
MAIN NIPR ROOM TO THE HAZMAT
STORAGE BUILDING. THIS CONDUIT
SHALL BE CONCRETE ENCASED AND
SHALL BE INSTALLED WITH ONE(1) 6-
PAIR OSP RATED UTP.
PROVIDE ALL BUILDING ENTRANCE
TERMINAL AND CROSS-CONNECT
BLOCKS IN EACH BUILDING.
CONTRACTOR TO FURNISH AND INSTALL
ONE (1) NEW 4-INCH EMPTY RNC FROM
THE MAIN NIPR ROOM TO THIS
LOCATION.
THIS CONDUIT SHALL BE CONCRETE
ENCASED AND CONTAIN A PULL STRING.
CONTRACTOR SHALL COORDINATE
FINAL LOCATION OF CAPPED CONDUIT
BEFORE COMMENCING ROUGH-IN.
TELECOMMUNCIATIONS NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
p ro j.
n o
F
IL
E N
A M
E
P N
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
B
C
D
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
2 3 4 5
T-100
T E
L E
C O
M M
U N
IC
A
T
IO
N S
F O
R T
B R
A G
G N
C W
IL
M
IN
G
T O
N D
IS
T
R
IC
T D
A R
L
IN
G T
O N
A V
E W
IL
M
IN
G
T O
N N
C
P .H
IE
B
IN
G
B .L
E W
IS
E X
P F
E D
E R
A L
P .H
IE
B
IN
G
J U
L Y
W P
M R
C O
R R
E C
T E
D F
IN
A
L
D
E S
IG
N
N
O T
F O
R C
O N
S T
R U
C T
IO
N
S O
F T
E C
H N
IC
A
L S
U P
P O
R T
T R
A
IN
IN
G
A N
N E
X
T E
L E
C O
M M
U N
IC
A
T
IO
N S
IT
E
P L A
N
C H
I- -A
T
W P
M F
.r v t
F Y
P
N
.2
F Y
P
N
.2
Site Plan1 04 8268 020 40 80103040
SCALE: 1"=40'-0" R
E
A D
Y T
O A
D V
E R
T
IS
E R
E A
D Y
T O
A D
V E
R T
IS
E
IS
S
U E
D A
T E
A U
G
APPROXIMATE
LOCATION OF
MH10B12
(3) 3" CONDUITS
PULL BOX
WITH TRAFFIC
RATED LID
(3) 3" CONDUITS
AM
EN
D M
EN
T
N O
. 0
8/
/2
1A COMPLETE OUTSIDE PLANT (OSP) COMMUNICATIONS
SYSTEM SHALL BE PROVIDED IN ACCORDANCE WITH THE
I3A, AND THE FORT BRAGG NETWORK ENTERPRISE CENTER
(NEC).
DUCT BANK, MANHOLE INFRASTRUCTURE, COPPER, AND
FIBER OPTIC CABLING TIE-IN POINTS SHALL BE
COORDINATED WITH THE FORT BRAGG NEC.
EXTERIOR CATV CABLING SHALL BE DESIGNED AND
INSTALLED BY THE LOCAL CATV PROVIDER.
AT EXISTING MH10B12, PICK UP 12 STRANDS SMF
(F508-13:25-36) AND 75 PAIRS COPPER (CA 284: 301-374).
FROM EXISTING MH10B12 TRENCH/CONCRETE ENCASE
NEW 3-INCH SCHEDULE 40 PVC 3-WAY DUCTS (500 LF
APPROXIMATELY) TO NEW TECHNICAL SUPPORT TRAINING
ANNEX MAIN NIPR TR. ONE (1) DUCT SHALL CONTAIN ONE
(1) 3” 3-CELL NON-DETECTABLE MAXCELL FOR FIBER. ONE
FOR COPPER AND ONE EMPTY DUCT WITH PULL STRING
AND PLUGGED WITH MECHANICAL DUCT PLUG.
THE CONTRACTOR SHALL CONDUCT A SITE SURVEY AND
MUST ENSURE USABLE CABLE PATHWAYS AND PERFORM
DESIGN AND INSTALLATION WORK IN ACCORDANCE WITH
THE I3A TC AND THE FORT BRAGG NEC IDC. COORDINATE
WITH THE FORT BRAGG NEC BEFORE ENTERING THE FORT
BRAGG OSP MANHOLE SYSTEM.
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
File details come from the government source that posted it. Updated .