REV D_Amend 01_A-101_Bldg 32 - Arch Roof Plan-RTA-2.pdf
PDF 210 KB Posted
- Attached to
- MOTSU-22018 Annual Roof Repairs Federal contract opportunity
- Solicitation number
- W912PM22B0010
About this file
This solicitation package provides details for a roof replacement project at Military Ocean Terminal Sunny Point in North Carolina. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to replace the roofs of Buildings 26 and 32, comprising approximately 10,400 and 3,100 square feet respectively. The work includes demolition of existing single-ply membranes and insulation down to the metal deck, and installation of a new two-ply modified bitumen roof system with insulation. Parapets and penetrations will be re-flashed. The project is set aside for Service-Disabled Veteran-Owned Small Businesses and has a magnitude of construction between $1,000,000 to $5,000,000. Interested contractors must register in the System for Award Management to be eligible for award. The solicitation number is W912PM22B0010 and the point of contact for any questions is the named contracting officer or contract specialist.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Sign-In Sheet.pdf | ||
| B1 Abstract W912PM22B0010_Electronic_SIGNED.pdf | ||
| W912PM22B00100003.pdf | ||
| LP System Site Visit Pictures.pdf | ||
| LP System Site Visit Roster.pdf | ||
| W912PM22B00100003 (conformed).pdf | ||
| NCIC_CONSENT_FORM.pdf | ||
| Bldg32AsBuilts.pdf | ||
| W912PM22B00100002 (conformed).pdf | ||
| W912PM22B00100002.pdf | ||
| Bldg26AsBuilts.pdf | ||
| REV D_Amend 01_A-102_Bldg 26 - Arch Roof Plan-RTA.pdf | ||
| Roof1-converted-compressed.pdf | ||
| W912PM22B00100001 (conformed).pdf | ||
| W912PM22B00100001.pdf | ||
| 07 52 00 - AMDT0001.pdf | ||
| TECHNICAL SUMMARY OF CHANGES MOTSU Annual Roofs.pdf | ||
| SiteVisitSignIn.pdf | ||
| NCIC CONSENT FORM.pdf | ||
| RTA-SPECS-MOTSU-22018-Roof Repairs.pdf | ||
| 2022_04.26_RTA_MOTSU 22018 - ANNUAL ROOF REPAIRS MILITARY OCEAN TERMINAL.pdf | ||
| W912PM22B0010.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
c5 ce cd a ca cb a c3c2'c2c1'c1
TYP22 2
TYP
TYP
TYP
TYP
TYP
TYP
79'-9 1/2"± (FIELD VERIFY)
10'-0 1/2"±
(FIELD VERIFY)
'-6
/2
(F
IE
LD
V
ER
IF
Y)
'-2
/4
(F
IE
LD
V
ER
IF
Y)
41'-11 1/4"± (FIELD VERIFY)
10'-0 1/2"±
(FIELD VERIFY)
'-1
1/
2"
(F
IE
LD
V
ER
IF
Y)
4 4
OPTIONAL BID ITEM 02:
REPLACE ROOF AT MECHANICAL
EQUIPMENT INSET
'-1
/2
(F
IE
LD
V
ER
IF
Y)
16'-4 1/4"±
(FIELD VERIFY)
HOT PROCESS COLD
PROCESS
c5 ce cd a ca cb a c3c2'c2c1'c1
A-101
BU
IL
D
IN
G
AR
C H
IT
EC
TU
R
AL
N
EW
R O
O F
PL
AN
R . B
ES
T
S.
S
U R
R
AT
T
J.
M
AN
N
IN
G
R . B
ES
T
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FI
LE
N
AM
E:
C
AT
EG
O
R Y
C O
D E
AN
SI
D
XX
XX
XX
-X
X- X-
XX
XX
W
2P M
-2 2-
B-
AP
R
IL
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
D
IS
TR
IC
T
A D
Q C
/U se r R ev ie w
S U
BM
IT
TA
L
.2
R
TA
B
BC
O
ES
R
EV
IE
W
FE
B
C
R
TA
AP
R
IL
M O
TS
U
AN
N
U
AL
R O
O F
R
EP
AI
R
S M
IL
IT
AR
Y
O C
EA
N
T
ER
M
IN
AL
SU
N
N Y
PO
IN
T (M
O
TS
U
BR
U
N
SW
IC
K
C O
U N
TY
, N
O R
TH
C
AR
O
LI
N
A
D
AM
EN
D
M
EN
T
O
PT
IO
N
AL
B
ID
IT
EM
M
AY
SCALE: 1/8" = 1'-0"1 BUILDING 32 - NEW ROOF PLAN
GENERAL CONSTRUCTION NOTES
1 CONTRACTOR SHALL FOLLOW ALL FACILITY RULES AND REGULATIONS
WHILE WORKING ON SITE. THIS INCLUDES BUT IS NOT LIMITED TO; ACCESS
ONTO THE FACILITY, SCHEDULED WORKING HOURS, GENERAL SAFETY
PROCEDURES, FIRE SAFETY PROCEDURES, SECURITY AND ENVIRONMENTAL
CONTROL PROCEDURES.
2 ALL PERMITTING REQUIREMENTS MUST BE SATISFIED/OBTAINED PRIOR TO
COMMENCEMENT OF ANY CONSTRUCTION WORK.
3. FIELD VERIFY DIMENSIONS.
CONSTRUCTION NOTES
1 DEMO EXISTING SINGLE PLY MEMBRANE & INSULATION DOWN TO EXISTING
METAL DECK - REPLACE WITH 2 PLY SBS MODIFIED BITUMEN ROOF ON 1/2"
COVER BOARD ON NEW POLYISOCYANURATE INSULATION BOARD - SEE
SPECIFICATION C7 52 00 FOR COMPLETE DESCRIPTION OF ROOF SYSTEM.
REPLACE EXISTING ROOF DRAIN W/ NEW - SLOPE NEW ROOF TO DRAINS.
EXISTING STANDING SEAM METAL ROOF & TRUSSES TO REMAIN.
RE-FLASH EXISTING OVERFLOW SCUPPERS.
PARAPET & ORNATE
CORNICE REMAIN
N.T.S.
KEY PLAN
Lightning Protection Scope of Work
1. REMOVE ONLY AS MUCH OF THE EXISTING LIGHTNING PROTECTION SYSTEM
AS IS REQUIRED FOR THE REPLACEMENT OF THE ROOF.
2. RE-INSTALL IN THE SAME POSITION AS EXISTING CONDITIONS.
3. PROVIDE CERTIFICATION FROM A COMMERCIAL THIRD-PARTY INSPECTION
COMPANY WHOSE SOLE WORK IS LIGHTNING PROTECTION, STATING THAT
THE LIGHTNING PROTECTION SYSTEM COMPLIES WITH NFPA 780. THIRD
PARTY INSPECTION COMPANY CANNOT BE THE SYSTEM INSTALLER OR THE
SYSTEM DESIGNER. PROVIDE A UL LIGHTNING PROTECTION INSPECTION
MASTER LABEL CERTIFICATE FOR EACH FACILITY INDICATING COMPLIANCE TO
NFPA 780. INSPECTION MUST COVER EVERY CONNECTION, AIR TERMINAL,
CONDUCTOR, FASTENER, ACCESSIBLE GROUNDING POINT AND OTHER
COMPONENTS OF THE LIGHTNING PROTECTION SYSTEM TO ENSURE 100%
SYSTEM COMPLIANCE. THIS INCLUDES WITNESSING THE TESTS FOR THE
RESISTANCE MEASUREMENTS FOR GROUND RODS WITH TEST WELLS, AND
FOR CONTINUITY MEASUREMENTS FOR BONDS. IT ALSO INCLUDES
VERIFICATION OF PROPER SURGE PROTECTIVE DEVICES FOR POWER, DATA
AND TELECOMMUNICATION SYSTEMS. RANDOM SAMPLING OR PARTIAL
INSPECTION OF A FACILITY IS NOT ACCEPTABLE.
4. TEST THE LIGHTNING PROTECTION AND GROUNDING SYSTEM TO ENSURE
CONTINUITY IS NOT IN EXCESS OF 1 OHM AND THAT RESISTANCE TO GROUND
IS NOT IN EXCESS OF 25 OHMS. PROVIDE DOCUMENTATION FOR THE
MEASURED VALUES AT EACH TEST POINT. TEST THE GROUND ROD FOR
RESISTANCE TO GROUND BEFORE MAKING CONNECTIONS TO THE ROD. TIE
THE GROUNDING SYSTEM TOGETHER AND TEST FOR RESISTANCE TO
GROUND. MAKE RESISTANCE MEASUREMENTS IN DRY WEATHER, NOT
EARLIER THAN 48 HOURS AFTER RAINFALL. INCLUDE IN THE WRITTEN
REPORT: LOCATIONS OF TEST POINTS, MEASURED VALUES FOR CONTINUITY
AND GROUND RESISTANCE'S, AND SOIL CONDITIONS AT THE TIME THAT
MEASUREMENTS WERE MADE. SUBMIT RESULTS OF EACH TEST TO THE
CONTRACTING OFFICER.
| Sheets and Views |
| CURRENT A-101 |
File details come from the government source that posted it. Updated .