REV D_Amend 01_A-101_Bldg 32 - Arch Roof Plan-RTA-2.pdf

PDF 210 KB Posted

Attached to
MOTSU-22018 Annual Roof Repairs Federal contract opportunity
Solicitation number
W912PM22B0010
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This solicitation package provides details for a roof replacement project at Military Ocean Terminal Sunny Point in North Carolina. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to replace the roofs of Buildings 26 and 32, comprising approximately 10,400 and 3,100 square feet respectively. The work includes demolition of existing single-ply membranes and insulation down to the metal deck, and installation of a new two-ply modified bitumen roof system with insulation. Parapets and penetrations will be re-flashed. The project is set aside for Service-Disabled Veteran-Owned Small Businesses and has a magnitude of construction between $1,000,000 to $5,000,000. Interested contractors must register in the System for Award Management to be eligible for award. The solicitation number is W912PM22B0010 and the point of contact for any questions is the named contracting officer or contract specialist.

View the file

Other files for this federal contract opportunity

Other files attached to MOTSU-22018 Annual Roof Repairs, newest first.
File Type Posted
Bid Opening Sign-In Sheet.pdf PDF
B1 Abstract W912PM22B0010_Electronic_SIGNED.pdf PDF
W912PM22B00100003.pdf PDF
LP System Site Visit Pictures.pdf PDF
LP System Site Visit Roster.pdf PDF
W912PM22B00100003 (conformed).pdf PDF
NCIC_CONSENT_FORM.pdf PDF
Bldg32AsBuilts.pdf PDF
W912PM22B00100002 (conformed).pdf PDF
W912PM22B00100002.pdf PDF
Bldg26AsBuilts.pdf PDF
REV D_Amend 01_A-102_Bldg 26 - Arch Roof Plan-RTA.pdf PDF
Roof1-converted-compressed.pdf PDF
W912PM22B00100001 (conformed).pdf PDF
W912PM22B00100001.pdf PDF
07 52 00 - AMDT0001.pdf PDF
TECHNICAL SUMMARY OF CHANGES MOTSU Annual Roofs.pdf PDF
SiteVisitSignIn.pdf PDF
NCIC CONSENT FORM.pdf PDF
RTA-SPECS-MOTSU-22018-Roof Repairs.pdf PDF
2022_04.26_RTA_MOTSU 22018 - ANNUAL ROOF REPAIRS MILITARY OCEAN TERMINAL.pdf PDF
W912PM22B0010.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

c5 ce cd a ca cb a c3c2'c2c1'c1

TYP22 2

TYP

TYP

TYP

TYP

TYP

TYP

79'-9 1/2"± (FIELD VERIFY)

10'-0 1/2"±

(FIELD VERIFY)

'-6

/2

(F

IE

LD

V

ER

IF

Y)

'-2

/4

(F

IE

LD

V

ER

IF

Y)

41'-11 1/4"± (FIELD VERIFY)

10'-0 1/2"±

(FIELD VERIFY)

'-1

1/

2"

(F

IE

LD

V

ER

IF

Y)

4 4

OPTIONAL BID ITEM 02:

REPLACE ROOF AT MECHANICAL

EQUIPMENT INSET

'-1

/2

(F

IE

LD

V

ER

IF

Y)

16'-4 1/4"±

(FIELD VERIFY)

HOT PROCESS COLD

PROCESS

c5 ce cd a ca cb a c3c2'c2c1'c1

A-101

BU

IL

D

IN

G

AR

C H

IT

EC

TU

R

AL

N

EW

R O

O F

PL

AN

R . B

ES

T

S.

S

U R

R

AT

T

J.

M

AN

N

IN

G

R . B

ES

T

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FI

LE

N

AM

E:

C

AT

EG

O

R Y

C O

D E

AN

SI

D

XX

XX

XX

-X

X- X-

XX

XX

W

2P M

-2 2-

B-

AP

R

IL

W

IL

M

IN

G

TO

N , N

O R

TH

C

AR

O

LI

N

A

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

D

IS

TR

IC

T

A D

Q C

/U se r R ev ie w

S U

BM

IT

TA

L

.2

R

TA

B

BC

O

ES

R

EV

IE

W

FE

B

C

R

TA

AP

R

IL

M O

TS

U

AN

N

U

AL

R O

O F

R

EP

AI

R

S M

IL

IT

AR

Y

O C

EA

N

T

ER

M

IN

AL

SU

N

N Y

PO

IN

T (M

O

TS

U

BR

U

N

SW

IC

K

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

D

AM

EN

D

M

EN

T

O

PT

IO

N

AL

B

ID

IT

EM

M

AY

SCALE: 1/8" = 1'-0"1 BUILDING 32 - NEW ROOF PLAN

GENERAL CONSTRUCTION NOTES

1 CONTRACTOR SHALL FOLLOW ALL FACILITY RULES AND REGULATIONS

WHILE WORKING ON SITE. THIS INCLUDES BUT IS NOT LIMITED TO; ACCESS

ONTO THE FACILITY, SCHEDULED WORKING HOURS, GENERAL SAFETY

PROCEDURES, FIRE SAFETY PROCEDURES, SECURITY AND ENVIRONMENTAL

CONTROL PROCEDURES.

2 ALL PERMITTING REQUIREMENTS MUST BE SATISFIED/OBTAINED PRIOR TO

COMMENCEMENT OF ANY CONSTRUCTION WORK.

3. FIELD VERIFY DIMENSIONS.

CONSTRUCTION NOTES

1 DEMO EXISTING SINGLE PLY MEMBRANE & INSULATION DOWN TO EXISTING

METAL DECK - REPLACE WITH 2 PLY SBS MODIFIED BITUMEN ROOF ON 1/2"

COVER BOARD ON NEW POLYISOCYANURATE INSULATION BOARD - SEE

SPECIFICATION C7 52 00 FOR COMPLETE DESCRIPTION OF ROOF SYSTEM.

REPLACE EXISTING ROOF DRAIN W/ NEW - SLOPE NEW ROOF TO DRAINS.

EXISTING STANDING SEAM METAL ROOF & TRUSSES TO REMAIN.

RE-FLASH EXISTING OVERFLOW SCUPPERS.

PARAPET & ORNATE

CORNICE REMAIN

N.T.S.

KEY PLAN

Lightning Protection Scope of Work

1. REMOVE ONLY AS MUCH OF THE EXISTING LIGHTNING PROTECTION SYSTEM

AS IS REQUIRED FOR THE REPLACEMENT OF THE ROOF.

2. RE-INSTALL IN THE SAME POSITION AS EXISTING CONDITIONS.

3. PROVIDE CERTIFICATION FROM A COMMERCIAL THIRD-PARTY INSPECTION

COMPANY WHOSE SOLE WORK IS LIGHTNING PROTECTION, STATING THAT

THE LIGHTNING PROTECTION SYSTEM COMPLIES WITH NFPA 780. THIRD

PARTY INSPECTION COMPANY CANNOT BE THE SYSTEM INSTALLER OR THE

SYSTEM DESIGNER. PROVIDE A UL LIGHTNING PROTECTION INSPECTION

MASTER LABEL CERTIFICATE FOR EACH FACILITY INDICATING COMPLIANCE TO

NFPA 780. INSPECTION MUST COVER EVERY CONNECTION, AIR TERMINAL,

CONDUCTOR, FASTENER, ACCESSIBLE GROUNDING POINT AND OTHER

COMPONENTS OF THE LIGHTNING PROTECTION SYSTEM TO ENSURE 100%

SYSTEM COMPLIANCE. THIS INCLUDES WITNESSING THE TESTS FOR THE

RESISTANCE MEASUREMENTS FOR GROUND RODS WITH TEST WELLS, AND

FOR CONTINUITY MEASUREMENTS FOR BONDS. IT ALSO INCLUDES

VERIFICATION OF PROPER SURGE PROTECTIVE DEVICES FOR POWER, DATA

AND TELECOMMUNICATION SYSTEMS. RANDOM SAMPLING OR PARTIAL

INSPECTION OF A FACILITY IS NOT ACCEPTABLE.

4. TEST THE LIGHTNING PROTECTION AND GROUNDING SYSTEM TO ENSURE

CONTINUITY IS NOT IN EXCESS OF 1 OHM AND THAT RESISTANCE TO GROUND

IS NOT IN EXCESS OF 25 OHMS. PROVIDE DOCUMENTATION FOR THE

MEASURED VALUES AT EACH TEST POINT. TEST THE GROUND ROD FOR

RESISTANCE TO GROUND BEFORE MAKING CONNECTIONS TO THE ROD. TIE

THE GROUNDING SYSTEM TOGETHER AND TEST FOR RESISTANCE TO

GROUND. MAKE RESISTANCE MEASUREMENTS IN DRY WEATHER, NOT

EARLIER THAN 48 HOURS AFTER RAINFALL. INCLUDE IN THE WRITTEN

REPORT: LOCATIONS OF TEST POINTS, MEASURED VALUES FOR CONTINUITY

AND GROUND RESISTANCE'S, AND SOIL CONDITIONS AT THE TIME THAT

MEASUREMENTS WERE MADE. SUBMIT RESULTS OF EACH TEST TO THE

CONTRACTING OFFICER.

Sheets and Views
CURRENT A-101

File details come from the government source that posted it. Updated .