About this file

This solicitation is for annual roof repairs at the Military Ocean Terminal Sunny Point in Southport, North Carolina. The U.S. Army Corps of Engineers Wilmington District requires a contractor to replace the roofs of Building 26 and Building 32. For Building 26, the contractor will demolish the existing single-ply membrane and insulation down to the metal deck and replace it with a 2-ply modified bitumen roof system and new insulation over an area of approximately 10,400 square feet. For Building 32, the work will cover 3,100 square feet. Additional work includes reflashing penetrations and parapets and replacing prefinished metal parapet caps. The contractor must perform all work in accordance with contract specifications, manufacturer's recommendations, and applicable building codes. This will be a firm-fixed price contract. The NAICS code is 238160 and size standard is $16.5 million. The magnitude of construction is between $1-5 million. The solicitation number is W912PM22B0010 and it is set aside for Service-Disabled Veteran-Owned Small Businesses. The response due date is not provided.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RD

RDRD

RD

TYP

TYP

TYP

TYP

140'-6"±

(FIELD VERIFY)

'-6

(F

IE

LD

V

ER

IF

Y)

EXIST. 12" x 4" OVERFLOW

SCUPPER - SEE DETAIL 3/A-501

(TYP. AT 4 LOCATIONS)

REPLACE EXISTING ROOF DRAIN -

SEE DETAIL 2/A-501 (TYP. AT 4

LOCATIONS)

EXIST. ROOF HATCH

- SEE DETAIL 5/A-501

EXISTING

CONDENSER

EXISTING

CONDENSER

EXISTING EXHAUST FAN

- SEE DETAIL 7/A-501

EXIST. RTU - REUSE

EXISTING OPENINGS

- SEE DETAIL 6/A-501

EXISTING TV

SATELLITE

EXIST. VTR -

SEE DETAIL

9/A-501

EXISTING BOILER

FLUE STACK TO

BE REUSED - SEE

DETAIL 7/A-501

TYP

TYP

A-501

A-501

A-501

A-501

EXIST. VTR -

SEE DETAIL

9/A-501

A-102

BU

IL

D

IN

G

AR

C H

IT

EC

TU

R

AL

N

EW

R O

O F

PL

AN

R . B

ES

T

S.

S

U R

R

AT

T

J.

M

AN

N

IN

G

R . B

ES

T

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FI

LE

N

AM

E:

C

AT

EG

O

R Y

C O

D E

AN

SI

D

XX

XX

XX

-X

X- X-

XX

XX

W

2P M

-2 2-

B-

AP

R

IL

W

IL

M

IN

G

TO

N , N

O R

TH

C

AR

O

LI

N

A

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

D

IS

TR

IC

T

A D

Q C

/U se r R ev ie w

S U

BM

IT

TA

L

.2

R

TA

B

BC

O

ES

R

EV

IE

W

FE

B

C

R

TA

AP

R

IL

M O

TS

U

AN

N

U

AL

R O

O F

R

EP

AI

R

S M

IL

IT

AR

Y

O C

EA

N

T

ER

M

IN

AL

SU

N

N Y

PO

IN

T (M

O

TS

U

BR

U

N

SW

IC

K

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

D

AM

EN

D

M

EN

T

O

PT

IO

N

AL

B

ID

IT

EM

M

AY

SCALE: 1/8" = 1'-0"1 BUILDING 26 - NEW ROOF PLAN

GENERAL CONSTRUCTION NOTES

1 CONTRACTOR SHALL FOLLOW ALL FACILITY RULES AND REGULATIONS

WHILE WORKING ON SITE. THIS INCLUDES BUT IS NOT LIMITED TO; ACCESS

ONTO THE FACILITY, SCHEDULED WORKING HOURS, GENERAL SAFETY

PROCEDURES, FIRE SAFETY PROCEDURES, SECURITY AND ENVIRONMENTAL

CONTROL PROCEDURES.

2 ALL PERMITTING REQUIREMENTS MUST BE SATISFIED/OBTAINED PRIOR TO

COMMENCEMENT OF ANY CONSTRUCTION WORK.

3. FIELD VERIFY DIMENSIONS.

CONSTRUCTION NOTES

1 DEMO EXISTING SINGLE PLY MEMBRANE & INSULATION DOWN TO EXISTING

METAL DECK - REPLACE WITH 2 PLY SBS MODIFIED BITUMEN ROOF ON 1/2"

COVER BOARD ON NEW POLYISOCYANURATE INSULATION BOARD - SEE

SPECIFICATION 07 52 00 FOR COMPLETE DESCRIPTION OF ROOF SYSTEM.

REPLACE EXISTING ROOF DRAIN W/ NEW - SLOPE NEW ROOF TO DRAINS.

REPLACE PREFINISHED METAL CAP ON ALL PARAPET WALLS WHERE NEW

ROOFING MUST RUN AND BE FASTENED UNDER ROOF CAP. METAL CAP ON

HIGH PARAPET WALLS TO REMAIN.

RE-FLASH EXISTING OVERFLOW SCUPPERS. SEE DETAIL 3/A-501.

PARAPET & ORNATE

CORNICE REMAIN

Lightning Protection Scope of Work

1. REMOVE ONLY AS MUCH OF THE EXISTING LIGHTNING PROTECTION SYSTEM

AS IS REQUIRED FOR THE REPLACEMENT OF THE ROOF.

2. RE-INSTALL IN THE SAME POSITION AS EXISTING CONDITIONS.

3. PROVIDE CERTIFICATION FROM A COMMERCIAL THIRD-PARTY INSPECTION

COMPANY WHOSE SOLE WORK IS LIGHTNING PROTECTION, STATING THAT

THE LIGHTNING PROTECTION SYSTEM COMPLIES WITH NFPA 780. THIRD

PARTY INSPECTION COMPANY CANNOT BE THE SYSTEM INSTALLER OR THE

SYSTEM DESIGNER. PROVIDE A UL LIGHTNING PROTECTION INSPECTION

MASTER LABEL CERTIFICATE FOR EACH FACILITY INDICATING COMPLIANCE TO

NFPA 780. INSPECTION MUST COVER EVERY CONNECTION, AIR TERMINAL,

CONDUCTOR, FASTENER, ACCESSIBLE GROUNDING POINT AND OTHER

COMPONENTS OF THE LIGHTNING PROTECTION SYSTEM TO ENSURE 100%

SYSTEM COMPLIANCE. THIS INCLUDES WITNESSING THE TESTS FOR THE

RESISTANCE MEASUREMENTS FOR GROUND RODS WITH TEST WELLS, AND

FOR CONTINUITY MEASUREMENTS FOR BONDS. IT ALSO INCLUDES

VERIFICATION OF PROPER SURGE PROTECTIVE DEVICES FOR POWER, DATA

AND TELECOMMUNICATION SYSTEMS. RANDOM SAMPLING OR PARTIAL

INSPECTION OF A FACILITY IS NOT ACCEPTABLE.

4. TEST THE LIGHTNING PROTECTION AND GROUNDING SYSTEM TO ENSURE

CONTINUITY IS NOT IN EXCESS OF 1 OHM AND THAT RESISTANCE TO GROUND

IS NOT IN EXCESS OF 25 OHMS. PROVIDE DOCUMENTATION FOR THE

MEASURED VALUES AT EACH TEST POINT. TEST THE GROUND ROD FOR

RESISTANCE TO GROUND BEFORE MAKING CONNECTIONS TO THE ROD. TIE

THE GROUNDING SYSTEM TOGETHER AND TEST FOR RESISTANCE TO

GROUND. MAKE RESISTANCE MEASUREMENTS IN DRY WEATHER, NOT

EARLIER THAN 48 HOURS AFTER RAINFALL. INCLUDE IN THE WRITTEN

REPORT: LOCATIONS OF TEST POINTS, MEASURED VALUES FOR CONTINUITY

AND GROUND RESISTANCE'S, AND SOIL CONDITIONS AT THE TIME THAT

MEASUREMENTS WERE MADE. SUBMIT RESULTS OF EACH TEST TO THE

CONTRACTING OFFICER.