W912PM-15-R-0003-0005.pdf

PDF 2 MB Posted

Attached to
MOTSU SATER SATOC Federal contract opportunity
Solicitation number
W912PM-15-R-0003
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to MOTSU SATER SATOC, newest first.
File Type Posted
W912PM-15-R-0003-0007.pdf PDF
W912PM-15-R-0003-0006.pdf PDF
15-R-0003_Amendment_4_Conformed_Copy.pdf PDF
15-R-0003_Amendment_4.pdf PDF
15-R-003_Amendment0003.pdf PDF
15-R-0003_Amendment_2.pdf PDF
15-R-0003_Amendment_2_Conformed_Copy.pdf PDF
15-R-0003_Amendment_1_Conformed_Copy.pdf PDF
15-R-0003_Amendment_1.pdf PDF
AdvSpecs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912PM-15-R-0003 Phase II is hereby amended for the follow ing reasons:

a) To include a Bid Pricing Schedule in the solicitation.

b) To replace Amendment 4, Attachment 2 - Utility w ith a corrected utility map.

c) The proposal due date and time is not extended by this modification.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Apr-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-15-R-0003

X 9B. DATED (SEE ITEM 11)

30-Jan-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 5 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Apr-2015

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CHARLENNE FIGGINS

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-15-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

BID PRICING SCHEDULE

Solicitation W912PM-15-R-0003, Phase II Seed Project

Demolish and Replace Building 20 Military Ocean Terminal, Sunny Point

Item No. Description Qty UoM Price

0001 Demolish and replace existing 1 Job ___________________ building in accordance with the attached Scope of Work.

Total Price: __________________________

(End of Bid Pricing Schedule)

Legend

Military Ocean Terminal, Sunny Point

596th Transportation Brigade - Directorate of Public Works

WGS_1984_Web_Mercator_Auxiliary_Sphere U.S. Survey Feet

110.50 55.25110.5

FOUO

Railroad Centerline

ARMY

PROGRESS

Berms

Dikes

MOTSU Buildings

Building

Canopy

LoadingDock/Ramp

Slab

Wall

Waterfront Structures

DOCK

PIER

RAMP

WHARF

Road Centerline

ACCESS_ROAD

FIRE_LANE

ROAD

Open Storage Areas

Parking

PAVED

UNPAVED

Roads

PAVED

UNPAVED

Navigation Channel

Shoreline

Harbor Barrier

Installation Boundary

In Grants

AIR FORCE

BLAST EASEMENT

MAN MADE

Separators/Interceptors

Pump Stations

Disposal Tanks

Fittings

Grit Chambers

Inlets

Manholes

Neutralizers

CLORINATOR VAULT

DECLORINATOR VAULT

Pumps

Septic Tanks

Valves

WW Lines

FM

MAIN

SERVICE

ABANDONED

Drain Fields

Discharge Points

Fittings

Headwalls

Inlets

Storm Reservoir Areas

Manholes

Valves

Culverts

Storm Lines

Ditches

Pedestals

Pads

Substations

Switches

Transformers

Generators

Lights - Govt

Poles - BEMC

Lights - BEMC

Poles - Govt & Progress

K7EPEOAF

Typewritten Text

AMENDMENT 0005

K7EPEOAF

Typewritten Text

SF 30 - AMDT 0005 (MOTSU LANDSIDE)
BID PRICING SCHEDULE
ATTACHMENT 2 - UTILITIES

File details come from the government source that posted it. Updated .