11R0004_Am13.pdf
PDF 56 KB Posted
- Solicitation number
- W912PL-11-R-0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11R0004_Am12.pdf | ||
| 11R0004_Am11.pdf | ||
| Civil.zip | ZIP file | |
| Architectural.zip | ZIP file | |
| 11R0004_Am10.pdf | ||
| Geotech.zip | ZIP file | |
| Dwgs.zip | ZIP file | |
| 11R0004_Am9.pdf | ||
| 11R0004_Am8.pdf | ||
| JA.doc | DOC document | |
| 11R0004-AM07.pdf | ||
| 11R0004-AM06.pdf | ||
| 11R0004-AM05.pdf | ||
| 11R0004-AM04.pdf | ||
| Am3.pdf | ||
| Am2.pdf | ||
| 11R0004-AM01.pdf | ||
| W912PL-11-R-0004 Vol 1.pdf | ||
| W912PL-11-R-0004 Vol 2.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
0013 Mar 16, 2011
US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017
US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017
W912PL-11-R-0004
Dec 15, 2010
FY11 Design and Construction of the Aerospace Maintenance and Regeneration Group (AMARG), Hangar, Davis-Monthan AFB, Arizona
AMENDMENT 0013 is issued under Solicitation No. W912PL-11-R-0004 to revise the Construction Cost Limitation (CCL)
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date) .
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data) .
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification) .
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
(g)
(h)
(i)
(ii)
(1)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(iii)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
W912PL-11-R-0004
Amendment No. 0013
1. SPECIFICATIONS: DELETE THE FOLLOWING LISTED PAGES AND SUBSTITUTE THE
PAGES ATTACHED HERETO. ON THE REVISED PAGES, FOR CONVENIENCE, CHANGES ARE
EMPHASIZED BY THE AMENDMENT NUMBER IN PARENTHESES BEFORE AND AFTER CHANGES
FROM THE PREVIOUS ISSUE. ALL PORTIONS OF THE REVISED (OR NEW) PAGES SHALL
APPLY WHETHER OR NOT CHANGES HAVE BEEN INDICATED.
Delete Page Insert Page
00010, Entire Document 00010, Entire Document
////////LAST ITEM////////
SECTION 00010 - 1
SECTION 00010 - PRICING SCHEDULE
Item Unit No. Description Quantity Unit Price Amount
BASE BID
0001 Total Cost of Design for
AMARG Hangar Including All Site Work, Complete
LS
0002 Total Cost of Construction for AMARG Hangar Within Building 5’-0” Line, Complete
0003 Total Cost of Construction for AMARG Hangar Outside the Building 5’-0” Line, Including Site Demolition, Grading, Stoops, Sidewalks, Access Drives, Parking Lot, Covered Parking, Curb and Gutter, Flexible Paving, Rigid Pavement, Striping, Dumpster Pad and Enclosure, Bike Rack, Landscaping, Irrigation, Utilities, Storm Drainage System, Pond, Lighting, Signage, and All Work Not Separately Listed, SECTION 00010 - 2
BASE BID (Cont’d)
0004 Total Cost of Demolition of Buildings 7410, 7411, 7412, 7413, and 7416, Foundations, and Associated Utility Services and All Work Not Separately Listed, Complete.
0005 Total Cost of Construction for Portland Cement Concrete Airfield Pavement, Complete
0006 Total Cost of Construction for Subgrade and Aggregate Base Course For Portland Cement Concrete Airfield , TOTAL AMOUNT – BASE BID $
BID OPTION NO. 1
0007 Total Cost of Design for
LEED Gold, Complete
0008 Total Cost of LEED Gold
Certification Including Increased Construction Cost and Certification Fees, Complete
TOTAL AMOUNT – BID OPTION NO. 1 $
SECTION 00010 - 3
BID OPTION NO. 2
0009 Total Cost of Design for
Additional Portland Cement Concrete Airfield
0010 Total Cost of Construction for Additional Portland Cement Concrete Airfield , 0011 Total Cost of Construction for Additional Subgrade and Aggregate Base Course For Portland Cement Concrete Airfield , TOTAL AMOUNT – BID OPTION NO. 2 $
BID OPTION NO. 3
0012 Total Cost for Design and
Construction of 80 KVA Photovoltaic System on POV Covered Parking Structure, TOTAL AMOUNT – BID OPTION NO. 3 $
(11)
(11)
SECTION 00010 - 4
RECAPITULATION
1. TOTAL AMOUNT - BASE BID $
2. TOTAL AMOUNT – BID OPTION NO. 1 $
3. TOTAL AMOUNT – BID OPTION NO. 2 $
4. TOTAL AMOUNT – BID OPTION NO. 3 $
5. TOTAL AMOUNT - BASE BID AND BID OPTIONS NO. 1,2 and 3 $
BIDDERS NOTES
1. EVALUATION: The Government intends to issue a task order resulting from the
Request for Proposal (RFP) to the responsible Offeror whose proposal represents the Best Value to the Government by using the Trade-Off procedure as described in Sections 00110 and 00120.
2. Award of all Base Bid and Options Items will be made to one offeror. Prices must be submitted on all individual items of the Price Schedules. Offeror must propose on all items. Failure to do so may cause the proposal to be determined unacceptable.
3. Performance Period: The Offeror shall complete and propose on all Base Bid and Options items in the Price Schedule to correspond with the completion time in calendar days after receipt of Notice To Proceed (NTP) as specified in Section 00800, Special Contract Requirements, Clause 52.211-10, Commencement, Prosecution and Completion of Work.
4. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offered amount.
5. If a modification to a price is submitted which provides for a lump sum adjustment to the total amount, the application of the lump sum adjustment to each item in the Price Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the Price Schedule.
6. The Offeror shall distribute his indirect costs (overhead, profit, bond, etc.,) over all items in the Price Schedule. The Government will review submitted Price Schedule for any unbalancing of the items. Any submitted Price Schedule determined to be unbalanced may cause the bidder to be ineligible for contract award.
(8)
(8)
SECTION 00010 - 5
7. The Lump Sum (LS) line items are not “estimated quantity” line items and therefore are not subject to the Variation in Quantity contract clause.
8. For the purpose of initial evaluation of offers, the following will be utilized in resolving arithmetic discrepancies found on the face of the Price Schedule as submitted by the offeror:
a. Obviously misplaced decimal points will be corrected;
b. In case of discrepancy between the unit price and the extended price, the unit price will govern;
c. Apparent errors in extensions of unit prices will be corrected;
d. Apparent errors in addition of lump sum and extended prices will be corrected.
9. The Contract Clause 52.232-27, "Prompt Payment for Construction Contracts" requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.
10. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment. The Contractors attention is directed to Contract Clause No.
52.232-33 "Mandatory Information for Electronic Funds Transfer" located in Section 00800.
11. PROGRESS PAYMENT REQUESTS made by the Contractor pursuant to the provisions of Contract Clause, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, shall be submitted on ENG FORM 93 to the administration office as designated in Block 26, Standard Form 1442 Back, Solicitation, Offer and Award. ENG FORM 93 shall be submitted to that office on the 20th day of each month in appropriate form and certified. Photocopies of the form shall be furnished on that same date to the Corps of Engineers offices designated at the Pre-Construction Conference.
12. Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer for this contract.
However, any Contracting Officer assigned to the Los Angeles District, Contracting Division within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.
13. Amounts and prices shall be indicated in either words or figures, NOT
BOTH.
14. Offeror is cautioned to check Price Schedule carefully prior to submission. If the Price Schedule contains unit prices, they should be round off to the second decimal point only NOT EXTENDED FURTHER.
SECTION 00010 - 6
15. The Offeror shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.
16. The Congress, in authorizing and funding this contract, has established certain cost limitations for the project. The current authorization for the complete construction of AMARG HANGAR, Project Number FBNV063501, $21,900,000.00 including Base Bid and all Optional Items. Proposals that exceed these funding limits may be rejected. Submission of desirable additional features exceeding minimum requirements may be considered as long as award can be made within the established funds.
17. The successful offeror grants the options listed in the Price Schedule to the Government and agrees that the options may be exercised any time up to 90 calendar days after NOTICE TO AWARD. No additional time for contract completion will be allowed when an option item is exercised. The given contract completion time was formulated to include time necessary to perform all option work. The time stated for completion shall include final clean-up of the premises. Refer to Section 00800, Contract Clause No. FAR 52.211- 10, “Commencement, Prosecution and Completion of Work.”
18. EVALUATION OF OPTIONS: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Please see FAR Clause 52.217-5, Entitled, “Evaluation of Options (Jul 1990), Section 00800.
19. Contractor is required to fill in CAGE CODE and DUNS NUMBER (Reference
Section 00700, entitled “Central Contractor Registration” (Apr 2008) in Block No 15 on Standard Form 1442, Name and Address Block (Cage Code under Cage and DUNS No. under Duns respectively).
20. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.0
21. CONTRACTOR PERFORMANCE EVALUATIONS. In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $100,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Construction Contractor Appraisal Support System (CCASS), which is now a web-based system. After an evaluation (interim or final) is written up by
(13)(7) (7)(13)
SECTION 00010 - 7
the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CCASS requires specific software, called PKI certification, which is
22. installed on the user’s computer. The certification is a Department of
Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site:
http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CCASS and PKI certification is the sole responsibility of the Contractor.
23. PLEASE NOTE: PROSPECTIVE OFFERORS SHOULD SUBMIT CONTRACTING AND TECHNICAL
INQUIRIES AND QUESTIONS RELATING TO PROPOSAL PROCEDURES ARE TO BE SUBMITTED
VIA BIDDER INQUIRY IN PROJNET AT WWW.PROJNET.ORG.PROJNET REFER TO SECTION
00100, CLAUSE NO. 52.0000-4010, ENTITLED, “INQUIRIES”.
24. ACCRUALS. In accordance with USACE Engineer Financial Regulation (ER) 37-
1-30, and other applicable Federal and DOD financial accounting standards, the Contractor must assist government personnel with providing reasonably accurate estimates of the value of goods and/or services rendered to the Government pursuant to this contract for each calendar month during which goods and services are delivered. Standard forms and instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before four (4) business days prior to each calendar month-end.
SECTION 00010 - 8
CERTIFICATE OF CORPORATE PRINCIPAL
1) IF THE OFFEROR IS A JOINT VENTURE, COMPLETE THE FOLLOWING:
(Company Name) (Signature) (Title)
(Company Name) (Signature) (Title)
(Company Name) (Signature) (Title)
2) IF THE OFFEROR IS PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS:
(Company Name) (Signature) (Title)
(Company Name) (Signature) (Title
(Company Name) (Signature) (Title)
3) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION SHOULD BE
COMPLETED:
CERTIFICATION AS TO CORPORATE PRINCIPAL
I, , certify that I am the Secretary of the corporation named as principal in the within contract; that , who signed the said contract on behalf of the principal, was the of the corporation; that I know his signature and that his signature is genuine; and that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.
CORPORATE PRINCIPAL
CORPORATE SEAL
SECRETARY