View the file

Other files

File Type Posted
11R0004_Am13.pdf PDF
11R0004_Am12.pdf PDF
11R0004_Am11.pdf PDF
Civil.zip ZIP file
Architectural.zip ZIP file
11R0004_Am10.pdf PDF
Geotech.zip ZIP file
Dwgs.zip ZIP file
11R0004_Am9.pdf PDF
11R0004_Am8.pdf PDF
JA.doc DOC document
11R0004-AM06.pdf PDF
11R0004-AM05.pdf PDF
11R0004-AM04.pdf PDF
Am3.pdf PDF
Am2.pdf PDF
11R0004-AM01.pdf PDF
W912PL-11-R-0004 Vol 1.pdf PDF
W912PL-11-R-0004 Vol 2.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

0007 Feb 1, 2011

US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017

US Army Corps of Engineers Los Angeles District P.O. Box 2711 Los Angeles, CA 90017

W912PL-11-R-0004

Dec 15, 2010

FY11 Design and Construction of the Aerospace Maintenance and Regeneration Group (AMARG), Hangar, Davis-Monthan AFB, Arizona

AMENDMENT 0007 is issued to incorporate the following changes.

Please see the attached sheet.

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date) .

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data) .

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

W912PL-11-R-0004

Amendment No. 0007

1. SPECIFICATIONS: DELETE THE FOLLOWING LISTED PAGES AND SUBSTITUTE THE

PAGES ATTACHED HERETO. ON THE REVISED PAGES, FOR CONVENIENCE, CHANGES ARE

EMPHASIZED BY THE AMENDMENT NUMBER IN PARENTHESES BEFORE AND AFTER CHANGES

FROM THE PREVIOUS ISSUE. ALL PORTIONS OF THE REVISED (OR NEW) PAGES SHALL

APPLY WHETHER OR NOT CHANGES HAVE BEEN INDICATED.

Delete Page Insert Page

SF1442, Entire Document SF1442, Entire Document

00010, Entire Document 00010, Entire Document

////////LAST ITEM////////

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION CALL

A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

Designed using Perform Pro, WHS/DIOR, Oct 96

1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

W912PL-11-R-0004

X

1 FEB 2011 1 OF 2

DACA63

U. S. Army Corps of Engineers Los Angeles District CESPL-CT-E, East Region Branch P. O. Box 532711 Los Angeles, CA 90053-2325

SEE BLOCK 7

Ms Sandra Oquita (213) 452-3249

FY11 Design and Construction the FY11 Aerospace Maintenance and Regeneration Group (AMARG), Hangar, Davis-Monthan AFB, Arizona This project will consist of One new 7,130 total square meters (76,707 square feet) high-bay hangar is required to support maintenance, repair, and inspection for planned Air Force regeneration/reclamation of C-130, KC-135, and P-3 aircraft to support Foreign Military Sales along with returning aircraft to DoD services and other federal and state agencies. This project will provide maintenance space with clear height of 52 feet to house two KC-135 aircraft. The facility will support fuel cell work, aircraft jacking, landing gear removal and replacement, engine removal/installation, flight control rigging and Technical Order (TO) procedures required to survey and repair air frame distortion and warping. Additional support space (included in the 76,707 square feet total) is needed for a TO library, records storage, tool cribs, and equipment storage. The project also includes grading, support utilities, a parking lot, entry drive, landscaping, interior finishes and demolition of Building 7413 (1,342 square meters [13,438 square feet]).

Estimated Cost Range is $10 to $25 Million This procurement is being solicited as Best Value Trade-Off. The goals are as follows: 50.0% with Small Business, 17% with Small Disadvantaged Business, 18% with Women-Owned Small Business, 10% with HubZone Small Business, 8.5% with Veteran-Owned Small Business, and 4.0% with Service-Disabled Veteran-Owned Small Business. THIS PROCUREMENT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE SOLICITATION, EVALUATION AND/OR FINAL AWARD PROCESS.

10 720

X X See Section 00800 x 10

Sec 0110 2:00 PM

17 FEB 2011

X

Amendment 7

OFFER (Must be fully completed by offeror)

STANDARD FORM 1442 BACK (REV. 4-85)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24.SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and

(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

30B. SIGNATURE 30C. DATE

31A. NAME OF CONTRACTING OFFICER (Type or print)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

DUNS NO.: TAX ID NO.:

CAGE CODE NO.:

( ) - ; FAX ( ) -

SEE PRICING SCHEDULE, SECTION 00010

Amendment 7

SECTION 00010 - 1

SECTION 00010 - PRICING SCHEDULE

Item Unit No. Description Quantity Unit Price Amount

BASE BID

0001 Total Cost of Design for

AMARG Hangar Including All Site Work, Complete

LS

0002 Total Cost of Construction for AMARG Hangar Within Building 5’-0” Line, Complete

0003 Total Cost of Construction for AMARG Hangar Outside the Building 5’-0” Line, Including Site Demolition, Grading, Stoops, Sidewalks, Access Drives, Parking Lot, Covered Parking, Curb and Gutter, Flexible Paving, Rigid Pavement, Striping, Dumpster Pad and Enclosure, Bike Rack, Landscaping, Irrigation, Utilities, Storm Drainage System, Pond, Lighting, Signage, and All Work Not Separately Listed, SECTION 00010 - 2

BASE BID (Cont’d)

0004 Total Cost of Demolition of Buildings 7410, 7411, 7412, 7413, and 7416, Foundations, and Associated Utility Services and All Work Not Separately Listed, Complete.

0005 Total Cost of Construction for Portland Cement Concrete Airfield Pavement, Complete

0006 Total Cost of Construction for Subgrade and Aggregate Base Course For Portland Cement Concrete Airfield , TOTAL AMOUNT – BASE BID $

BID OPTION NO. 1

0007 Total Cost of Design for

LEED Gold, Complete

0008 Total Cost of LEED Gold

Certification Including Increased Construction Cost and Certification Fees, Complete

TOTAL AMOUNT – BID OPTION NO. 1 $

SECTION 00010 - 3

BID OPTION NO. 2

0009 Total Cost of Design for

Additional Portland Cement Concrete Airfield

0010 Total Cost of Construction for Additional Portland Cement Concrete Airfield , 0011 Total Cost of Construction for Additional Subgrade and Aggregate Base Course For Portland Cement Concrete Airfield , Pavement, TOTAL AMOUNT – BID OPTION NO. 2 $

RECAPITULATION

1. TOTAL AMOUNT - BASE BID $

2. TOTAL AMOUNT – BID OPTION NO. 1 $

3. TOTAL AMOUNT – BID OPTION NO. 2 $

4. TOTAL AMOUNT - BASE BID AND BID OPTIONS NO. 1 and 2

SECTION 00010 - 4

BIDDERS NOTES

1. EVALUATION: The Government intends to issue a task order resulting from the

Request for Proposal (RFP) to the responsible Offeror whose proposal represents the Best Value to the Government by using the Trade-Off procedure as described in Sections 00110 and 00120.

2. Award of all Base Bid and Options Items will be made to one offeror. Prices must be submitted on all individual items of the Price Schedules. Offeror must propose on all items. Failure to do so may cause the proposal to be determined unacceptable.

3. Performance Period: The Offeror shall complete and propose on all Base Bid and

Options items in the Price Schedule to correspond with the completion time in calendar days after receipt of Notice To Proceed (NTP) as specified in Section 00800, Special Contract Requirements, Clause 52.211-10, Commencement, Prosecution and Completion of Work.

4. All extensions of the unit prices shown will be subject to verification by the

Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offered amount.

5. If a modification to a price is submitted which provides for a lump sum adjustment to the total amount, the application of the lump sum adjustment to each item in the Price Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the Price Schedule.

6. The Offeror shall distribute his indirect costs (overhead, profit, bond, etc.,) over all items in the Price Schedule. The Government will review submitted Price Schedule for any unbalancing of the items. Any submitted Price Schedule determined to be unbalanced may cause the bidder to be ineligible for contract award.

7. The Lump Sum (LS) line items are not “estimated quantity” line items and therefore are not subject to the Variation in Quantity contract clause.

8. For the purpose of initial evaluation of offers, the following will be utilized in resolving arithmetic discrepancies found on the face of the Price Schedule as submitted by the offeror:

a. Obviously misplaced decimal points will be corrected;

b. In case of discrepancy between the unit price and the extended price, the unit price will govern;

c. Apparent errors in extensions of unit prices will be corrected;

d. Apparent errors in addition of lump sum and extended prices will be corrected.

SECTION 00010 - 5

9. The Contract Clause 52.232-27, "Prompt Payment for Construction Contracts" requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.

10.Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment.

The Contractors attention is directed to Contract Clause No. 52.232-33 "Mandatory Information for Electronic Funds Transfer" located in Section 00800.

11.PROGRESS PAYMENT REQUESTS made by the Contractor pursuant to the provisions of

Contract Clause, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, shall be submitted on ENG FORM 93 to the administration office as designated in Block 26, Standard Form 1442 Back, Solicitation, Offer and Award. ENG FORM 93 shall be submitted to that office on the 20th day of each month in appropriate form and certified. Photocopies of the form shall be furnished on that same date to the Corps of Engineers offices designated at the Pre-Construction Conference.

12.Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer for this contract. However, any Contracting Officer assigned to the Los Angeles District, Contracting Division within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.

13.Amounts and prices shall be indicated in either words or figures, NOT BOTH.

14.Offeror is cautioned to check Price Schedule carefully prior to submission. If the Price Schedule contains unit prices, they should be round off to the second decimal point only NOT EXTENDED FURTHER.

15.The Offeror shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.

16.The Congress, in authorizing and funding this contract, has established certain cost limitations for the project. The current authorization for the complete construction of AMARG HANGAR, Project Number FBNV063501, $23,000,000.00 $20,000,000.00 including Base Bid and all Optional Items. Proposals that exceed these funding limits may be rejected. Submission of desirable additional features exceeding minimum requirements may be considered as long as award can be made within the established funds.

17.The successful offeror grants the options listed in the Price Schedule to the

Government and agrees that the options may be exercised any time up to 90 calendar days after NOTICE TO AWARD. No additional time for contract completion will be allowed when an option item is exercised. The given contract completion time was formulated to include time necessary to perform all option work. The time stated for completion shall include final clean-up of the premises. Refer to Section 00800, Contract Clause No. FAR 52.211-10, “Commencement, Prosecution and Completion of Work.”

(7) (7)

SECTION 00010 - 6

18.EVALUATION OF OPTIONS: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Please see FAR Clause 52.217-5, Entitled, “Evaluation of Options (Jul 1990), Section 00800.

19.Contractor is required to fill in CAGE CODE and DUNS NUMBER (Reference Section

00700, entitled “Central Contractor Registration” (Apr 2008) in Block No 15 on Standard Form 1442, Name and Address Block (Cage Code under Cage and DUNS No.

under Duns respectively).

20.PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.0

21.CONTRACTOR PERFORMANCE EVALUATIONS. In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415- 1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $100,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Construction Contractor Appraisal Support System (CCASS), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CCASS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions.

The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: http://www.cpars.navy.mil/.

If the Contractor wishes to participate in the performance evaluation process, access to CCASS and PKI certification is the sole responsibility of the Contractor.

22.PLEASE NOTE: PROSPECTIVE OFFERORS SHOULD SUBMIT CONTRACTING AND TECHNICAL

INQUIRIES AND QUESTIONS RELATING TO PROPOSAL PROCEDURES ARE TO BE SUBMITTED VIA

BIDDER INQUIRY IN PROJNET AT WWW.PROJNET.ORG.PROJNET REFER TO SECTION 00100,

CLAUSE NO. 52.0000-4010, ENTITLED, “INQUIRIES”.

SECTION 00010 - 7

23.ACCRUALS. In accordance with USACE Engineer Financial Regulation (ER) 37-1-30, and other applicable Federal and DOD financial accounting standards, the Contractor must assist government personnel with providing reasonably accurate estimates of the value of goods and/or services rendered to the Government pursuant to this contract for each calendar month during which goods and services are delivered. Standard forms and instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before four (4) business days prior to each calendar month-end.

SECTION 00010 - 8

CERTIFICATE OF CORPORATE PRINCIPAL

1) IF THE OFFEROR IS A JOINT VENTURE, COMPLETE THE FOLLOWING:

(Company Name) (Signature) (Title)

(Company Name) (Signature) (Title)

(Company Name) (Signature) (Title)

2) IF THE OFFEROR IS PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS:

(Company Name) (Signature) (Title)

(Company Name) (Signature) (Title

(Company Name) (Signature) (Title)

3) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION SHOULD BE

COMPLETED:

CERTIFICATION AS TO CORPORATE PRINCIPAL

I, , certify that I am the Secretary of the corporation named as principal in the within contract; that , who signed the said contract on behalf of the principal, was the of the corporation; that I know his signature and that his signature is genuine; and that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.

CORPORATE PRINCIPAL

CORPORATE SEAL

SECRETARY

File details come from the government source that posted it. Updated .