W912PF19Q0065
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 02
The purpose of this amendment is to:
a) - delete paragraphs 1.5.1.8 and 1.5.1.9 (Call back tests) and related note in the PWS.
- detete CDRL 0002 "Call back analysis of Potable Water" in the PWS.
- add the parameter POPs (Persistent Organic Pollutant) in the table at paragraph
1.5.3.2 of the PWS.
- add CLIN 0015, Sampling and Analysis of Unknown Solid and Liquid Substance - POPs and related CLINs for the option years (CLIN 1015-2015-3015-4015).
as CLIN 0016. (The same for the related option year CLINs)
b) Reply to the below Request for Information:
Question: May be used equivalent analytical methods to the ones indicated in the tender documents?
Answer: Yes, only if the proposed method is equivalent and it shall be submitted for acceptance.
c) Postpone the due-in date to 11 September 2019 at 12.00 pm.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 09-Sep-2019 12:00 PM to 11-Sep-
2019 12:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0015
The CLIN description has changed from Emergency Sampling and analysis, to Sampling and analysis.
The CLIN extended description has changed from:
in strict accordance with the attached Performance Work Statement, paragraph 1.5.2 and 1.5.3.
To:
Unknown Solid and Liquid Substances - POPs, in strict accordance with the attached Performance Work Statement, paragraph 1.5.3.
The pricing detail quantity has increased by 3.00 from 3.00 to 6.00.
CLIN 1015
Unknown Solid and Liquid Substances - POPs, in strict accordance with the attached Performance Work Statement, paragraph 1.5.3.
The pricing detail quantity has increased by 3.00 from 3.00 to 6.00.
CLIN 2015
Unknown Solid and Liquid Substances - POPs, in strict accordance with the attached Performance Work Statement, paragraph 1.5.3.
The pricing detail quantity has increased by 3.00 from 3.00 to 6.00.
CLIN 3015
Unknown Solid and Liquid Substances - POPs, in strict accordance with the attached Performance Work Statement, paragraph 1.5.3.
The pricing detail quantity has increased by 3.00 from 3.00 to 6.00.
CLIN 4015
To:
Unknown Solid and Liquid Substances - POPs, in strict accordance with the attached Performance Work Statement, paragraph 1.5.3.
The pricing detail quantity has increased by 3.00 from 3.00 to 6.00.
CLIN 0016 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0016 3 Each Emergency Sampling and Analysis, FFP in strict accordance with the attached Performance Work Statement, paragraph
1.5.2 and 1.5.3.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011384741-0002
PSC CD: F103
NET AMT
CLIN 1016 is added as follows:
1016 3 Each OPTION Emergency Sampling and Analysis, FFP in strict accordance with the attached Performance Work Statement, paragraph
1.5.2 and 1.5.3.
FOB: Destination
CLIN 2016 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2016 3 Each OPTION Emergency Sampling and Analysis, FFP in strict accordance with the attached Performance Work Statement, paragraph
1.5.2 and 1.5.3.
CLIN 3016 is added as follows:
3016 3 Each OPTION Emergency Sampling and Analysis, FFP in strict accordance with the attached Performance Work Statement, paragraph
1.5.2 and 1.5.3.
CLIN 4016 is added as follows:
4016 3 Each OPTION Emergency Sampling and Analysis, FFP in strict accordance with the attached Performance Work Statement, paragraph
1.5.2 and 1.5.3.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0015 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 25-SEP-2019 TO
24-SEP-2020
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
W582RR
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule for CLIN 0016 has been added:
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule item for CLIN 1015 has been changed from:
POP 25-SEP-2020 TO
24-SEP-2021
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule for CLIN 1016 has been added:
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule item for CLIN 2015 has been changed from:
POP 25-SEP-2021 TO
24-SEP-2022
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule for CLIN 2016 has been added:
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule item for CLIN 3015 has been changed from:
POP 25-SEP-2022 TO
24-SEP-2023
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule for CLIN 3016 has been added:
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule item for CLIN 4015 has been changed from:
POP 25-SEP-2023 TO
24-SEP-2024
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
24-SEP-2024
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
The following Delivery Schedule for CLIN 4016 has been added:
25-SEP-2024
N/A W582RR USAG ITALY
N/A
USAG ITALY, DARBY MILITARY
COMMUNITY VIA AUR
TIRRENIA (PISA)
N/A
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0016:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for CLIN 1016:
The following Acceptance/Inspection Schedule was added for CLIN 2016:
The following Acceptance/Inspection Schedule was added for CLIN 3016:
The following Acceptance/Inspection Schedule was added for CLIN 4016:
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
(PWS)
FOR
LABORATORY SAMPLING AND ANALYSIS,
POTABLE WATER, WASTE WATER AND
UNKNOWN WASTE AND MATERIALS
USAG Italy - DMC
JULY 2019
Rev#3
TABLE OF CONTENTS
.................................................................................................................................................................S
ECTION I
................................................................................................................................................................. D
ESCRIPTION OF SERVICES
1.1 SCOPE OF WORK:
1.2 LOCATION OF SERVICES:
1.3 HOURS OF OPERATION:
1.4 GENERAL CONTRACT SERVICES: The Contractor shall accomplish the following in conjunction with the specific contract services detailed herein:
1.4.1. ANTITERRORISM/OPERATIONS SECURITY:
1.4.2. ABSENSES:
1.4.3. KICK-OFF MEETING:
1.5 SPECIFIC TASKS:
1.5.1. POTABLE WATER
1.5.1.1. SAMPLE DRAWING PROCEDURES:
1.5.1.2. PARAMETERS TO BE CHECKED:
1.5.1.3. TESTING FREQUENCY:
1.5.1.4. ANALYSIS METHODS:
1.5.1.5. ANALYTICAL PARAMETERS:
1.5.1.6. NUMBER OF ANALYSIS:
1.5.1.7. ANALYSIS RESULTS:
1.5.2. WASTE WATER
1.5.2.1 SAMPLE DRAWING AND ANALYSIS PROCEDURE
1.5.2.2 TOTAL ANALYSIS
1.5.2.3 SAMPLE DRAWING PROCEDURES:
1.5.2.4 ANALYSIS RESULTS:
1.5.2.5 ADDITIONAL SAMPLING:
1.5.2.6 QUARTERLY ANALYSIS SUMMARY REPORT:
1.5.2.7 :
1.5.3. UNKNOWN WASTE AND MATERIALS
1.5.3.1 CHEMICAL ANALYSIS
1.5.3.2 CHEMICAL ANALYSIS SUMMARY
1.5.3.3. MONTHLY REPORT:
1.6. CONDUCT:
1.7. PAYMENT:
1.8. SAFETY:
1.9. CONTRACTOR MANPOWER REPORTING (CLIN 7500-7501-7502-7053-7504):. 24
1.10. USAG ITALY ENVIRONMENTAL POLICY:
................................................................................................................................................................. S
ECTION II
................................................................................................................................................................. S
ERVICE DELIVERY SUMMARY
................................................................................................................................................................. S
ECTION III
................................................................................................................................................................. G
OVERNMENT FURNISHED SERVICES
3.1. CONTRACTOR FURNISHED PROPERTY (CFP)
3.2. GOVERNMENT-FURNISHED PROPERTY:
................................................................................................................................................................. S
ECTION IV
................................................................................................................................................................. G
ENERAL INFORMATION
4.1. CONTRACTOR QUALIFICATIONS
4.2. CONTRACTOR PERSONNEL
4.3. QUALITY CONTROL
4.4. QUALITY ASSURANCE
4.5. PHYSICAL SECURITY
4.6. HOURS OF OPERATIONS
4.7. CONSERVATION OF UTILITIES
4.8. RECORDS
................................................................................................................................................................. S
ECTION V
................................................................................................................................................................. T
ECHNICAL EXHIBITS
5.1. GENERAL
5.2 REQUIRED REPORTS
SECTION I
DESCRIPTION OF SERVICES
1. SCOPE OF WORK:
1.1.1 Perform microbiological and chemical analysis of potable water coming from water supply lines, located within the USAG Italy in order to verify conformance with the requirements set forth in Chapter 3 of the Italian Final Governing Standards (IFGS). The services included in this Performance Work Statement shall be accomplished based on Appendices #1 and #2. The Contractor shall collect water samples from the water distribution system at Camp Darby, Supply & Maintenance Area (Depot) and ASA.
1.1.2 Perform chemical analysis of wastewater produced by the wastewater treatment plant located at Supply & Maintenance Area (South Depot) in order to verify conformance with the requirement call for by applicable current Italian regulations and the Italian Final Governing Standard (IFGS).
1.1.3 Perform chemical analysis of solid and/or liquid unknown materials to document their composition, chemical analysis of unknown wastes to be disposed of, chemical analysis of substances that may have been mixed with other unknown chemical substances/wastes, and soil and groundwater samples resulting from activities and investigations performed by USAG Italy, Darby Military Community (DMC)
2. LOCATION OF SERVICES:
Service is located at the USAG Italy DMC: Camp Darby, Supply and Maintenance Area (Depot) and Ammunition Storage Area (ASA)
3. HOURS OF OPERATION:
The Contractor shall work from 0800 1700, Monday through Friday, excluding U.S. and Italian Federal Holidays. The sample drawings points, on the water distribution system and the water tr Representative (COR). Sample points may be changed from time to time, depending on operation requirements.
4. GENERAL CONTRACT SERVICES: The Contractor shall accomplish the following in conjunction with the specific contract services detailed herein:
a. Contractor shall report immediately any serious incident (e.g. accidents, abuse of Government property) to the COR.
b. This contract will be performed in Government buildings and structures. All buildings will be occupied during the performance of work, therefore the Contractor might accomplish the work within the hours previously coordinated and programmed with COR.
1.4.1. ANTITERRORISM/OPERATIONS SECURITY:
a. AT Level I Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas will complete AT Level I awareness training within 30 calendar days after the contract start-date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, prior to issuance of Installation Access Passes. AT Level I awareness training is available online at https://atlevel1.dtic.mil/at.
b. Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractor employees will comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The contractor will also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
c. iWATCH/iSALUTE Training. The contractor and all associated subcontractors will brief all employees on the local iWATCH/iSALUTE program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training will be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR.
d. Contractor Employees Who Require Access to Government Information Systems. All contractor employees with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete DOD information assurance awareness training before access to the information system and then annually thereafter.
e. OPSEC Training. According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.
1.4.2. ABSENSES:
If the contractor is unable to perform services, they must notify the absence at least three days in advance to the contracting officer representative (COR) and coordinate with the COR on a new schedule for the sampling campaign. In case of emergencies or unforeseen absences, the contractor must notify the COR as soon as possible and only in this case, the contractor may sub-contract out part of these services.
1.4.3. KICK-OFF MEETING:
Prior to the start of work, a Kick-off meeting shall be held. The Contractor shall provide a proposed activity schedule that covers the work at the Garrison and explains the intended approach in executing the contract, provide a list of personnel to be involved in the contract work, provide any additional information which the Contractor feels may be helpful in initiating the effort, and provide meeting minutes. Point of contact for the necessary organizations and offices shall be invited by the Contractor to the Kick-off Meeting where the Contractor shall present an overview of the process.
5. SPECIFIC TASKS:
Contractor shall provide the following specific tasks:
1.5.1. POTABLE WATER
Contractor shall draw and analyze all the parameters as strictly described in this PWS and in Appendices # 1 and # 2. The Contractor shall provide the Contracting Officer Representative (COR) with all the tests results via email, on the same day the analytical results have been completed, showing all analysis results and highlighting all results that exceed the limited established by the mentioned laws. In addition, all analytical results shall be available after 24 hours for Total Coliforms and E. Coli, and after 48/72 hours for Fecal Streptococcus and Colonies computations, and after 15 days for chemical analysis. The original signed analysis report copy shall be delivered to the contract COR office no later than 15 working days from the sampling day.
Reference CDRL 0001 under exhibit 5.2 of this PWS
1.5.1.1. SAMPLE DRAWING PROCEDURES:
Drawing of samples shall be performed in strict accordance with methods indicated by Chapter 3 of the IFGS. The sampling locations are indicated in Appendix #1.
1.5.1.2. PARAMETERS TO BE CHECKED:
The parameters to be checked are listed in paragraph 1.5.1.5./Appendix # 2.
1.5.1.3. TESTING FREQUENCY:
The sampling frequency shall follow the schedule in Appendix #1.
1.5.1.4. ANALYSIS METHODS:
All analytical methods shall be performed in strict accordance with Chapter 3 of the IFGS (Appendix #3). All analyses shall be performed by an ACCREDIA laboratory that is authorized for the parameter being analyzed (see section 1.5.1.5/Appendix # 2).
1.5.1.5. ANALYTICAL PARAMETERS:
This contract requires seven (7) Test Types (TT). Test Type combinations allow for the required biological and chemical parameter sampling. In addition, call-back control sampling (see paragraphs 1.7.4, 1.7.5) is required in accordance with I-FGS 2012, rev. 2, 2015, for parameters resulting in noncompliance. Test Types descriptions (see Appendix #2), are briefly listed below:
Test Type 1 (TT1): Total coliform; Chlorine and Chloramines (on site and laboratory analysis);
Test Type 2 (TT2): E-coli, turbidity, aluminum, ammonium, electrical conductivity, pH, iron, nitrite, nitrate, total nitrite and nitrate, sodium hypochlorite (residual disinfectant) Test Type 3 (TT3): total trihalomethane, chloroform, dichlorobromomethane, dibromochloromethane, bromoform, haloacetic acid;
Test Type 4 (TT4): fecal streptococci (enterococci), agar colony count at 36 oC, agar colony count at 22 oC, sulfide-reducing bacteria, clostridium perfringensis, antimony, arsenic, boron, bromate, cadmium, chlorides, chlorite, cromium, cyanide, dry residues, fluoride, manganese, mercury, nickel, oxidability, selenium, sodium, sulfates, total hardness, vanadium, copper, lead;
Test Type 5 (TT5): Barium, Beryllium, Thallium, Polycyclic aromatic hydrocarbons (summ of benzo [b] fluoranthene, benzo [k] fluoranthene, benzo [ghi] perylene, ideno [1,2,3-cd] pyrene), Benzene, Carbon tetrachloride (Tetrachloromethane), o- Dichlorobenzene (1,2-Dichlorobenzene), cis-1,2-Dicloroethylene (cis-1,2-Dicloroethene), trans-1,2-Dicloroethylene (trans-1,2-Dicloroethene), 1,1-Dicloroethylene (1,1- Dicloroethene), 1,1,1-trichloroethane, 1,2-Dichloroethane, Dichloromethane, 1,1,2- Trichloroethane, 1,2,4-trichloro-benzene, 1,2-dichloropropane, Ethylbenzene, Monochlorobenzene (Chlorobenzene), para-Dichlorobenzene (1,4-Dichlorobenzene), Styrene, Tetrachloroethylene (Tetrachloroethene), Trichloroethylene (Trichloroethene), Toluene, Vinil chloride, Xylene (total), pesticides, total pesticides, aldrin, dieldrin, alachlor, aldicarb, aldicarb sulfone, aldicarb sulfoxide, atrazine, carbofuran,chlordane, dalapon, 2,4-D, 1,2-Dibromo-3-chloropropane (DBCP), Di (2-ethylhexyl) adipate, Di (2-ethylhexyl) phthalate, Dinoseb, Diquat, Endrin, Endothall, Ethylene dibromide (EDB) (1,2-Dibromoethane, Glyphosphate, Heptachlor, Heptachlorepoxide, Hexachlorobenzene, Hexachlorocyclopentadiene, Lindane, Methoxychlor, Vydate, PCBs (as decachlorobiphenyls), Pentachlorophenolo, Picloram, Simazine, 2,3,7,8-TCDD (Dioxin), Toxaphene, Silvex, Benzo(a)pyrene;
Test Type 6 (TT6): Copper, Lead (N.B.: Samples taken from a 6-8 hours inactive tap);
Test Type 7 (TT7): Asbestos.
1.5.1.6. NUMBER OF ANALYSIS:
The number of analysis and sampling frequency shall be performed in accordance with Appendix #1, and shall follow the contract duration as follow:
Test Type 1: base year: 24; 1st option year: 24; 2nd option year: 24, 3rd option year: 24, 4th option year: 24; total number of 120 Test Type 2: base year: 9; 1st option year: 9; 2nd option year: 9, 3rd option year: 9, 4th option year: 9; total number of 45 Test Type 3: base year: 1; 1st option year: 1; 2nd option year: 1, 3rd option year: 1, 4th option year: 1; total number of 5 Test Type 4: base year: 3; 1st option year: 3; 2nd option year: 3, 3rd option year: 3, 4th option year: 3; total number of 15 Test Type 5: base year: 1; 1st option year: 0; 2nd option year: 0, 3rd option year: 1, 4th option year: 0; total number of 2 Test Type 6: base year: 10; 1st option year: 0; 2nd option year: 0, 3rd option year: 10, 4th option year: 0; total number of 20 Test Type 7: base year: 1; 1st option year: 0; 2nd option year: 0, 3rd option year: 0, 4th option year: 0; total number of 1
NOTE: The Contractor is required to provide the COR with sampling dates no later than 15 days prior to sampling activities.
1.5.1.7. ANALYSIS RESULTS:
The Contractor shall provide the COR with all tests results on the same day that the analytical results have been completed, highlighting any parameters that are not in compliance with the referenced legal requirements. Draft results reports will be provided by email. If microbiological
Valori di parametro .S. MCL (Maximum Contaminant Level), the contractor shall immediately notify the COR by email and telephone. Analytical results shall be available within 24 hours for Total Coliforms and E. Coli; within 48/72 hours for Fecal Streptococcus and Colonies computations; and within 15 calendar days for chemical analysis. The original signed analysis report copy shall be delivered to the contract COR office no later than 15 working days from the sampling period. The original signed copy, and the excel spreadsheet, shall contain the following information:
1. Contract Number
2. Sampling location, date, and time;
3. Sample Identification;
4. Registration date;
5. Analysis starting date;
6. Individual responsible for performing the samples drawing;
7. Laboratory and individual responsible for performing the analysis;
8. Analytical method used;
9. Valori di parametro unit of measure for the concentration of the analytic in water).
1.5.2. WASTE WATER
The Contractor shall forward electronically and digitally signed to the COR the analysis results within 10 working days from the date on which the samples were drawn. In the case the results do not comply with the allowed limits, the Contractor shall notify the COR
Reference CDRL 0003 under exhibit 5.2 of this PWS
1.5.2.1 SAMPLE DRAWING AND ANALYSIS PROCEDURE
In case of a sampling request in response to an emergency, the sampling shall be performed within 8 hours from the COR s request, and analytical results shall be transmitted by FAX or electronic means within 48 hours of sample collection.
1.5.2.2 TOTAL ANALYSIS
The Contractor shall perform sampling and analysis once a month for the parameters listed in Appendix 3, Attachment 5, Table 3, of the D.Lgs. 152/06 and table 4.1, Section 4, IFGS 2012, rev.
2, 2015:
DESCRIPTION ANALYSIS TOTAL NO. OF SAMPLES
Total Waste Water Analysis pH
24 In (equalization basin) and Out Wastewater Treatment Plant Supply and Maintenance Area (Depot)
12 Additional sampling upon request between: IN (Equalization basin), MID (Oxidation basin) and
OUT
SAR (Sodium adsorption Ratio) Temperature Color Odor Suspended Solids Coarse Material
BOD 5
COD
Aluminum Arsenic Barium Boron Beryllium Chromium Chromium VI Cadmium Total Chromium Iron Manganese Mercury Nickel Lead Copper Selenium Tin Vanadium Zinc Total Cyanides Activated Free Chlorine Sulphide Sulphite Sulphate Chlorides Fluorides Total Phosphorus Total Nitrogen Ammonium Nitrogen Nitrous Nitrogen Nitric Nitrogen Nitrites Nitrates Total Greasy and Oily substances Total Hydrocarbons Total Phenols Total Aldeides Total Aromatic Organic Solvents Total Nitrogenous Organic Solvents Tot Surface active agents (MBAS + non-ionic) Phosphorated Pesticides Total Pesticides (phosphorated excluded) Aldrin Dieldrin Endrin Isodrin Chlorinated Solvents Escherichia Coli
Acute Toxicity Test Daphnia Magna Activated Sludge Concentration IN and MID only
1.5.2.3 SAMPLE DRAWING PROCEDURES:
The Contractor shall draw samples from each sampling point, in accordance with the requirements set forth: D.Lgs 152/06 and subsequent modifications and implementations; the Regional Law No.
20 dated 31 May 2006 and subsequent changes and/or implementations; IFGS 2012, Chapter 4;
and as specified in the Wastewater Discharge permit # 3131 dated 07 September 2015 provided for reference. A new permit will be forwarded as soon as received.
1.5.2.4 ANALYSIS RESULTS:
The Contractor shall forward the analyses results to the COR within 10 working days from the date on which the samples were taken.
In the case that the results do not comply with the allowed limits, the Contractor shall notify the COR
1.5.2.5 ADDITIONAL SAMPLING:
Additional samples are available in the contract to re-sample if the laboratory results do not comply with allowed limits or to sample the water of MID basin (Oxidation) if requested, as follow:
- 12 samples for Base year and 1st option year
- 4 samples for 2nd, 3rd and 4th options year).
Reference CDRL 0004 under exhibit 5.2 of this PWS
1.5.2.6 QUARTERLY ANALYSIS SUMMARY REPORT:
The Contractor shall electronically forward quarterly, separate reports in both English and Italian, on the operational conditions of each plant, the characteristics of the sampling points (e.g.
treatment plant name, location, etc.), the wastewater analysis results from the monthly sampling events highlighting the parameters that do not comply with the requirements of aforementioned laws. In addition, the report shall include the printed version of the database (see Section 1.5.2.7.
Database).
Reference CDRL 0005 under exhibit 5.2 of this PWS
1.5.2.7 :
The Contractor shall furnish, on a quarterly basis, an updated database in the Excel format with the following data:
- Treatment Plant name and location
- Reference number - D.Lgs 152/06, Appendix 3, Attachment 5, Table 3
- Tested analyte
- Reference limit value (set by the D.Lgs. 152/06, any regional Law, and IFGS 2012)
- Month, date, and time of tests
- Values found in effluent
- Values found in influent
- Any kind of unconformity noticed during the sampling (e.g., oily sheen in the water, unusual colors and/or odors
Test results exceeding the admissible limits shall be highlighted.
Reference CDRL 0006 under exhibit 5.2 of this PWS
1.5.3. UNKNOWN WASTE AND MATERIALS
Reference CDRL 0007 under exhibit 5.2 of this PWS
1.5.3.1 CHEMICAL ANALYSIS
Material samples will be collected from any material/waste within the USAG Italy, DMC as requested by the COR. The Contractor shall also conduct chemical analysis of any groundwater and/or soil samples resulting from subsurface soil and/or groundwater investigation activities when requested. The sampling shall be performed within 24 hours from the COR s request. The Contractor shall provide the COR with the analytical report within 10 working days of the sample collection date. In case of a sampling request in response to an emergency, the sampling shall be performed within 8 hours from the COR s request, and analytical results shall be electronically transmitted within 48 hours of sample collection. The set of chemical analyses to be performed shall comply with the summary shown at Paragraph 1.5.3.2. If the substance to be analyzed is deemed was by the COR, the analysis shall be completed with the waste classification in accordance with, as base line, the Italian Legislative Decree No. 152, dated April 2006, and subsequent changes and/or implementations. For this reasons, the Contractor the tests required by the Italian Law valid for the classification and the consequent delivery of the waste to the appropriate landfill. The final report shall also include the European Waste Code; the Italian Waste Code, in the event it is different from the European Waste Code; the UN number; and the ADR classification.
1.5.3.2 CHEMICAL ANALYSIS SUMMARY
DESCRIPTION OF MATERIAL ANALYSIS (Minimum)
Asbestos Released fibers
Unknown SOLID Substances and Contaminated Soil
Specific Weight Density Organic Chloride Solvents Polycyclic Aromatic Hydrocarbons (PAHs) Benzene Toluene Ethyl benzene Xylenes Organic Solvents Mercury Zinc Cadmium Chromium Chromium VI Copper Lead Metal release test Anions: Nitrate, Fluoride, Sulfate, Chloride Cyanide C.O.D.
Dissolved Organic Carbon (D.O.C.)
Total Dissolved Solids (TDS) pH
DESCRIPTION OF MATERIAL ANALYSIS (Minimum)
Residual at 105 C Total Organic Carbon T.O.C.
Unknown SOLID Substances and Contaminated Soil
Lead
Unknown LIQUID Substances and Contaminated Water p.H.
Percent Oil After Centrifuge Chlorides Phenols Aromatic Hydrocarbons Organic Chloride Solvents Polycyclic Aromatic Hydrocarbons (PAHs) Benzene Toluene Ethyl benzene Xylenes Organic Solvents Mercury Zinc Cadmium Chromium Chromium VI Iron Copper Lead Arsenic Manganese Nitric Nitrogen (NO3) Nitrous Nitrogen (NO2) Ammonia (NH4) Total Cyanides Total Phosphates (PO4) Total Sulfates (SO3) Pesticides Residual at 105 C and 600 C Tecnoactives MBAS
Unknown Liquid, Oil and Lubricants Substances
PCB (Policlorobifenili)
Unknown SOLID and LIQUID Substances POPs (Persistent Organic Pollutant
1.5.3.3. MONTHLY REPORT:
Every month and always before submitting an invoice, the Contractor shall submit, via email, a report in Excel format that includes the following information:
a. Date of sampling
b. Location
c. Number of samples taken and reference number d. Analysis certificate number
e. Number of samples analyzed during the reporting period by CLIN
f. Cumulative number of samples analyzed by CLIN Report shall be submitted no later than the 5 days after the end of the month subject of the report.
Reference CDRL 0008 under exhibit 5.2 of this PWS
1.6. CONDUCT:
Wear a name tag (provided at Contractor cost) identifying her/himself as a Contractor, and ensure that in all correspondence the Contractor identifies her/himself as a Contractor in accordance with D.Lgs Nr. 81/9 April 2008, ART 20 par. 3.
1.7. PAYMENT:
The Contractor will submit invoices to the COR, through WAWF Portal, who will certify that the services were provided and submit the invoice to the Finance Office for payment.
1.8. SAFETY:
The Contractor shall be aware of local safety requirements and ensure that all reasonable efforts are made to protect all persons from harm and U.S. Government property from damage.
For compliance with the Italian Legislative Decree 81/2008 in particular article 26 the Contractor shall develop the final DUVRI and shall submit the Safety Operational Plan.
Reference CDRL 0009 under exhibit 5.2 of this PWS
1.9. CONTRACTOR MANPOWER REPORTING (CLIN 7500-7501-7502-7053-7504):
The Contractor is responsible for providing input into the CMR system in accordance with the information provided herein. The Contractor is required to report all Contractor manpower required for the performance of this contract. The Contractor is required to completely fill in all the required fields in the reporting system using the following web address:
https://www.ecmra.mil/. The requiring activity will assist the Contractor with the reporting requirement as necessary. The Contractor may enter reports at any time during the reporting period, which is defined as the period of performance not to exceed 12 months ending 30 September of each Government fiscal year. Reporting must be completed no later than 31 Oct for every year or part of a year for which the contract is in place. Failure to comply with this reporting requirement will result in contract termination. Contractor shall notify the COR in writing on the last business day of October of each year with status of the CMR compliance or non-compliance via E-mail.
Reference CDRL 0010 under exhibit 5.2 of this PWS
1.10. USAG ITALY ENVIRONMENTAL POLICY:
SECTION II
SERVICE DELIVERY SUMMARY
REQUIRED SERVICE PWS PERFORMANCE STANDARD
PERFORMANCE
COMPLIANCE
Description of Services. 1.1 1.4
Perform the services as described in the PWS
100% of PWS requirements in accordance with contract terms
Sampling and Analysis of Potable Water
1.5.1.
Performance the sampling and analysis as described in the PWS
100% of PWS requirements in accordance with all applicable laws and standard
Sampling and Analysis of Waste Water 1.5.2
100% of PWS requirements in accordance with all applicable laws and standard
Sampling and Analysis of unknown waste and materials
1.5.3
100% of PWS requirements in accordance with all applicable laws and standard
Contract Manpower Reporting (CMR) 1.9
100% entry of Contractor man hours by required due date
100% of the report submitted on time
Final DUVRI and submit Safety Operational Plan (POS)
1.10
Provide and follow the required documents in compliance with Safety Laws and Safety Officer
100% of the time the Contractor complies with the Safety Documents
Quality Control Plan (QCP) 4.3
Meets PWS requirements and follows QC Plan
100% of the time the Contractor complies with the Safety Documents
CDRL Submissions - Data provided meets requirements of timeliness, accuracy and its complete.
Technical Exhibit 5.2
IAW Technical Exhibit 5.2 100% of the time the data, results and reports are submitted on time and with correct information
SECTION III
GOVERNMENT FURNISHED SERVICES
3.1. CONTRACTOR FURNISHED PROPERTY (CFP).
The Contractor shall provide her/his own transportation and all necessary equipment to fulfill this contract. Supplies not available through Government channels will be purchased by the Contractor at its expenses. The Government will not be responsible in any way for damages to the accident, natural disaster, or other events.
3.2. GOVERNMENT-FURNISHED PROPERTY:
The contractor will not be required to reimburse the Government for the cost of the following services. Notwithstanding the services listed below, the contractor shall perform all tasks identified in this contract.
3.2.1. Government-Furnished Utilities. Including electricity and water.
3.2.2. Security Police and Fire Protection.
3.2.3. Facilities. The Government shall provide or make available to the contractor the facility described on this PWS.
SECTION IV
GENERAL INFORMATION
4.1. CONTRACTOR QUALIFICATIONS.
The contractor shall provide qualified personnel, equipment and supervision necessary to perform the service called by these specifications. The Contractor shall provide proper documentation demonstrating their expertise and ex The Contractor shall provide proper documentation providing that the laboratory complies with
4.1.1. The Contractor shall be certified in accordance with ACCREDIA credit registration as follows:
POTABLE WATER more than 90% of all parameters to be analyzed WASTE WATER more than 70% of all parameters to be analyzed WASTE MATERIALS more than 50% of all parameters to be analyzed
4.2. CONTRACTOR PERSONNEL.
The contractor shall not employ any person for work under this contract if such person is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. In the event it becomes necessary to replace any contract personnel for any of the above reasons, the contractor shall not be reimbursed for costs associated with such removal including the costs for replacement of any personnel so removed. The contractor shall inform the COR in writing within 5 working days of any incidents of misconduct by their employees that violate laws of the USA or the Host Nation.
4.2.2. The contractor shall be responsible for obtaining any necessary licenses and permits to comply with any applicable U.S. and host nation laws, codes, and regulations. The contractor shall ensure that employees have current and valid professional certifications before starting work as required in this PWS. The contractor shall ensure all employees driving on base are required to hygiene and a neat, professional appearance while in the performance of their duties. The the company or by wearing appropriate badges, which contain the company name and employee name.
4.2.3. ll contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials, unless, in the judgment of the agency, no harm can come from failing to identify themselves. They must also ensure that all documents or reports produced by contractors are suitably marked as
4.3. QUALITY CONTROL.
The contractor shall provide a Quality Control Plan. This plan shall describe in detail the no later than 10 calendar days after contract start. The plan shall become a compliance document after review and acceptance by the Contracting Officer.
The Quality Control Plan will include the following as a minimum:
(a) Procedures covering key control;
(b) Procedures covering the tests certificate and its format.
Reference CDRL 0011 under exhibit 5.2 of this PWS
4.4. QUALITY ASSURANCE.
4.4.1.
-4 -- Contract Terms and Conditions --
4.4.2. Inspections/Evaluations/Reviews By Other Than COR. The contractor shall permit Department of Defense inspection visits, COR team visits, host base visits, other required functional reviews, evaluations or inspections as required by the Government, to include Army Head Quarters Europe, Defense Information Systems Agency, General Accounting Office or other Government agencies. The inspection teams may make unannounced visits and shall be provided unescorted access to facilities and equipment. The contractor will be given the purpose of the visit and copies of any reports created. The contractor shall take necessary actions and coordinate with the Government to resolve any discrepancies found as part of these inspections
4.5. PHYSICAL SECURITY.
The Contractor shall be responsible for safeguarding and protecting all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured. The Contractor shall immediately report to the COR any occurrences of lost or duplicated keys. In the event that keys are lost or duplicated, the Contractor shall be required, upon direction of the COR, to re-key or replace the affected lock(s) without cost to the Government
4.6. HOURS OF OPERATIONS
4.6.1. NORMAL HOURS. The contractor shall perform the services required under this contract during the following hours: Monday through Friday, 0800 1700 hours
4.6.2.
4.6.2.1. Work shall not be performed on U.S. or Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. Holiday occurs on a Saturday or a Sunday, the Holiday is observed on the preceding Friday or following Monday, respectively.
4.6.2.2. U.S. Holidays:
Name of U.S. Holiday Date
January 1
Martin Luther King, Jr. Day 3rd Monday of January
3rd Monday of February
Memorial Day Last Monday of May
Independence Day July 4
Labor Day 1st Monday of September
Columbus Day 2nd Monday of October
November 11
Thanksgiving 4th Thursday of November
Christmas Day December 15
4.6.2.3. Host Nation Holidays
English Name of Host Nation Holiday
Italian Name Holiday Date
Capodanno January 1
Epiphany Day Epifania January 6
Easter Monday Pasquetta Monday after Easter
Liberation Day Festa della Liberazione April 25
Labor Day Festa del Lavoro May 1
Local Public Holiday* Saint Giulia May 22
Republic Day Festa della Repubblica June 2
Local Public Holiday* Saint Ranieri June 17
Ferragosto / Assumption Day Ferragosto and Assunta August 15
Tutti i santi (or Ognissanti)
November 1
Immaculate Conception Day Immacolata Concezione December 8
Christmas Day Natale December 25
Santo Stefano December 26
4.7. CONSERVATION OF UTILITIES.
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions, which preclude all waste of utilities
4.8. RECORDS.
4.8.1. The Contractor shall be responsible for creating, maintaining, and disposing of only those Government required records that are specifically cited in this PWS or those required by the provisions of a mandatory directive listed in Technical Exhibit 5.2. If requested by the Government, the Contractor shall provide the original record or a reproducible copy of any such record within 5 working days of receipt of the request.
4.8.2. Records Management Documentation created or received by the contractor in performance of this contract are considered Government records, and the contractor shall be responsible for their maintenance
SECTION V
TECHNICAL EXHIBITS
5.1. GENERAL.
Publications and forms applicable to the PWS are listed below. The publications and forms have been coded as mandatory (M) or advisory (A).
NUMBER TITLE M OR A APPLICABLE
Italian Final Governing Standards (IFGS), Chapter # 3
Drinking Water M All
Final Governing Standard (IFGS) for Italy, Chapter # 4
Waste Water
M All
Italian Legislative Decree # 152 dated 3 Apr 2006
Testo Unico Ambientale M All
Italian Legislative Decree # 4 dated January 2008
Ulteriori disposizioni integrative e correttive del decreto legislativo 3 aprile 2006, n.152, recante norme in materia ambientale.
M All
Italian Legislative Decree # 81 dated 9 April 2008
Testo Unico Sicurezza sul Lavoro 81/08
Tuscany
Norme per la tutela delle acque dall'inquinamento
These directives are considered as basic and establish minimum requirements. They are not to be considered all-inclusive. References made to additional directives in the basic or supplements, will also be considered as part of the PWS. The contractor is encouraged to maintain additional technical and administrative publications as necessary.
5.2 REQUIRED REPORTS
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Sampling and Analysis of Potable Water
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
1.5.1.1., 1.5.1.2., 1.5.1.3., 1.5.1.4., .1.5.1.5., 1.5.1.6., 1.5.1.7.
6. REQUIRING OFFICE
DPW ED- COR
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
As described in Appendix #1
12. DATE OF FIRST SUBMISSION
15 days from Authorization to proceed
14. DISTRIBUTION
Reserved
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
COR
b. COPIES
Draft Final
Reg Repro
16. REMARKS
The Contractor shall draw and analyze all the parameters as strictly described in this PWS, Appendices # 1, and # 2. The Contractor shall provide the Contracting Officer Representative (COR) with all the tests results, via email, the same day that the analytical results have been completed, showing all analysis results highlighting all results that exceed the limited established by the mentioned laws. . In addition, all analytical results shall be available after 24 hours for Total Coliforms and E. Coli, and after 48/72 hours for Fecal Streptococcus and Colonies computations, and after 15 days for chemical analysis. The original signed analysis report copy shall be delivered to the contract COR office no later than 15 working days from the sampling day
Base Year 49 49
15. TOTAL (Base Year)
DD FORM 1423, AUG 96
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
Sampling and Analysis of Waste Water
1.5.2.1., 1.5.2.2., 1.5.2.3., 1.5.2.4., .1.5.2.5.
DPW ED - COR
NO
Monthly
12. DATE OF FIRST SUBMISSION
On the same day that the analytical results have been completed
Draft Final
Reg Repro
16. REMARKS
The Contractor shall forward electronically and digitally signed to the COR, the analysis results within 10 working days from the date on which the samples were drawn. In the case that the results do not comply with the allowed limits, the Contractor shall notify the COR
Base plus four year options 24 24
15. TOTAL
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO.
ADDITIONAL SAMPLING OF WASTE WATER
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
1.5.2.5
WHEN REQUIRED
RESERVED
Draft
Final
Reg Repro
16. REMARKS
Additional samples are available in the contract to re-sample if the laboratory results do not comply with allowed limits or to sample the water of MID basin (Oxidation) if requested
Base year 12 12
4 year options 4 4
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
QUARTERLY ANALYSIS SUMMARY REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
1.5.2.6.
6. REQUIRING OFFICE
DPW ED - COR
7. DD 250 REQ
NO
QUARTERLY
100 calendar days from Authorization to proceed
SUBMISSION
N/A
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
The Contractor shall electronically forward the quarterly reports to the COR, in both English and Italian on the operational condition of each plant, the characteristics of the sampling points (e.g. treatment plant name, location, etc.), wastewater analysis results for monthly sampling events on a quarterly basis.
Base year + 4 year options 8 8 0
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
DATABASE
1.5.2.7.
NO
QUARTERLY
100 calendar days from Authorization to proceed
15. DISTRIBUTION
b. COPIES
Draft Final
Reg Repro
16. REMARKS:
The Contractor shall furnish electronically, on a quarterly basis, an updated database in the Excel format with information data as listed in the PWS.
Base year + 4 year options 4 4 0
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours…