A22_W912P919R0044_Amend_6.pdf

PDF 128 KB Posted

Attached to
Clarence Cannon Dam Excitation Replacement System Federal contract opportunity
Solicitation number
W912P919R0044
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

About this file

This document contains an amendment to a federal solicitation and answers to pre-proposal questions. The purpose of the amendment is to post the last question from 19 August 2019 and revise the contract specification based on the answers provided. The solicitation is for replacing two excitation systems at the Clarence Cannon Power Plant on Mark Twain Lake in Monroe City, Missouri. The contractor will remove asbestos-containing excitation cubicles and field wiring, properly abate the asbestos, and repair the floor. The contractor must also provide a new digital exciter and power potential transformer for each hydroelectric generating unit, connect new non-segregated bus, replace generator brush and holders, and refurbish collector rings. The main control board must be modified to interface with the new digital excitation systems. The solicitation number is W912P919R0044 and is a best value tradeoff request for proposal issued by the U.S. Army Corps of Engineers St. Louis District. The contract duration is 18 months and the project value is between $1-5 million. The response due date is contained in the solicitation package available on FedBizOpps.

Amendment 0006 to Solicitation W912P919R0044.

View the file

Other files for this federal contract opportunity

Other files attached to Clarence Cannon Dam Excitation Replacement System, newest first.
File Type Posted
Revised_Excitation_Specs.pdf PDF
A22_W912P919R0044_Amend_5.pdf PDF
Unit_2_Test_Report.pdf PDF
Unit_1_Test_Report.pdf PDF
A22_W912P919R0044_Amend_4.pdf PDF
Asbestos_Testing_Report_391609384_001.pdf PDF
Pre-Bid_Sign-In.pdf PDF
A22_W912P919R0044_Amend_3.pdf PDF
20190812_CT_Cabinet_Photos.zip ZIP file
A22_W912P919R0044_Amend_2.pdf PDF
A22_W912P919R0044_Amend_1.pdf PDF
A02_CC_Excitation_Plans.pdf PDF
A02_CC_Excitation_Ref_Drawings.pdf PDF
A22_Sol_W912P919R0044_Clarence_Cannon_Dam_Excitation_Replacement_System.pdf PDF
A02_CC_Excitation_Spec.pdf PDF
A12_Synopsis_19R044.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81C8X91150348

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to post the last question from 19 August 2019. There are no other changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P919R0044

X 9B. DATED (SEE ITEM 11)

25-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Sep-2019

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P919R0044

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

QUESTION & ANSWER NO. 5

Clarence Cannon Power Plant Excitation System Replacement

Pre-proposal Questions 19 Aug 2019

Answers to these questions have resulted in a revised contract specification.

1. Subcontracting Plan Large business, If a Commercial Plan is accepted will only SSR Reporting be necessary or will this contract require ISR Reporting?

This contract will require both the SSR Reporting and the ISR Reporting.

End of Questions and Answer