This is a solicitation for a Single Award Task Order Contract to provide Hazardous, Toxic and Radioactive Waste remedial action services at the Formerly Utilized Sites Remedial Action Program St. Louis Sites. The services include interdisciplinary support for the Formerly Utilized Sites Remedial Action Program and other Hazardous, Toxic and Radioactive Waste remediation programs managed by the U.S. Army Corps of Engineers St. Louis District. The contract will provide for low level radioactive contaminated material investigation, extent of contamination surveys, environmental assessments, on-site laboratory analysis, radiological support, removal action verification, and environmental monitoring at sites in the St. Louis metropolitan area and potentially other locations within the boundaries of the Mississippi Valley Division or as assigned to the St. Louis District. Task orders issued under the contract will be on a cost reimbursement basis. The response date for proposals was May 14, 2019. The solicitation includes details on the requirements, evaluation criteria, and templates for proposals and cost submissions.
W912P919R0020 Solicitation Amendment 4
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P919R0020
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add Questions and Answ ers and to revise the Sample Task Order, Section L & M, and Attachments page. NOTICE: Worksheet A in the Sample Worksheet needs to be created for each Task
1. CONTRACT ID CODE PAGE OF PAGES
U 1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P919R0020
X 9B. DATED (SEE ITEM 11)
08-Apr-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-May-2019
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
TASK ORDER SAMPLE
TASK ORDER DESCRIPTION
Task Order Description
The contractor shall complete the Cost Realism Table and sample worksheets (including direct cost, fringes, material, equipment and other direct costs). The Sample Tasks are for the General Conditions (Project Management/Site Management, Home Office, Construction Support, Engineering During Construction, Radiological Support), Remedial Action and Remedial Design Activities. The Period of Performance for the Sample Task is one year.
Work under this Sample Task Order involves the Hazardous, Toxic, and Radioactive Waste (HTRW) remediation activities managed by the U.S. Army Corps of engineers St. Louis District. The St. Louis FUSRAP Sites contain low-level radiological and non-radiologically contaminated material. The St. Louis Sites are located in the metropolitan St. Louis area in two primary vicinities, the St. Louis Downtown Site (SLDS) and the St. Louis North County Sites (NORCO). Work may be concurrent at multiple locations within these sites. The estimated volumes of remaining contaminated material to be excavated are 5,000 bank cubic yards (SLDS) and 20,000 bank cubic yards (NORCO). Both sites contain a field office compound and load out area that is to be maintained.
General Sample Assumptions:
The contractor shall provide labor, material and equipment for the task order work.
Contractor personnel and qualifications can be found in Section 3.9 of the Statement of Work.
Period of Performance is one (1) year; FTE (52 weeks minus holiday and vacation days) Assume from historical utility costs average NORCO monthly costs for telephone $2,000, sewer - $600 ; electric -
$2,000; trash - $400; water - $600. SLDS average monthly costs for telephone $1,600, sewer - $1,400 ; electric - $2,000; trash - $500; water - $1,000.
Government Furnished Equipment - 1 drill rig (shared between sites) o NORCO – 2 14cy Mack dump trucks, 4000 gal water truck, Caterpillar 323 hydraulic excavator, 1 backhoe, D6 LGP dozer, loader, two GSA vans, five 5 GSA trucks (GSA vehicles used to transport personnel and small equipment) o SLDS – Two 8,000 gal water trucks, Caterpillar 323 hydraulic excavator, backhoe, 2 Caterpillar 950M wheel loaders, 1 vibratory roller, bobcat, 2 GSA vans, 5 trucks and 4 golf cars (GSA vehicles and golf cars are for transporting personnel and small equipment)
Assume other equipment will rented or contractor owned Government Furnished Property o NORCO - modular building complex, break facility, water-water treatment facility and load out pad o SLDS - industrial trailer complex to include break facility, 2 waste-water treatment facilities, and load out pad Cost Plus Fixed
Fee Offeror shall submit detailed worksheets for each Task work breakdown structure (WBS) 01.01.01 Project Management Support NORCO, 01.01.02 Project Management Support SLDS, 01.02.01 Home Office Support NORCO, 01.02.02 Home Office SLDS, 01.03.01 Construction Support NORCO, 01.03.02 Construction Support SLDS, 01.04.01 Engineering During Construction NORCO, , 01.04.02 Engineering During Construction SLDS, 01.05.01 Radiological Support NORCO, 01.05.02 Radiological Support SLDS, 01.05.02, Ballfield RA, 02.02.01 Frost Avenue Sampling,
03.09.02 DT-9 Terminal Railroad Property, 03.08.02 Mallinckrodt Plant 1. The direct labor, subcontracting, material, equipment, indirect overhead, fringes , G&A. The proposal should include the Basis of Estimate and assumptions.
Attachment 3 is a worksheet example but the offeror can submit in their own format.
Task 1 - Project/Site Management Support (General Conditions) - The contractor shall provide field office staff, material and equipment for the overall project management, and field site operations for the NORCO and SLDS project sites. The general support activities include but are not limited to project management, administrative services, quality control, safety, water compliance, scheduling, project accounting and procurement. All computers, software and associated IT equipment must be supplied by the contractor.
01.01.01 Project Management Support NORCO
01.01.02 Project Management Support SLDS
Task 2 - Home Office Support (General Conditions) - The contractor shall provide the personnel and labor necessary for home office support efforts. The level of effort is for management and administrative functions for NORCO and SLDS project sites.
01.02.01 Home Office Support NORCO
01.02.02 Home Office Support SLDS
Task 3 - Construction Support (General Conditions) - Contractor shall provide craft labor, equipment, and supplies necessary to maintain the office complexes at both the St. Louis Airport Site (SLAPS) for NORCO and SLDS. Maintenance items include general site, site entrance gates, craft trailers, storage areas, connex boxes, stored equipment and supplies, load out facility, site erosion control, dust suppression, site security perimeters, grass mowing at NORCO and SLDS (there is 1 acre at SLDS and approximately 8 acres at SLAPS), management of surface water and water pumping to the Metropolitan Sewer District (MSD). Crew staff labor hours for period of performance is one (1) year. The contractor must provide all lawn mowers and weed eaters. The contractor is responsible for loading approximately 25 railcars per month at NORCO and approximately 15 railcars per month at SLDS. Contractor is responsible for manifesting each railcar. Another contractor is responsible for providing railcars and lids. The remediation contractor is only responsible for loading the railcars. The GFE loaders are sufficient to remove and place the lids on the railcars. Transportation and disposal will be performed by others.
The contractor is responsible for supplying all equipment and supplies to maintain both office complexes. Task 3 should contain the minimum amount of craft labor required for each location. However, if the contractor feels that additional support is necessary for Tasks 6-9, they may add additional support. Assume $4,000 per month at each site for FOGM.
01.03.01 Construction Support NORCO
01.03.02 Construction Support SLDS
Task 4 - Engineering During Construction (General Conditions) - Contractor shall provide field engineering, CADD support, GTS support, and supervision to support design efforts. Contractor shall develop written documentation and remedial action work plans for the remediation efforts. Deliverable items at a minimum include; Pre-Design Investigation Work Plans, Pre- Design Investigation Reports, Remedial Action Work Plans, Remedial Action Summary Reports, and Field Work Variances.
Daily Quality Control Reports are required under this task. Assume 2 reports completed for SLDS and 2 reports for NORCO.
The government issues Rev. A, Rev. B, and Rev. 0 reports.
Assume the following personnel at a minimum (NORCO): Civil Design Engineer, Field Engineer, Geologist, CADD Operator, GIS Technician, and Surveyor.
Assume the following personnel at a minimum (SLDS): Civil Design Engineer, Field Engineer, Geologist, CADD
Operator, GIS Technician, and Surveyor.
01.04.01 Engineering During Construction Support NORCO
01.04.02 Engineering During Construction Support SLDS
Task 5 - Radiological Support (General Conditions) - Contractor shall oversee all radiological work and provide direction to project workers to ensure compliance with regulatory and programmatic requirements. Prepare Radiation Work Permits that prescribe the requirements for personal protective equipment (PPE), dosimetry, air sampling and radiological work practices. Conduct gamma walkover surveys during excavation, collect screening and final status survey soil samples, perform data reduction, and prepare data reports and related documentation using the GPS/GIS equipment and software.
Provide all necessary PPE and safety monitoring equipment, supplies and calibration. Task 5 should contain the minimum amount of radiological support and supplies required for each location. However, if the contractor feels that additional support is necessary for Tasks 6-9, they may add additional support and supplies.
01.05.01 Radiological Support NORCO
01.05.02 Radiological Support SLDS
Task 6 - NORCO Ballfields Phase 3 Remedial Action - Provide the necessary labor, equipment and materials to excavate approximately 20,000 bank cubic yards of contaminated soils, backfill and restore to previous condition. Of the 20,000, approximately 5,000 bank cubic yards could potentially be clean overburden to be removed, stockpiled and used as backfill.
The excavation does not extend below groundwater. Assume clay soil material for the 5,000 CY. Backfill in the ballfields does not require 95% compaction. The average excavation depth is six (6) feet. Work should include site mobilization and setup of the controlled area. The utilities have been cleared and haul roads have been established. The contaminated material should be hauled to the load out rail spur across McDonnell Boulevard from the remediation area. Backfill with clean stockpile of existing material onsite. Restore approximately 10 acres of disturbed area with seed and mulch.
02.06.01 TA-9 Ballfields Phase 3 Remedial Action
Task 7 - Pre Design Investigation (PDI) Sampling at Frost Avenue - Based on the criteria a total of 128 sample locations will be drilled. Drill rig is supplied as Government Furnished Equipment. Assume all samples will be drilled to a depth of six (6) feet below ground surface. Collection of samples will begin below any cover material. MARSSIM Systematic Class 2 grid sample locations shall be applied to the 13,367 square meter area. Assume sample density of 1 sample per 120 square meters.
All sampling on Frost Avenue will require the use of a lane drop and flagmen for traffic control purposes. Assume 4 samples will be collected from each location.
02.07.01 PDI Sampling Frost Avenue
Task 8 - Mallinckrodt Plant 1 Bldg 6,7,8 Areas - this location includes buildings that will be demolished in the future. The remedial contractor will not be responsible for building demolition. Assume remediation depth to 8ft under the building footprint.
Building dimensions are 82 ft. by 167 ft. The estimated quantity of contaminated soil for removal is approximately 4,000 cubic yards. Assume sheetpile with bracing on all four sides of the excavation. Assume PZ-27 40' long sheets. Ground elevation approximately SLDS418' and bedrock is 380-385'. All sheets will be driven to bedrock by a vibratory sheetpile driver. Assume a crane is used to lift sheets into place Haul distance to load-out approximately 0.25 miles with Government Furnished haul trucks. Backfill with 1 inch minus, ungraded limestone. The bracing will be removed as the excavation is backfilled. The sheetpile will be decontaminated and left in place. The above ground portion shall be torch cut and disposed offsite. There are two (2) GFE dump trucks available at SLDS.
03.08.02 Mallinckrodt Plant 1 Bldg 6, 7, 8
Task 9 - DT-9 Terminal Railroad Property (Lange-Stegmann railspur) - Assume remediation to 2 feet depth, surface area is approximately 14,500 square feet. Estimated quantity of contaminated soil for removal is approximately 1,000 cubic yards. Haul distance to load-out approximately 0.25 miles with Government Furnished haul trucks. There is an existing railspur on this property. It will require removal of current rails and replacement with the rails that were removed. The excavation is to be backfilled with one inch minus gravel provided by the contractor. Assume 95% compaction requirements. There are two (2) GFE dump trucks available at SLDS.
03.09.02 DT-9 Terminal Railroad Property RA
COST REIMBURSEMENT TYPE TASK ORDERS FORM
Cost Reimbursement Type Task Orders will be issued against this contract and will be for allowable incurred costs for best effort on the part of the contractor. The contractor will use DCAA/DCMA approved forward pricing rates or Certified Public Accountant (CPA) established cost pools in accordance with FAR Part 31 for Year 1 for Overhead, G&A, and other indirect costs. Fee will be negotiated on individual cost reimbursable task orders issued. Contractor shall have an accounting system that is in compliance with FAR Part 30, Cost and Accounting Standards Administration, if applicable and in compliance with Generally Accepted Accounting Principles (GAAP). Finally, the contractor will provide a cap for Overhead, G&A and other indirect cost for Years 1, 2 and 3 as shown below, which will be incorporated into their Contract Management Procedures. The contractor’s Contract Management Procedures shall include standard operating procedures to cover detailed actions relating to cost reimbursement contract work with the Government. The contractor will submit a new Federal/State audit to establish new Forward Pricing Rates and New Caps for Year 2 through 5. The contractor shall have the ability to support cost reimbursable task orders (i.e., an acceptable cost tracking system and adequate purchasing system). The government reserves the right to request a DCAA Audit prior to award. Additionally, each cost reimbursable task order issued will be subject to DCAA Audit. Prices will be based on the following list, which will be included in the RFP as Section L.
Year 1 Cap Home Office Overhead Total overhead components (fringes, overhead, and G&A) will be capped at ______% of [ ] total cost or [ ] direct labor costs. (Check appropriate box) A ceiling for G&A for Other Direct Costs (ODCs) is ____%. This includes all other markups other than Facilities Capital Cost of Money (FCCM)
Field Office Overhead Total overhead components (fringes, overhead, and G&A) will be capped at ______% of [ ] total cost or [ ] direct labor costs. (Check appropriate box) A ceiling for G&A for Other Direct Costs (ODCs) is ____%. This includes all other markups other than FCCM
The contract will have a base performance period of one year with four option periods of (1) year or until the capacity amount is reached, whichever occurs first.
Offerors are cautioned against submitting an unbalanced offer. The government will analyze each offer to determine whether they are unbalanced with respect to prices or separately priced line items. Offers that are determined to be materially unbalanced may be rejected. An offer is mathematically unbalanced if it is based on prices which are significantly less than the cost for some contract line items and significantly overstated in relation to costs for others. In addition, an offer is materially unbalanced if it is mathematically unbalanced and there is a reasonable doubt that the offer would result in the lowest overall cost to the government, even though it is the lowest evaluated offer.
Applicable Department of Labor Wage Rates (FAR 52.222-41) and Statement of Equivalent Rates for Federal Hires (FAR 52.222-42) will be included at the individual task order level.
The amount to be paid to the contractor for each task order shall be based on the hourly rate for labor disciplines listed in the Hourly Labor Rates table shown below. All hourly rates shall include Overhead, General/Administrative, Labor Burden Fringes, or other costs and shall be exclusive of profit/fee. The labor rates provided by the Offeror, and determined fair and reasonable by the government, will be binding on the basic contract and will be the maximum rates at the task order level. Solicitations shall advise offerors that rates lower than the maximum contract rates may be offered at the task order level.
DISCIPLINE BASE
HOURLY
RATE
FULLY
LOADED
HRLY RATE
Base Period Year 1
FULLY
LOADED
HRLY RATE
Option Period Year 2
FULLY
LOADED
HRLY RATE
Option Period Year 3
FULLY
LOADED
HRLY RATE
Option Period Year 4
FULLY
LOADED
HRLY RATE
Option Period Year 5
Program Manager Project Manager Quality Control Supv.
Quality Control Tech Site Safety and Health Officer
Payroll Clerk Civil Engineer, Sr.
Civil Engineer Civil Engineer, Jr.
Cert. Health Physicist Health Physics Technician Sr Health Physics Technician Jr CADD Operator Procurement Specialist Geologist, Sr.
Geologist Geologist, Jr.
Technical Writer Contract Administrator Cert. Ind Hygienist Site Superintendent Clerical
Offerors are to submit their labor rates for each of the ordering periods at the time of proposal submission.
For each labor discipline, please annotate whether the discipline provided is the Prime contractor or the Subcontractor
Rates/Markups (included in the Hourly Rates Shown in Table below)
Base Year 1 Option Year 2 Option Year 3 Option Year 4 Option Year 5 Total Labor % Overhead Rate * % G&A Rate * Annual Escalation % % % %
*Must be substantiated by DCAA at a later time
The following items shall be paid at negotiated cost, plus markups identified below:
Specialized equipment and/or material ___________% Rental Equipment ___________% Reproduction ___________% Other Direct Costs including but not limited to: telephone, shipping, mailing and miscellaneous supplies ___________% Subcontracting Effort ___________%
Due to current economic uncertainties, it is recognized that labor rates may need to be adjusted on a 12-month basis. Therefore, offerors will be afforded an opportunity to propose annual escalation percentages which will be used for evaluation of basic contract price and may be subject to renegotiation prior to the start of each 12-month cycle. The Contracting Officer will compare the contractor’s proposed rates to the most recent “core” Consumer Price Index and other accepted price indices, with the goal of negotiating a fair escalation percentage.
Sample Project Worksheets
FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM
(FUSRAP) ST. LOUIS SITES
SINGLE AWARD TASK ORDER CONTRACT (SATOC)
SAMPLE WORKSHEETS (WORKSHEET A SHOULD BE CREATED FOR EACH TASK)
Cost Realism Table
Estimated Overhead and G&A Costs on Direct Costsl/ Follow all instructions in the explanatory notes below
Base2/ Overhead/G&A Rate3/
Subtotal Note Reference4/
Labor Costs $ $ $
Material Costs $ $ $
Equipment Costs $ $ $
Subcontracts $ $ $
Other Direct Costs
Total (without fee)
Basic Rates: Field Office Overhead % Home Office Overhead %
General Administrative % Fringe Benefits % Proposed Fee Rate %
* Must be substantiated by DCAA at a later time
Note l: The purpose of this worksheet is to compute the average overhead and G&A cost per expended direct dollar and apply this average cost to compute an estimate of average overhead and G&A allocable to direct costs.
Note 2: The Base costs are the total costs (labor, material, equipment, subcontract and other direct costs) from the worksheets.
Note 3: Identify all rates you are applying to the base (i.e., fringe, labor overhead, material overhead, general and administrative expense (G&A), etc.) with a note reference in the far right column. For example, if you apply multiple overhead rates such as fringe, overhead and/or G&A to labor costs, provide the rates used and explain and detail the rates used with a note reference in the far right column
Note 4: Identify the major items included in Other Direct Cost with a note reference in the far right column. In other words, identify any costs other than material, labor, and subcontracts that your company charges direct to contracts. If none, state so in a note.
Note 5: Provide proposed fee rate %. Do not include profit/fee in the markup rates.
SUMMARY TOTAL
TASK DESCRIPTION COST Labor Material Equipment Subcontract ODC
01.01.01 Proj. Managt
NORCO
01.01.02 Proj. Managt.
SLDS
01.02.01 Home Off.
NORCO
01.02.02 Home Off. SLDS $ $ $ $ $ $
01.03.01 Const. Supp.
NORCO
01.03.02 Const. Supp.
SLDS
01.04.01 EDC NORCO $ $ $ $ $ $
01.04.02 EDC SLDS $ $ $ $ $ $
01.05.01 Rad Support
NORCO
01.05.02 Rad Support
SLDS
02.06.01 IA-9 Ballfields
Phase 3
02.07.01 PDI Samp Frost
Ave
03.08.02 Mallinckrodt Plant 1
RA
03.09.02 DT-9 RA $ $ $ $ $ $
TOTAL
* Summary Costs should be transferred to the Cost Realism Table
WORKSHEET A (THIS NEEDS TO BE CREATED FOR EACH TASK)
01.01.01 Project Management Support (General Condition)
Worksheet
Scope:
Assumptions:
Direct Cost
Labor Job Description
XXX
Unit Qty Base Rate Base SubTotal hrs. 0 0.00 0
XXX hrs. 0 0.00 0
Total Hrs
Sub-Total Labor Costs
Fringe Benefits Direct Labor 0.00% 0
Overhead Direct Labor 0.00% 0 SubTotal 0
TOTAL Direct Labor
Other Direct Costs
Unit Qty Base Rate Base SubTotal
Sub Contracting
Subcontracting Total Cost
Materials
Material Total Cost
Equipment
Equipment Total Cost 0
0 0
Sub-Total ODC
= 0
G&A 0.00% 0
TOTAL
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
EXHIBIT/ATTACHMENT
Attachments: Name Pages
Attachment 1 Sample Worksheets (Formerly Fully Burden Labor Rates) 4
Attachment 2 Past Performance Questionnaire 4
Attachment 3 Questions and Asnwers 2
Attachment 4 Questions and Asnwers II 13
Attachment 5 Task 6 – Ballfields Phase 3 1
Attachment 6 Task 6- Ballfields Photo 1
Attachment 7 Task 7 – Frost Ave Sampling 1
Attachment 8 Task 8 – Mallinckrodt Bldg 6,7,8 SLDS 1
Attachment 9 DT 9Potential Rail Removal Area Update 1
Attachment 10 DT – 9 Railspur 1
Attachment 11 Site Visit Attendance Sheet 2
Attachment 12 Site Visit Meeting Agenda 2
Attachment 13 Site Visit Map 1
Attachment 14 Cost Reimbursement Type Task Order 4
Attachment 15 Cost Reimbursement Type Task Order Tables 2
Attachment 16 Questions and Answers III 9
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. GENERAL INFORMATION
This Source Selection Plan (SSP) defines the criteria, organization, and policies to be used in selecting a contractor to provide Hazardous Toxic and Radioactive Waste (HTRW) remedial action operations in support of the U.S. Army Corps of Engineers (USACE) St. Louis District (St. Louis District) Formerly Utilized Sites Remedial Action Program (FUSRAP). It is provided to ensure that the selection is made in accordance with the acquisition plan, the Request for Proposals (RFPs), the Federal Acquisition Regulation (FAR) Part 15, and any corresponding Agency regulations. The magnitude of construction for this project is more than $10M.
The four (4) factors for this solicitation are outlined below.
FACTORS AND RELATIVE ORDER OF IMPORTANCE
FACTOR
NUMBER
FACTOR RELATIVE ORDER OF IMPORTANCE
(1) Technical Capabilities (1A) Field Engineering (2A) Remediation Work
Equal to Factor 2
(2) Management Approach (1B) Technical Staff Approach (2B) Cost Control
Equal to Factor 1
(3) Past Performance
Less important than Factors 1 or 2
4 Cost/Price Factors 1, 2, and 3 combined are significantly more important than Factor 4
Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation. As this is a competitive negotiation acquisition, there is no public proposal opening and no information will be given out as to the number of offerors or the results of the competition until all awards are made.
2. REQUIRED REGISTRATIONS
Offerors must have and must maintain an active registration in the following databases:
System for Award Management (SAM): Offerors must have and must maintain an active registration in the SAM database at https://www.sam.gov/portal/public/SAM/ to be eligible for a Government contract award. If the offeror is a Joint Venture (JV), the JV entity must have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective offeror. The Joint Venture has to be named a Joint Venture in the SBA. The Joint Venture will be approved by the Small Business Administration (SBA) prior to contract award. On-Line Representations and Certifications: Prospective Contractors shall complete electronic representations and certifications at https://www.sam.gov/portal/public/SAM/ in conjunction with required registration in the SAM.
3. DEFINITIONS
When the word ‘offeror’ is encountered throughout this Section 00100, it is intended to mean a company, teaming arrangement, or Joint Venture seeking to do business with the Government that submits a proposal in response to this solicitation.
A ‘proposal’ is documentation prepared by the offeror and submitted to the Government for evaluation purposes in response to this solicitation.
When the word ‘Government’ is encountered throughout this Section 00100, it is intended to mean the U.S. Army Corps of Engineers, St. Louis District (MVS).
4. SUBMISSION OF INQUIRIES
Proposals for this solicitation will be accepted until the date and time indicated on Standard Form 33. Prospective offerors should submit inquiries related to this solicitation only by e-mail to:
E-MAIL ADDRESS: Reid.A.Drewes@usace.army.mil
Include the solicitation number, and project title with any questions/clarifications.. TELEPHONE INQUIRIES WILL
NOT BE ACCEPTED.
5. DIRECTIONS FOR SUBMITTING PROPOSALS
Offers must be placed in binders and marked and addressed as follows:
MARK PACKAGES:
Solicitation Number: W912P9-19-R-0020 Offer Closing Date: 05/14/2019 Offer Closing Time: 02:00 pm CST
ADDRESS PACKAGES TO:
Reid Drewes
U.S. Army Corps of Engineers (USACE) St. Louis District, CEMVS-CT 1222 Spruce Street – 4th Floor Room 4.207 St. Louis, MO 63103-2833
Additional Instructions Pertaining to Hand Carried Offers: Hand-carried offers must be delivered to 1222 Spruce Street, 4th Floor Room 4.207, St. Louis, MO 63103-2833. Proposals must be properly marked package(s) and given to a member of the Contracting Division no later than the time specified above.
Questions and Answers: All requests shall be made via email to Reid Drewes at Reid.A.Drewes@usace.army.mil and Karla.L.Babb@usace.army.mil. The email request, shall contain the subject “Question! FUSRAP W912P919R0020.”
All inquiries will be answered in writing and posted to all Offerers via Federal Business Opportunities at www.fbo.gov.
Questions & Clarifications shall be submitted no later than C.O.B April 24th, 2019.
PROPOSALS SUBMITTED AFTER THE DATE AND TIME ESTABLISHED FOR SUBMISSION OF PROPOSALS
WILL NOT BE EVALUATED.
6. ELECTRONIC OFFERS
Electronic proposals, and their applicable modifications or cancellations, will not be accepted. However, proposals may be withdrawn in writing by letter or e-mail. Any written notice to withdraw an offer sent to this office must be received in the office designated in the RFP for receipt of offers not later than the exact date and time set for receipt of proposals.
7. PROPOSALS SHALL BE SUBMITTED IN THE FOLLOWING FORMAT
VOLUME 1: Technical Proposal PROPOSAL PACKAGE: Original Copies CD
1 4 1
FACTOR 1 – Technical Capabilities
Subfactor (1A) – Field Engineering Subfactor (2A) – Remediaton Work
FACTOR 2 – Management Approach
Subfactor (1B) - Technical Staff Approach Subfactor (2B) - Cost Control
FACTOR 3 – Past Performance
Past Performance shall also include the following:
• Letters of Commitment from Sub-Contractors (if applicable)
• Teaming Arrangements (if applicable) (include teaming agreements and letters of commitment in Volume 1, Section 1 which is titled “Business Proposal”)
• Joint Venture Agreements (if applicable)
VOLUME 2: Cost/Price Proposal and Administrative Submission
PROPOSAL PACKAGE: Original Copies CD
1 2 1
Cost/Price Proposal shall also include the following:
• Signed Standard Form 33 and all Amendments, signed and dated
• Sample Task Order
• SAM Representations and Certification
• Offeror’s e-mail address and cell phone number
• Name, Address, DUNS, CAGE Code, and TAX Identification Numbers of Contractor submitting proposal
The Government will not make assumptions concerning intent, capabilities, or experience. Clear identification of proposal details shall be the sole responsibility of the offeror. The Government may reject incomplete proposals after initial evaluation without further consideration. Complete proposals shall meet the basic requirements identified in the RFP.
8. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
a. REQUIREMENT FOR SEPARATE TECHNICAL AND PRICE PROPOSALS.
DO NOT MIX CONTENTS OF VOLUME 1 (Technical) AND VOLUME 2 (Cost/Price) IN THE SAME
BINDER.
(1) Each offeror must submit a Technical Proposal and a Price Proposal. The Technical Proposal and the Price
Proposal must be submitted as separate volumes. Both the Technical and Price Proposal shall be paginated (contain consecutive page numbers on each page).
(2) The outside cover of each separate volume (Vol 1 – Technical; Vol 2 – Price) must be clearly marked to indicate its contents and the identity of the Offeror. Additionally, identify the “original” Technical proposal and the “original” Cost/Price proposal on the outside cover.
(3) Both the Technical Proposal and the Price Proposal must be received by the closing date and time set for receipt of proposals.
(4) Pricing Schedule, Vol 2, shall be completed in full.
(5) Do not include any dollar amounts in the Technical Proposal that are taken from the Price Proposal.
(6) All information intended to be evaluated as part of the Technical Proposal must be submitted within the Technical Proposal. Do not cross-reference material in the Price Proposal, or vice versa. Also, do not include links to websites in your proposal. Technical Proposals will not be provided to the price team and Price Proposals will not be provided to the technical team. Therefore, information submitted in the wrong Volume could lead to the proposal being determined “unacceptable” if materially incomplete in any aspect.
(7) Do not attempt to modify the terms and conditions of the solicitation in either the technical or price proposal or add conditions or qualifications to your offer. Should the offeror include terms and conditions that conflict with the terms and conditions of the Solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Any questions related to specific terms and conditions contained within the Solicitation should be resolved prior to submission of the offer. Notwithstanding the above, the offeror must clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any modifications to the contractual and/or technical terms and conditions of the solicitation contained in the Offer.
(8) Failure to submit required documents or failure to properly complete documents may result in rejection of the offer without further evaluation. Therefore, offerors are urged to follow instructions carefully and to speak with the Contracting Officer if the offeror does not understand any part of the Solicitation.
b. DISCUSSIONS.
The Government intends to evaluate proposals and award a contract without discussions. However, the Government reserves the right to hold discussions if it determines that discussions are necessary. Therefore, proposals should be submitted on the most favorable terms that the offeror can submit to the Government.
c. GENERAL INSTRUCTIONS.
(1) Submit only the documents specifically required in this section. Do not submit excess information; do not include audio-visual materials, electronic media, etc.
(2) Use only 8 ½ by 11 inch paper or A4 paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14”) . Do not use a font size smaller than Arial or Times New Roman, 12, or an unusual font style such as script, or condensed print for any submission. All page margins must be at least one inch wide, but may include headers and footers. All pages must be numbered.
(3) The preferred method for assembling your proposal is to use three-ring binders; however, the use of pressboard or other report covers with compression or other type fasteners is acceptable. Do not use spring clamps or exceed the recommended capacity of the fastener or binder. Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages. Do not include loose papers.
(4) References to “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the offeror’s technical proposal. Offerors that include in their proposals information they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark their proposals in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors— Competitive Acquisition,” paragraph (e), Restriction on disclosure and use of “data .”
(5) In the case of an offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.
(6) For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.
9. INSTRUCTIONS FOR SUBMISSION OF JOINT VENTURE AGREEMENTS
a. A Joint Venture offeror must submit with its technical proposal a copy of the joint venture agreement upon which the
Joint Venture organization has been formed. The joint venture agreement must indicate that the Joint Venture is in existence as of the date and time that proposals are due to be submitted; or, alternatively, that the Joint Venture will approved by the Small Business Administration (SBA) prior to contract award.
b. The joint venture agreement must be signed by a representative of each Joint Venture partner who has the requisite authority to bind the partner to the agreement, with the chief executive of each entity identified.
c. To be acceptable to the Government, the joint venture agreement must clearly state within its terms that each member of the Joint Venture is jointly and severally liable for all of the obligations of the Joint Venture itself with respect to completion of all work and services under the contract expected to result from the Solicitation.
d. The terms of the Joint Venture must detail, in terms of percentages, where appropriate, the relationship of the Joint
Venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
e. Additionally, the joint venture agreement must specify who among the joint venture partners is authorized to sign the Solicitation's Standard Form 33, acknowledge the amendments to the Solicitation, if any, and bind the entire Joint Venture to its obligations under any contract which may result from the Solicitation.
10. SUB-CONTRACTOR CONTRACTORS
a. If an offeror wishes to receive credit for the experience or past performance of a Sub-Contractor, including a firm that is a proposed Sub-Contractor to the prime Contractor or a Joint Venture partner, the offeror must submit a letter of commitment to subcontract under the proposed project, signed both by the Sub-Contractor and the offeror.
b. For purposes of this Solicitation, such a Sub-Contractor shall be considered to be a “qualified Sub-Contractor.”
c. The commitment letter must be submitted even if the Sub-Contractor is in some way affiliated with a Joint Venture partner (for example, the Sub-Contractor is a subsidiary of a Joint Venture partner, or a subsidiary of a firm to which the Joint Venture partner is also a subsidiary).
d. Include letters of commitment in Volume 1, Factor 3 Past Performance.
11. TEAMING ARRANGEMENT
If a contractor wishes to receive credit for the experience or past-performance from a teaming arrangement with another small business, provide the complete information on the arrangement, to include any relevant and recent past/present performance information on previous teaming arrangements with same partner.
12. SPECIFIC INSTRUCTIONS FOR VOLUME 1 – TECHNICAL PROPOSAL
a. Number of Copies of the Technical Proposal. Submit an ORIGINAL and four (4) additional copies of the Technical
Proposal, with each set in a separate binder along with a CD containing the Technical Proposal and Price Proposal.
The Technical and Price Proposals shall not be combined on a CD, they should be on separate CD’s. Each CD should go with the appropriate Proposal.
b. Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the technical proposal will be appropriately labeled as such. Each technical proposal shall be organized using the tabs specified in the following chart
Note: The main tabs directly correlate to the evaluation factors identified in Section 00100 of the RFP.
TAB CONTENTS OF
THE TECHNICAL PROPOSAL
PAGE LIMITS
TAB 1
Factor 1
Technical Approach
30*
TAB 2
Factor 2
Management Approach
TAB 3
Factor 3
Past Performance
25 plus 10 for each subcontractor
Pages submitted which exceed limitations listed above will not be evaluated. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
*Technical and Management Approach shall not exceed 30 pages combined.
13. SPECIFIC INSTRUCTIONS FOR VOLUME 2 – PRICE PROPOSAL
a. Number of Copies of the Cost/Price Proposal. Submit an ORIGINAL and two (2) copies of the Price Proposal with each set in a separate binder. Also furnish Cost/Price Proposal on CD.
b. Size Restrictions and Page Limits. Use only 8 ½” x 11” or A4 pages. There are no page limits set for the Price
Proposal. However, please provide only the information required by this solicitation. Excess information will not be considered in the Government’s evaluation.
c. Format and Contents of the Cost/Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled and shall be organized and tabbed as indicated in the following chart.
TAB CONTENTS OF THE PRICE PROPOSAL
TAB 1
The Proposal Cover Sheet, to include the offeror’s e-mail address, cell phone number, Name, Address, DUNS, CAGE Code and Tax Identification Numbers
TAB 2
Signed Standard Form 33 and all Amendments (signed and dated)
TAB 3
Sample Task Order
TAB 4
SAM Representations, Certifications, and Other Statements of the Offeror
If the Offeror is a Joint Venture, the Joint Venture partner entity must complete and attach the Online Representations and Ceritifications, and submit on behalf of the joint venture offeror.
14. PROPOSAL FORMAT – VOLUME 1
1. General Instructions
a. Submittals
The Offeror’s proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal. Files shall not contain classified data.
The use of hyperlinks in proposals is prohibited.
The non-cost volumes for Business, Technical, and Past Performance can be submitted in the same three-ring binder;
the Cost proposal shall be submitted in a separate binder. Each binder shall be clearly labeled with its Title and copy number (e.g., copy 1 of 4). 11 x 17 folded pages are acceptable for tables/graphic representations; however, 11 x 17 pages are limited to 5 pages, and those 5 pages will be included with the page limit. Each 11 x 17 will count as one page.
Proposals shall be submitted on plain white paper, 8 ½ x 11, margins 1”, gutter 0”, header/footer 0.5” (from edge), double-sided, Arial or Times New Roman, 12 font. Font size maybe adjusted for charts, graphs, or titles.
By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation.
The Offeror’s proposal shall consist of two (2) volumes:
Volume I – Section 1 Business Proposal Volume I – Section 2 Technical/Management (Two Separate Factors included) Volume I – Section 3 Past Performance Volume II – Cost/Price
Offerors are cautioned that “parroting” of the Technical requirements or the Statement of Work (SOW) with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.
Proprietary information shall be clearly marked. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 4).
The following volumes of material shall be submitted:
Volume Title Printed Copies Digital Copies Maximum Pages Volume I Section 1 – Business Proposal
Original plus 4 Copies 1 N/A
Section 2 – Technical Proposal
Original plus 4 Copies
30*
Section 3 – Past Performance
Original plus 4 Copies 1 25 Prime Contractor Plus 10 each for subcontractors**
Volume II
– Cost/Price Original plus 2 Copies 1
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
* Pages furnished for organizational purposes only, such as Table of Contents or divider tabs, are not included in the page limitation.
**Excluding the Past Performance Questionnaire Forms
b. File Packaging
All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. All price breakdown information to aide in the cost/price evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2013. Each disc shall be externally labeled with the volume number, date, and the Offeror’s name. **Please note – Self extracting exe files are not acceptable. ** If the hard-copy proposal differs from the electronic version, the hard copy will govern.
c. Content Requirement
All information shall be confined to the appropriate file. The Offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal.
Each volume of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion.
Table of Contents, Summary Section, and the Narrative Section are not included in the page count.. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked.
2. VOLUME I, SECTION 1 – BUSINESS PROPOSAL
Offerors are required to comply with the following format and content requirements for Volume 1 of their business proposal.
a. Solicitation/Contract Form
Offerors shall complete the SF Form 33, blocks 12, 13, 14, 15, 16, 17, and 18. Block 15 should include the CAGE code. Signature by the Offeror on the SF 33 constitutes an offer, which Government may accept, and acknowledgment by the Offeror that they accede to the contract terms and conditions and the SOW requirements.
b. Block 15c
Check this block if your remittance address is different, identify the remittance address in your proposal, and ensure this address is in the System for Award Mangement database.
c. Acknowledge of Solicitation Amendments (if any)
Return one signed copy of each amendment.
d. Prime and Subcontractor Information
For the prime and any major subcontractor(s) provide the Company/Division Address, Identifying Codes, and Applicable Designations. Provide company/division’s street address, CAGE code and DUNS code. A major subcontractor is defined as a subcontractor that will perform major or critical aspects of this requirement. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 10% of the total proposed cost/price. In addition, letters of commitment and teaming agreements shall be included for all principle subcontractors.
e. Letter
Signed identifying individuals who are authorized to negotiate and sign documents on the behalf of the contractor.
3. VOLUME I, SECTION 2 – TECHNICAL PROPOSAL (2 FACTORS)
This volume shall not exceed 30 pages combined for both Factors 1 & 2.
FACTOR 1A: TECHNICAL CAPABILITIES
a. Section 2, Tab 1 – Subfactor 1A, Field Engineering The Offeror shall address their Field Engineering capabilities and how these technical capabilities will ensure successful execution on this project. Specifically addressing the following:
i. Remedial Design
ii. Environmental Investigation
iii. Subsurface boring capabilities
iv. GIS capabilities
b. Section 2, Tab 2A – Subfactor 2A, Remediation Work The Offeror shall address their Remediation Work capabilities and how these technical capabilities will ensure successful execution on this project. Specifically the Offeror shall address:
i. Construction Remediation
ii. Deep Excavation
iii. Backfilling and Site Resortation
iv. Decontamination
v. Waste Management and Water Control
FACTOR 2: MANAGEMENT APPROACH
a. Section 2, Tab 1 – Subfactor 1B, Technical Staff Approach
In this Subfactor, the Offeror shall provide the management organization and staffing plan, including a list of key personnel positions and the professional qualifications related to environmental response actions associated with investigation, design, removal, and construction activities at sites contaminated with radiological waste. The Offeror’s Management staff shall include safety support, quality control, radiological support, and site-wide management.
The Offeror shall provide information on his management organization (including subcontractors) and staff. Offerors shall provide a narrative of how the effort required by the RFP will be assigned for performance within the Offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government SOW subparagraph number. The proposal should provide a diagrammed organizational chart showing staff and subcontractor’s relationships and lines of authority.
b. Section 2, Tab 1 – Subfactor 2B, Cost Control
The Offeror shall provide information on Cost Reimbursable Contract Management, scheduling, and cost control. The Offer shall provide an approach to control management cost and offer a competitive overhead rate.
4. VOLUME I, SECTION 3 – PAST PERFORMANCE
This volume shall contain past performance information regarding similar contracts. This volume shall not exceed 25 pages for the prime contractor plus ten (10) additional pages for each major subcontractor…