A02._Burden_Labor_Costs_FINAL.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
FUSRAP Remedial Action Services at the St. Louis Sites
Solicitation number
W912P919R0020
Issued by

About this file

This document includes a cost proposal template and summary tables for a federal contract to provide remedial action services at St. Louis sites under the Formerly Utilized Sites Remedial Action Program. The contract will be awarded as a single-award task order contract with cost reimbursement cost-plus-fixed-fee task orders. Services will include investigations of low-level radiological and chemical contamination, surveys to determine the extent of contamination, environmental assessments, on-site laboratory analysis, radiological support, removal action verification, and environmental monitoring. Additional services will include administrative recordkeeping, document management, data management, technical and regulatory integration, and project controls. Work will primarily involve sites in the St. Louis metropolitan area managed by the St. Louis District of the U.S. Army Corps of Engineers, including the St. Louis Downtown Site and St. Louis North County sites, but may also include other locations. The formal solicitation for this remedial action services contract is expected to be released on or around April 8, 2019.

Burden Labor Cost

View the file

Other files

File Type Posted
A22._Attachment_18_-_Questions_and_Answers_IV.pdf PDF
A22._Attachment_17_-_Pre-Award_Survey_Assertion_Checklist.pdf PDF
A22._W912P919R0020_Solicitation_Amendment_5.pdf PDF
A22._Attachment_16_-__Questions_and_Answers_III.pdf PDF
A22._Attachment_14_-_Cost_Reimbursement_Type_Task_Orders.pdf PDF
A22._Attachment_15_-_Cost_Reimbursement_Type_Task_Order_Tables.xlsx XLSX spreadsheet
A22._W912P919R0020_Solicitation_Amendment_4.pdf PDF
A22._W912P919R0020_Solicitation_Amendment_3.pdf PDF
A22._Attachment_11_-_Site_Visit_Attendance_Sheet.pdf PDF
A22._Attachment_10_-_Task_9_-_DT-9_Railspur.pdf PDF
A22._Attachment_7_-_Task_7_Frost_Ave_Sampling.pdf PDF
A22._Attachment_9_-_Task_9_-_DT_9Potential_Rail_Removal_Area_Update_New_(004).pdf PDF
A22._Attachment_13_-_Site_Visit_Map.pdf PDF
A22._Attachment_5_-_Task__6_-_BallFields_Phase_3.pdf PDF
A22._Attachment_6_-_Task_6_Ballfields_photo_.pdf PDF
A22._Attachment_8_-_Task_8_Mallinckrodt_Bldg_6,7,8_SLDSt.pdf PDF
A22._W912P919R0020_Solicitation_Amendment_2.pdf PDF
A22._Attachment_12_-_Site_Visit_Meeting_Agenda.pdf PDF
A22._Attachment_4_-_Questions_and_Answers_II.pdf PDF
Past_Performance_Questionnaire_Amendment.pdf PDF
Attachment_3_-_Burden_Labor_Costs.xlsx XLSX spreadsheet
A22._Solicitation_Amendment_One.pdf PDF
A22._Questions_and_Answers_.pdf PDF
A22._Questions_and_Answers_.pdf PDF
A22._Solicitation_Amendment_One.pdf PDF
B09._Past_Performance_Questionarre.pdf PDF
A22._Final_Solicitation_19R0020.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Sheet Sample Project Worksheets

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM (FUSRAP) ST. LOUIS SITES SINGLE AWARD TASK ORDER CONTRACT (SATOC)

Cost Realism Table

Cost Realism Table
Estimated Overhead and G&A Costs on Direct Costsl/ Follow all instructions in the explanatory notes below
Base2/Overhead/G&A Rate3/SubtotalNote Reference4/
Labor Costs$$$

Material Costs $ $ $

Equipment Costs $ $ $

Subcontracts $ $ $

Other Direct Costs $ $ $

I
Total (without fee)$$$

Basic Rates: Field Office Overhead _________ % Home Office Overhead __________ %

General Administrative _______ % Fringe Benefits ________ % Proposed Fee Rate ______ %
* Must be substantiated by DCAA at a later time
Note l: The purpose of this worksheet is to compute the average overhead and G&A cost per expended direct dollar and apply this average cost to compute an estimate of average overhead and G&A allocable to direct costs.
Note 2: The Base costs are the total costs (labor, material, equipment, subcontract and other direct costs) from the worksheets.
Note 3: Identify all rates you are applying to the base (i.e., fringe, labor overhead, material overhead, general and administrative expense (G&A), etc.) with a note reference in the far right column. For example, if you apply multiple overhead rates such as fringe, overhead and/or G&A to labor costs, provide the rates used and explain and detail the rates used with a note reference in the far right column
Note 4: Identify the major items included in Other Direct Cost with a note reference in the far right column. In other words, identify any costs other than material, labor, and subcontracts that your company charges direct to contracts. If none, state so in a note.
Note 5: Provide proposed fee rate %. Do not include profit/fee in the markup rates.

WORKSHEET

Summary Table

SUMMARY TOTAL

TASKDESCRIPTIONCOSTLaborMaterialEquipmentSubcontractODC
01.01.01Proj. Managt NORCO$$$$$$
01.01.02Proj. Managt. SLDS$$$$$$
01.02.01Home Off. NORCO$$$$$$
01.02.02Home Off. SLDS$$$$$$
01.03.01Const. Supp. NORCO$$$$$$
01.03.02Const. Supp. SLDS$$$$$$
01.04.01EDC NORCO$$$$$$
01.04.02EDC SLDS$$$$$$
01.05.01Rad Support NORCO$$$$$$
01.05.02Rad Support SLDS$$$$$$
02.06.01IA-9 Ballfields Phase 3$$$$$$
02.07.01PDI Samp Frost Ave$$$$$$
03.08.02Mallinckrodt Plant 1 RA$$$$$$
03.09.02DT-9 RA$$$$$$
TOTAL$$$$$$
* Summary Costs should be transferred to the Cost Realism Table

Worksheet A

01.01.01 Project Management Support (General Condition) Worksheet

Scope:

Assumptions:

Direct Cost
LaborJob DescriptionUnitQtyBase RateBaseSubTotal
XXXhrs.00.000
XXXhrs.00.000

Total Hrs 0 0

Sub-Total Labor Costs = 0

Fringe Benefits Direct Labor0.00%0
0
Overhead Direct Labor0.00%0
SubTotal0
TOTAL Direct Labor0
Other Direct Costs
UnitQtyBase RateBaseSubTotal
Sub Contracting

Subcontracting Total Cost 0

Materials
0
Material Total Cost

Equipment

Equipment Total Cost 0

00
Sub-Total ODC=0

G&A 0.00% 0

TOTAL 0