A22._Attachment_14_-_Cost_Reimbursement_Type_Task_Orders.pdf

PDF 148 KB Posted

Attached to
FUSRAP Remedial Action Services at the St. Louis Sites
Solicitation number
W912P919R0020
Issued by

About this file

This document outlines the terms for a cost reimbursement type single award task order contract to provide hazardous, toxic and radioactive waste investigation and remediation services. The contractor shall support the Formerly Utilized Sites Remedial Action Program and other hazardous waste programs managed by the U.S. Army Corps of Engineers St. Louis District. Services include radiological and chemical surveys, assessments, sampling, analysis, monitoring, and administrative tasks to execute remediation of sites contaminated with thorium, radium, uranium, cadmium and arsenic in the St. Louis metropolitan area. Task orders will be cost-plus-fixed-fee and labor rates are provided for evaluation and negotiation purposes. The base period of performance is one year with four optional one-year extensions.

Attachment 14 - Cost Reimbursement Type Task Orders

View the file

Other files

File Type Posted
A22._Attachment_18_-_Questions_and_Answers_IV.pdf PDF
A22._Attachment_17_-_Pre-Award_Survey_Assertion_Checklist.pdf PDF
A22._W912P919R0020_Solicitation_Amendment_5.pdf PDF
A22._Attachment_16_-__Questions_and_Answers_III.pdf PDF
A22._Attachment_15_-_Cost_Reimbursement_Type_Task_Order_Tables.xlsx XLSX spreadsheet
A22._W912P919R0020_Solicitation_Amendment_4.pdf PDF
A22._W912P919R0020_Solicitation_Amendment_3.pdf PDF
A22._Attachment_11_-_Site_Visit_Attendance_Sheet.pdf PDF
A22._Attachment_10_-_Task_9_-_DT-9_Railspur.pdf PDF
A22._Attachment_7_-_Task_7_Frost_Ave_Sampling.pdf PDF
A22._Attachment_9_-_Task_9_-_DT_9Potential_Rail_Removal_Area_Update_New_(004).pdf PDF
A22._Attachment_13_-_Site_Visit_Map.pdf PDF
A22._Attachment_5_-_Task__6_-_BallFields_Phase_3.pdf PDF
A22._Attachment_6_-_Task_6_Ballfields_photo_.pdf PDF
A22._Attachment_8_-_Task_8_Mallinckrodt_Bldg_6,7,8_SLDSt.pdf PDF
A22._W912P919R0020_Solicitation_Amendment_2.pdf PDF
A22._Attachment_12_-_Site_Visit_Meeting_Agenda.pdf PDF
A22._Attachment_4_-_Questions_and_Answers_II.pdf PDF
Past_Performance_Questionnaire_Amendment.pdf PDF
Attachment_3_-_Burden_Labor_Costs.xlsx XLSX spreadsheet
A22._Solicitation_Amendment_One.pdf PDF
A22._Questions_and_Answers_.pdf PDF
A22._Questions_and_Answers_.pdf PDF
A22._Solicitation_Amendment_One.pdf PDF
A02._Burden_Labor_Costs_FINAL.xlsx XLSX spreadsheet
B09._Past_Performance_Questionarre.pdf PDF
A22._Final_Solicitation_19R0020.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Reimbursement Type Task Orders will be issued against this contract and will be for allowable incurred costs for best effort on the part of the contractor. The contractor will use DCAA/DCMA approved forward pricing rates or Certified Public Accountant (CPA) established cost pools in accordance with FAR Part 31 for Year 1 for Overhead, G&A, and other indirect costs. Fee will be negotiated on individual cost reimbursable task orders issued. Contractor shall have an accounting system that is in compliance with FAR Part 30, Cost and Accounting Standards Administration, if applicable and in compliance with Generally Accepted Accounting Principles (GAAP). Finally, the contractor will provide a cap for Overhead, G&A and other indirect cost for Years 1, 2 and 3 as shown below, which will be incorporated into their Contract Management Procedures. The contractor’s Contract Management Procedures shall include standard operating procedures to cover detailed actions relating to cost reimbursement contract work with the Government. The contractor will submit a new Federal/State audit to establish new Forward Pricing Rates and New Caps for Year 2 through 5. The contractor shall have the ability to support cost reimbursable task orders (i.e., an acceptable cost tracking system and adequate purchasing system). The government reserves the right to request a DCAA Audit prior to award.

Additionally, each cost reimbursable task order issued will be subject to DCAA Audit. Prices will be based on the following list, which will be included in the RFP as Section L.

Year 1 Cap

Home Office Overhead Total overhead components (fringes, overhead, and G&A) will be capped at ______% of [ ] total cost or [ ] direct labor costs. (Check appropriate box) A ceiling for G&A for Other Direct Costs (ODCs) is ____%. This includes all other markups other than Facilities Capital Cost of Money (FCCM)

Field Office Overhead Total overhead components (fringes, overhead, and G&A) will be capped at ______% of [ ] total cost or [ ] direct labor costs. (Check appropriate box) A ceiling for G&A for Other Direct Costs (ODCs) is ____%. This includes all other markups other than

FCCM

The contract will have a base performance period of one year with four option periods of (1) year or until the capacity amount is reached, whichever occurs first.

Offerors are cautioned against submitting an unbalanced offer. The government will analyze each offer to determine whether they are unbalanced with respect to prices or separately priced line items. Offers that are determined to be materially unbalanced may be rejected. An offer is mathematically unbalanced if it is based on prices which are significantly less than the cost for some contract line items and significantly overstated in relation to costs for others. In addition, an offer is materially unbalanced if it is mathematically unbalanced and there is a reasonable doubt that the offer would result in the lowest overall cost to the government, even though it is the lowest evaluated offer.

Applicable Department of Labor Wage Rates (FAR 52.222-41) and Statement of Equivalent Rates for Federal Hires (FAR 52.222-42) will be included at the individual task order level.

The amount to be paid to the contractor for each task order shall be based on the hourly rate for labor disciplines listed in the Hourly Labor Rates table shown below. All hourly rates shall include Overhead, General/Administrative, Labor Burden Fringes, or other costs and shall be exclusive of profit/fee. The labor rates provided by the Offeror, and determined fair and reasonable by the government, will be binding on the basic contract and will be the maximum rates at the task order level. Solicitations shall advise offerors that rates lower than the maximum contract rates may be offered at the task order level.

DISCIPLINE BASE

HOURLY

RATE

FULLY

LOADED

HRLY RATE

Base Period Year 1

FULLY

LOADED

HRLY RATE

Option Period Year 2

FULLY

LOADED

HRLY RATE

Option Period Year 3

FULLY

LOADED

HRLY RATE

Option Period

Year 4

FULLY

LOADED

HRLY RATE

Option Period

Year 5

Program Manager

Project Manager

Quality Control Supv.

Quality Control Tech

Site Safety and Health Officer

Payroll Clerk

Civil Engineer, Sr.

Civil Engineer

Civil Engineer, Jr.

Cert. Health Physicist

Health Physics Technician Sr

Health Physics Technician Jr

CADD Operator

Procurement Specialist

Geologist, Sr.

Geologist

Geologist, Jr.

Technical Writer

Contract Administrator

Cert. Ind Hygienist

Site Superintendent

Clerical

• Offerors are to submit their labor rates for each of the ordering periods at the time of proposal submission.

• For each labor discipline, please annotate whether the discipline provided is the Prime contractor or the Subcontractor

Rates/Markups (included in the Hourly Rates Shown in Table below)

Base Year 1 Option Year 2 Option Year 3 Option Year 4 Option Year 5

Total Labor %

Overhead Rate * %

G&A Rate *

Annual Escalation % % % %

*Must be substantiated by DCAA at a later time

The following items shall be paid at negotiated cost, plus markups identified below:

Specialized equipment and/or material ___________% Rental Equipment ___________% Reproduction ___________% Other Direct Costs including but not limited to: telephone, shipping, mailing and miscellaneous supplies ___________% Subcontracting Effort ___________%

Due to current economic uncertainties, it is recognized that labor rates may need to be adjusted on a 12-month basis. Therefore, offerors will be afforded an opportunity to propose annual escalation percentages which will be used for evaluation of basic contract price and may be subject to renegotiation prior to the start of each 12-month cycle. The Contracting Officer will compare the contractor’s proposed rates to the most recent “core” Consumer Price Index and other accepted price indices, with the goal of negotiating a fair escalation percentage.

File details come from the government source that posted it. Updated .