A22-17-R-0009-0004.pdf

PDF 107 KB Posted

Attached to
STE GEN #2 PL 84-99 Federal contract opportunity
Solicitation number
W912P917R0009
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to STE GEN #2 PL 84-99, newest first.
File Type Posted
A22-17-R-0009-0011-specs.pdf PDF
A22-17-R-0009-0011-Amendment.pdf PDF
A22-17-R-0009-00011-Plans.pdf PDF
A22-17-0009-0010.pdf PDF
A22-17-R-0009-0004-Att1-M-SG-09_R-001.pdf PDF
A22-17-R-0009-0004-Att2-M-SG-09_G-002.pdf PDF
A22-17-R-0009-0003.pdf PDF
A22-17-R-0009-0002.pdf PDF
2am01_22_00.99_15.pdf PDF
17-R-0009-0001-Bid_Revised.pdf PDF
17-R-0009-0001-01_22_00.99_15.pdf PDF
17-R-0009-0001.pdf PDF
17-R-0009-0001-Site_Visit_Sign_In_Sheet.pdf PDF
A02-17-R-0009_SteGen2AdvSpecs.pdf PDF
A22-17-R-0009-SOL.pdf PDF
H01-17-R-0009-2ND-SET.pdf PDF
H01-17-R-0009-1ST_SET.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RESPONSE DATE IS CHANGED TO 01/19/17 - TIME: 11:30 AM.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jan-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-17-R-0009

X 9B. DATED (SEE ITEM 11)

08-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jan-2017

CODE

CONTRACTING DIVISION

USARMY ENGR DIST ST LOUIS

1222 SPRUCE ST RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P9-17-R-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0004

PL84-99 2015 FLOOD RECOVERY, LEVEE REPAIRS, STE. GENEVIEVE #2 LD are amended as follows:

GENERAL REQUIREMENTS

PLEASE NOTE RESPONSE DATE IS CHANGED TO 01/19/17 TIME: 11:30 AM

CONTRACTOR QUESTIONS

1. Is it possible to move the bid date from a Monday?

Answer:

Response date is moved to 01/19/17.

2. I have a question on non‐nuclear gauges on this project. Will the Corps accept the use of these on this levee repair project? The gauge supports ASTM D7698. Here is additional information on the product.

The contractor needs to follow specifications.

3. The specification for the drainage fill material (section 33 40 00 paragraph 2.6) is very specific and not readily available. Will a commercially available sand such as a C‐33 sand be acceptable for this material?

The contractor needs to follow specifications. They can submit a grain size distribution for materials to be approved/disapproved, and we will accept some variance from the specs.

However C33 sand is too coarse to use as a filter in this case.

4. We respectfully request that the government consider extending the proposal due date to

Friday, January 13th to accommodate proposal delivery, as Mondays are particularly difficult to coordinate submission due to logistics when shipping or travel is required. ?

Response date is moved to 01/19/17.

5. Is this project tax exempt for materials?

The contractor will have to request for the tax exempt forms after award.

6. Does the contractor need railway/railroad insurance?

Contractor will only be crossing RR tracks over permanent crossings to access work sites. If all laws and regulations are adhered to, special RR insurance will not be required for this contract.

7. Will the government provide all of the permits required for this project?

No, the contractor is responsible for getting any necessary permits.

8. The hydrograph furnished on sheet R‐001 is for the Cape Gage at river mile 52. Can you please provide the slope of the river in ft/mile between river mile 52 and river mile 120.5 (location of breach 1).

Also is you could provide hydrograph at Chester gage (river mile 110).

Answer:

See amendment. Sheet R‐001 has been replaced with new sheet R‐001 which has the Chester Gage hydrograph.

9. Note 6 on sheet C102 and note 9 on sheet C106 state that the borrow areas are covered with pervious material. It was mentioned at the site showing and is indicated on the typical sections that the levee district is to place pervious material in the levee foundation to fill the scour areas. Are we to assume that all of the pervious material covering the borrow will be removed by the levee district? If not, how is this material to be disposed of and how will it be paid for?

Answer:

The levee district intends on using all of the pervious material on top of the borrow areas to fill the scour holes. Any remaining unsatisfactory material shall be disposed of according to the requirements of the specifications.

10. It was mentioned at the site showing that the A stone revetment at EMB‐T3‐01R could be placed by water with the stone being transported by water. The levee district personnel indicated that the chute was only accessible during high water (flood stage). If this placement method is elected by the contractor will the contract time be modified to allow this to occur should a high water event not be experienced during the contract period.

Answer:

Contract time will be extended if river stages are not sufficient to access chute during initial period of performance.

11. At the site visit it was suggested that the bituminous surfacing would be in the area shown on plan sheet C‐101 if the contract option is exercised. Can you confirm this and let us know if there would be any other potential areas that would require bituminous surfacing?

If the option is exercised, Bituminous Surfacing will only be used for the slide repairs which require crown removal at the slide repair locations shown on sheet C‐101. Bituminous surfacing will not be used at any other repair locations.

12. On Sheet C‐304 the drawing detail for the Bituminous Surface Treatment Line Item shows:

aggregate base course on geotextile fabric, prime coat, and two separate lifts for chip and seal. The general sheet notes on C‐304 say: If the optional Item is exercised the bituminous surfacing will be used in lieu of the crushed stone surfacing on the levee crowns for slide repairs in areas where existing levee crown surface is bituminous surfacing. My question is, what is included in the bituminous surfacing line item: Is it just two coats of chip n seal or does it include the crushed stone, fabric, and prime as well?

Answer:

Bituminous surfacing requires all materials/layers shown in detail B4 on sheet C‐304. Bituminous surfacing includes geotextile, aggregate base course, prime coat, and 2 separate applications of seal coat material and aggregate.

13. If a contractor has received a FINAL CPARS evaluation, can that be submitted in lieu of a Past

Performance Questionnaire? Some USACE clients are hesitant to complete the PPQS if they have already completed a final CPARS.

You can send in your final CPARS.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 10-Jan-2017 01:10 PM to 19-Jan-2017 11:30 AM.

(End of Summary of Changes)