Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to STE GEN #2 PL 84-99, newest first.
File Type Posted
A22-17-R-0009-0011-specs.pdf PDF
A22-17-R-0009-0011-Amendment.pdf PDF
A22-17-R-0009-00011-Plans.pdf PDF
A22-17-0009-0010.pdf PDF
A22-17-R-0009-0004.pdf PDF
A22-17-R-0009-0004-Att1-M-SG-09_R-001.pdf PDF
A22-17-R-0009-0004-Att2-M-SG-09_G-002.pdf PDF
A22-17-R-0009-0003.pdf PDF
A22-17-R-0009-0002.pdf PDF
2am01_22_00.99_15.pdf PDF
17-R-0009-0001-01_22_00.99_15.pdf PDF
17-R-0009-0001.pdf PDF
17-R-0009-0001-Site_Visit_Sign_In_Sheet.pdf PDF
A02-17-R-0009_SteGen2AdvSpecs.pdf PDF
H01-17-R-0009-1ST_SET.pdf PDF
A22-17-R-0009-SOL.pdf PDF
H01-17-R-0009-2ND-SET.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDING SCHEDULE

Item Estimated Unit Estimated

NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT _

00 00 10-1

0001. Mobilization and Demobilization 1 JOB _ ___ $________

0002. Impervious Embankment Type I

a. First 4000 LF 4000 LF _____ $________

b. All over 4000 LF 4000 LF _____ $________

0003. Impervious Embankment Type III

a. First 70,900 CY 70,900 CY _____ $________

b. All over 70,900 CY 70,900 CY _____ $________

0004. Semi-Compacted Impervious Embankment

a. First 13,200 CY 13,200 CY _____ $________

b. All over 13,200 CY 13,200 CY _____ $________

0005. Slide Repair

a. First 4,900 CY 4,900 CY _____ $________

b. All over 4,900 CY 4,900 CY _____ $________

0006. Crushed Stone Surfacing

a. First 2,300 TN 2,300 TN _____ $________

b. All over 2,300 TN 2,300 TN _____ $________

0007. Establishment of Turf

a. First 10 Acre 10 AC _____ $________

b. All over 10 Acre 10 AC _____ $________

0008. Graded A Stone

a. First 3,750 TN 3,750 TN _____ $________

b. All over 3,750 TN 3,750 TN _____ $________

0009. 400 LB Riprap

a. First 50 TN 50 TN _____ $________

b. All over 50 TN 50 TN _____ $________

0010. Bedding Material

a. First 15 TN 15 TN _____ $________

b. All over 15 TN 15 TN _____ $________

0011. Geotextile

a. First 4,200 SY 4,200 SY _____ $________

b. All over 4,200 SY 4,200 SY _____ $________

0012. 36” Reinforced Concrete 420 LF _ ___ $________ Pipe

0013. 36” Reinforced Concrete 1 EA _ ___ $________ Concrete Flared End Section

0014. Flowable Backfill

a. First 15 CY 15 CY _____ $________

BIDDING SCHEDULE

Item Estimated Unit Estimated

NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT _

00 00 10-2

b. All over 15 CY 15 CY _____ $________

0015. Drainage Fill

a. First 55 TN 55 TN _____ $________

b. All over 55 TN 55 TN _____ $________

0016. 36” Flap Gate 1 EA _ ___ ________

0017. Headwall 1 JOB _ ___ ________

0018. Care of Water 1 JOB _ ___ ________

0019. Bonds 1 JOB _ ___ ________

TOTAL $ ________

Optional Items

0020. Bituminous Surfacing

a. First 500 SY 500 SY _____ $________

b. All over 500 SY 500 SY _____ $________

TOTAL $ ________

TOTAL + Option $ ________

ABBREVIATIONS

JOB Job EA Each LF Linear Feet AC Acre TN Ton CY Cubic Yards SY Square Yards

(See BIDDING SCHEDULE NOTES)

00 00 10-3

BIDDING SCHEDULE NOTES

1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as Job "JOB".

2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.

4. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.

6. Bidders are encouraged to pay particular attention to the requirements on lab “validation” in Section 01 14 40 of the contract specifications.

7. OPTIONAL BID ITEMS. Bid Item No. 0020 is an OPTIONAL ITEM. Upon the review of inspection at the site, the Contracting Officer, in accordance with the specifications and drawings, will direct the optional bid item work as needed. The Contractor shall perform the appropriate work ONLY when directed by the Contracting Officer. The Government is not obligated to request any work under any optional item(s). The bid prices for each optional item shall represent your firm price to perform that service. Payment will be made ONLY for work actually requested and performed to the Government's satisfaction.