Amendment 0010.pdf

PDF 5 MB Posted

Attached to
West Shore Lake Pontchartrain WSLP 114
Solicitation number
W912P825B0024
Issued by

About this file

This is a federal solicitation amendment for the West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Project in St. John the Baptist Parish, Louisiana. The amendment, issued by the U.S. Army Corps of Engineers New Orleans District, modifies the original solicitation for Reserve Relief and I-55 Pump Stations and Drainage Structures. Key changes include reestablishing the bid due date to February 6, 2026 at 9:30 AM CST, removing the Project Labor Agreement requirement, and deleting specific contract clauses. The project involves complex infrastructure construction, including pump stations, drainage structures, flood walls, and associated civil, mechanical, and electrical work across two primary sites (Reserve Relief and I-55). The bidding schedule includes over 150 line items covering everything from mobilization and site preparation to specialized construction activities, with estimated quantities for various materials and construction elements. The contract will be awarded as a whole to a single bidder, with the primary goal of completing a flood risk reduction system that can become operational as quickly as possible.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

06-Jan-2026

The above numbered solicitation for West Shore Lake Pontchartrain, Louisiana Hurricane and Storm Damage Risk Reduction Project, WSLP-114, Reserve Relief & I-55 Pump Stations and Drainage Structures, is hereby amended as follows:

- Reestablish the bid due date and time to Feb 6, 2026 no later than 9:30 AM CST

- Reestablish the bid opening date and time to Feb 6, 2026 at 10:30 AM CST

- Bid opening will be held virtually via teams. Phone number: 503-207-9433, Conference ID: 469 322 39#

- Remove the requirement for Project Labor Agreements

- Delete clauses 52.222-33 Alt 1 and 52.222-34

- Provide updates to specifications and drawings

- This is the final opportunity for submitting questions. Questions must be received no later than by January 20, 2026, at 9:00 am CST.

CONTRACTING DIV- CHIEF

7400 LEAKE AVENUE, ROOM 172

NEW ORLEANS LA 70118-3651

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 W912P8

W912P825B0024

27-Feb-2025

1 22

W912P825B0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - INSTRUCTIONS TO BIDDERS

The following has been deleted:

52.222-33 Alt I Notice of Requirement for Project Labor Agreement Alternate I

Jan 2024

SECTION 00700 - CONTRACT CLAUSES

The following has been deleted:

52.222-34 Jan 2024 Project Labor Agreement

SECTION SF 30 - SF 30 CONTINUATION

The required response date/time 06-Feb-2025 09:30 AM has been added.

(End of Summary of Changes)

SECTION 00010

Delete the Bidding Schedule in its entirety and substitute the attached revised Bidding Schedule, therefore.

SECTION 01100

1. Page 13, paragraph 9, subparagraph (e). Delete this subparagraph in its entirety and substitute the following therefore:

“(e) Shell Ethylene Pipeline. The Contractor shall perform settlement monitoring of the existing 4” Shell ethylene pipeline at the Reserve Relief site located under the required preload; as shown on the drawings. No measurement will be made for the settlement monitoring and settlement monitoring pipe. Payment for the settlement monitoring surveys; including installation and removal of the monitoring pipe will be made at the contract job price for “Settlement Monitoring of Preload Embankment – RRC”. Price and payment shall constitute full compensation for furnishing all plant, labor, materials, and equipment; surveying, furnishing, installing, maintaining, and removing the settlement monitors; and all other work incidental thereto.

1. No excavation or other construction activity shall be conducted in the vicinity of the pipeline without proper notification of a Shell representative. All pipeline monitoring work shall be limited to ten (10) hours per day, Monday through Friday. An exception to this is the 14 days of continuous monitoring required in subparagraph 4(c) below which includes holidays and weekends. The Contractor shall notify the Shell representative at least 48 hours prior to commencing construction so that they may be present.

2. The Contractor shall mat over the Shell 4” Pinnacle pipeline for the entire length of the preload prior to the start of preloading to further dissipate the load and protect the pipeline against any construction equipment that may be operating over the area.

3. The Contractor shall install “pipeline settlement monitors” as shown on the drawings at the location of maximum preload fill over the pipeline and then every 50’ maximum until reaching the outer limit of the pre-load footprint on both sides (8 total). The pipeline monitors shall be installed by auguring as shown on the drawings. Any mechanical digging will be restricted, unless approved by a Shell representative. After installation of the monitors and prior to placing preload fill, an initial baseline survey of the pipeline depths shall be made at each monitoring location. Further surveys shall be taken as preload work proceeds as specified below.

4. Surveys. The pipeline shall be routinely checked for settlement by a Professional surveyor and as detailed below:

(a) The Contractor shall provide an initial baseline survey to the Shell Pipeline representatives' contacts provided below.

(b) The Contractor shall provide an additional survey after each preload lift. Each lift is limited to two feet per week. A minimum of two surveys shall be provided per week.

(c) After 100% completion of pre-load, the Contractor shall take readings twice daily (morning and afternoon) for 14 continual calendar days (including holidays and weekends). The report shall be provided daily to the COR and the Shell contacts provided below.

(d) After 14 days, additional surveys shall be provided weekly for the next 3 months and then monthly for the remainder of the preload duration.

(e) If settlement greater than 8” is detected in any of the surveys, the Contractor shall stop work and contact the COR and the Shell Pipeline representatives below to address/assess the situation to determine what action shall be taken.

(f) All surveys shall be referenced to the project benchmarks.

5. Shell Pipeline Representatives:

(a) Young Yim, SPLC PM, (832) 762-2618, young.yim@shell.com

(b) Damian Cambre, SPLC Land Agent, (225) 380-9089, damian.cambre@shell.com

(c) Shane Degruise, SPLC ROW Supervisor, (346) 773-5782 or (985) 343-5885, Shane.degruise@shell.com

(d) Morgan Stagg, GIS Director of MS Engineering, (281) 785- 6406, mstagg@gisy.com

6. Removal. The settlement monitoring pipe shall be removed above the original ground line after removal of the preload and disposed of by removal from the site.

The portion of the monitoring pipes below ground shall be grouted in place and abandoned. The timber matting shall remain throughout the construction period with removal thereafter.

7. Submittal. The Contractor shall submit to the Contracting Officer for approval his/her Installation and Removal Plan of the pipeline monitors.”

mailto:young.yim@shell.com mailto:damian.cambre@shell.com mailto:Shane.degruise@shell.com

2. Add the following new paragraph after paragraph 37, as:

“38. ORDER OF WORK

The Contractor shall organize his work schedule to provide a completed flood risk reduction closure across the project alignment at both locations as soon as possible. To accomplish this goal Phases 1 thru 4 of the Order Of Work shall be completed first at each site. Improvements to the Order Of Work are encouraged to better achieve a faster completion should be brought to the attention and submitted to the Contracting Officer for approval.

(a) Order Of Work At Reserve Pump Station Site.

PHASE 1

1. Site Clearing and Grubbing.

2. Site Access Road.

3. Construction of Bypass Channel.

4. Sand base and wick drains, Preload for T-walls and operations area.

PHASE 2

5. Laydown Areas

6. Removal of Preloads and Construction of T-walls and Swing Gate

7. Cofferdams, pile foundations, and concrete for Navigation Gate, Pump Station, and Drainage Structure

PHASE 3

8. Construct Environmental Canals and Drainage Canals

9. Installation Drainage Structure gates, Navigation Gate Stop Logs, and installation of pump station stop log/bulkhead closure at all pump station inlets to continue work within the pump station and navigation gate sumps in the dry.

10. Removal of Cofferdams

11. T-wall closure for Bypass

12. Stage 0 Levee Lift

13. Structure Access Ramp

PHASE 4

14. Channel Grading

15. Stage 1 Levee Lift

PHASE 5

16. Channel Riprap.

17. Completion of remaining civil, structural, mechanical, Hydraulic, and electrical items for commissioning of the pump station, drainage structure, Navigation Gate Operations Area, fuel storage, water well and miscellaneous items.

18. Final Grading/Seeding and Fertilizing

19. Removal of access culvert crossing and installation of permanent access bridge.”

(b) Order Of Work At I-55 Pump Station Site.

PHASE 1

1. Site Clearing and Grubbing.

2. Site Access Road.

3. Water Conveyance to Maintain flow

4. Sand base and wick drains, Preload for T-walls and operations area.

PHASE 2

5. Laydown Area

6. Cofferdams, Pile foundations, and concrete for Pump Station, Drainage Structure, and T-walls.

PHASE 3

7. Installation of Drainage Structure gates and installation of pump station stop log/bulkhead closure at all pump station inlets to continue work within the pump station sumps in the dry.

8. Cofferdam Removal

9. Removal of all Preloads for T-walls and Operations area and completion of west side land based T-walls.

10. Completion of water based T-walls and Cofferdam Removal.

11. Construction of Environmental Canal

12. Stage 0 Levee Lift

13. Structure Access Ramp

PHASE 4

14. Braced Floodwall Construction, Closure of Bypass

15. Stage 1 Levee Lift

16. Monoliths 3-5E and 3-6E. (See restrictions to construction of these walls as specified in paragraph COORDINATION WITH OTHER GOVERNMENT

CONTRACTORS)

PHASE 5

17. Channel Grading and Placement of Riprap.

18. Completion of remaining civil, structural, mechanical, Hydraulic, and electrical items for commissioning of the pump station, drainage structure, water well, Operations Area, fuel storage, and miscellaneous items.

19. Final Grading/Seeing and Fertilizing

20. Removal of access culvert crossing and installation of permanent access bridge.”

DRAWINGS

1. SHEET ID Nos. 2C-101, 2C-102, 3C-101, 3C-102, 3CF405, and 3S-325. Delete these drawings in their entirety and substitute the revised attached drawings SHEET ID Nos. 2C- 101, 2C-102, 3C-101, 3C-102, 3CF405, and 3S-325, therefore.

2. SHEET ID No. 0S-541, CONCEPTUAL TRS SEQUENCE OF CONSTRUCTION, subpart B. FLOOD WALLS; DRAINAGE STRUCTURE (RESERVE RELIEF AND 1- 55). Delete Note 2 in its entirety and substitute the following therefore: “2. CUT OFF

TEMPORARY RETAINING STRUCTURE FOR PUMP STATION AND DRAINAGE

STRUCTURE UNLESS OTHERWISE NOTED ON DRAWINGS.”

3. SHEET ID No. 0S-541, GENERAL NOTES. Delete Note 4 in its entirety and substitute the following therefore: “4. PROVIDE 3 COMPLETE SETS OF 5 STOP LOGS AT

RESERVE REFLIEF AND I-55 PUMP STATION INTAKES FOR A TOTAL OF 30 EA

STOP LOGS.”

00010-3 Ed 19-019

SECTION 00010 – BIDDING SCHEDULE

West Shore Lake Pontchartrain, LA, Hurricane and Storm Damage Risk Reduction Project, Reserve Relief & 1-55 Pump Stations and Drainage Structures, WSLP-114, St. John the Baptist, Louisiana

Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount

0001 Mobilization and Demobilization -

RRC 1 JOB

0002 Mobilization and Demobilization -

I-55 1 JOB

0003 CSX Pipeline Removal 1 JOB

0004 Temporary Retaining Structures -

RRC 1 JOB

0005 Temporary Retaining Structures -

I-55 1 JOB

0006 Traffic Control and Coordination -

RRC 1 JOB

0007 Traffic Control and Coordination -

I-55 1 JOB

0008 Silt Fences - RRC 6,275 LF

0009 Silt Fences - I-55 4,724 LF

0010 Truck Wash-Down Rack - RRC 1 JOB

0011 Truck Wash-Down Rack - I-55 1 JOB

0012 Reinforced Concrete Floodwalls -

RRC 1 JOB

0013 Reinforced Concrete Floodwalls -

I-55 1 JOB

0014 Reinforced Concrete Drainage Structure - RRC 1 JOB

0015 Reinforced Concrete Drainage Structure - I-55 1 JOB

0016 Reinforced Concrete Pump Station Substructure - RRC 1 JOB

0017 Reinforced Concrete Pump Station Substructure - I-55 1 JOB

0018 Reinforced Concrete Sleeper Slabs - RRC 1 JOB

0019 Reinforced Concrete Sleeper Slabs - I-55 1 JOB

0020 Reinforced Concrete Slabs-On- Grade - RRC 1 JOB

0021 Reinforced Concrete Slabs-On- Grade - I-55 1 JOB

0022 Reinforced Concrete Fuel Farm Structure - RRC 1 JOB

00010-4 Ed 19-019

0023 Reinforced Concrete Fuel Farm Structure - I-55 1 JOB

Reinforced Concrete Mechanical/Electrical Building -

RRC

1 JOB

Reinforced Concrete Mechanical/Electrical Building - I-

1 JOB

0026 Pump Station/Drainage Structure Tremie Slab Concrete - RRC 1 JOB

0027 Pump Station/Drainage Structure Tremie Slab Concrete - I-55 1 JOB

0028 Floodwall Tremie Slab Concrete -

RRC 1 JOB

0029 Floodwall Tremie Slab Concrete -

I-55 1 JOB

0030 Draw Bridge - RRC 1 JOB

0031 Miscellaneous Metalwork - RRC 1 JOB

0032 Miscellaneous Metalwork - I-55 1 JOB

0033 Navigation Aids - RRC 1 JOB

0034 Pumping Station - RRC 1 JOB

0035 Pumping Station - I-55 1 JOB

0036 Cybersecurity - RRC 1 JOB

0037 Cybersecurity - I-55 1 JOB

0038 Electrical Work- RRC 1 JOB

0039 Electrical Work- I-55 1 JOB

0040 Diesel Generator Sets - RRC 1 JOB

0041 Diesel Generator Sets - I-55 1 JOB

0042 Separator Geotextile - RRC 5,832 SY

0043 Separator Geotextile - I-55 6,035 SY

0044 Levee Reinforcement Geotextile -

RRC 3,000 SY

0045 Levee Reinforcement Geotextile -

I-55 2,500 SY

0046* Preload Reinforcement Geotextile

- RRC 31,490 SY

0047 Preload Reinforcement Geotextile

- I-55 15,350 SY

0048 Geogrid Composite System - RRC 18,901 SY

0049 Geogrid Composite System - I-55 8,202 SY

00010-5 Ed 19-019

0050 High Strength Geogrid - RRC 6,798 SY

0051 High Strength Geogrid - I-55 6,420 SY

0052 Clearing and Grubbing - RRC 1 JOB

0053 Clearing and Grubbing - I-55 1 JOB

0054 Interior and Floodside Drainage Canal Excavation - RRC 1 JOB

0055 Interior and Floodside Drainage Canal Excavation - I-55 1 JOB

0056 Dewatering - RRC 1 JOB

0057 Dewatering - I-55 1 JOB

0058 Embankment - RRC 41,274 CY

0059 Embankment - I-55 33,131 CY

0060 Preload Embankment - RRC 118,000 CY

0061 Preload Embankment - I-55 22,000 CY

0062 Sand Fill Base - RRC 47,465 TON

0063 Sand Fill Base - I-55 44,025 TON

0064 Lightweight Aggregate Fill - I-55 100 CY

0065 Vertical Wick Drains - RRC 322,760 LF

0066 Vertical Wick Drains - I-55 809,850 LF

0067 Horizontal Strip Drains - RRC 36,765 LF

0068 Horizontal Strip Drains - I-55 25,760 LF

0069 Grouted Riprap - RRC 900 CY

0070 Grouted Riprap - I-55 550 CY

0071 Piling, Steel Sheet, PZ-22 - RRC 26,244 SF

0072 Piling, Steel Sheet, PZ-22 - I-55 32,780 SF

0073 Piling, Steel Sheet, NZ-28 - RRC 11,467 SF

0074 Piling, Steel Sheet, PZ-35 - I-55 4,202 SF

0075 Braced Floodwall - I-55 1 JOB

0076 Flow Training Walls - I-55 1 JOB

0077 18” Prestressed Concrete Piles -

RRC 3,017 LF

00010-6 Ed 19-019

0078 18” Prestressed Concrete Piles -

I-55 3,258 LF

0079 14” Prestressed Concrete Piles -

RRC 2,456 LF

0080 14” Prestressed Concrete Piles -

I-55 1,021 LF

0081 Dynamic Pile Testing - RRC 1 JOB

0082 Dynamic Pile Testing - I-55 1 JOB

0083 Steel H-Piling (HP14 x 89) - RRC 26,489 LF

0084 Steel H-Piling (HP14 x 89) - I-55 25,673 LF

0085 Furnish 30" x 0.625" Steel Pipe Piles - RRC 23,530 LF

0086 Drive 30" x 0.625" Steel Pipe Piles - RRC 23,530 LF

0087 Furnish 30" x 0.625" Steel Pipe Piles - I-55 27,280 LF

0088 Drive 30" x 0.625" Steel Pipe Piles - I-55 27,280 LF

0089 Furnish 24" x 0.5" Steel Pipe Piles - I-55 18,164 LF

0090 Drive 24" x 0.5" Steel Pipe Piles - I-55 18,164 LF

0091 Surfacing (Separation Stone) -

RRC 6,338 TON

0092 Surfacing (Separation Stone) - I-

55 5,164 TON

0093 Surfacing (Drainage Layer) - RRC 3,003 TON

0094 Surfacing (Drainage Layer) - I-55 2,579 TON

0095 Surfacing (Crushed Stone) - RRC 1,401 TON

0096 Surfacing (Crushed Stone) - I-55 1,203 TON

0097 Chain Link Fencing and Gates -

RRC 1 JOB

0098 Chain Link Fencing and Gates - I-

55 1 JOB

0099 Precast Access Ramps - RRC 1 JOB

0100 Precast Access Ramps - I-55 1 JOB

0101 HPU Platform – RRC 1 JOB

0102 Precast Access Road F Bridge –

RRC 1 JOB

0103 Precast Access Road P Bridge - I-

55 1 JOB

0104 Seeding and Mulching - RRC 9 AC

00010-7 Ed 19-019

0105 Seeding and Mulching - I-55 5 AC

0106++ Lime Soil Amendment - RRC 9 TON

0107++ Lime Soil Amendment - I-55 5 TON

0108++ Sulfur Soil Amendment - RRC 5 TON

0109++ Sulfur Soil Amendment - I-55 3 TON

0110 Fertilizer - RRC

0110AA First 270 LBS 270 LBS

0110AB All Over 270 LBS 154 LBS

0111 Fertilizer - I-55 229 LBS

0112 Utility Modifications (Shell Pipeline) - RRC 1 JOB

0113 Diesel Fuel System - RRC 1 JOB

0114 Diesel Fuel System - I-55 1 JOB

0115 Water Well - RRC 1 EA

0116 Water Well - I-55 1 EA

0117 Temporary Construction Bridge –

RRC 1 JOB

0118 Stoplogs - RRC 1 JOB

0119 Stoplogs - I-55 1 JOB

0120 Navigation Gate - RRC 1 JOB

0121 Slide Gates - RRC 1 JOB

0122 Slide Gates - I-55 1 JOB

0123 Vehicular Swing Gate - RRC 1 JOB

0124 Trash Screens - RRC 1 JOB

0125 Trash Screens I-55 1 JOB

0126 R90 Riprap – RRC 1,458 TON

0127 R90 Riprap - I-55 1,985 TON

0128 R200 Riprap - RRC 8,751 TON

0129 R200 Riprap - I-55 7,899 TON

0130 R400 Riprap – RRC8 11,877 TON

00010-8 Ed 19-019

0131 R1000 Riprap - RRC 14,083 TON

0132 R3500 Riprap – RRC 1,715 TON

0133 R650 Riprap - I-55 4,469 TON

0134 R2200 Riprap - I-55 3,415 TON

0135 Bedding Stone - RRC 7,335 TON

0136 Bedding Stone - I-55 3,358 TON

0137 ACB/Bypass Canal - RRC 1 JOB

0138 Floating Trash Barrier - RRC 1 JOB

0139 Floating Trash Barrier - I-55 1 JOB

0140 Vertical Pumps - RRC 1 JOB

0141 Vertical Pumps - I-55 1 JOB

0142 Submersible Pump - RRC 1 JOB

0143 Submersible Pump - I-55 1 JOB

0144 Process Control and Automation -

RRC 1 JOB

0145 Process Control and Automation -

I-55 1 JOB

0146 Bridge Crane and Hoist - RRC 1 JOB

0147 Bridge Crane and Hoist - I-55 1 JOB

0148 Pump Diesel Engines - RRC 1 JOB

0149 Pump Diesel Engines - I-55 1 JOB

0150 Settlement Monitoring of Preload Embankment – RRC 1 JOB

TOTAL $

++Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.

*Denotes a change from the previous Bidding Schedule.

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

Award will be made as a whole to one bidder.

00010-9 Ed 19-019

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE

DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR

AWARD.

NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

00010-10 Ed 19-019

EVALUATION OF SUBLINE ITEMS (Dec 2019 - AFARS 5152.211-9000).

Item No. 0110 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS (Dec 2019) - AFARS 5152.211-9001).

This variation in estimated quantities clause is applicable only to item No. 0110.

(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.

(b) Where the actual quantity of work performed for item No. 0110 is less than 85% of the quantity of the first subline item listed under such item, the contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause at Federal Acquisition Regulation (FAR) 52.211-18, VARIATION IN ESTIMATED QUANTITY.

(c) If the actual quantity of work performed under item No. 0110 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY.

(End of Clause)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

New Orleans District of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T H

U R

R

IC

A N

E A

N D S

T O

R M D

A M

A G

E R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

A

N E

W O

R L E

A N

S L

H

C -1

.d g n s ta n p w -p w -s v c

-D

E C -2

S T

A N

T E

C C

O N

S U

L T

IN

G S

E R

V

IC

E S I

N C

P

O Y

D R

A S S

T S

T E

N E

W O

R L E

A N

S L

A

-1

D S

IZ

E

New Orleans District of Engineers

US Army Corps

S T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H W

P -2

-B -0

R E

S E

R V

E R

E L

IE

F I -5

P

U M

P S

T A

T

IO

N S A

N D D

R A

IN

A G

E S

T R

U C

T U

R E

S

W S

L P -1

R E

A D

Y F

O R A

D V

E R

T

IS

E M

E N

T

FO

A

NAISI

UO

S

TA

TE

L

CIVIL

EN

G

NIR

ENIG

IN

PROFESSIONAL ENGINEER

E

License No. 31527

THOMAS A. CANCIENNE III

GENERAL NOTES

SHEET KEYNOTES

A1

SCALE: 1" = 150'

NORTH

PLAN

SCALE: 1" = 150'

H9

NORTH

PLAN

P H

A S

IN

G A

N D S

T A

G

IN

G P

L A

N O

F

R E

S E

R V

E R

E L

IE

F C

A N

A L

2C-101

150' 300'0

150' 300'0

T

C A

N C

IE

N N

E

J P

L A

T E

N B

U R

G

H T

H

IB

O D

E A

U X

E

D A

L L

IM

O R

E

H1

SCALE: 1" = 150' 150' 300'0

NORTH

PLAN

GRUBBING

SITE CLEARING AND

2SITE ACCESS ROAD

STRUCTURE ACCESS RAMP13

12STAGE 0 LEVEE LIFTSTAGE 0 LEVEE LIFT

GATE CONSTRUCTION

T-WALL AND SWING

LAYDOWN

BYPASS

T-WALL CLOSURE FOR

AND OPERATIONS AREA

PRELOAD FOR T-WALLS

WICK DRAIN AREAS,

LEGEND

WICK DRAIN AREA

T R

U E N

T R

U E N

T R

U E N

5 LAYDOWN

MAT

CONCRETE BLOCK

ARTICULATED

MAT

CONCRETE BLOCK

ARTICULATED

RESERVE RELIEF CANAL - PHASE 1 RESERVE RELIEF CANAL - PHASE 2

RESERVE RELIEF CANAL - PHASE 3

CANALS

AND DRAINAGE

ENVIRONMENTAL

CONSTRUCTION OF

CONSTRUCTION OF BYPASS CANAL

DONE BY OTHERS.

ACCESS ROAD TO THE SITE AND CULVERTS TO BE INSTALLED IN PRIOR CONTRACT 6.

DRAWINGS FOR PHYSCIAL DIMENSIONS AND LOCATIONS.

ALL OUTLINED AREAS ARE FOR REFERENCE ONLY. CONTRACTOR TO SEE DETAIL 5.

APPROVED SITES.

ALL EXCAVATED MATERIAL TO BE HAULED OFF SITE AND DISPOSED OF AT 4.

STRUCTURE ACCESS RAMP, DRAINAGE AND ENVIORNMENTAL CANALS.

PHASE III: COFERDAM REMOVAL, T- WALL CONSTRUCTION, STAGE 0 LEVEE LIFT, 3.

AND DRAINAGE STRUCTURE COFFERDAM AND CONSTRUCTION.

PHASE II: LAYDOWN, T-WALL AND SWING GATE CONSTRUCTION, PUMP STATION 2.

CLEARING AND GRUBBING.

BYPASS CANAL AND PRELOAD FOR T-WALLS. SEE SHEET 2CD101 FOR LIMITS OF

PHASE I: SITE CLEARING AND GRUBBING, SITE ACCESS ROAD, CONSTRUCTION OF 1.

GATE) COFFERDAM AND CONSTRUCTION

STRUCTURE (INCLUDING NAVIGATION

PUMP STATION AND DRAINAGE

LOG/BULKHEAD CLOSURE.

LOGS, AND PUMP STATION STOP

GATES, NAVIGATION GATE STOP

INSTALL DRAINAGE STRUCTURE

AND T-WALLS)

STRUCTURE, NAVIGATION GATE,

(PUMP STATION, DRAINAGE

REMOVAL OF COFFERDAM

E

D

IT

S T

O O

R D

E R O

F W

O R

K D

E C

13. STRUCTURE ACCESS RAMP

12. STAGE 0 LEVEE LIFT

CAN BE MADE WHOLE AS SOON AS POSSIBLE.

COMPLETE THE PROJECT TO A STAGE WHERE THE RISK REDUCTION SYSTEM

BECOMES OPERATIONAL. THE PRIMARY GOAL OF THE PROJECT IS TO

CONSTRUCTION TO BEGIN IMMEDIATELY AFTER THE DRAINAGE STRUCTURE

11. T-WALL CLOSURE FOR BYPASS. BRACED COFFERDAM/CLOSURE OF BYPASS

COFFERDAM REMOVAL (PUMP STATION AND T-WALL)10.

LOGS, AND PUMP STATION STOP LOG/BULKHEAD CLOSURE.

INSTALLATION OF DRAINAGE STRUCTURE GATES, NAVIGATION GATE STOP 9.

CONSTRUCTION OF ENVIRONMENTAL AND DRAINAGE CANALS8.

PHASE 3

PUMP STATION AND DRAINAGE STRUCTURE.

7. COFFERDAMS, PILE FOUNDATIONS AND CONCRETE FOR NAVIGATION GATE,

6. REMOVAL OF PRELOADS AND CONSTRUCTION OF T-WALLS AND SWING GATE.

LAYDOWN5.

PHASE 2

4. WICK DRAIN AREAS, PRELOAD FOR T-WALLS AND OPERATIONS AREA

3. CONSTRUCTION OF BYPASS CANAL

SITE ACCESS ROAD2.

1. SITE CLEARING AND GRUBBING

PHASE 1

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

New Orleans District of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T H

U R

R

IC

A N

E A

N D S

T O

R M D

A M

A G

E R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

A

N E

W O

R L E

A N

S

C -1

.d g n s ta n p w -p w -s v c

-D

E C -2

S T

A N

T E

C C

O N

S U

L T

IN

G S

E R

V

IC

E S I

N C

P

O Y

D R

A S S

T S

T E

N E

W O

R L E

A N

S L

A

-1

D S

IZ

E

New Orleans District of Engineers

US Army Corps

S T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H W

P -2

-B -0

R E

S E

R V

E R

E L

IE

F I -5

P

U M

P S

T A

T

IO

N S A

N D D

R A

IN

A G

E S

T R

U C

T U

R E

S

W S

L P -1

R E

A D

Y F

O R A

D V

E R

T

IS

E M

E N

T

FO

A

NAISI

UO

S

TA

TE

L

CIVIL

EN

G

NIR

ENIG

IN

PROFESSIONAL ENGINEER

E

H9

NORTH

PLAN

P H

A S

IN

G A

N D S

T A

G

IN

G P

L A

N O

F

R E

S E

R V

E R

E L

IE

F C

A N

A L

2C-102

150' 300'0

T

C A

N C

IE

N N

E

J P

L A

T E

N B

U R

G

H T

H

IB

O D

E A

U X

E

D A

L L

IM

O

NORTH

PLAN

150' 300'0

14CHANNEL GRADING

CHANNEL RIPRAP

LEVEE LIFT

STAGE 1

LEVEE LIFT

STAGE 1

T R

U E N

T R

U E N

RESERVE RELIEF CANAL - PHASE 4 RESERVE RELIEF CANAL - PHASE 5

APPROVED SITES

ALL EXCAVATED MATERIAL TO BE HAULED OFF SITE AND DISPOSED OF AT 3.

PERMANENT BRIDGE INSTALLATION AND CUVERT REMOVAL

PHASE V: FINAL GRADING / SEEDING AND FERTILIZING, CHANNEL RIPRAP, 2.

PHASE IV: CHANNEL GRADING, STAGE 1 LEVEE LIFT1.

E

D

IT

S T

O O

R D

E R O

F W

O R

K D

E C

LEGEND

CONSTRUCTION

LOCATION OF PRELOAD REMOVAL AND LAND BASED T-WALL

RIPRAP

FINAL GRADING

FERTILIZING

SEEDING AND

REMOVAL

INSTALLATION AND CULVERT

PERMANENT BRIDGE

FERTILIZING

SEEDING AND

19. PERMANENT BRIDGE INSTALLATION AND CULVERT REMOVAL

FINAL GRADING/SEEDING AND FERTILIZATING.18.

PARKING AREA.

HYDRAULIC, AND ELECTRICAL ITMES FOR COMMISSIONING, WATER WELL, FUEL,

REMAINING PUMP STATION AND DRAINAGE STRUCTURE MECHANICAL, 17.

16. CHANNEL RIPRAP

PHASE 5

15. STAGE 1 LEVEE LIFT

CHANNEL GRADING14.

PHASE 4

FUEL, PARKING AREA

COMMISSIONING, WATER WELL,

ELECTRICAL ITEMS FOR

MECHANICAL, HYDRAULIC, AND

DRAINAGE STRUCTURE

REMAINING PUMP STATION AND

I-55

I-55

I-55

TEMPORARY US51 BYPASS ROAD

TEMPORARY US51 BYPASS ROAD

TEMPORARY US51 BYPASS ROAD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

New Orleans District of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T H

U R

R

IC

A N

E A

N D S

T O

R M D

A M

A G

E R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

A

N E

W O

R L E

A N

S

C -1

.d g n s ta n p w -p w -s v c

-D

E C -2

S T

A N

T E

C C

O N

S U

L T

IN

G S

E R

V

IC

E S I

N C

P

O Y

D R

A S S

T S

T E

N E

W O

R L E

A N

S L

A

-1

D S

IZ

E

New Orleans District of Engineers

US Army Corps

S T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H W

P -2

-B -0

R E

S E

R V

E R

E L

IE

F I -5

P

U M

P S

T A

T

IO

N S A

N D D

R A

IN

A G

E S

T R

U C

T U

R E

S

W S

L P -1

R E

A D

Y F

O R A

D V

E R

T

IS

E M

E N

T

FO

A

NAISI

UO

S

TA

TE

L

CIVIL

EN

G

NIR

ENIG

IN

PROFESSIONAL ENGINEER

E

A1

NORTH

PLAN

SCALE: 1" = 150'

H9

NORTH

PLAN

P H

A S

IN

G A

N D S

T A

G

IN

G P

L A

N O

F

I- C

A N

A L

I-55 CANAL - PHASE 2

3C-101

T

C A

N C

IE

N N

E

J P

L A

T E

N B

U R

G

H T

H

IB

O D

E A

U X

E

D A

L L

IM

O

NORTH

PLAN

SITE ACCESS ROAD

SITE CLEARING AND GRUBBING 1

REMOVAL

COFFERDAM

LIFT

STAGE 0 LEVEE

AND CONSTRUCTION

T-WALL COFFERDAM

STRUCTURE, AND

DRAINAGE

PUMP STATION,

AND OPERATIONS AREA

PRELOAD FOR T-WALLS

WICK DRAIN AREAS,

LEGEND

WICK DRAIN AREAS

WATER CONVEYANCE TO MAINTAIN FLOW

I-55 CANAL - PHASE 1

150' 300'0 150' 300'0

T R

U E N

I-55 CANAL - PHASE 3

150' 300'0

T R

U E N

T R

U E N

PHASE 2 LAYDOWN

SEE SPECS FOR RESTRICTIONS TO THIS AREA.8.

DONE BY OTHERS.

ACCESS ROAD TO THE SITE AND CULVERTS TO BE INSTALLED IN PRIOR CONTRACT 7.

DRAWINGS FOR PHYSCIAL DIMENSIONS AND LOCATIONS.

ALL OUTLINED AREAS ARE FOR REFERENCE ONLY. CONTRACTOR TO SEE DETAIL 6.

LIMITS.

SEE 3CD101 FOR LIMITS OF CLEARING AND GRUBBING AND LEVEE CLEARING 5.

APPROVED SITES

ALL EXCAVATED MATERIAL TO BE HAULED OFF SITE AND DISPOSED OF AT 4.

STRUCTURE ACCESS RAMP, DRAINAGE STRUCTURE GATES OPERATIONAL.

PHASE III: COFFERDAM REMOVAL, T- WALL CONSTRUCTION, STAGE 0 LEVEE LIFT, 3.

COFFERDAM AND CONSTRUCTION

PHASE II: LAYDOWN, PUMP STATION, DRAINAGE STRUCTURE, AND T-WALL 2.

GRUBBING.

PRELOAD FOR T-WALLS. SEE SHEET 3CD101 FOR LIMITS OF CLEARING AND

PHASE I: SITE CLEARING AND GRUBBING, SITE ACCESS ROAD, WICK DRAIN AREAS, 1.

CONSIDERATION BY THE GOVERNMENT.

CONTRACTOR MAY SUBMIT ALTERNATIVE SEQUENCING WITH SCHEDULE FOR

THIS IS THE REQUIRED CONSTRUCTION SEQUENCING FOR THE CONTRACT. THE

CONSTRUCTION

LOCATION OF PRELOAD REMOVAL AND LAND BASED T-WALL

T-WALL

COMPLETION OF

PRELOADS AND

REMOVAL OF ALL

ACCESS RAMP

STRUCTURE

REMOVAL

COFFERDAM

T-WALLS AND

COMPLETION OF

A

P R

IL

E

D

IT

S T

O O

R D

E R O

F W

O R

K

R E

S T

R

IC

T E

D W

O R

K A

R E

A T -W

A L L M

O N

O L

IT

H S -5

E A

N D -6

E

D E

C

STRUCTURE ACCESS RAMP13.

STAGE 0 LEVEE LIFT12.

CONSTRUCTION OF ENVIRONMENTAL CANAL.11.

COMPLETION OF WATER BASED T-WALLS AND COFFERDAM REMOVAL.10.

T-WALLS.

REMOVAL OF ALL PRELOADS AND CONSTRUCTION OF WEST SIDE LAND BASED 9.

COFFERDAM REMOVAL8.

LOG/BULKHEAD CLOSURE.

INSTALLATION OF DRAINAGE STRUTURE GATES, AND PUMP STATION STOP 7.

PHASE 3

CONSTRUCTION

6. PUMP STATION, DRAINAGE STRUCTURE, AND T-WALL COFFERDAM AND

PHASE 2 LAYDOWN5.

PHASE 2

4. WICK DRAIN AREAS, PRELOAD FOR T-WALLS AND OPERATIONS AREA

3. WATER CONVEYANCE TO MAINTAIN FLOW

SITE ACCESS ROAD2.

1. SITE CLEARING AND GRUBBING

PHASE 1

CANALS

ENVIRONMENTAL

CONSTRUCTION OF

STATION STOP LOG/BULKHEAD CLOSURE.

DRAINAGE STRUCTURE GATES, AND PUMP

SEE NOTE 8

SEE NOTE 8

SEE NOTE 8

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

New Orleans District of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T H

U R

R

IC

A N

E A

N D S

T O

R M D

A M

A G

E R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

A

N E

W O

R L E

A N

S

C -1

.d g n s ta n p w -p w -s v c

-D

E C -2

S T

A N

T E

C C

O N

S U

L T

IN

G S

E R

V

IC

E S I

N C

P

O Y

D R

A S S

T S

T E

N E

W O

R L E

A N

S L

A

-1

D S

IZ

E

New Orleans District of Engineers

US Army Corps

S T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H W

P -2

-B -0

R E

S E

R V

E R

E L

IE

F I -5

P

U M

P S

T A

T

IO

N S A

N D D

R A

IN

A G

E S

T R

U C

T U

R E

S

W S

L P -1

R E

A D

Y F

O R A

D V

E R

T

IS

E M

E N

T

FO

A

NAISI

UO

S

TA

TE

L

CIVIL

EN

G

NIR

ENIG

IN

PROFESSIONAL ENGINEER

E

H9

NORTH

PLAN

P H

A S

IN

G A

N D S

T A

G

IN

G P

L A

N O

F

I-55 CANAL - PHASE 5

I- C

A N

A L

T

C A

N C

IE

N N

E

J P

L A

T E

N B

U R

G

H T

H

IB

O D

E A

U X

E

D A

L L

IM

O R

E

3C-102

150' 300'0

NORTH

PLAN

I-55 CANAL - PHASE 4

150' 300'0

CLOSURE OF BYPASS

CONSTRUCTION.

BRACED FLOODWALL

15STAGE 1 LEVEE LIFT

T R

U E N

T R

U E N

CULVERT REMOVAL

INSTALLATION AND

PERMANENT BRIDGE

AND FERTILIZING

FINAL GRADING/SEEDING

TEMPORARY US51 BYPASS ROAD

I-55

MAY LIMIT ACCESS TO SITE)

(CONSTRUCTED BY OTHERS

TEMPORARY US51 BYPASS ROAD

US-51

A

P R

IL

R E

S T

R

IC

T E

D W

O R

K A

R E

A T -W

A L L M

O N

O L

IT

H S -5

E A

N D -6

E

3-5E AND 3-6E

T-WALL MONLITHS

LEGEND

CONSTRUCTION

LOCATION OF PRELOAD REMOVAL AND LAND BASED T-WALL

RIPRAP

ACCESS BRIDGE.

OF PERMANENT REMOVAL OF ACCESS CULVERT CROSSING AND INSTALLATION 20.

FINAL GRADING/SEEDING AND FERTILIZING 19.

PARKING AREA.

HYDRAULIC, AND ELECTRICAL ITEMS FOR COMMISSIONING, WATER WELL, FUEL,

REMAINING PUMP STATION AND DRAINAGE STRUCTURE MECHANICAL, 18.

CHANNEL GRADING AND CHANNEL RIPRAP17.

PHASE 5

MONLITHS 3-5E AND 3-6E16.

STAGE 1 LEVEE LIFT15.

BRACED FLOODWALL CONSTRUCTION. CLOSURE OF BYPASS14.

PHASE 4

SEE SPECS FOR RESTRICTIONS TO THIS AREA.5.

LIMITED.

DURING CONSTRUCTION OF THE WSLP-103 PROJECT, ACCESS FROM US-51 WILL BE 4.

APPROVED SITES.

ALL EXCAVATED MATERIAL TO BE HAULED OFF SITE AND DISPOSED OF AT 3.

STORAGE, PARKING, AND ACCESS BRIDGE.

HYDRAULIC, AND ELECTRICAL FOR COMMISSIONING, WATER WELL, FUEL

PHASE V: CHANNEL GRADING AND RIPRAP, COMPLETION OF ALL MECH, 2.

BE MADE WHOLE AS SOON AS POSSIBLE.

COMPLETE THE PROJECT TO A STAGE WHERE THE RISK REDUCTION SYSTEM CAN

STRUCTURE BECOMES OPERATIONAL. THE PRIMARY GOAL OF THE PROJECT IS TO

BYPASS CONSTRUCTION TO BEGIN IMMEDIATELY AFTER THE DRAINAGE

LEVEE LIFT, MONOLITHS 3-5E AND 3-6E. BRACED COFFERDAM/CLOSURE OF

PHASE IV: BRACED FLOODWALL CONSTRUCTION, CLOSURE OF BYPASS, STAGE 1 1.

CHANNEL GRADING

RIPRAP

CHANNEL

FUEL, PARKING AREA

COMMISSIONING, WATER WELL,

ELECTRICAL ITEMS FOR

MECHANICAL, HYDRAULIC, AND

DRAINAGE STRUCTURE

REMAINING PUMP STATION AND

D

E C

E D

IT

S T

O O

R D

E R O

F W

O R

K

SEE NOTE 5

SEE NOTE 5

STA 770+00 B/L STA 771+00 B/L

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

New Orleans District of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

A

H U

R R

IC

A N

E A

N D S

T O

R M D

A M

A G

E R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

A

H

C D -3

S -3

.d g n s ta n p w -p w -s v c

-D

E C -2

D S

IZ

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

H

S T

A N

T E

C C

O N

S U

L T

IN

G S

E R

V

IC

E S I

N C

P

O Y

D R

A S S

T S

T E

N E

W O

R L E

A N

S L

A

-1

S T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H W

P -2

-B -0

R E

S E

R V

E R

E L

IE

F I -5

P

U M

P S

T A

T

IO

N S A

N D D

R A

IN

A G

E S

T R

U C

T U

R E

S

W S

L P -1

O C

T O

B E

R

R E

A D

Y F

O R A

D V

E R

T

IS

E M

E N

T

B2

SCALE: 1/4" = 1'-0" 0 4' 8'2'3S-142

C3

H

C D -3

S -3

T-WALL SECTION - MONOLITH 3-1W

3 3

B13

SCALE: 1/4" = 1'-0"3S-142

C3

0 4' 8'2'

EL. -11.0'

3S-325

M A

R R

B Z

A H

A W I

E

C O

O N

L

C A

T T

U R

IN

I

I-

P U

M P S

T A

T

IO

N

T -W

A L L S

E C

T

IO

N

W E

S T

E

C O

O N

R

M A

R R

EL. -40.0'

EL. 3.5'

EL. 5.5'

EL. -16.75'

EL. -19.75'

EL. 3.5'

FLOOD WALLSPUMP STATION

T-WALL SECTION 1 - MONOLITH 3-1W

EL. -28.0'

B.O. TREMIE SLAB

EL. -23.0'

T.O. LEVELING SLAB

EL. -18.0'

T.O. FOUNDATION

EL. -19.75'

B.O. TREMIE SLAB

EL. -16.75'

T.O. LEVELING SLAB

EL. -11.0'

T.O. FOUNDATION

EL. 5.5'

T.O. SHEET PILE

FO

A

NAISI

UO

S

TA

TE

L

CIVIL

EN

G

NIR

ENIG

IN

PROFESSIONAL ENGINEER

E

License No. 38983

ERIC COON

FO

A

NAISI

UO

S

TA

TE

L

CIVIL

EN

G

NIR

ENIG

IN

PROFESSIONAL ENGINEER

E

License No. 38983

ERIC COON

D

E C

A D J

U S

T E

D S

H E

E T P

IL

E T

IP

E

L E

V A

T

IO

N

H6

3S-327

OR EQUIVALENT

AZ 52-700 SHEET PILE

WF 24x55 WALER

FOR DETAILS

SEE SHEETS 3S-398

TO CIVIL GRADING SHEETS

FG ELEV VARIES REFER

±4'-6"

6" LEVELING SLAB

CONSTRUCTING FLOOD WALL

TREMIE SLAB PRIOR TO

COFFERDAM CUT TO TOP OF

PUMP STATION STRUCTURE

TREMIE SLAB

6" LEVELING SLAB

TREMIE SLAB

6" LEVELING SLAB

PILE.

ELEVATION TO MATCH FLOODWALL

HP 14x89 TREMIE ANCHOR PILES. TIP

12'-6" 12'-6"

8'-6"

(T

Y P

WALERS.

TO INSTALLATION OF TRS

PILE TO BE DRIVEN PRIOR

COMES FIRST

OR 2,000 PSI WHICHEVER

REACHES 7 DAY STRENGTH

FLOWABLE FILL AFTER SLAB

STRUCTURAL FILL OR

BACKFILL WITH COMPACTED

DTL, SHT. 3S-326

SEE CASING

4'-6"8'-0"6'-6"

AFTER REMOVAL OF TRS

CONTRACTOR TO SEAL HOLES

PUMP STATION STRUCTURE WALL.

WALERS TO BE ANCHORED TO

EMBEDMENT

V3 (OR EQUAL) WITH 8" MIN.

WALL USING HILTI HIT-RE 500

ROD AT 24" O.C. EPOXY INTO

7/8" Ø F1554 GR. 55 ANCHOR

TO SHEET PILE

L8X8X5/8 WELDED

SLAB

STATION WALL AND TREMIE

BE SUPPORTED BY PUMP

COFFERDAM AND WALER TO

STRUCTURE COFFERDAM.

REMOVAL OF PUMP STATION

BE INSTALLED PRIOR TO

BEYOND PUMP STATION TO

FLOOD WALL COFFERDAM

.2

Am_0010_REVISED_W912P825B0004_WSLP 114_Ed 19-019.pdf
Am_0010
!00010 _Am_0010
WSLP114_Order of Work drawings Stamped
H448294_2C-101
H448294_2C-101
H448294H_G-BS----.dgn, ANSI D
PHASE I, H448294_2C-101.dgn, Model Space
PHASE II, H448294_2C-101.dgn, Model Space
PHASE III, H448294_2C-101.dgn, Model Space
H448294_2C-102
H448294_2C-102
H448294H_G-BS----.dgn, ANSI D
PHASE I, H448294_2C-102.dgn, Model Space
PHASE II, H448294_2C-102.dgn, Model Space
H448294_3C-101
H448294_3C-101
H448294H_G-BS----.dgn, ANSI D
PHASE I, H448294_3C-101.dgn, Model Space
PHASE II, H448294_3C-101.dgn, Model Space
PHASE III, H448294_3C-101.dgn, Model Space
H448294_3C-102
H448294_3C-102
H448294H_G-BS----.dgn, ANSI D
PHASE I, H448294_3C-102.dgn, Model Space
PHASE II, H448294_3C-102.dgn, Model Space
H448294_CD-3_S-325
H448294_CD-3_S-325
References
65% Border, PW_WORKDIR:d0124799
H448294V_G-BS----.dgn
H448294_CD-3_S-325.dgn, Drawing
Ref, H448294_CD-3_S-325.dgn, Drawing

H448294-3_114C-3CF405

File details come from the government source that posted it. Updated .