W912P823B0024 BID ABSTRACT.pdf
PDF 448 KB Posted
- Attached to
- West Shore Lake Pontchartrain, WSLP-101a Levee, St. John the Baptist Parish & St. Charles Parish, Louisiana
- Solicitation number
- W912P823B0024
About this file
This solicitation package is for a construction project to improve the West Shore Lake Pontchartrain levee in St. John the Baptist and St. Charles Parishes in Louisiana. The work includes clearing and grubbing, excavation, embankment construction, installation of vertical wick and horizontal strip drains, geotextile placement, crushed stone surfacing, corrugated metal pipe installation, and turf establishment. The estimated value is between $25-100 million. Interested contractors must monitor the SAM website for release of the solicitation and any amendments. Questions are due by March 7, 2023. The award will be a single firm fixed price contract issued by the US Army Corps of Engineers New Orleans District to the responsible bidder with the lowest price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
West Shore Lake Pontchartrain, Louisiana, Hurricane Storm Damage Risk Reduction Project, WSLP-101A Levee, St. John the Baptist Parish and St.
Charles Parish, Louisiana
Solicitation Number: W912P823B0024
2. DATE ISSUED
3. DATE OPENED PAGE_1_0F__ PAGES
22-Feb-23
DATE SIGNED
19-Apr-23
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 Mobilization & Demobilization 1 JOB $ 379,095.00 $ 379,095.00 $ 2,876,000.00 $ 2,876,000.00 $ 37,969,715.20 $ 37,969,715.20 $ 2,100,000.00 $ 2,100,000.00 $ 1,500,000.00 $ 1,500,000.00 $ 1,300,000.00 $ 1,300,000.00 $ 1,650,000.00 $ 1,650,000.00 $2,410,000.00 $ 2,608,000.00 $ 1,890,011.83 $ 1,890,011.83 $ 900,000.00 $ 900,000.00 $ 2,100,000.00 $ 2,100,000.00 $ 3,685,000.00 $ 3,685,000.00 $ 3,501,428.74 $ 3,501,428.74 $ 2,704,712.29 $ 2,704,712.29
0002 Access Road “J” Maintenance
0002AA First 7,000 TON 7000 TON $ 107.91 $ 755,370.00 $ 63.00 $ 441,000.00 $ 78.57 $ 550,000.00 $ 75.60 $ 529,200.00 $ 95.00 $ 665,000.00 $ 70.00 $ 490,000.00 $ 80.00 $ 560,000.00 $ 47.05 $ 329,350.00 $ 117.62 $ 823,340.00 $ 122.00 $ 854,000.00 $ 75.00 $ 525,000.00 $ 325.00 $ 2,275,000.00 $ 98.64 $ 690,480.00 $ 56.21 $ 393,470.00
0002AB All Over 7,000 TON 2000 TON $ 107.39 $ 214,780.00 $ 63.00 $ 126,000.00 $ 78.57 $ 157,143.00 $ 75.60 $ 151,200.00 $ 85.00 $ 170,000.00 $ 71.00 $ 142,000.00 $ 70.00 $ 140,000.00 $ 30.80 $ 61,600.00 $ 115.88 $ 231,760.00 $ 99.00 $ 198,000.00 $ 65.00 $ 130,000.00 $ 66.10 $ 132,200.00 $ 77.53 $ 155,060.00 $ 56.21 $ 112,420.00
0003 Traffic Control and Coordination 1 JOB $ 253,000.00 $ 253,000.00 $ 25,000.00 $ 25,000.00 $ 1,560,000.00 $ 1,560,000.00 $ 315,000.00 $ 315,000.00 $ 220,000.00 $ 220,000.00 $ 10,000.00 $ 10,000.00 $ 45,000.00 $ 45,000.00 $ 891,000.00 $ 891,000.00 $ 143,705.27 $ 143,705.27 $ 80,000.00 $ 80,000.00 $ 180,000.00 $ 180,000.00 $ 12,000.00 $ 12,000.00 $ 65,539.93 $ 65,539.93 $ 87,500.00 $ 87,500.00
0004 Truck Wash-Down Racks 1 JOB $ 330,000.00 $ 330,000.00 $ 182,000.00 $ 182,000.00 $ 40,000.00 $ 430,500.00 $ 430,500.00 $ 100,000.00 $ 100,000.00 $ 50,500.00 $ 50,500.00 $ 45,000.00 $ 45,000.00 $ 251,250.00 $ 251,250.00 $ 187,926.98 $ 187,926.98 $ 54,000.00 $ 54,000.00 $ 200,000.00 $ 200,000.00 $ 42,530.00 $ 42,530.00 $ 48,216.24 $ 48,216.24 $ 98,041.00 $ 98,041.00
0005 Separator Geotextile 13000 SY $ 4.32 $ 56,160.00 $ 4.00 $ 52,000.00 $ 0.77 $ 10,000.00 $ 3.70 $ 48,048.00 $ 4.50 $ 58,500.00 $ 4.00 $ 52,000.00 $ 5.00 $ 65,000.00 $ 3.30 $ 42,900.00 $ 3.90 $ 50,700.00 $ 9.50 $ 123,500.00 $ 4.00 $ 52,000.00 $ 5.00 $ 65,000.00 $ 3.55 $ 46,150.00 $ 5.44 $ 70,720.00
0006 Reinforcement Geotextile 76000 SY $ 15.02 $ 1,141,520.00 $ 15.00 $ 1,140,000.00 $ 0.86 $ 65,000.00 $ 8.93 $ 678,300.00 $ 11.00 $ 836,000.00 $ 11.85 $ 900,600.00 $ 14.00 $ 1,064,000.00 $ 6.60 $ 501,600.00 $ 11.70 $ 889,200.00 $ 15.70 $ 1,193,200.00 $ 11.00 $ 836,000.00 $ 11.25 $ 855,000.00 $ 14.90 $ 1,132,400.00 $ 11.29 $ 858,040.00
0007 Clearing and Grubbing 1 JOB $ 2,026,000.00 $ 2,026,000.00 $ 4,160,000.00 $ 4,160,000.00 $ 40,000.00 $ 8,573,040.00 $ 8,573,040.00 $ 2,850,000.00 $ 2,850,000.00 $ 2,370,000.00 $ 2,370,000.00 $ 3,500,000.00 $ 3,500,000.00 $1,626,250.00 $ 1,626,250.00 $ 1,340,800.62 $ 1,340,800.62 $ 2,690,490.00 $ 2,690,490.00 $ 5,000,000.00 $ 5,000,000.00 $ 1,777,500.00 $ 1,777,500.00 $ 1,943,377.73 $ 1,943,377.73 $ 2,339,276.25 $ 2,339,276.25
Land Side Drainage Channel
Excavation
1 JOB
$ 868,000.00 $ 868,000.00 $ 1,600,000.00 $ 1,600,000.00 $ 850,000.00 $ 25,725,000.00 $ 25,725,000.00 $ 2,000,000.00 $ 2,000,000.00 $ 870,000.00 $ 870,000.00 $ 2,300,000.00 $ 2,300,000.00 $1,083,950.00 $ 1,083,950.00 $ 1,443,963.81 $ 1,443,963.81 $ 1,332,000.00 $ 1,332,000.00 $ 4,757,000.00 $ 4,757,000.00 $ 2,643,900.00 $ 2,643,900.00 $ 2,748,537.68 $ 2,748,537.68 $ 2,962,360.00 $ 2,962,360.00
Embankment, Compacted Fill, Government Furnished
Stockpile
0009AA First 254,000 CY 254000 CY $ 16.88 $ 4,287,520.00 $ 28.75 $ 7,302,500.00 $ 25.00 $ 6,350,000.00 $ 30.10 $ 7,646,289.00 $ 22.50 $ 5,715,000.00 $ 13.55 $ 3,441,700.00 $ 18.00 $ 4,572,000.00 $ 16.95 $ 4,305,300.00 $ 20.80 $ 5,283,200.00 $ 35.50 $ 9,017,000.00 $ 20.00 $ 5,080,000.00 $ 21.05 $ 5,346,700.00 $ 27.88 $ 7,081,520.00 $ 14.08 $ 3,576,320.00
0009AB All Over 254,000 CY 127000 CY $ 16.52 $ 2,098,040.00 $ 28.75 $ 3,651,250.00 $ 25.00 $ 3,175,000.00 $ 30.10 $ 3,823,144.50 $ 22.50 $ 2,857,500.00 $ 13.55 $ 1,720,850.00 $ 16.00 $ 2,032,000.00 $ 16.50 $ 2,095,500.00 $ 20.79 $ 2,640,330.00 $ 35.50 $ 4,508,500.00 $ 18.00 $ 2,286,000.00 $ 21.45 $ 2,724,150.00 $ 19.25 $ 2,444,750.00 $ 14.08 $ 1,788,160.00
0010 Uncompacted Fill 1 JOB $ 79,000.00 $ 79,000.00 $ 400,000.00 $ 400,000.00 $ 1,500,000.00 $ 10,290,000.00 $ 10,290,000.00 $ 50,000.00 $ 50,000.00 $ 245,000.00 $ 245,000.00 $ 75,000.00 $ 75,000.00 $ 248,000.00 $ 248,000.00 $ 131,989.37 $ 131,989.37 $ 160,000.00 $ 160,000.00 $ 300,000.00 $ 300,000.00 $ 170,735.00 $ 170,735.00 $ 633,037.22 $ 633,037.22 $ 80,000.00 $ 80,000.00
0011 Sand Fill
0011AA First 50,000 TON 50000 TON $ 5.67 $ 283,500.00 $ 14.50 $ 725,000.00 $ 78.57 $ 3,928,571.43 $ 30.10 $ 1,505,175.00 $ 15.50 $ 775,000.00 $ 7.80 $ 390,000.00 $ 17.00 $ 850,000.00 $ 17.00 $ 850,000.00 $ 15.18 $ 759,000.00 $ 45.70 $ 2,285,000.00 $ 14.00 $ 700,000.00 $ 19.80 $ 990,000.00 $ 22.70 $ 1,135,000.00 $ 12.80 $ 640,000.00
0011AB All Over 50,000 TON 25000 TON $ 5.67 $ 141,750.00 $ 11.25 $ 281,250.00 $ 78.57 $ 1,964,285.71 $ 30.10 $ 752,587.50 $ 13.00 $ 325,000.00 $ 9.50 $ 237,500.00 $ 17.00 $ 425,000.00 $ 16.25 $ 406,250.00 $ 15.13 $ 378,250.00 $ 24.50 $ 612,500.00 $ 14.00 $ 350,000.00 $ 15.95 $ 398,750.00 $ 18.27 $ 456,750.00 $ 7.80 $ 195,000.00
0012 Vertical Wick Drains 5050000 LF $ 1.50 $ 7,575,000.00 $ 0.45 $ 2,272,500.00 $ 1.25 $ 6,312,500.00 $ 0.49 $ 2,492,175.00 $ 0.60 $ 3,030,000.00 $ 0.51 $ 2,575,500.00 $ 0.55 $ 2,777,500.00 $ 0.53 $ 2,676,500.00 $ 0.54 $ 2,727,000.00 $ 0.47 $ 2,373,500.00 $ 0.50 $ 2,525,000.00 $ 0.50 $ 2,525,000.00 $ 0.60 $ 3,030,000.00 $ 0.38 $ 1,919,000.00
0013 Horizontal Strip Drains 335000 LF $ 5.43 $ 1,819,050.00 $ 2.00 $ 670,000.00 $ 7.50 $ 2,512,500.00 $ 0.49 $ 165,322.50 $ 1.80 $ 603,000.00 $ 1.59 $ 532,650.00 $ 1.70 $ 569,500.00 $ 1.96 $ 656,600.00 $ 2.02 $ 676,700.00 $ 1.50 $ 502,500.00 $ 1.50 $ 502,500.00 $ 1.65 $ 552,750.00 $ 1.71 $ 572,850.00 $ 1.80 $ 603,000.00
0014 Surfacing
0014AA First 6,000 TON 6000 TON $ 88.67 $ 532,020.00 $ 66.00 $ 396,000.00 $ 25.00 $ 150,000.00 $ 96.26 $ 577,584.00 $ 85.00 $ 510,000.00 $ 71.40 $ 428,400.00 $ 82.00 $ 492,000.00 $ 107.51 $ 645,060.00 $ 66.54 $ 399,240.00 $ 114.00 $ 684,000.00 $ 75.00 $ 450,000.00 $ 70.50 $ 423,000.00 $ 71.40 $ 428,400.00 $ 52.45 $ 314,700.00
0014AB All Over 6,000 TON 2000 TON $ 88.67 $ 177,340.00 $ 66.00 $ 132,000.00 $ 25.00 $ 50,000.00 $ 96.26 $ 192,528.00 $ 85.00 $ 170,000.00 $ 71.40 $ 142,800.00 $ 81.00 $ 162,000.00 $ 88.55 $ 177,100.00 $ 66.54 $ 133,080.00 $ 102.00 $ 204,000.00 $ 65.00 $ 130,000.00 $ 70.50 $ 141,000.00 $ 71.19 $ 142,380.00 $ 52.45 $ 104,900.00
0015 Seeding and Mulching 45 AC $ 7,500.00 $ 337,500.00 $ 7,600.00 $ 342,000.00 $ 5,000.00 $ 225,000.00 $ 5,250.00 $ 236,250.00 $ 4,500.00 $ 202,500.00 $ 7,550.00 $ 339,750.00 $ 8,000.00 $ 360,000.00 $ 7,865.00 $ 353,925.00 $ 6,651.01 $ 299,295.45 $ 5,600.00 $ 252,000.00 $ 7,000.00 $ 315,000.00 $ 3,555.00 $ 159,975.00 $ 8,128.24 $ 365,770.80 $ 2,600.00 $ 117,000.00
0016 Fertilizer
0016AA First 9,000 LBS 9000 LBS $ 6.24 $ 56,160.00 $ 2.50 $ 22,500.00 $ 1.15 $ 10,350.00 $ 0.44 $ 3,969.00 $ 1.50 $ 13,500.00 $ 3.08 $ 27,720.00 $ 1.75 $ 15,750.00 $ 2.64 $ 23,760.00 $ 3.19 $ 28,710.00 $ 1.70 $ 15,300.00 $ 2.00 $ 18,000.00 $ 5.55 $ 49,950.00 $ 1.45 $ 13,050.00 $ 4.05 $ 36,450.00
0016AB All Over 9,000 LBS 5000 LBS $ 6.24 $ 31,200.00 $ 2.50 $ 12,500.00 $ 1.15 $ 5,750.00 $ 0.44 $ 2,205.00 $ 1.50 $ 7,500.00 $ 3.08 $ 15,400.00 $ 1.50 $ 7,500.00 $ 2.64 $ 13,200.00 $ 3.19 $ 15,950.00 $ 1.70 $ 8,500.00 $ 1.00 $ 5,000.00 $ 5.55 $ 27,750.00 $ 1.45 $ 7,250.00 $ 4.05 $ 20,250.00
0017 Lime Soil Amendment 45 TON $ 822.00 $ 36,990.00 $ 900.00 $ 40,500.00 $ 26.00 $ 1,170.00 $ 0.44 $ 19.85 $ 600.00 $ 27,000.00 $ 1,080.00 $ 48,600.00 $ 250.00 $ 11,250.00 $ 170.50 $ 7,672.50 $ 1,107.16 $ 49,822.20 $ 300.00 $ 13,500.00 $ 100.00 $ 4,500.00 $ 2,700.00 $ 121,500.00 $ 290.92 $ 13,091.40 $ 1,950.00 $ 87,750.00
0018 Sulfur Soil Amendment 23 TON $ 2,470.00 $ 56,810.00 $ 2,000.00 $ 46,000.00 $ 200.00 $ 4,600.00 $ 0.44 $ 10.14 $ 600.00 $ 13,800.00 $ 2,590.00 $ 59,570.00 $ 350.00 $ 8,050.00 $ 1,870.00 $ 43,010.00 $ 2,616.07 $ 60,169.61 $ 850.00 $ 19,550.00 $ 100.00 $ 2,300.00 $ 2,650.00 $ 60,950.00 $ 407.28 $ 9,367.44 $ 1,900.00 $ 43,700.00
Corrugated Metal Pipe 72"
Diameter
800 LF
$ 820.00 $ 656,000.00 $ 1,375.00 $ 1,100,000.00 $ 350.00 $ 280,000.00 $ 545.53 $ 436,422.00 $ 800.00 $ 640,000.00 $ 600.00 $ 480,000.00 $ 850.00 $ 680,000.00 $ 783.90 $ 627,120.00 $ 722.29 $ 577,832.00 $ 1,000.00 $ 800,000.00 $ 700.00 $ 560,000.00 $ 520.00 $ 416,000.00 $ 771.13 $ 616,904.00 $ 754.00 $ 603,200.00
0020 R-90 Stone
0020AA First 170 TON 170 TON $ 107.00 $ 18,190.00 $ 120.00 $ 20,400.00 $ 300.00 $ 51,000.00 $ 67.99 $ 11,557.88 $ 110.00 $ 18,700.00 $ 122.00 $ 20,740.00 $ 150.00 $ 25,500.00 $ 776.92 $ 132,076.40 $ 97.40 $ 16,558.00 $ 194.00 $ 32,980.00 $ 140.00 $ 23,800.00 $ 121.35 $ 20,629.50 $ 159.13 $ 27,052.10 $ 87.65 $ 14,900.50
0020AB All Over 170 TON 80 TON $ 107.00 $ 8,560.00 $ 120.00 $ 9,600.00 $ 300.00 $ 24,000.00 $ 67.99 $ 5,439.00 $ 110.00 $ 8,800.00 $ 122.00 $ 9,760.00 $ 150.00 $ 12,000.00 $ 107.80 $ 8,624.00 $ 97.40 $ 7,792.00 $ 142.00 $ 11,360.00 $ 140.00 $ 11,200.00 $ 122.30 $ 9,784.00 $ 181.80 $ 14,544.00 $ 87.65 $ 7,012.00
0021 Geogrid 1500 SY $ 7.63 $ 11,445.00 $ 8.00 $ 12,000.00 $ 1.53 $ 2,300.00 $ 5.84 $ 8,757.00 $ 12.00 $ 18,000.00 $ 6.65 $ 9,975.00 $ 10.50 $ 15,750.00 $ 22.40 $ 33,600.00 $ 10.99 $ 16,485.00 $ 22.30 $ 33,450.00 $ 10.00 $ 15,000.00 $ 6.05 $ 9,075.00 $ 11.37 $ 17,055.00 $ 7.62 $ 11,430.00
$ 24,230,000.00 $ 28,038,000.00 $ 67,788,885.34 $ 66,699,723.36 $ 23,384,800.00 $ 16,911,015.00 $ 22,459,800.00 $ 20,699,197.90 $ 21,202,812.14 $ 28,958,830.00 $ 10.00 $ 27,058,300.00 $ 25,635,828.50 $ 27,339,962.28 $ 19,789,312.04
Option
Embankment, Compacted Fill, Government Furnished Borrow
Pit - OW
127000 CY
$ 22.20 $ 2,819,400.00 $ 44.74 $ 5,681,980.00 $ 35.00 $ 4,445,000.00 $ 37.80 $ 4,800,600.00 $ 42.00 $ 5,334,000.00 $ 44.75 $ 5,683,250.00 $ 31.00 $ 3,937,000.00 $ 39.46 $ 5,011,420.00 $ 14.39 $ 1,827,530.00 $ 56.72 $ 7,203,440.00 $ 39.00 $ 4,953,000.00 $ 30.15 $ 3,829,050.00 $ 22.97 $ 2,917,190.00 $ 25.68 $ 3,261,360.00
Option
Borrow Pit Development - OW 1 JOB
$ 596,000.00 $ 596,000.00 $ 1.00 $ 1.00 $ 600,000.00 $ 1,292,550.00 $ 1,292,550.00 $ 150,000.00 $ 150,000.00 $ 1,000.00 $ 1,000.00 $ 215,000.00 $ 215,000.00 $1,492,562.50 $ 1,492,562.50 $ 916,353.86 $ 916,353.86 $ 1.00 $ 1.00 $ 70,000.00 $ 70,000.00 $ 333,506.50 $ 333,506.50 $ 875,730.65 $ 875,730.65 $ 200,000.00 $ 200,000.00
$ 3,415,400.00 $ 5,681,981.00 $ 5,045,000.00 $ 6,093,150.00 $ 5,484,000.00 $ 5,684,250.00 $ 4,152,000.00 $ 6,503,982.50 $ 2,743,883.86 $ 7,203,441.00 $ 5,023,000.00 $ 4,162,556.50 $ 3,792,920.65 $ 3,461,360.00
$ 27,645,400.00 $ 33,719,981.00 $ 73,273,885.34 $ 72,792,873.36 $ 28,868,800.00 $ 22,595,265.00 $ 26,611,800.00 $ 27,203,180.40 $ 23,946,696.00 $ 36,162,271.00 $ 32,081,300.00 $ 29,798,385.00 $ 31,132,882.93 $ 23,250,672.04
NOTE 1: Harris Construction LLC includes math errors in bid.
NOTE 2: Venice Engineering, LLC includes math errors in bid.
NOTE 3: Genesis 360, LLC includes math errors in bid.
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
ABSTRACT OF OFFERS - CONSTRUCTION Solicitation Number: W912P823B0024
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Contract Specialist
Margaret C. Maine
Contracting Officer
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) 20%, $3,000,000.00 B. BID SECURITY (Type and amount) No Bid Bond received.
TOTAL:
West Shore Lake Pontchartrain, Louisiana, Hurricane
Storm Damage Risk Reduction Project, WSLP-101A Levee, St. John the Baptist Parish and St. Charles Parish, Louisiana
7B. DESCRIPTION OF OFFERED ITEM
(Check A, B or C and complete D, E, and F)
C. REASONABLE CONTRACT
(Including Profit)
OPTIONAL WORK TOTAL:
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED- NO
18-Apr-23
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR
Cycle Construction, L.L.C.
A. OFFEROR
Harris Construction
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calvin Fogle
NO. 1 NO. 2 NO. 3
A. OFFEROR
Venice Engineering, LLC
B. BID SECURITY (Type and amount) No Bid Bond received.
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 4
A. OFFEROR
Circle, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 5
A. OFFEROR
Onshore Materials, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 6
A. OFFEROR
PHYLWAY Construction, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 7
A. OFFEROR
Genesis 360, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 8
A. OFFEROR
Rigid Constructors, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 9
A. OFFEROR
Clark Construction Enterprises, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 10
A. OFFEROR
B&K Construction Company, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 13
A. OFFEROR
Dynamic Group, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 11
A. OFFEROR
Five D Group, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
NO. 12
A. OFFEROR
Durr Heavy Construction, LLC
B. BID SECURITY (Type and amount) 20%, $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED- YES
| 2023-04-18T15:18:00-0500 | |
| MAINE.MARGARET.COOKSEY.1151563550 |
File details come from the government source that posted it. Updated .