This document provides details on a federal contract solicitation issued by the Department of the Army Corps of Engineers Engineering District New Orleans. Solicitation number W912P823B0024 is seeking bids for work on the West Shore Lake Pontchartrain WSLP-101a Levee in St. John the Baptist Parish and St. Charles Parish, Louisiana. The work consists of clearing and grubbing, construction of a channel crossing, excavation, embankment construction, construction of a levee berm road and access ramp, installation of vertical wick and horizontal strip drains, placement of geotextiles, crushed stone surfacing, installation of corrugated metal pipe, stone construction, and turf establishment. The estimated value of the contract is between $25-100 million. Questions regarding the solicitation are due by March 7, 2023. Bids must be submitted through the System for Award Management website. The contracting officers for this opportunity are Calvin Fogle and Margaret C. Maine.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
SECTION 00010
Delete pages 3, 4, 5, and 6 in their entirety and substitute the attached revised pages 3, 4, 5, and 6, therefore.
SUBMITTAL REGISTER
Page 104/421 thru 106/421. Delete the SUBMITTAL REGISTER in its entirety and substitute the attached revised SUBMITTAL REGISTER, therefore.
NEW SECTION 31 05 20.10 12
Add the attached new Section 31 05 20.10 12 - HIGH STRENGTH GEOGRID
SECTION 31 11 00.00 12
Page 3, paragraph 3.2.3. Delete this paragraph in its entirety and substitute the following, therefore.
“3.2.3 Contractor Surveys
The Contractor shall clear the baseline traverse, centerline traverse, and ranges at all P.C.'s, P.I.'s, P.T.'s, 100-foot centerline stations and tie-in stations to facilitate the taking of original cross-sections by the Contractor. This clearing shall consist of the removal to within 6-inches of the ground surface of all trees, brush and vegetation. This clearing shall be completed in 5,000-foot increments and in advance of embankment construction by a minimum of 1,000 feet.”
DRAWINGS
1. SHEET ID Nos. G-03, G-04, C-001, C-002, C-003, C-004, C-005, C-011, C-014, C-015, C- 016, C-017, C-018, C-019, and C-025. Delete these drawings in their entirety and substitute the attached revised drawings SHEET ID Nos. G-03, G-04, C-001, C-002, C-003, C-004, C-005, C- 011, C-014, C-015, C-016, C-017, C-018, C-019, and C-025, therefore.
2. Add the attached new drawing SHEET ID No. G-029.
00010-3 Ed 19-020
SECTION 00010 – BIDDING SCHEDULE
West Shore Lake Pontchartrain, Louisiana, Hurricane Storm Damage Risk Reduction Project, WSLP-101A Levee, St. John the Baptist Parish and St. Charles Parish, Louisiana
Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
0002 Access Road “J” Maintenance 1 JOB
0003 Traffic Control and Coordination 1 JOB
0004 Truck Wash-Down Racks 1 JOB
0005* Separator Geotextile 11,000 SY
0006* Reinforcement Geotextile 76,000 SY
0007 Clearing and Grubbing 1 JOB
0008 Land Side Drainage Channel Excavation 1 JOB
0009 Borrow Pit Development 1 JOB
0010 Embankment, Compacted Fill, Government Furnished
0010AA* First 254,000 CY 254,000 CY
0010AB* All Over 254,000 CY 127,000 CY
0011 Uncompacted Fill 1 JOB
0012 Sand Fill TON
0012AA* First 49,000 TON 49,000 TON
0012AB* All Over 49,000 TON 19,000 TON
0013* Vertical Wick Drains 6,730,000 LF
0014* Horizontal Strip Drains 300,000 LF
0015 Surfacing TON
0015AA* First 16,000 TON 16,000 TON
0015AB* All Over 16,000 TON 8,000 TON
0016* Seeding and Mulching 45 AC
00010-4 Ed 19-020
0017 Fertilizer
0017AA* First 9,000 LBS 9,000 LBS
0017AB* All Over 9,000 LBS 4,500 LBS
0018++* Lime Soil Amendment 45 TON
0019++* Sulfur Soil Amendment 23 TON
0020 Corrugated Metal Pipe 72" Diameter 570 LF
0021 R-90 Stone TON
0021AA First 170 TON 170 TON
0021AB All Over 170 TON 80 TON
0022* Geogrid 1,500 SY
TOTAL BASE WORK: $
OPTIONAL WORK (OW)
0023 Embankment – Compacted Fill Contractor Furnished - OW 130,000 CY
TOTAL OPTIONAL WORK: $
TOTAL BASE WORK + OPTIONAL WORK: $
*Denotes a change from the previous Bidding Schedule.
++Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
00010-5 Ed 19-020
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPaym ent.aspx
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item, identified in the schedule as OPTIONAL WORK, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor no later than the start of Stage 2 embankment construction. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that OPTIONAL WORK is exercised under the terms of the contract, no additional time will be added the contract duration of 1,070 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”.
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
00010-6 Ed 19-020
EVALUATION OF SUBDIVIDED ITEMS.
Item Nos. 0010, 0012, 0015, 0017, and 0021 is subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS.
The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. 0010, 0012, 0015, 0017, and 0021.
a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Item Nos. 0010, 0012, 0015, 0017, and 0021 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
c. If the quantity of work performed under Item Nos. 0010, 0012, 0015, 0017, and 0021 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(End of Clause)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
WSLP-101A Levee
01 32 01.00 12 SD-01 Preconstruction Submittals
1.4 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 45 04.00 10 SD-01 Preconstruction Submittals
3.2 G CDContractor Quality Control Plan
01 55 26.00 12 SD-01 Preconstruction Submittals
3.2 GTraffic Control Device Plan
01 78 02.00 10 SD-02 Shop Drawings
1.3.1 G DO'As-Built' Drawings
31 05 19.04 12 SD-01 Preconstruction Submittals 1.5.1Work Plan
SD-04 Samples 1.5.1Geotextile
SD-07 Certificates
1.5.1 GGeotextile
31 05 19.05 12 SD-01 Preconstruction Submittals
1.4.1 GWork Plan
SD-04 Samples
1.4.1 GGeotextile
SD-06 Test Reports 1.4.1Geotextile
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
31 05 19.05 12 1.4.1Geotextile 31 05 20.10 12 SD-01 Preconstruction Submittals
1.6.1 G ROWork Plan
SD-06 Test Reports
1.7 G ROHigh Strength Geogrid
3.5.2 G ROHigh Strength Geogrid
SD-07 Certificates 1.7High Strength Geogrid 3.5.2High Strength Geogrid
31 26 00.00 12 SD-01 Preconstruction Submittals
3.1 GSequence and Method of
Installation SD-03 Product Data
GVertical Wick Drains
2.1.2 GHorizontal Strip Drains
SD-04 Samples
1.4.1 GQuality Assurance Samples and
Tests SD-07 Certificates
GVertical Wick Drains
2.1.2 GHorizontal Strip Drains
1.7 GCompletion and Performance
GDrain Survey 32 15 00.00 12 SD-06 Test Reports
1.6.2 GSampling and Testing
32 92 19.23 12 SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
32 92 19.23 12 2.1.3Seed GTurf Establishment Plan G EDCHerbicide Application Plan
33 40 01.00 12 SD-07 Certificates 1.4.2Test results 1.4.2Test data 3.1.1Specified sheet thickness 3.1.1Specified coating thickness 1.4.2Hydrostatic Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
WSLP 101A Levee Ed 19-020
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 05 20.10 12
HIGH STRENGTH GEOGRID
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.3 REFERENCES
1.4 HIGH STRENGTH GEOGRID MANUFACTURER/INSTALLER
1.5 PRE-QUALIFIED TESTING LABORATORY
1.6 QUALITY CONTROL
1.6.1 General
1.6.2 Reporting
1.6.3 Testing Laboratory
1.7 ACCEPTANCE REQUIREMENTS
1.8 SUBMITTALS
1.9 SHIPMENT AND STORAGE
PART 2 PRODUCTS
2.1 HIGH STRENGTH GEOGRID REQUIREMENTS
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Procedure
3.1.2 Exposure to Field Conditions
3.1.2.1 Testing
3.1.2.2 Ultraviolet Protection
3.2 MECHANICAL EQUIPMENT
3.3 SEAMS AND OVERLAPS
3.3.1 Overlaps
3.4 SAMPLING AND TESTING
3.5 FIELD SPECIMEN LOCATIONS
3.5.1 High Strength Geogrid
3.5.2 Test Results
3.6 FIELD QUALITY CONTROL
-- End of Section Table of Contents --
SECTION 31 05 20.10 12 Page 1
SECTION 31 05 20.10 12
HIGH STRENGTH GEOGRID
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of providing all plant, labor, materials, and equipment and performing all operations required for placing the high strength geogrid complete; including testing, furnishing, hauling, seaming; as specified herein and shown on the drawings;until placement is completed and accepted. Implementing specified corrective measures at seams that fail to meet the required strength is also included.
1.2 MEASUREMENT AND PAYMENT
Geogrid will be measured in place to the nearest square yard of installed fabric as shown on the drawings. Payment will be made at the contract unit price per square yard for "Geogrid". Price and payment shall constitute full compensation for providing all plant, labor and materials for placing the high strength geogrid complete; including cutting, sewing, testing, maintaining, destructive seam testing, hauling, seaming, and corrective actions to fix deficiencies, to complete the work as specified herein and as shown on the drawings. Overlaps will be measured as a single layer. No payment will be made for corrective action that is required to correct deficiencies that are due to Contractor fault, negligence, defective materials or workmanship.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 4354 (1999; R 2009) Standard Practice for ASTM Sampling of Geosynthetics for Testing
ASTM D 4355 (2007) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus
ASTM D4759 (2011) Determining the Specification Conformance of Geosynthetics
ASTM D 6637 (2001; R 2009) Standard Test Method for Determining Tensile Properties of Geogrids by the Single or Multi-Rib Tensile Method
ASTM D7737/D7737M (2015) Standard Test Method for Individual Geogrid Junction Strength
SECTION 31 05 20.10 12 Page 2
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 9090 Compatibility Test for Wastes and Membrane Liners
1.4 HIGH STRENGTH GEOGRID MANUFACTURER/INSTALLER
The Contractor shall procure the services of a Geogrid Manufacturer/Installer (GMI) to supply the high strength geogrids as specified in this section and shown on the approved design drawings. The GMI and field sewing machine supplier selected by the Contractor will be subject to the approval by the Government.
1.5 PRE-QUALIFIED TESTING LABORATORY
The GMI shall procure the services of an independent third-party laboratory to perform all high strength geogrid testing specified.
The laboratory selected by the GMI shall have qualified personnel who have previous experience in performing the required tests and shall be able to furnish test results within 4 days of sampling. Sampling shall be performed in accordance with ASTM D 4354. If the laboratory selected by the GMI has not been pre-qualified by the Government, it shall be subject to the approval of the Contracting Officer's representative. All testing shall be performed at the GMI's expense.
1.6 QUALITY CONTROL
1.6.1 General
The Contractor shall establish and maintain quality control for the storage, handling, and placement of the high strength geogrid to assure compliance with contract requirements. He/she shall also maintain records of quality control for all construction operations including, but not limited to the following:
(1) Equipment. Type, size, and suitability for construction of the prescribed work.
(2) High Strength Geogrid Submittals. High strength geogrid samples, manufacturer's certification of compliance, and Work Plan.
(3) Construction. Layout, high strength geogrid inspection, and fill placement above the high strength geogrid.
1.6.2 Reporting
The original and two copies of these records, as well as the records of corrective actions taken, shall be furnished to the COR daily. Format of report shall be as prescribed in the Section 01 45 04.00 10 CONTRACTOR
QUALITY CONTROL.
1.6.3 Testing Laboratory
The Contractor shall retain the services of a laboratory that is accredited by the Geosynthetic Accreditation Institute (GAI). The laboratory shall perform only tests for which it is accredited and shall furnish field test results to the Contracting Officer within 4 days of sampling.
SECTION 31 05 20.10 12 Page 3
1.7 ACCEPTANCE REQUIREMENTS
All brands of high strength geogrid and all seams that are to be used in construction shall be accepted on the following basis. At least 30 days prior to installation, the Contractor shall furnish to the Contracting Officer, in duplicate, a mill certificate or affidavit signed by a legally authorized official from the company manufacturing the high strength geogrid. The certificate shall contain the signer's title, name and address of the Contractor, contract number, and project name and location.
The mill certificate or affidavit shall attest that the high strength geogrid meets the chemical, physical, and manufacturing requirements stated in this specification and that the seams used meet the seam requirements.
1.8 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Work Plan; G, RO
The Contractor shall submit a Work Plan to the Contracting Officer. The plan shall include the following:
a. The dimensions of the high strength geogrid panels, whether the high strength geogrid will be seamed, overlapped, or both.
Distance between laps, if applicable.
b. A detailed description of how the high strength geogrid will be placed, and stretched to eliminate wrinkles and folds.
SD-06 Test Reports
High Strength Geogrid Test Results; G, RO
The Contractor shall submit high strength geogrid test results, as specified in paragraph FIELD SPECIMEN LOCATIONS.
SD-07 Certificates
High Strength Geogrid Certificate of Compliance
The Contractor shall submit high strength geogrid certificate of compliance, as specified in paragraph ACCEPTANCE REQUIREMENTS.
1.9 SHIPMENT AND STORAGE
High strength geogrid shall be shipped and maintained in a heavy protective cover until it is placed. During all periods of shipment and storage, the high strength geogrid shall be protected from direct sunlight, ultra-violet rays, temperatures greater than 140 degrees Fahrenheit, contaminant chemicals, abrasion, mud, dirt, or any other harmful elements. Only approved geogrid shall be delivered and used in revetment construction.
Geogrid delivered to the project site shall be clearly marked to show the brand name, type of geogrid, tensile strength at 5 percent strain, location
SECTION 31 05 20.10 12 Page 4 and date of manufacture, and its length (machine direction) and width.
PART 2 PRODUCTS
2.1 HIGH STRENGTH GEOGRID REQUIREMENTS
The high strength geogrid shall be a synthetic planar structure formed by a network of integrally connected polymeric tensile elements with apertures designed to interlock with the surrounding fill materials. The high strength geogrid shall conform to the physical requirements specified in Table 1.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Procedure
The high strength geogrid shall be installed to the lines and grades as shown on the contract drawings. Objects or debris that are capable of damaging the high strength geogrid shall be removed before the high strength geogrid is placed. At the time of installation, the high strength geogrid shall be rejected if it has defects, rips, deterioration, or damage incurred during manufacture, transportation, or storage. Fill shall not be placed on the high strength geogrid until sags and wrinkles are removed from the high strength geogrid. The Contractor shall take precautions to avoid damaging the high strength geogrid during placement.
3.1.2 Exposure to Field Conditions
High strength geogrid shall not be exposed to field conditions for a duration that exceeds 5 calendar days. Exposure to field conditions is the time interval between the removal of the protective shipment cover and placement of fill on top of the high strength geogrid. Additional time, up to a maximum of 2 weeks, can be added on a day-by-day basis for each full day the high strength geogrid is covered by an industry accepted ultraviolet protective cover.
3.1.2.1 Testing
Any high strength geogrid that is exposed to field conditions for more than 2 calendar weeks shall be tested for strength. The Contracting Officer will determine the number of samples to be tested.
3.1.2.2 Ultraviolet Protection
Immediately after removal of the samples to be tested, the exposed high strength geogrid shall be covered with black Visqueen or equivalent ultraviolet protection. The ultraviolet protection shall be maintained until such time as the test results are obtained and the Contractor's plan for corrective action is approved by the Contracting Officer. Corrective action shall consist of:
(a) Removal of the exposed high strength geogrid and installation of new high strength geogrid.
(b) No corrective action when the test results indicate conformance with the strength requirements.
SECTION 31 05 20.10 12 Page 5
All corrective actions are subject to prior approval of the Contracting Officer. High strength geogrid that is rejected, or damaged due to Contractor negligence shall be tested and repaired or replaced as directed by the Contracting Officer at no additional expense to the Government.
3.2 MECHANICAL EQUIPMENT
Mechanical equipment, except for light rubber-tire equipment, will not be permitted directly on the high strength geogrid surface. Equipment used to spread the first layer of fill on top of the high strength geogrid shall have a unit tread pressure that does not exceed 3 pounds per square inch.
The first soil layer on top of the high strength geogrid shall have a minimum thickness of 12 inches, with a tolerance of +3 inches between the high strength geogrid and the track of the equipment and shall be placed and spread in a direction perpendicular to the levee centerline, unless a different method is approved by the Contracting Officer for specific locations. After a sufficient work area is established, the thickness of the layer shall be reduced to 1 foot and compacted to the specified density. Successive layers shall be of the specified thickness for levee embankment fill.
3.3 SEAMS AND OVERLAPS
3.3.1 Overlaps
A minimum of 3 feet overlap shall be used to join adjacent high strength geogrid panels together. Overlap shall be in the direction of fill placement to prevent "peeling" of the geogrid at overlaps by the advancing fill. Nylon cable ties ("zip ties") should be used every 10 linear feet of overlap.
3.4 SAMPLING AND TESTING
The Contractor shall take the required samples to be tested. Samples shall not be any larger than are required to perform the specified tests and shall be catalogued to correspond with the levee station from which the sample was taken. The Contracting Officer reserves the right to change the location of any test, or to increase the frequency of tests, as specified in paragraph FIELD SPECIMEN LOCATIONS.
3.5 FIELD SPECIMEN LOCATIONS
3.5.1 High Strength Geogrid
The Contractor shall take and perform tensile strength tests in the machine direction (MD) and cross-machine direction (XMD) of high strength geogrid that was delivered to the site. One sample shall be taken from the first panel and additionally at 3,000-foot increments, measured along the centerline. Samples shall be obtained from the end of the panel.
3.5.2 Test Results
The Contractor's testing laboratory shall perform ASTM D 6637, tensile strength tests on all high strength geogrid samples and shall submit certified test reports indicating the following results:
(1) Tensile strength at 5 percent strain and ultimate in the machine direction and cross-machine direction. A stress/strain plot of each test shall be submitted with clearly marked values at 5 percent and
SECTION 31 05 20.10 12 Page 6 ultimate, in (lbs/in) units.
(2) The job name and station from where the sample was taken shall be printed on each test sheet. Test results shall be furnished to the Contracting Officer no later than 4 days after sampling.
3.6 FIELD QUALITY CONTROL
The Quality Control Representative shall examine the high strength geogrid for damage and defects prior to installation. Any high strength geogrid found to be damaged or defective shall be removed from the site and replaced by an approved high strength geogrid. In the event that samples fail to meet the specified results, the Contracting Officer has the right to direct the Contractor to perform additional tests on samples taken between the location of the failed test and the location of the previous successful test. High strength geogrid that fails to meet test requirements shall be replaced with high strength geogrid that meets the required strength.
SECTION 31 05 20.10 12 Page 7
TABLE 1
PHYSICAL REQUIREMENTS FOR GEOGRID
The geogrid shall have typical characteristics shown in the table below, and shall be certified in writing by the manufacturer to meet these characteristics.
Properties(1) Longitudinal Diagonal General /Transverse
Rib Pitch(2) 1.60 inches 1.60 inches ------
Mid-rib depth(2) 0.06 inches 0.06 inches ------
Mid-rib width(2) 0.05 inches 0.05 inches ------
Rib shape rectangular
Aperture shape triangular
Junction Efficiency(3) 93%
Isotropic Stiffness Ratio(4) 0.6
Radial stiffness at low strain(5) (lb/ft @ 0.5% strain) 20,580
Resistance to chemical degradation(6) 100%
Resistance to ultra-violet light and weathering(7) 70%
1. Unless indicated otherwise, values shown are minimum average roll values determined in accordance with ASTM D4759. Brief descriptions of test procedures are given in the following notes.
2. Nominal dimensions.
3. Load transfer capability determined in accordance with ASTM D 6637 and ASTM D7737/D7737M and expressed as a percentage of ultimate tensile strength.
4. The ratio between the minimum and maximum observed values of radial stiffness at 0.5% strain, measured on rib and midway between rib directions.
5. Radial stiffness is determined from tensile stiffness measured in any in-plane axis from testing in accordance with
ASTM D 6637.
6. Resistance to loss of load capacity or structural integrity when subjected to chemically aggressive environments in accordance with
SECTION 31 05 20.10 12 Page 8
EPA 9090 immersion testing.
7. Resistance to loss of load capacity or structural integrity when subjected to 500 hours of ultraviolet light and aggressive weathering in accordance with ASTM D 4355.
SECTION 31 05 20.10 12 Page 9
TABLE 2
PHYSICAL REQUIREMENTS FOR BIAXIAL GEOGRID
The geogrid shall have typical characteristics shown in the table below, and shall be certified in writing by the manufacturer to meet these characteristics.
Properties(1) Longitudinal Diagonal General /Transverse
Rib Pitch(2) 1.3 inches 1.3 inches ------
Mid-rib width(2) 0.12 inches 0.08 inches ------
Rib shape rectangular
Aperture shape rectangular
Junction Efficiency(3) 95%
Isotropic Stiffness Ratio(4) 0.45
Radial stiffness at low strain(5) (lb/ft @ 0.5% strain) 53,000
Resistance to chemical degradation(6) 100%
Resistance to ultra-violet light and weathering(7) 100%
1. Unless indicated otherwise, values shown are minimum average roll values determined in accordance with ASTM D4759. Brief descriptions of test procedures are given in the following notes
2. Nominal dimensions.
3. Load transfer capability determined in accordance with ASTM D 6637 and ASTM D7737/D7737M and expressed as a percentage of ultimate tensile strength.
4. The ratio between the minimum and maximum observed values of radial stiffness at 0.5% strain, measured on rib and midway between rib directions
5. Radial stiffness is determined from tensile stiffness measured in any in-plane axis from testing in accordance with
ASTM D 6637.
6. Resistance to loss of load capacity or structural integrity when subjected to chemically aggressive environments in accordance with EPA 9090 immersion testing.
7. Resistance to loss of load capacity or structural integrity when
SECTION 31 05 20.10 12 Page 10 subjected to 500 hours of ultraviolet light and aggressive weathering in accordance with ASTM D 4355.
-- End of Section --
SECTION 31 05 20.10 12 Page 11
NUMBER
DETAIL
DETAILED INFORMATION
AREA ENLARGED FOR
DETAILED INFORMATION
AREA ENLARGED FOR
NUMBER
DETAIL
IS SHOWN
DETAIL
WHERE
SHEET
METAL PIPE. COVER IS STAMPED: WSLP-J-03 2022
THE CENTERLINE OF A GRAVEL RAOD, 67 FEET EAST OF A 18" CORRUGATED
SET IN CONCRETE WITH ALUMINUM ACCESS COVER. SET 19 FEET NORTH OF
STAINLESS STEEL ROAD DRIVEN TO A DEPTH OF 44 FEET INCASED IN 6" PVC
SAID GRAVEL ROAD 2.4 MILES TO THE MARK ON THE LEFT. WSLP-J03 IS A 1/2"
GRAVEL ROAD DESIGNATED AS ACCESS ROAD "J". THENCE NORTHERLY ALONG
51 PROCEED EASTERLY 0.69 MILES ALONG HIGHWAY 61 TO AN EXISTING
TO REACH STATION FROM THE INTERSECTION OF HIGHWAY 61 AND HIGHWAY
Y = 573,619.779 X = 3,564,826.005
LON. -90°26'7.6366
LAT. 30°4'27.42602
(2009.55)
NAVD88
EL. 1.93
WSLP-J03
CENTERLINE OF THE ROAD. COVER IS STAMPED: WSLP-J-02 2022
FARM ROAD AND TOP BANK OF DITCH, 15 FEET NORTHWEST OF THE
SET IN CONCRETE WITH ALUMINUM ACCESS COVER. SET AT THE EDGE OF THE
STAINLESS STEEL ROAD DRIVEN TO A DEPTH OF 60 FEET INCASED IN 6" PVC
SAID GRAVEL ROAD 1.1 MILES TO THE MARK ON THE RIGHT. WSLP-J02 IS A 1/2"
GRAVEL ROAD DESIGNATED AS ACCESS ROAD "J". THENCE NORTHERLY ALONG
51 PROCEED EASTERLY 0.69 MILES ALONG HIGHWAY 61 TO AN EXISTING
TO REACH STATION FROM THE INTERSECTION OF HIGHWAY 61 AND HIGHWAY
Y = 571,006.905 X = 3,558,598.929
LON. -90°27'18.73737
LAT. 30°4'2.03912
(2009.55)
NAVD88
EL. 4.54
WSLP-J02
ROAD AND HIGHWAY 61. COVER IS STAMPED: WSLP-J-01 2022
EDGE OF HIGHWAY 61, 71 FEET WEST OF THE INTERSECTION OF THE GRAVEL
SET IN CONCRETE WITH ALUMINUM ACCESS COVER. SET AT THE NORTHEAST
STAINLESS STEEL ROAD DRIVEN TO A DEPTH OF 60 FEET INCASED IN 6" PVC
GRAVEL ROAD DESIGNATED AS ACCESS ROAD "J". WSLP-J01 IS A 1/2"
51 PROCEED EASTERLY 0.69 MILES ALONG HIGHWAY 61 TO AN EXISTING
TO REACH STATION FROM THE INTERSECTION OF HIGHWAY 61 AND HIGHWAY
Y = 568,778.548 X = 3,553,290.193
LON. -90°28'19.34465
LAT. 30°3'40.37963
(2009.55)
NAVD88
EL. 6.46
WSLP-J01
MAKING IT EASIER TO ACCESS AND PROTECT THE MARK.
AND LOGO CAP STAMPED F 95 1938 WERE PLACED OVER THE ORIGINAL MARK
RAILROAD CROSSING AND MARK ON THE LEFT. A 5- INCH (13 CM) PVC PIPE
(SOUTHWEST) 0.3 MILE ALONG STATE HIGHWAY 44 TO STATE HIGHWAY 628, A
MILE ON U.S. HIGHWAY 61 TO STATE HIGHWAY 44, THENCE RIGHT
OUTSIDE LANE OF TWO LEFT TURN LANES), THENCE LEFT (SOUTHEAST) 0.05
(SOUTHWEST) 3.1 MI (5.0 KM) ALONG U.S. 51 TO U.S. HIGHWAY 61, (STAY IN THE
DOWN EXIT RAMP TO U.S. HIGHWAY 51 AT STOP LIGHT, THENCE LEFT
18.75 MI (30.2 KM) WEST ALONG I-10 TO EXI 209, THENCE RIGHT (WEST) 0.2 MILE
FROM CAUSEWAY BOULEVARD AND I-10 WESTBOUND LANES IN METAIRIE, GO
Y = 569,496.57 X = 3,549,438.90
LON. -90°29'3.11156
LAT. 30°3'47.77183
(2009.55)
NAVD88
EL. 11.84 FT
(PRIMARY)
F 95
DESCRIPTION
(EPOCH)
(NAVD 88)
ELEVATION
BENCHMARKS
TABULATION OF BENCHMARKS
CROSS SECTIONSCS-01 - CS-05
LAKE PONTCHARTRAIN AT WEST END - HYDROGRAPHH-01
BORING LOGSB-024
CONE PENETRATION TEST WSLP-19-012CB-023
CONE PENETRATION TEST WSLP-19-012CB-022
CONE PENETRATION TEST WSLP-19-011CB-021
CONE PENETRATION TEST WSLP-19-011CB-020
CONE PENETRATION TEST WSLP-19-010CB-019
CONE PENETRATION TEST WSLP-19-010CB-018
CONE PENETRATION TEST WSLP-19-009CB-017
INDEX OF DRAWINGS (CONT.)NO.
CONE PENETRATION TEST WSLP-19-009CB-016
CONE PENETRATION TEST WSLP-19-008CB-015
CONE PENETRATION TEST WSLP-19-008CB-014
CONE PENETRATION TEST WSLP-19-007CB-013
CONE PENETRATION TEST WSLP-19-007CB-012
CONE PENETRATION TEST WSLP-19-006CB-011
CONE PENETRATION TEST WSLP-19-006CB-010
CONE PENETRATION TEST WSLP-19-005CB-009
CONE PENETRATION TEST WSLP-19-005CB-008
CONE PENETRATION TEST WSLP-19-004CB-007
CONE PENETRATION TEST WSLP-19-004CB-006
CONE PENETRATION TEST WSLP-19-003CB-005
CONE PENETRATION TEST WSLP-19-003CB-004
BORING LOGSB-003
BORING LOGSB-002
BORING LOGSB-001
BORING LEGENDB-000
TEST AREA SECTIONSR-003
TEST AREA SECTIONSR-002
TEST AREA PLAN VIEWR-001
LAND SIDE DRAINAGE CHANNEL CULVERT CROSSING DETAILSDT-101
CRUSHED STONE ROAD EXTENSION FOR PIPELINE CROSSINGC-029
GOVERNMENT FURNISHED (BONNIE CARRE) BORROW PIT AREA EXCAVATION PLAN AND BORINGS PLANC-028
GOVERNMENT FURNISHED (BONNIE CARRE) BORROW PIT AREA PLAN VIEWC-027
SETTLEMENT PLATE DETAILSC-026
GEOTECHNICAL INSTRUMENTATION DETAILSC-025
TRUCK WASH DOWN RACK DETAILSC-024
BERM ROAD & ACCESS ROAD DETAILSC-023
STOCKPILE CULVERT DETAILSC-022
HORIZONTAL STRIP & VERTICAL WICK DRAIN DETAILSC-021
PLACEMENT PATTERN DETAILSC-020
EXISTING ACCESS ROAD J EASEMENTC-019
EXISTING ACCESS ROAD J EASEMENT AND EMBANKMENT STOCKPILE PLAN VIEWC-018
EXISTING ACCESS ROAD J EASEMENT, SAND STOCKPILE & STAGING AREA PLAN VIEWC-017
LAND SIDE DRAINAGE CHANNEL SECTION & DETAILC-016
EMBANKMENT SECTIONC-015
EMBANKMENT SECTIONC-014
SAND BASE AND LAND SIDE BERM SECTIONC-013
SAND BASE AND LAND SIDE BERM SECTIONC-012
SAND BASE AND LAND SIDE BERM SECTIONC-011
EXISTING WSLP-101 TEST AREA EXCAVATION SECTIONC-010
EXISTING WSLP-101 TEST AREA EXCAVATION SECTIONC-009
CLEARING & GRUBBING SECTIONC-008
CLEARING & GRUBBING SECTIONC-007
CLEARING & GRUBBING SECTIONC-006
CLEARING & GRUBBING SECTIONC-005
PLAN AND PROFILE, B/L STA. 960+00 TO B/L STA. 978+62C-004
PLAN AND PROFILE, B/L STA. 935+00 TO B/L STA. 960+00C-003
PLAN AND PROFILE, B/L STA. 910+00 TO B/L STA. 935+00C-002
PLAN AND PROFILE, B/L STA. 885+00 TO B/L STA. 910+00C-001
TABULATIONSG-04
INDEX, BENCHMARKS & LEGENDSG-03
LOCATION AND VICINITY MAPG-02
COVER SHEETG-01
INDEX OF DRAWINGSNO.
G-03
IN
D
E X
B
E N
C H
M A
R K
S
L E
G E
N D
S
H -8
-4 G
-0 .d g n
F E
B
U P
D A
T E
D P
H O
T O
D A
T E
D
U P
D A
T E
D I
N D
E X
O F
D R
A W
IN
G
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S W
E S
T S
H O
R E
L A
K E
P O
N T
C H
A R
T R
A
IN
L
O U
IS
IA
N A
H U
R R
IC
A
N E
S T
O R
M D
A M
A G
E R
IS
K
R E
D U
C T
IO
N
P R
O J E
C T
P O
N T
C H
A R
T R
A
IN
L E
V E
E D
IS
T
R
IC
T
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W P
-2
-B
N O
V E
M B
E R
A N
S I
D P
A R
IS
H
L
O U
IS
IA
N A
S T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
A N
D S
T
C H
A R
L E
S
T
A L
B E
R T
H U
E T
E
M C
C A
R T
Y
L H
A T
T E
N
D B
E C
K H
-8 -4
W S
L P
-1 A
L E
V E
E
BREAK LINE
BENCHMARK
EXISTING GROUND
AERIAL POWER LINE
NATURAL GAS LINE
WATER MAIN
RIGHT OF WAY
PROJECT BASELINE
LEVEE CROWN (PLAN VIEW)
LEVEE TOE (PLAN VIEW)
LEVEE CENTERLINE
EARTHWORK - SAND FILL
EARTHWORK - CRUSHED STONE
EARTHWORK - COMPACTED FILL
EXISTING GROUND
STAGING AREA
CONSTRUCTION LIMIT/
EARTHWORK - UNCOMPACTED FILL
EARTHWORK - UNDISTURBED
GENERAL LEGEND
X
SCALE:
TITLE
X
(SHOWN ON SAME SHEET)
DETAIL
(SHOWN ON ANOTHER SHEET)
DETAIL
X
SHT #
(SHOWN ON SAME SHEET)
OR SECTION TITLE
PLAN, ELEVATION, DETAIL
X
SHT #
X
CROSS REFERENCE SYMBOL LEGEND
14-2022.
13. THE RIGHT OF WAY DRAWINGS FOR THIS PROJECT CAN BE OBTAINED USING THE FILE NUMBER H-8-48927 AND THE DATE 7-
AND THE USACE SAFETY MANUAL EM-385-1-1.
12. ALL WORK AROUND HIGH VOLTAGE POWER LINES SHALL BE IN ACCORDANCE WITH OSHA AND ENTERGY REQUIREMENTS, WATERING, DUST CONTROL, REMOVAL OF MUD, SPILLAGE, AND DISPOSAL OF DEBRIS.
DURATION OF THE CONTRACT. MAINTENANCE OF ACCESS ROAD J SHALL INCLUDE GRADING, REPLACING ROAD SURFACING,
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ACCESS ROAD J THROUGHOUT THE
SHALL RE-ESTABLISH THE BASELINE AS REQUIRED BEFORE BEGINNING THE WORK. ALL UNITS ARE US SURVEY FEET.
IMPLEMENTED. THE CONTRACTOR SHALL VERIFY THE ESTABLISHMENT OF THE PROJECT BASELINE AT THE PROJECT SITE, AND
10. THE BENCHMARKS AND BASELINES HAVE BEEN ESTABLISHED BY THE GOVERNMENT. THE STATE PLANE ZONE HAS BEEN
SPECIFICATIONS AND/OR DRAWINGS.
DETAILS. FOR THE UTILITY OWNER'S REPRESENTATIVE CONTACT THE DESIGNATED INDIVIDUAL REFERRED TO IN THE
PRIOR TO WORK ADJACENT TO AND OVER THE UTILITY ALIGNMENT. REFER TO THE SPECIFICATIONS, SECTION 01100, FOR
LOCATIONS WERE PROVIDED BY THE RESPECTIVE UTILITY COMPANIES. THE CONTRACTOR SHALL CONTACT THE OWNER(S)
9. THE LOCATIONS OF THE EXISTING UTILITIES INDICATED ON THE DRAWINGS ARE FOR INFORMATIONAL PURPOSES. THE
8. ALL THE STATIONS ARE BASELINE STATIONS UNLESS OTHERWISE NOTED.
2009.55 (NAVD88(2009.55)) USING GEOID12B UNLESS OTHERWISE NOTED.
7. ALL ELEVATIONS ARE EXPRESSED IN US FEET AND REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 988 EPOCH
6. THE DRAWINGS MARKED "NOT TO SCALE" (N.T.S.) ARE GENERALLY DRAWN TO SCALE, BUT SHOULD NOT BE SCALED.
VERIFICATION.
5. THE DIMENSIONS, ELEVATIONS AND TABULATION COORDINATES ARE APPROXIMATE READINGS, AND REQUIRE FIELD
4. THE AERIAL PHOTOGRAPHY WAS FLOWN IN DECEMBER 2022.
DATUM 1983, STATE PLANE, LOUISIANA SOUTH, ZONE 1702, US SURVEY FEET.
3. THE XY COORDINATES USED IN THE DRAWINGS REFER TO THE FOLLOWING HORIZONTAL DATUM: NORTH AMERICAN
LINES, AND THE LAMBERT CONFORMAL CONIC PROJECTION IS REPRESENTED BY DASH TICK LINES.
2. INSIDE THE PLAN AREAS, THE POLYCONIC PROJECTION NORTH AMERICAN DATUM 1983 IS REPRESENTED BY SOLID TICK
DISTRICT, SURVEY SECTION (504) 862-1852.
1. THE DESCRIPTIONS OF HORIZONTAL AND VERTICAL CONTROL POINTS ARE AVAILABLE FROM USACE, NEW ORLEANS
GENERAL NOTES:
CPT CONE PENETROMETER TEST
ABBREVIATIONS
* UNLESS OTHERWISE NOTED ON EACH SHEET
BASELINE
BENCHMARK
CENTERLINE
CONSTRUCTIONCONST.
C/L
BM
B/L
NOT TO SCALEN.T.S.
LAND SIDEL/S
R/W RIGHT OF WAY
STATIONSTA.
ELEVATIONEL.
FOOT OR FEETFT.
HWY. HIGHWAY
OF ENGINEERS
UNITED STATES ARMY CORPS USACE
TYP. TYPICAL
LIMIT OF CONSTRUCTIONLOC
C/E CONSTRUCTION EASEMENT
+/- APPROXIMATE
X:X XV:XH SLOPE
(SHOWN ON SAME SHEET)
SECTION CUT
(SHOWN ON ANOTHER SHEET)
SECTION CUT
568,526.983,568,948.043
573,442.983,566,001.552
577,117.903,567,364.781
568,835.443,569,462.683
573,504.373,566,664.272
576,909.223,567,927.331
YX
STATE PLANE COORDINATES
POINT
RIGHT-OF-WAY TABULATION
* STATIONS ARE SHOWN FOR CONTINUITY
567,713.753,570,812.67996+80.46*
568,894.633,569,105.99976+05.07
573,475.613,566,360.29922+64.26
578,447.363,568,204.60869+61.45*
YX
STATE PLANE COORDINATES
ITEM
BASELINE TABULATION
574,184.443,566,307.20140+79.57
572,266.723,561,520.9989+23.32
572,264.333,561,516.0989+17.86
572,123.233,561,263.0986+28.18
572,120.503,561,257.3886+21.85
572,045.923,561,071.7884+21.82
572,044.793,561,069.1984+19.00
571,949.763,560,875.4182+03.24
571,948.733,560,873.1382+00.74
571,867.613,560,654.1479+67.36
571,866.713,560,651.9279+64.97
568,763.503,553,412.460+87.90
568,747.863,553,392.330+62.12
568,698.483,553,354.620+00
YX
STATE PLANE COORDINATES
STATION
CENTERLINE TABULATION
EXISTING ACCESS ROAD J
571,265.083,559,201.426
571,953.713,558,857.535
572,260.133,559,481.134
572,379.133,559,421.793
573,035.223,560,340.732
571,968.583,560,856.401
YX
STATE PLANE COORDINATES
POINT
TABULATION
EMBANKMENT STOCKPILE
572,132.663,561,230.4767
572,204.333,561,360.6666
572,275.063,561,491.3365
572,358.033,561,686.1264
572,441.003,561,880.9163
574,267.933,566,630.6262
572,794.783,562,744.1161e
572,817.913,562,734.6361d
572,836.883,562,780.8961c
572,813.743,562,790.3761b
572,875.233,562,940.4061a
574,215.643,566,609.9561
572,939.123,563,101.8860i
572,962.373,563,092.6860h
572,980.763,563,139.1860g
572,957.513,563,148.3860f
573,275.613,563,952.4460e
YX
STATE PLANE COORDINATES
NAD 83
POINT
J EASEMENT
EXISTING ACCESS ROAD
573,298.863,563,943.2460d
573,317.253,563,989.7360c
573,294.003,563,998.9360b
573,532.763,564,602.4660a
574,308.863,566,551.8160
573,581.583,564,725.8659i
573,604.833,564,716.6659h
573,623.223,564,763.1659g
573,599.983,564,772.3559f
573,863.373,565,546.8859e.4
573,854.933,565,552.7859e.3
573,683.263,565,118.7559e.2
573,691.613,565,112.7259e.1
574,053.413,565,918.5259e
574,076.663,565,909.3259d
574,095.053,565,955.8159c
574,071.813,565,965.0159b
574,255.713,566,526.4859
574,196.903,566,281.2258
574,146.493,566,262.5257
574,033.773,565,977.5956i
574,010.523,565,986.7856h
573,992.133,565,940.2956g
574,015.373,565,931.0956f
573,724.913,565,088.1556e.4
573,733.263,565,082.1356e.3
573,905.533,565,517.4656e.2
573,897.083,565,523.3656e.1
573,561.853,564,784.7056e
573,538.603,564,793.9056d
573,520.213,564,747.4156c
573,543.453,564,738.2156b
573,495.613,564,617.2956a
573,256.833,564,013.7155i
573,233.593,564,022.9155h
573,215.193,563,976.4155g
573,238.443,563,967.2155f
572,920.253,563,162.9155e
572,897.003,563,172.1155d
572,878.603,563,125.6155c
572,901.853,563,116.4155b
572,838.133,562,955.3455a
572,775.363,562,802.1954e
572,752.233,562,811.6754d
572,733.263,562,765.4054c
572,756.403,562,755.9254b
572,621.113,562,425.8454a
572,404.093,561,896.3353
572,238.993,561,508.7252
YX
STATE PLANE COORDINATES
NAD 83
POINT
J EASEMENT
EXISTING ACCESS ROAD
572,097.483,561,247.2951
572,094.383,561,242.9250
572,037.663,561,099.1949
572,029.053,561,070.1248
571,934.163,560,878.3747
571,855.833,560,673.4846
571,583.523,560,039.8445
571,311.223,559,406.2044
571,182.843,559,113.4743
571,054.453,558,820.7542
570,968.163,558,587.0141
570,792.063,558,160.1840
570,615.973,557,733.3439
570,543.893,557,563.5838
570,471.823,557,393.8137
570,360.273,557,127.0736
570,208.793,556,765.9335
570,057.313,556,404.7934
569,755.743,555,719.9733
569,454.163,555,035.1532
569,330.113,554,750.9531
569,206.053,554,466.7530
569,037.793,554,091.9529
568,869.523,553,717.1528
568,723.373,553,417.0327
568,630.693,553,440.1326
568,626.673,553,437.1525
568,758.053,553,262.2824
568,761.913,553,265.3723
568,753.133,553,341.7422
568,906.343,553,701.5021
569,074.483,554,076.0320
569,242.633,554,450.5619
569,366.713,554,734.8318
569,490.803,555,019.0917
569,792.433,555,704.0416
570,094.063,556,388.9915
570,245.613,556,750.3114
570,580.773,557,548.0913
570,652.863,557,717.9012
570,829.153,558,145.1811
571,005.433,558,572.4510
571,048.493,558,689.119
571,091.563,558,805.788
571,347.913,559,390.277
571,620.413,560,024.356
571,892.903,560,658.435
571,970.853,560,862.324
572,066.423,561,055.463
572,075.513,561,086.152
572,132.663,561,230.471
YX
STATE PLANE COORDINATES
NAD 83
POINT
J EASEMENT
EXISTING ACCESS ROAD
568,724.153,569,277.0092+94.25
573,481.653,566,425.5037+47.59
576,995.283,567,728.910+00
YX
STATE PLANE COORDINATES
STATION
TABULATION
NEW LEVEE CENTERLINE
BASELINE.
* NEW DRAINAGE CHANNEL CENTERLINE IS 229.96' OFFSET OF
568,575.583,569,029.12978+62.14
573,322.783,566,183.79923+04.61
573,593.423,566,158.72922+23.91
577,084.853,567,453.89885+00
YX
STATE PLANE COORDINATES
B/L STATION*
CENTERLINE TABULATION
DRAINAGE CHANNEL
NEW LAND SIDE
574,225.663,566,669.50144+70.85
574,236.353,566,642.50144+40.84
574,277.623,566,538.25143+28.72
574,184.443,566,307.20140+79.62
YX
STATE PLANE COORDINATES
STATION
RAMP CENTERLINE TABULATION
CULVERT CROSSING & ACCESS
569,640.623,555,347.22D1
569,820.383,555,259.53C1
569,765.573,555,147.19B1
569,590.313,555,232.68A1
YX
STATE PLANE COORDINATES
POINT
STAGING AREA TABULATION
570,110.603,556,404.04D
570,744.853,556,124.19C
570,557.693,555,703.83B
569,921.863,555,990.13A
YX
STATE PLANE COORDINATES
POINT
SAND STOCKPILE TABULATION
575,306.433,566,983.074A
575,270.033,567,082.903A
575,450.503,567,149.322A
575,487.133,567,050.051A
YX
STATE PLANE COORDINATES
POINT
TABULATION
PILE LOAD TEST SITE
TEMPORARY WORK AREA FOR
DO NOT DISTURBC-027OVERHEAD POWERLINEENTERGYE-5
DO NOT DISTURBC-027ABANDONED, GAS PIPELINEUNKNOWNG-8
DO NOT DISTURBC-02722-INCH, GAS PIPELINE
LP
BOARDWALK PIPELINE PARTNERS,
G-7
DO NOT DISTURBC-02718-INCH, GAS PIPELINE
LP
BOARDWALK PIPELINE PARTNERS,
G-6
DO NOT DISTURBC-02712-INCH, GAS PIPELINE
INC.
AIR PRODUCTS & CHEMICALS,
G-5
DO NOT DISTURBC-027GAS PIPELINE
OPERATION, LLC
ENTERPRISE PRODUCTS
G-4
DO NOT DISTURBC-027GAS PIPELINESHELL PIPELINE CO., LLCG-3
DO NOT DISTURBC-012WATER VALVEPRIVATEWV-01
DO NOT DISTURBC-012WATER METERPRIVATEWM-01
DO NOT DISTURBC-013ABANDONED WELL HEADUNKNOWNWH-01
DO NOT DISTURBC-012WATER LINEST. JOHN THE BAPTISTW-001
DO NOT DISTURBC-01412 IN OXYGENAIR LIQUIDEN-082
DO NOT DISTURBC-01412 IN OXYGENAIR LIQUIDEO-081
DO NOT DISTURBC-0146 IN BUCKEYE PARTNERSBUCKEYEG-071
DO NOT DISTURBC-01412 IN HYDROGEN GASPRAXAIR/LINDEG-068
DO NOT DISTURBC-01410 IN ETHYLENESHELLG-057
DO NOT DISTURBC-0146 IN PROPYLENESHELLG-056
DO NOT DISTURBC-0146 IN BUTANESHELLG-055
DO NOT DISTURBC-0146 IN LIQUID PROPYLENEENTERPRISEG-054
DO NOT DISTURBC-0146 IN ETHANEENTERPRISEG-053
DO NOT DISTURBC-0144 IN LIQUID BUTADIENEBUCKEYEG-050
DO NOT DISTURBC-0148 IN PROPANEENTERPRISEG-045
DO NOT DISTURBC-0148 IN BUTANEENTERPRISEG-044
DO NOT DISTURBC-0148 IN DRY GASSHELLG-041
DO NOT DISTURBC-01424 IN VGOENERGY TRANSFERG-039
DO NOT DISTURBC-0146 IN OLEFIN PIPELINEENERGY TRANSFERG-038
DO NOT DISTURBC-01424 IN CRUDE OILENERGY TRANSFERG-037
DO NOT DISTURBC-01420 IN NATUAL GASENLINKG-036
DO NOT DISTURBC-0146 IN PROPANEPHILLIP 66G-035
DO NOT DISTURBC-0146 IN LIQUID NATURAL GASPHILLIP 66G-034
DO NOT DISTURBC-01420 IN NATUAL GASENLINKG-033
DO NOT DISTURBC-01412 IN HYDROGENPRAXAIR/LINDEG-032
DO NOT DISTURBC-0148 IN ISOBUTANEENTERPRISEG-031
DO NOT DISTURBC-0148 IN NATURAL GASENTERPRISEG-030
DO NOT DISTURBC-01424 IN MULTI-PRODUCTSHELLG-021
DO NOT DISTURBC-01412 IN LGLENTERPRISEG-020
DO NOT DISTURBC-01412 IN DRY GASSHELLG-019
DO NOT DISTURBC-01412 IN KOCH PIPELINE SE INCKOCHG-015
DO NOT DISTURBC-01212 IN NATURAL GASSHELLG-002
DO NOT DISTURBC-00412 IN NATURAL GASENTERPRISEG-1
DO NOT DISTURBC-012ABANDONEDUNKNOWNG-A01
DO NOT DISTURBC-012POWER POLEENTERGY PP-01
DO NOT DISTURBC-012OVERHEAD DISTRIBUTION LINESENTERGY E-4
DO NOT DISTURBC-004OVERHEAD DISTRIBUTION LINESENTERGY E-3
DO NOT DISTURBC-004OVERHEAD DISTRIBUTION LINESENTERGY E-2
DO NOT DISTURBC-004OVERHEAD DISTRIBUTION LINESENTERGY E-1
CONTRACTOR
TO BE FILLED IN BY
C-001EXISTING CHANNELST. JOHN THE BAPTISTCHANNEL
DISPOSITIONSHEETDESCRIPTIONOWNERITEM
UTILITY TABULATION
H -8
-4 G
-0 .d g n
T A
B U
L A
T
IO
N S
G-04
U P
D A
T E
D E
X
IS
T
IN
G A
C C
E S
S R
O A
D J
E A
S E
M E
N T
T
A B
U L
A T
IO
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S W
E S
T S
H O
R E
L A
K E
P O
N T
C H
A R
T R
A
IN
L
O U
IS
IA
N A
H U
R R
IC
A
N E
S T
O R
M D
A M
A G
E R
IS
K
R E
D U
C T
IO
N
P R
O J E
C T
P O
N T
C H
A R
T R
A
IN
L E
V E
E D
IS
T
R
IC
T
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W P
-2
-B
N O
V E
M B
E R
A N
S I
D P
A R
IS
H
L
O U
IS
IA
N A
S T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
A N
D S
T C
H A
R L
T
A L
B E
R T
H U
E T
E
M C
C A
R T
Y
L H
A T
T E
N
D B
E C
K H
-8 -4
W S
L P
-1 A
L E
V E
E
C/L STA. 0+00.00
WSLP-19-011U
WSLP-19-010UWSLP-19-090C-V
WSLP-19-012C
WSLP-19-011C
WSLP-19-010C
EXISTING GRADE
COMPACTED FILL
NEW LAND SIDE CHANNEL, BOTTOM EL. -5.0
REINFORCEMENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .