W912P820C0019-P00003.pdf

PDF 972 KB Posted

Attached to
W912P820B0019 - WSLP STOCKPILE 1
Solicitation number
W912P820B0019
Issued by

About this file

This amendment modifies a federal solicitation to procure clay processing and stockpiling services for the West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Project in Louisiana. The contractor will excavate, process, and stockpile up to 1 million cubic yards of clay material within the Bonnet Carre Spillway and has the option to stockpile additional clay at an alternate site within 6 miles. The work also includes reconstructing an asphalt ramp. Bids are due to the Army Corps of Engineers New Orleans District by December 2019. The contractor must provide bid, payment, and performance bonds and complete all work by early 2023, with additional time allowed for optional items.

View the file

Other files

File Type Posted
W912P820B0019 Abstract signed.pdf PDF
W912P820B0019-0012.pdf PDF
W912P820B0019-0010.pdf PDF
W912P820B0019-0009.pdf PDF
W912P820B0019-0008.pdf PDF
W912P820B0019-0007.pdf PDF
W912P820B0019-0005 .pdf PDF
W912P820B0019-0004.pdf PDF
W912P820B0019-0002.pdf PDF
20B0019-0001.pdf PDF
A21_20B0019_Solicitation rev.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0003 is the follow ing:

To provide draw ings and revised bid schedule that w ere omitted from Amendment 0002.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Dec-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0019

X 9B. DATED (SEE ITEM 11)

14-Nov-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Dec-2019

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P820B0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

00010-3 Ed 19-007

SECTION 00010 – BIDDING SCHEDULE

West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, Bonnet Carre Stockpile, Contract 1, Charles Parish, Louisiana

Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount

BASE WORK

0001 Mobilization and Demobilization 1 JOB

0002 Borrow Pit Development 1 JOB

0003 Development of Bonnet Care Stockpile Area #1 1 JOB

0004 Clay Processing/Stockpiling at Bonnet Carre 500,000 CY

0005 Asphalt Ramp Reconstruction 1 JOB

TOTAL BASE WORK: $

OPTIONAL WORK (OW)

Additional Clay Processing/Stockpiling at Bonnet Carre - OW

500,000 CY

0007 Clay Processing/Stockpiling at Alternate Site - OW 500,000 CY

0008 Development of Bonnet Carre Stockpile Area #2 - OW 1 JOB

TOTAL OPTIONAL WORK $

TOTAL BASE WORK + OPTIONAL WORK $

++ Denotes a change from the previous Bidding Schedule.

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

Award will be made as a whole to one bidder.

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE

DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR

AWARD.

NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).

00010-4 Ed 19-007

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within ten (10) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.

NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.

Evaluation of options will not obligate the Government to exercise the option(s).

NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF

OPTIONAL WORK.

(a) In the event that Optional Work Item 0006 is exercised under the terms of the contract, the time required for completion of the contract shall be 240 calendar days in addition to the original contract duration of 370 calendar days established for the BASE WORK items specified in the Contract Clause entitled

“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-

211-10 – APR 1984)”.

(b) In the event that Optional Work Item 0007 is exercised under the terms of the contract, the time required for completion of the contract shall be 240 calendar days in addition to the original contract duration of 370 calendar days established for the BASE WORK items specified in the Contract Clause entitled

“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-

211-10 – APR 1984)”.

(c) In the event that Optional Work Item 0008 is exercised, no additional time will be added to the contract.

++ NOTE 8: The Government will determine the total quantity to be acquired for any unit priced item under either the Base or Optional Work items. If Optional Work Item 0007 is exercised then Optional Work Items 0006 and 0008 will not be exercised. If Optional Work Item 0006 is exercised then Optional Work Item 0008 will be exercised concurrently, and Optional Work Item 0007 will not be exercised.

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

BC3B-19

BC3B-20

BC3B-107

BC3B-106

BC3B-110

BC3B-108

BC3B-109

BC3B-2

BC3B-3

BC3B-104

BC3B-105

PIT 1A

PIT 1B

PIT 2

PIT 3

BC3B-111

NOT TO SCALE

BOTTOM CUT

EXISTING GROUND WATER OR TRAPPED

WATER FROM HIGH RIVER STAGES

EXISTING GROUND

1V ON 3H

AVAILABLE CLAY BORROW

1V:3H

1V ON 3H

1V :3H

EL -20

EL -12

EL -20

EL -25

DIKE - 2' TALL

EXCAVATION ELEVATIONS

EXCAVATION ELEVATIONS

SEE ADJACENT TABLE FOR

BORROW AREA

TYPICAL EXCAVATION SECTION

SEE NOTE 1

(OVERBURDEN)

INTO ADJACENT PIT

BE REMOVED AND PLACED

SAND LAYER TO

BC3B-104

BC3B-105

30°01'6.305"

30°01'3.819"

90°26'12.198"

90°26'9.509"

BC3B-106

BC3B-107

BC3B-108

BC3B-109

BC3B-110

BC3B-111 30°01'0.119"

30°01'4.574"

30°01'9.279"

30°01'8.029"

30°01'5.155"

30°01'2.297" 90°25'58.006"

90°26'1.374"

90°25'53.136"

90°25'58.469"

90°25'54.106"

90°25'54.638"

BC3B-16

BC3B-17

BC3B-18

BC3B-19

BC3B-20 30°01'10.142"

30°01'13.187"

30°00'29.518"

30°00'29.906"

30°00'30.332" 90°26'56.119"

90°26'53.039"

90°26'50.232"

90°26'10.425"

90°26'6.044"

ITEMS LATITUDE LONGITUDE

BORING LOCATIONS

BORING LOCATION

ELEVATIONS AT

CURRENT GROUND

12.16 FT

10.42 FT

10.38 FT

-0.70 FT

3.82 FT

4.35 FT

3.91 FT

5.08 FT

4.34 FT

4.14 FT

4.17 FT

5.21 FT

6.86 FT

A N

S I

D

L H

H

X D

A V

ID

A

B E

C K

NEW ORLEANS DISTRICT

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

O U

IS

IA

N A

L A

U R

E N H

A T T E

N

/0

/1

H -8 -4

J .S

H A

H

O C

T

B O

N N

E T C

A R

R E S

T O

C K

P

IL

E C

O N

T R

A C

T

R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

H U

R R

IC

A N

E A

N D S

T O

R M D

A M

A G

E

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

O U

IS

IA

N A

W P -2

-B -0

S T

C H

A R

L E

S /S

T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H E

S L

A H

C .d g n

C-02

PIT 3

BORROW

PIT 1

BORROW

E X

C A

V A

T

IO

N P

L A

N A

N D B

O R

IN

G S P

L A

N

A

D

B

C

STOCKPILE PIT

SAND OVERBURDEN

B C

F

A

E

D

G-7

PIT 2

BORROW

G-6

G-5

N

600'0 300'

SCALE:1"=300'

:1

FT

OF BOTTOM OF THE PIT

1:3 SLOPE TRANSITION

1B

1A

3. PIPELINE PROTECTION NOT REQUIRED.

STOCKPILED IN THE BOTTOM OF THE SAND STOCKPILE PIT.

BORROW PIT MAY BE LEFT IN PLACE. ALL OTHER SHALL BE REMOVED AND

STUMPS AND ROOTS. STUMPS LOCATED WITHIN THE BOTTOM 3 FEET ON THE

2. WOOD SHOWN ON THE SOIL BORINGS LIKELY INDICATES THE PRESENCE OF

REMOVE AND DISPOSE IN DISPOSAL PIT.

PERCENT SAND CONTENT. DO NOT BLEND OVERBURDEN WITH SUITABLE CLAY.

1. OVERBURDEN INCLUDES CLAYS OR SILTS CONTAINING GREATER THAN 35

NOTES:

A

D D

E D C

U R

R E

N T E

L E

V A

T

IO

N S A

T B

O R

IN

G S

/1

/1

M .A .B

2009.55

ELEVS: NAVD88

File details come from the government source that posted it. Updated .