About this file
This solicitation is for a stockpile contract to excavate, process, and stockpile clay material in the Bonnet Carre Spillway and optional locations within six miles. Work includes clearing, grubbing, reconstructing an asphalt ramp, and incidental work. The magnitude of acquisition is estimated between $25-100 million. Bidders must provide a bid bond and, upon award, payment and performance bonds within three days. The soliciting agency is the Department of the Army Corps of Engineers New Orleans District. The response due date is not provided but award will require bonds within three days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P820B0019 Abstract signed.pdf | ||
| W912P820B0019-0012.pdf | ||
| W912P820B0019-0010.pdf | ||
| W912P820B0019-0009.pdf | ||
| W912P820B0019-0008.pdf | ||
| W912P820B0019-0007.pdf | ||
| W912P820B0019-0004.pdf | ||
| W912P820C0019-P00003.pdf | ||
| W912P820B0019-0002.pdf | ||
| 20B0019-0001.pdf | ||
| A21_20B0019_Solicitation rev.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0005 is the follow ing:
1) To provide revisions to Solicitation W912P820B0019. Please see continuation page and attachments.
2) Please provide any questions to katherine.b.younts@usace.army.mil
New proposal due date 07 September 2020.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0019
X 9B. DATED (SEE ITEM 11)
14-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
STANDARD FORM 1442
Block 11. Change “370 calendar days” to “345 calendar days”.
SECTION 00010
Pages 7 and 8 of 434. Delete these pages in their entirety and substitute the attached revised pages 00010-7 and 8 therefore.
SECTION 00100
Page 13 of 434. Provision 52.217-7. Delete this provision in its entirety.
WAGE DETERMINATION RATES
Page 22 of 434 thru 26 of 434. Delete these Wage Determination Rates in their entirety and substitute the attached revised Wage Determination Rates therefore.
SECTION 00700
1. Page 46 of 434. Paragraph 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. Delete this subparagraph in its entirety and substitute the following therefore:
“52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 345 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)”
2. Page 57 of 434. Paragraph 52.236-4 PHYSICAL DATA, subparagraph (c). Delete this subparagraph in its entirety and substitute the following therefore:
“(c) Transportation Facilities. Ingress and egress to the borrow areas in Bonne Carre Spillway will be via Airline Highway, La Hwy 628, the reconstructed levee access ramp over the guide levee, and the graded, ungraded, and unsurfaced roads in the spillway, as shown in the drawings. Egress from the Spillway to the stockpile location shall only be via the newly reconstructed ramp. Only right turns into and out of the stockpile access road to and from Hwy 61 are allowed for all vehicles. The Contractor will not have exclusive use of the access road from Hwy 61 to the stockpile site. The access road is a shared use roadway which will be utilized by other contractors, land owners and farmers during the construction duration. The Contractor shall coordinate with adjacent contractors, landowners, and farmers. The Contractor is responsible for providing flaggers if the landowner/farmer partially blocks the roadway during harvest season. An approved Traffic Plan is required, in accordance with the requirements of Section 01 55
26.00 12. Roads in the spillway are principally maintained by permitted sand haulers and in some instances by the Government. The Contractor shall obtain specific permission for the extension of existing roads or the construction of new roads within the spillway from the Contracting Officer. The Contractor shall maintain new roads that he/she constructs and contributes, including the maintenance of any existing or other roads within the spillway limits that benefits his/her activities. Speed of all vehicles operating on the roads within the spillway is restricted to 20 mph maximum. All vehicles shall come to a full stop at all intersections. Hauling shall be conducted as to minimize interference with permitted sand haulers and the Government operating in the spillway.
Hauling over the levee is restricted to those approved ramps that are properly maintained.”
3. Page 59 of 434. Provision 5252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS, subparagraph (e). Delete this subparagraph in its entirety and substitute the following therefore:
“(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
West Shore Lake Pontchartrain Louisiana, Hurricane and Storm Damage H-8-48226 G-01 thru G-04;
Risk Reduction System Project C-01 thru C-04;
Bonnet Carre Stockpile Contract 1 B-01 thru B-13; H-01 Charles Parish, Louisiana”
SECTION 01100
Page 71 of 434, paragraph 9. Delete this paragraph in its entirety and substitute the following therefore:
“9. PERMISSIBLE HOURS OF WORK
The Bonnet Carre Spillway is open daily between 0500 and 2200 hours, however equipment operation and truck loading are only permissible during daylight hours. Permissible hours at the Hwy 61 stockpile site is limited to between 0700 to 1800 hours.”
SUBMITTAL REGISTER
Delete the Submittal Register in its entirety and substitute the attached revised Submittal Register therefore.
SECTION 01 55 26.00 12
Page 2, paragraph 1.3. Delete this paragraph in its entirety and substitute the following
“1.3 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the preparation of a Traffic Control Device Plan, nor the maintenance, control and coordination of traffic routing including barricades, danger, warning and detour signs as specified herein. Payment will be included in the contract price for "Clay Processing/Stockpiling at Hwy 61 Stockpile”. “
SECTION 01 57 23.01 12
Page 4, paragraph 3.1.3. Delete this paragraph in its entirety and substitute the following
“1.2 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the temporary truck wash-down rack designed, constructed and maintained by the Contractor. Payment will be included in the contract unit price per cubic yard for "Clay Processing/Stockpiling at Hwy 61 Stockpile".”
NEW SECTION 31 05 19.04 12
Add the attached new Section 31 05 19.04 12.
SECTION 31 11 00.00 12
Delete this section in its entirety and substitute the attached revised Section 31 11 00.00 12 therefore.
SECTION 31 23 00.00 12
Delete this section in its entirety and substitute the attached revised Section 31 23 00.00 12
SECTION 31 24 00.00 12
Delete this section in its entirety and substitute the attached revised Section 31 24 00.00 12
NEW SECTION 32 15 00.00 12
Add the attached new Section 32 15 00.00 12.
DRAWINGS
1. SHEET IDENTIFICATION Nos. G-02, G-03, G-04, C-01, and C-03. Delete these drawings in their entirety and substitute the attached revised SHEET IDENTIFICATION Nos. G-02, G-03, G-04, C-01, and C-03 therefore.
2. Add the attached new drawings as: SHEET IDENTIFICATION Nos. C-02A and C-04.
00010-3 Ed 19-007
SECTION 00010 – BIDDING SCHEDULE
West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, Bonnet Carre Stockpile, Contract 1, Charles Parish, Louisiana
Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
0002 Silt Fences
0002AA First 3,725 LF 3,725 LF
0002AB All over 3,725 LF 660 LF
0003 Clearing and Grubbing Stockpile 1 JOB
0004 Borrow Pit Development 1 JOB
0005 Clay Processing/Stockpiling at Hwy 61 Stockpile 500,000 CY
0006 Asphalt Ramp Reconstruction 1 JOB
TOTAL BASE WORK: $
OPTIONAL WORK 1 (OW1)
0007 Clearing and Grubbing Stockpile
– OW1 1 JOB
0008 Clay Processing/Stockpiling at Hwy 61 Stockpile – OW1 500,000 CY
TOTAL OW1: $
TOTAL BASE WORK + OW1: $
OPTIONAL WORK 2 (OW2)
0009 Separator Geotextile – OW2 23,000 SY
0010 Surfacing – OW2 8,000 CY
TOTAL OW2: $
TOTAL BASE WORK + OW2: $
TOTAL BASE WORK + OW1 + OW2: $
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
00010-4 Ed 19-007
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within ten (10) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that Optional Work is exercised under the terms of the contract, the time required for completion of the contract will be as follows:
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
00010-5 Ed 19-007
OW1 – 274 calendar days in addition to the original contract duration of 345 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”.
OW2 – will not be adjusted but will be performed concurrently with the original contract duration of 345 calendar days established for the BASE WORK items specified in the Contract Clause entitled
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(FAR 52-211-10 – APR 1984)”.
NOTE 8: The Government will determine the total quantity to be acquired for any unit priced item under either the Base Work or Optional Work Items.
00010-6 Ed 19-007
EVALUATION OF SUBLINE ITEMS (Dec 2019 - AFARS 5152.211-9000).
Item Nos. 0002 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS (Dec 2019) - AFARS 5152.211-9001).
This variation in estimated quantities clause is applicable only to item Nos. 0002.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for item Nos. 0002 is less than 85% of the quantity of the first subline item listed under such item, the contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause at Federal Acquisition Regulation (FAR) 52.211-18, VARIATION IN ESTIMATED QUANTITY.
(c) If the actual quantity of work performed under item Nos. 0002 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY.
(End of Clause)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
WSLP Borrow Stockpile Contract
01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction Schedule
SD-07 Certificates 1.5Monthly Updates
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 45 04.00 10 SD-01 Preconstruction Submittals
3.2 G CDContractor Quality Control Plan
01 55 26.00 12 SD-01 Preconstruction Submittals GTraffic Control Plan
01 57 23.00 12 SD-01 Preconstruction Submittals GStormwater Pollution Prevention
Plan (SWPPP) SD-04 Samples
2.1.1 G EDCSilt Fence Geotextile
SD-07 Certificates
2.1.1 G EDCSilt Fence Geotextile
01 78 02.00 10 SD-02 Shop Drawings
1.3.1 G DO'As-Built' Drawings
31 05 19.04 12 SD-01 Preconstruction Submittals
1.5.1Work Plan SD-04 Samples
1.5.1Geotextile SD-07 Certificates
1.5.1 GGeotextile
32 12 16.00 12 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
WSLP Borrow Stockpile Contract
32 12 16.00 12 3.5.1 GSuperpave Asphaltic Concrete Mixtures
SD-07 Certificates 2.3.1Asphaltic Prime Coat 2.3.2Asphaltic Tack Coat 2.3.3.2Asphalt Cement
32 15 00.00 12 SD-06 Test Reports
1.6.2 GSampling and Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Am_0005_WSLP Bonnet Carre Stockpile Contract 1 Ed 19-007
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 05 19.04 12
SEPARATOR GEOTEXTILE
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 MEASUREMENT AND PAYMENT
1.4 SUBMITTALS
1.5 QUALITY CONTROL
1.5.1 General
1.5.2 Reporting
1.6 SHIPMENT AND STORAGE
PART 2 PRODUCTS
2.1 GEOTEXTILE
PART 3 EXECUTION
3.1 GEOTEXTILE INSTALLATION
3.2 SEAMS AND LAPS
3.2.1 Seams
3.2.2 Laps
-- End of Section Table of Contents --
SECTION 31 05 19.04 12 Page 1
SECTION 31 05 19.04 12
SEPARATOR GEOTEXTILE
PART 1 GENERAL
1.1 SCOPE
The work provided for herein consists of furnishing all plant, labor, material, equipment; performing all operations required for furnishing, hauling, placing the separator geotextile; and maintaining the geotextiles until placement of the crushed stone access road and asphalt ramp subbase is completed and accepted.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 883 (2000) Terminology Relating to Plastics
ASTM D 4491 (1999; R 2004e1) Water Permeability of Geotextiles by Permittivity
ASTM D 4632 (1991; R 2003) Standard Test Method for Grab Breaking Load and Elongation of Geotextiles
ASTM D 4751 (2004) Determining Apparent Opening Size of a Geotextile
ASTM D 4884 (1996; R 2003) Strength of Sewn or Thermally Bonded Seams of Geotextiles
1.3 MEASUREMENT AND PAYMENT
Geotextile will be measured in place to the nearest square yard as delineated on the drawings. Overlaps will be measured as a single layer.
Payment for the geotextile will be made at the contract unit price per square yard for "Separator Geotextile - OW2" if Optional Work 2 is exercised.
Price and payment shall include full compensation for providing all plant, equipment, labor and materials, and for cutting, sewing, placing, testing, taking corrective measures to fix deficiencies, and incidentals as shown on the plans and as specified herein. No payment shall be made for geotextile that is rejected or damaged due to Contractor fault or negligence.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SECTION 31 05 19.04 12 Page 2
SD-01 Preconstruction Submittals
Work Plan
The Contractor shall submit a work plan to the Contracting Officer. The plan shall include the following information:
a. The dimensions of the geotextile panels, whether the geotextile will be seamed, lapped, or both. Distance between laps, if applicable.
b. A detailed description of how the geotextile will be placed and stretched.
SD-04 Samples
Geotextile
A 5-foot by 5-foot sample of each geotextile that the Contractor plans to use shall accompany the certificate. If seams are to be used, then an additional 5-foot by 5-foot sample of each geotextile containing a sample seam in the center of the geotextile sample shall be submitted with the certificate.
Geotextiles shall not be delivered to the project site until the geotextile samples and the Contracting Officer approves their certificates.
SD-07 Certificates
Geotextile; G
Contractor shall submit the geotextile manufacturer's certification of compliance. All brands of geotextile and all seams that are used in construction shall be accepted on the following basis. At least 30 days prior to installation, the Contractor shall furnish to the Contracting Officer, in duplicate, a mill certificate or affidavit signed by a legally authorized official from the company manufacturing the geotextile. The certificate shall contain the signer's title, name and address of the Contractor, contract number, and project name and location.
The mill certificate or affidavit shall attest that the geotextile meets the chemical, physical, and manufacturing requirements stated in this specification and that the seams used meet the seam requirements.
1.5 QUALITY CONTROL
1.5.1 General
The Contractor shall establish and maintain quality control for the geotextile and placement to assure compliance with contract requirements, and maintain records of his quality control for all construction operations including but not limited to the following:
(1) Installation Equipment. Type, size and suitability for construction of the prescribed work.
(2) Geotextile Submittals. Geotextile samples, manufacturer's
SECTION 31 05 19.04 12 Page 3 certification of compliance, and work plan.
(3) Construction. Lay-out, geotextile inspection, and stone placement above the geotextile.
1.5.2 Reporting
The original and two copies of these records, as well as the records of corrective action taken, shall be furnished the Government daily. Format of report shall be as prescribed in the Section 01 45 04.00 12 CONTRACTOR
QUALITY CONTROL.
1.6 SHIPMENT AND STORAGE
Geotextile shall be shipped and maintained in a heavy-duty protective cover until it is placed. During all periods of shipment and storage, the geotextile shall be protected from direct sunlight, ultra-violet rays, temperatures greater than 140 degrees Fahrenheit, mud, dirt, and other contaminants. Geotextiles delivered to the project site shall be clearly marked to show the brand name, type of geotextile, tensile strength, location and date of manufacture, and its length (machine direction) and width.
PART 2 PRODUCTS
2.1 GEOTEXTILE
The geotextile shall be a woven pervious sheet made with plastic yarn as defined by ASTM D 883. The geotextiles shall meet the requirements listed in Table 1 . Geotextile fibers shall consist of a long-chain synthetic polymer composed of at least 85 percent by weight of propylene, ethylene, ester, amide, or vinylidene-chloride, and shall contain stabilizers and/or inhibitors added to the base plastic, if necessary, to make the filaments resistant to deterioration due to ultra-violet exposure. The edges of the geotextile shall be selvedged.
TABLE 1
REQUIREMENTS* FOR SEPARATOR GEOTEXTILE
PROPERTY TEST PROCEDURE ACCEPTABLE VALUES
Grab Breaking Load ASTM D 4632 200 pounds minimum in any principal direction Seam Strength (**) ASTM D 4884 100 pounds per inch minimum Elongation at Break ASTM D 4632 15 percent minimum in any principle direction Apparent Opening Size (AOS) ASTM D 4751 No finer than the U.S. Standard Sieve No. 70 and no coarser than the U.S. Standard Sieve No. 30 Permittivity ASTM D 4491 0.35 per second minimum
SECTION 31 05 19.04 12 Page 4
TABLE 1
REQUIREMENTS* FOR SEPARATOR GEOTEXTILE
(*) Value represents minimum average roll value of new geotextile received from the manufacturer or distributor.
(**) All of the samples shall yield test values that are greater than the minimum value that is specified.
PART 3 EXECUTION
3.1 GEOTEXTILE INSTALLATION
The geotextile shall be placed in the manner and at the locations shown on the drawings. The Contractor shall prepare the surface to receive the geotextile to insure that the surface is relatively smooth and free of obstructions, depressions, debris, soft or low density pockets of material, or stone which could damage the geotextile during placement. At the time of installation, the geotextile shall be rejected if it has defects, rips, holes, flaws, deterioration or damage incurred during manufacture, transportation or storage. The geotextile shall be protected at all times during construction to insure that the geotextile's original chemical and physical properties are not changed. The work shall be scheduled so that all of the geotextile that is placed is covered with a layer of the specified material by the end of each workday. Failure to comply shall require replacement of geotextile. All wrinkles and sags shall be stretched out immediately before stone is placed on the geotextile. The geotextile shall be protected from damage during placement of stone. This shall be accomplished by limiting the height of drop to less than 1 foot, or the water surface, whichever is greater. In the event that this damages the geotextile, the subbase shall be placed directly on the geotextile with zero height of drop. Before placement of subbase, the Contractor shall demonstrate that the placement technique will not damage the geotextile.
The Contractor at no additional cost to the Government shall replace any geotextile that is rejected or damaged.
3.2 SEAMS AND LAPS
Seams or laps may be utilized to produce panels of geotextile large enough to cover the area shown on the drawings. Seams or laps shall be perpendicular to the centerline of the structure. Seams or laps shall not run parallel with the direction of the centerline.
3.2.1 Seams
All seams shall be sewn using thread meeting the requirements for plastic yarn specified in paragraph "GEOTEXTILE REQUIREMENTS." The sheets of geotextile shall be sewn at the factory or other approved location. Seam strengths shall meet the requirements of Table 1.
3.2.2 Laps
Geotextile panels placed along the ramp centerline shall be overlapped a minimum of (2 feet).
-- End of Section --
SECTION 31 05 19.04 12 Page 5
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 11 00.00 12
CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.2.1 Clearing and Grubbing, Borrow Areas
1.2.2 Clearing and Grubbing, Hwy 61 Stockpile Area
1.3 QUALITY CONTROL
1.4 REFERENCES
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 CLEARING
3.2.1 General
3.2.2 Merchantable Timber
3.2.3 Government Surveys
3.2.4 Trees
3.2.5 Vegetation
3.2.6 Miscellaneous Structure Foundations and Debris
3.2.7 Areas to be Cleared
3.2.7.1 General
3.2.7.2 Borrow Areas
3.2.7.3 Other Areas
3.3 GRUBBING
3.3.1 General
3.3.2 Areas to be Grubbed
3.3.2.1 Embankments and Structures
3.3.3 Borrow Areas
3.3.4 Filling of Holes in the Stockpile Area
3.4 DISPOSAL OF DEBRIS
3.4.1 General
3.4.2 Windrows
3.4.3 Burning
3.4.4 Burying
3.4.5 Chipping
3.4.6 Removal From Site of Work
3.4.7 Storage On-SIte
SECTION 31 11 00.00 12 Page 1
SECTION 31 11 00.00 12
CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all plant, labor, equipment, and materials, and performing all operations necessary for the clearing and grubbing of the areas specified herein or indicated on the drawings, including clearing and grubbing in stockpile areas; for the removal and disposal of all cleared and grubbed materials; and for the filling of all holes caused by grubbing operations, as specified herein.
1.2 MEASUREMENT AND PAYMENT
1.2.1 Clearing and Grubbing, Borrow Areas
No separate measurement or payment will be made for clearing, grubbing, and vegetation removal in the borrow areas. Payment shall be included in the contract job price for "Borrow Pit Development".
1.2.2 Clearing and Grubbing, Hwy 61 Stockpile Area
No measurement will be made for clearing and grubbing in Hwy 61 Stockpile Area. Payment will be made at the applicable contract job price for "Clearing and Grubbing Stockpile" or "Clearing and Grubbing Stockpile - OW1", if Optional Work 1 is exercised. Price and payment shall constitute full compensation for furnishing all plant, labor, material and equipment and performing all operations necessary for clearing, grubbing, and vegetation removal within Hwy 61 Stockpile Area, removal and storage of existing culverts as shown on the plans, and for removing and disposing of those materials as specified herein or indicated on the drawings.
1.3 QUALITY CONTROL
The Contractor shall establish and maintain quality control for clearing and grubbing operations to assure compliance with contract requirements, and maintain records of his/her quality control for all construction operations including but not limited to the following:
(1) Clearing. Station to station limits transverse clearing limits from applicable centerline; percentages of area complete; type of material.
(2) Grubbing. Station to station limits, transverse grubbing limits from applicable centerline; percentage of area complete; type of material.
(3) Disposition of Cleared and Grubbed Materials. Method and location of disposition; damage to timber or improvements which are not to be cleared.
SECTION 31 11 00.00 12 Page 2
The original and two copies of these records of inspections and tests, as well as the records of corrective action taken, shall be furnished the Government daily. Format of the report shall be as prescribed in Section 01 45 04.00 10 CONTRACTOR QUALITY CONTROL.
1.4 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 76 Acid Rain Nitrogen Oxides Emission Reduction Program
STATE OF LOUISIANA, AIR CONTROL COMMISSION (LACC)
Act 1964, No. 259 (Title 40, Section 2201) Acid Rain Nitrogen Oxides Emission Reduction Program
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
All clearing and grubbing work for stockpiling and processing shall be completed in advance of stockpile construction. If regrowth of vegetation or trees occurs after clearing and grubbing and before placement of fill, the Contractor will be required to clear and grub the area again prior to stockpile construction. Additional clearing and grubbing will be at the Contractor's expense.
3.2 CLEARING
3.2.1 General
Clearing, unless otherwise specified, shall consist of the complete removal above the ground surface of all trees, stumps, down timber snags, brush, vegetation, and similar debris. Growth standing in water in areas that are not drained in accordance with Section 31 24 00.00 12 STOCKPILING CLAY FILL, paragraph "Drainage" may be cut off so as not to protrude more than 12 inches above the existing water surfaces.
3.2.2 Merchantable Timber
Merchantable timber remaining within the areas to be cleared on or after the date of award of this contract may be disposed of as the Contractor sees fit, as long as such merchantable timber is either removed from the right-of-ways indicated on the drawings or is satisfactorily disposed of in accordance with the provisions of paragraph "DISPOSAL OF DEBRIS".
3.2.3 Government Surveys
The Contractor shall clear the entire stockpile area, fill depressions and holes, and allow for original Government surveys to be taken prior to
SECTION 31 11 00.00 12 Page 3 stockpiling material. This clearing shall consist of the removal to within 6-inches of the ground surface of all trees, brush and vegetation. This clearing shall be completed in advance of stockpile construction.
3.2.4 Trees
Certain trees, as designated by the Contracting Officer, shall be left standing. Trees shall be felled in such a manner as to avoid damage to trees to be left standing, to existing structures and installations and to those under construction, and with due regard for the safety of employees and others.
3.2.5 Vegetation
Vegetation to be removed shall consist of crops, grass, bushes, and weeds. Close-growing grass and other vegetation shall be removed from the borrow pit. For the stockpile area, close-growing grass and other vegetation shall be mowed not to exceed 2-inches above the ground surface prior to placement of clay. Fill material necessary for filling holes and depressions in the stockpile area may be obtained by grading high areas in the stockpile area, and from excavation of required drainage ditches. After all clearing, grubbing and filling operations in the stockpile area, the site shall be well graded to provide a smooth surface for surveying prior to stockpiling operations.
3.2.6 Miscellaneous Structure Foundations and Debris
The Contractor shall also remove all abandoned foundations, debris, and other materials.
3.2.7 Areas to be Cleared
3.2.7.1 General
The entire area to be occupied by the stockpile area together with strips 5-feet wide contiguous thereto, shall be cleared.
3.2.7.2 Borrow Areas
Borrow areas shall be cleared to the extent necessary to provide materials free from unsuitable matter as described in Section 31 24 00.00 12 STOCKPILING CLAY FILL, paragraph "Materials".
3.2.7.3 Other Areas
Clearing required to access the borrow pits from haul roads shall be kept to the minimum width required to establish such access for hauling to and from the pits.
3.3 GRUBBING
3.3.1 General
Grubbing shall consist of the removal of all stumps, roots, buried logs, old piling, old paving, old foundations, pipes, drains, and other unsuitable matter as described in Section 31 24 00.00 12 STOCKPILING CLAY FILL, paragraph "Materials".
SECTION 31 11 00.00 12 Page 4
3.3.2 Areas to be Grubbed
3.3.2.1 Embankments and Structures
Grubbing shall be performed within the limits of the Stockpile Area together with the 5-foot strips contiguous thereto. All roots and other projections over 1-1/2-inches in diameter shall be removed to a depth of 3-feet below the natural surface of the ground and to a depth of 3-feet below the subgrade for the foundation of the Stockpile Area. The areas to be grubbed are those specific areas within the limits specified herein above from which trees, stumps, down timber, snags, abandoned structures, and other projections have been removed.
3.3.3 Borrow Areas
Grubbing of borrow areas will be required to the extent necessary to provide materials free from unsuitable matter as described in Section 31 24 00.00 12 STOCKPILING CLAY FILL, paragraph "Materials".
3.3.4 Filling of Holes in the Stockpile Area
All holes caused by grubbing operations and removal of pipes and drains, excluding holes in borrow areas, channels, ditches, and old borrow pits shall be backfilled with sand or clay material in 12-inch layers to the elevation of the adjacent ground surface, and each layer compacted to a density at least equal to that of the adjoining undisturbed material. Fill material necessary for filling in holes, ditches, and old borrow pits, maybe be obtained from the stockpile area or excavation of new drainage ditches. If material is obtained from the stockpile area the ground surface shall be graded to provide a smooth level surface for surveying and stockpiling.
3.4 DISPOSAL OF DEBRIS
3.4.1 General
All debris resulting from clearing and grubbing operations at the stockpile area shall, at the Contractor's option, be disposed of either by windrowing and burning within the stockpile area, chipping and burning, or removal from the site of work. Remnants from burning may be hauled and placed within excavated borrow sites. Debris resulting from clearing and grubbing at the borrow pit shall be buried in the borrow pit. The Contractor shall make a reasonable effort to channel merchantable material into the commercial market to make beneficial use of materials resulting from clearing and grubbing operations. The Contractor shall make a reasonable effort to channel merchantable material into the commercial market to make beneficial use of materials resulting from clearing and grubbing operations.
3.4.2 Windrows
All stockpile areas debris may be placed in a temporary windrow at the edge of the stockpile areas before being burned or removed. The debris shall be placed in a neat windrow or piles with the tree limbs trimmed sufficiently to make the windrow as small as practicable. No debris or cleared or grubbed material shall extend beyond the clearing limit.
SECTION 31 11 00.00 12 Page 5
3.4.3 Burning
The Contractor shall comply with the applicable pollution restrictions of 40 CFR 76 and Louisiana Air Control Commission, effective 17 July 1972, amended November 1972 (Act 1964, No. 259). Subject to such restrictions and obtaining any permit which may be required by said commission, the Contractor may burn material within the contract area, and at any time within the contract period. Burning operations shall be conducted so as to prevent damage to standing timber or other flammable growth. The Contractor shall be responsible for any damage to life and/or property resulting from fires that are started by his/her employees or as a result of his/her operations. The Contractor shall furnish, at the site of burning operations, adequate fire fighting equipment to properly equip his/her personnel for fighting fires. Fires shall be guarded at all times and shall be under constant surveillance until they have been extinguished.
3.4.4 Burying
If the Contractor elects to bury the debris in borrow areas, the area available for burial shall be the excavated borrow pits. No material shall be buried within 20-feet of any standing timber. All material disposed of by burying shall be covered with a minimum of 18 inches of earth.
The Contractor will be allowed to bury unburned debris that has been determined by the Contracting Officer to be unburnable and other material remaining after the initial burning operation has been completed. All material disposed of by burying shall be covered with a minimum of 18 inches of earth.
3.4.5 Chipping
All cut timber, down timber, dead timber, branches, and brush may be chipped and burned or removed from the jobsite.
3.4.6 Removal From Site of Work
The Contractor shall remove all non-vegetative debris from the site of the work. Such disposal shall comply with all applicable Federal, State, and Local laws. The Contractor shall, at his/her option, either retain for his/her own use or dispose of by sale or otherwise, such materials of value. The Government is not responsible for the protection and safekeeping of any materials retained by the Contractor. Such materials shall be removed from the site of the work before the date of completion of the work. If debris from clearing operations is placed on adjacent property, the Contractor shall obtain, without cost to the Government, additional right-of-way for such purposes. Such material shall be so placed as not to interfere with roads, drainage or other improvements and in such a manner as to eliminate the possibility of its entering into channels, ditches, or streams. The Contractor shall submit written evidence to the Contracting Officer that he/she has obtained from the property owner permission for disposal of material on the owner's property. The written evidence shall consist of an authenticated copy of the conveyance under which the Contractor acquired the property rights and access thereto, prepared and executed in accordance with the laws of the State of Louisiana. If temporary rights are obtained by the Contractor, then the period of time shall coincide with the requirements in the Contract Clause in Section 00700 entitled, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10), plus any extension authorized under the Contract Clause entitled, DEFAULT (FIXED-PRICE CONSTRUCTION) (FAR
SECTION 31 11 00.00 12 Page 6
52.249-10), subparagraph (b) (1). However, delay resulting from acquisition of additional rights-of- way for alternate disposal areas will not qualify as excusable delays if suitable Government-furnished disposal areas are available.
3.4.7 Storage On-SIte
Existing culverts within the stockpile and as shown on the drawings shall be stored on-site at a location as directed by the Contracting Officer.
The Contractor shall take care not to damage the culverts during removal and where stored during construction.
SECTION 31 11 00.00 12 Page 7
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 23 00.00 12
EXCAVATION
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMEN
1.2.1 Excavation/Waste Materials
1.2.2 Borrow Pit Development
1.2.2.1 Borrow Pit Development Maintenance - Optional Work
1.3 QUALITY CONTROL
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 EXCAVATION IN BORROW AREAS
3.1.1 General
3.1.2 Criteria
3.1.3 Use of Bonnet Carre Floodway Borrow Area
3.1.4 Stripping and Stockpiling Operations in Bonnet Carre Floodway
Borrow Areas
3.2 DISPOSITION OF MATERIALS (WASTED MATERIALS)
3.3 PROTECTION OF PIT
3.3.1 General
3.3.2 Drainage Ditches
3.4 HAULING
3.5 GRADE TOLERANCES
SECTION 31 23 00.00 12 Page 1
SECTION 31 23 00.00 12
EXCAVATION
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all plant, labor, equipment, and materials, and performing all operations necessary for stockpiling materials and for excavation in borrow areas, borrow pit development, and all other excavation incidental to the construction of the stockpile areas; as specified herein and as shown on the drawings.
1.2 MEASUREMENT AND PAYMEN
1.2.1 Excavation/Waste Materials
No separate measurement or payment will be made for excavation; nor for materials ordered wasted. Payment will be included in the applicable contract unit price per cubic yard for "Clay Processing/Stockpiling at Hwy 61 Stockpile" or "Clay Processing/Stockpiling at Hwy 61 Stockpile - OW1", if Optional Work 1 is exercised.
1.2.2 Borrow Pit Development
No measurement will be made for borrow pit development satisfactorily performed. Payment will be made at the contract job price for "Borrow Pit Development". Price and payment shall constitute full compensation for furnishing all plant, labor, materials, and equipment required to complete construction access; clearing and grubbing in borrow areas; constructing and maintaining protection dikes around the perimeter of the borrow pit;
dewatering operations necessary for excavation; moisture control processing; and removal of retaining dikes upon completion of borrow operations; and other work incidental thereto; all as specified herein and as shown on the drawings.
1.2.2.1 Borrow Pit Development Maintenance - Optional Work
No separate measurement or payment will be made for maintenance components related to the Optional Work borrow pit development. Payment shall be included in the applicable contract unit prices for "Clay Processing/Stockpiling at Hwy 61 Stockpile - OW1", if Optional Work 1is exercised.
1.3 QUALITY CONTROL
The Contractor shall establish and maintain quality control for excavation operations to assure compliance with contract requirements, and maintain records of its quality control for all construction operations including but not limited to the following:
(1) Borrow Areas. Location, station limits, and allowable depths, drainage, and substitute borrow areas. Before and after excavation, SECTION 31 23 00.00 12 Page 2 the Contractor shall perform, plot and submit compliance cross sections to the Contracting Officer at a maximum of 300 feet intervals within the borrow areas with the theoretical sections superimposed thereon.
(2) Disposition of Materials. Testing Program, Location of tested materials (station and lift), Applicable Compaction Curves.
(3) Ditches. Locations grade and cross-section.
(4) Retaining Dikes. Check elevations and wastewater
(5) Quantity Surveys. Accuracy and timeliness.
The original and two (2) copies of these records of inspections and tests, as well as the records of corrective action taken, shall be furnished the Government daily. Format of the report shall be as prescribed in Section 01 45 04.00 10 CONTRACTOR QUALITY CONTROL.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 EXCAVATION IN BORROW AREAS
3.1.1 General
In order to fully utilize available borrow areas, the borrow pit shall be excavated to full depth and width starting along the north side of the pit and working in a southerly direction. Any bench, shelf or partial excavation in the borrow area shall be limited to 100 feet of the full depth of the pit excavation. All excavations shall be performed in an unwatered borrow pit. Sand or silt removal from the ground surface is not limited by the 100 foot bench limitation.
3.1.2 Criteria
The bottom of the clay borrow area excavated under this contract shall be left relatively smooth and sloped to provide surface drainage to the low side of borrow areas as soon as all satisfactory materials have been removed or the Contractor has completed use of the borrow area. Abrupt changes in grade shall be avoided. Material wastes in the borrow area shall be sloped to drain. Any excavation below the depths and slopes shown on the drawings shall be backfilled by the Contractor, at his/her expense.
The clay borrow area shall be drained and kept dry during excavation.
Excavation will not be permitted in water nor shall excavated material be scraped, dragged, or otherwise moved through water. Drainage of the borrow areas shall be accomplished by ditching, sump pumping, or other approved methods. The borrow areas which are flooded from high river stages or rain events shall be drained and allowed to dry after the high river stage or rain event has passed. Any existing pockets of standing water shall be drained prior to excavation.
3.1.3 Use of Bonnet Carre Floodway Borrow Area
Government-furnished borrow and stockpile areas for the exclusive use in the performance of this contract work have been established in the Bonnet Carre Floodway at the location and within the respective limits shown on
SECTION 31 23 00.00 12 Page 3 the drawings. Borrow and stockpiling from this source shall be performed in accordance with applicable notations on the drawings and as provided in these specifications. This Government-furnished source of borrow material may be overlain by alluvial sand and silt, deposited by the river, of varying thicknesses as a result of Floodway operation and the removal of sand under the terms of annually issued and renewable Federally granted sand hauling permits for specific tracts. Permit tracts may overlay portions of the designated borrow and stockpile area. The permits for this tract, as well as other tracts, grant a permittee 20 calendar days in which to vacate the tract, remove its equipment and any stockpiled sand from its tract after it receives notice from the Government to vacate the tract.
Therefore, the Contractor must give written notice to the Contracting Officer that will allow at least 30 calendar days for notification to the affected sand hauler. This notice will allow the sand hauler adequate time to terminate its operations and grant unobstructed occupancy of the borrow and stockpile areas to the contractor. River water may seep through the Bonnet Carre' Spillway structure when the river stage at Bonnet Carre' is at or above elevation 15.0 feet N.G.V.D.. Delays to the Contractor's borrow, stockpiling, and hauling operation from water flowing through the unopened structure when the floodway is not being operated will be subject to the provisions of Section 00700 Contract Clause entitled "DEFAULT (FIXED-PRICE CONSTRUCTION) (FAR 52.249-10)". The Government may need to operate the Bonnet Carre Floodway, which may adversely affect the availability of borrow. The operation of the floodway will only occur after the President of the Mississippi River Commission has determined that the river has reached a stage or flow that threatens the Federal flood control system downstream of the Spillway. The Government will, in all anticipatory circumstances, give written notice to the Contractor of the potential need or intent to operate the floodway, granting 10 calendar days to cease borrow operations and remove equipment. This notice shall not relieve the Contractor from taking whatever steps necessary to protect its equipment and operations from rising river stages. The Contractor shall cooperate and coordinate its use of mutual haul roads with others. Any changes or delays to the Contractor's operations due to opening the Bonnet Carre Floodway will be made pursuant to Contract Clause in Section 00700, entitled "CHANGES (FAR 52.243-4)".
3.1.4 Stripping and Stockpiling Operations in Bonnet Carre Floodway Borrow Areas
The Contractor shall remove the sand and any materials specified to be wasted encountered in the borrow area overlying the clay material. The stripped material shall be stockpiled in the areas provided as shown on the contract drawings.
This is the start of the file's text. The full file is on GovTribe.