This document provides an amendment to a solicitation for a federal construction contract. The key details are as follows:
The solicitation is for Contract #1 of the West Shore Lake Pontchartrain Louisiana Hurricane and Storm Damage Risk Reduction System Project. The scope of work includes excavating, processing, and stockpiling clay material within the Bonnet Carre Spillway and hauling/stockpiling at a site outside the spillway within 12 miles. The period of performance is 345 calendar days from notice to proceed. Bids are due via electronic submission on September 15, 2020, and bond requirements include bid bonds and payment and performance bonds within three days of award. The estimated value of the contract is between $25-100 million. The solicitation is issued by the Department of the Army Corps of Engineers New Orleans District and provides revisions to specifications, drawings, wage rates and responses to bidder questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P820B0019 Abstract signed.pdf | ||
| W912P820B0019-0012.pdf | ||
| W912P820B0019-0010.pdf | ||
| W912P820B0019-0009.pdf | ||
| W912P820B0019-0007.pdf | ||
| W912P820B0019-0005 .pdf | ||
| W912P820B0019-0004.pdf | ||
| W912P820C0019-P00003.pdf | ||
| W912P820B0019-0002.pdf | ||
| 20B0019-0001.pdf | ||
| A21_20B0019_Solicitation rev.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0006 is not issued due to an administrative error. It does not require acknow ledgement.
The purpose of this amendemnt is to: add provisions 52.204-24 & -26, add clause 52.204-25, provide specific details on how contractors are to submit Bids, Bonds and the Conference Call details for the Virtual Bid Opening w hich is now scheduled for Thursday, September 15, 2020 at 11:30 AM CST, and provide answ ers to questions provided to date.
The Contracting Officer and Contract Specialist w ill begin dow nloading bids at 11:00 AM CST, w hich is the bid receipt cutoff time. All bids received after 11:00 AM CST on Thursday, 15 September 2020 w ill be considered late. See the attached pages.
For any questions, please contact the Contract Specialist, (Katherine Younts, Katherine.b.younts@usace.army.mil) by midnight CST, 04 September 2020.
1. CONTRACT ID CODE PAGE OF PAGES
1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0019
X 9B. DATED (SEE ITEM 11)
14-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: HPO CT - ROOM 184
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
INSTRUCTIONS TO BIDDERS
INSTRUCTION TO BIDDERS
Due to the response for COVID-19, most federal employees have been mandated to telework, and currently only authorized personnel are allowed access to the District buildings throughout USACE. As a result, we have implemented the below procedures for all current and future bid openings, until such restrictions have been lifted and normal access has resumed at the MVN HQ Building.
Electronic Submission of Bids:
MVN will utilize the DoD Safe website for receipt of electronic bids under IFB Solicitations. In order to submit an electronic bid please follow these steps:
1. Send an email containing your name and email address to the Contract Specialist associated with the IFB:
Contract Specialist – Mrs. Katherine Younts, email: katherine.b.younts@usace.army.mil
2. The Contracting Officer or Contract Specialist will go to the DoD Safe site, input your name and email address, and then will request the file from you. You will then receive an automated email from the site with a unique link in the email.
3. Once the email with the link is received, please click on the link in the email, which will take you to the DoD Safe site.
4. This will be a unique webpage where you can upload your file. The default page will load with the box checked off next to, “Send me an email when each recipient picks up the files”.
Please leave this box checked in order to receive a notification when the file is received from the Contracting Officer or Contract Specialist. Please leave unchecked, “Encrypt every file”. The site itself contains a high level of security in which additional encryption is not required.
5. When you are ready to upload your bid file (please use pdf format for bid submission), you can either click the blue button which says, “Click to Add Files or Drag Them Here” to locate the file on your computer, or simply drag the file onto the screen.
6. In the Description box that appears after uploading your file, please type your Company Name.
7. Click the button that appears at the bottom of the page, “Drop-off Files”. A banner will pop-up asking for confirmation that your upload does not contain Classified Information. Click ok on the banner.
8. You will be taken to a confirmation page that should say, “Drop-Off Completed” at the top.
This is your confirmation that your file was successfully uploaded to the site.
9. The Contracting Officer or Contract Specialist will receive an automated email stating that the file has been submitted. They will then send an email back to the company, confirming that they received the notice from the DoD Safe site.
The Bid Opening is currently scheduled for Tuesday, 15 September 2020 at 11:30 AM CST.
The Contracting Officer and Contract Specialist will begin downloading bids at 11:00 AM CST, which is the bid receipt cutoff time. All bids received after 11:00 AM CST on Tuesday, 15 September 2020 will be considered late.
Audio Teleconference Bid Opening Information:
Bid Opening will be held on Tuesday, 15 September 2020 at 11:30 AM CST. Please use the following call-in information to attend the meeting:
Toll-Free: 844-291-6362 Access Code: 2964511
Following the conclusion of the bid opening, the Bid Abstract will be uploaded to Beta.SAM website under this solicitation, within 24 hours.
Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package as per the scheduled Bid Opening on Amendment. As per Class Deviation 2020-O0016, Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. In addition, a Corporate Seal is not required, the SF 28 need not be sworn and notarized and a written authorization of the release signed by the surety is acceptable in lieu of the notarized authorization of release by the surety. Original Certified Bonds need not be submitted at time of bid. USACE MVN Contracting Division reserves the right to request the Original Certified Bonds, if deemed necessary to verify their authenticity.
The following deviation clauses now apply, in lieu of the corresponding FAR clauses:
52.228-11, Pledges of Assets (DEVIATION 2020-O0016), which removes the requirement for the Standard Form 28 to be sworn and notarized.
52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020- O0016), which removes the requirements for seals on Standard Forms.
52.228-16, Performance and Payment Bonds—Other than Construction (DEVIATION 2020-O0016), which removes requirements for seals on Standard Forms.
For any Questions please contact:
Contract Specialist – Mrs. Katherine Younts, email: katherine.b.younts@usace.army.mil
RESPONSES TO QUESTIONS
* Since there was no hour established with the bid date, it is apparent that posting the bid date for Labor Day is only a placeholder. Could you please give the tentative expected date and time?
Government Response: See response in Description of Amendment.
* Is the solicitation still to read “Work will be performed within the Bonnet Carre Spillway with an option … outside the Bonnet Carre Spillway …? The new Bidding Schedule indicates all of the stockpiling will be outside the spillway.
Government Response: Solicitation description needs to be updated from "The work consists of excavating, processing and stockpiling of clay material. Work will be performed within the Bonnet Carre Spillway with an option to stockpile clay materials outside of the Bonnet Carre Spillway, but within 12 miles" to "The work consists of excavating, processing and stockpiling of clay material within the Bonnet Carre Spillway and hauling/stockpiling at a site outside the Bonnet Carre Spillway."
* With the Separator Geotextile and Surfacing listed as Optional Work, please confirm; is the Base Work to be quoted without surfacing for the Hwy 61 Stockpile Access? If so, is cement stabilization required to meet EM 385- 1-1 04B-13 through 15?
Government Response: Base Work is to be quoted without Option Work Items as per Bid Schedule, Cement stabilization not required.
* Please confirm what minimum quantity of turnouts is required on the haul roads?
Government Response: Number of turnouts from haul roads within the Spillway shall be determined by Contractor to accommodate his/her means and methods of hauling in the Spillway. One turnout is shown for accessing the stockpile site from the access road off of Hwy 61. How many maximum speed limit signs? Speed limit signs shall be spaced as per any/all applicable guidelines for such. Barring any such guidance, as a minimum 2 per direction of travel shall be placed along the access road leading to the stockpile
* Please confirm that the reduced 24 foot haul road width for two-way traffic is acceptable?
Government Response: Yes.
* Part of new Paragraph 52.236-4, subparagraph (c) requires: “All vehicles shall come to a full stop at all intersections.” Will stop signs be required?
Government Response: No
* Where access to Borrow Pit 3 crosses the Stockpile Contract 2 haul road, will the Contract 1 on-road dump truck traffic be required to yield to the off-road equipment?
Government Response: Yes
* What minimum measures are required at the gas main crossings? Are existing crossings considered to already be sufficient?
Government Response: No additional measures are required.
* Does the new Section 31 05 19.04 12 Separator Geotextile completely delete the old one?
Government Response: Yes.
* Are any additional culverts needed in the approximate 8400 feet of new access road to the stockpile site?
Government Response: No.
* With the number of recent openings and durations of the Spillway, does the USACE have a current survey/estimate of sand overburden for the Borrow Pits?
Government Response: Amendment P00003 issued on December 11, 2019 indicated updated elevations at boring locations to provide such an estimate. More recent surveys are not available.
*Will we be loading and unloading the materials from Government property?
Government Response: The stockpile contract will require the contractor to develop a borrow pit in the Bonnet Carre Spillway, which is Government owned property and stockpile the borrow at a stockpile site that was acquired by the non-Federal Sponsor. The stockpile site is not owned by the Government but we have been granted permission to use the property as a stockpile site.
* Section 01 57 23.01 12, Para 1.1 states that a wash down rack must be installed "at the borrow site." Para 3.1 states that the wash down rack shall be located at a "point of egress from the construction site onto Hwy 61."
Drawing C-03 note 1 states that the washdown rack shall be located at the stockpile exit. Please clarify. Does this mean at the exit from the Bonnet Carre spillway onto US-61, at the Stockpile exit onto US-61, or both?
Government Response: Both.
*Also will that wash down rack(s) constructed as a part of this contract be shared with other contractors hauling sand or clay out of the spillway or into the stockpile location during the life of this contract?
Government Response: No
*If so, who is responsible for maintenance and/or repair?
Government Response: Contractor shall be responsible for wash racks constructed under the contract.
*Will the access road at the stockpile location as a part of this contract be shared with other contractors hauling sand or clay into the location during the life of this contract?
Government Response: Yes
*If so, which contractor will be responsible for maintenance?
Government Response: Any Contractor utilizing the road is jointly responsible for maintenance.
*Will the asphalt access ramp that is required for this project be shared with other contractors hauling sand or clay out of the spillway during the life of this contract?
Government Response: Yes.
*If so, which contractor will be responsible for maintenance and repairs that may occur?
Government Response: The contractor for this contract.
*Are there specifications for the Silt Fence?
Government Response: The specs for the silt fence were not in the amendment 00005. The specifications for such will be added.
*Is the bid opening still happening on Labor Day, September 7, 2020?
Government Response: bid opening date has changed. Please see Description of Amendment.
The following have been modified:
STANDARD FORM 1442
Block 11. Change “370 calendar days” to “345 calendar days”.
SECTION 00010
Pages 7 and 8 of 434. Delete these pages in their entirety and substitute the attached revised pages 00010-7 and 8 therefore.
SECTION 00100
Page 13 of 434. Provision 52.217-7. Delete this provision in its entirety.
WAGE DETERMINATION RATES
Page 22 of 434 thru 26 of 434. Delete these Wage Determination Rates in their entirety and substitute the attached revised Wage Determination Rates therefore.
SECTION 00700
1. Page 46 of 434. Paragraph 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. Delete this subparagraph in its entirety and substitute the following therefore:
“52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 345 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)”
2. Page 57 of 434. Paragraph 52.236-4 PHYSICAL DATA, subparagraph (c). Delete this subparagraph in its entirety and substitute the following therefore:
“(c) Transportation Facilities. Ingress and egress to the borrow areas in Bonne Carre Spillway will be via Airline Highway, La Hwy 628, the reconstructed levee access ramp over the guide levee, and the graded, ungraded, and unsurfaced roads in the spillway, as shown in the drawings. Egress from the Spillway to the stockpile location shall only be via the newly reconstructed ramp. Only right turns into and out of the stockpile access road to and from Hwy 61 are allowed for all vehicles. The Contractor will not have exclusive use of the access road from Hwy 61 to the stockpile site. The access road is a shared use roadway which will be utilized by other contractors, land owners and farmers during the construction duration. The Contractor shall coordinate with adjacent contractors, landowners, and farmers. The Contractor is responsible for providing flaggers if the landowner/farmer partially blocks the roadway during harvest season. An approved Traffic Plan is required, in accordance with the requirements of Section 01 55
26.00 12. Roads in the spillway are principally maintained by permitted sand haulers and in some instances by the Government. The Contractor shall obtain specific permission for the extension of existing roads or the construction of new roads within the spillway from the Contracting Officer. The Contractor shall maintain new roads that he/she constructs and contributes, including the maintenance of any existing or other roads within the spillway limits that benefits his/her activities. Speed of all vehicles operating on the roads within the spillway is restricted to 20 mph maximum. All vehicles shall come to a full stop at all intersections. Hauling shall be conducted as to minimize interference with permitted sand haulers and the Government operating in the spillway.
Hauling over the levee is restricted to those approved ramps that are properly maintained.”
3. Page 59 of 434. Provision 5252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS, subparagraph (e). Delete this subparagraph in its entirety and substitute the following therefore:
“(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
West Shore Lake Pontchartrain Louisiana, Hurricane and Storm Damage H-8-48226 G-01 thru G-04;
Risk Reduction System Project C-01 thru C-04;
Bonnet Carre Stockpile Contract 1 B-01 thru B-13; H-01 Charles Parish, Louisiana”
SECTION 01100
Page 71 of 434, paragraph 9. Delete this paragraph in its entirety and substitute the following therefore:
“9. PERMISSIBLE HOURS OF WORK
The Bonnet Carre Spillway is open daily between 0500 and 2200 hours, however equipment operation and truck loading are only permissible during daylight hours. Permissible hours at the Hwy 61 stockpile site is limited to between 0700 to 1800 hours.”
SUBMITTAL REGISTER
Delete the Submittal Register in its entirety and substitute the attached revised Submittal Register therefore.
SECTION 01 55 26.00 12
Page 2, paragraph 1.3. Delete this paragraph in its entirety and substitute the following
“1.3 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the preparation of a Traffic Control Device Plan, nor the maintenance, control and coordination of traffic routing including barricades, danger, warning and detour signs as specified herein. Payment will be included in the contract price for "Clay Processing/Stockpiling at Hwy 61 Stockpile”. “
SECTION 01 57 23.01 12
Page 4, paragraph 3.1.3. Delete this paragraph in its entirety and substitute the following
“1.2 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the temporary truck wash-down rack designed, constructed and maintained by the Contractor. Payment will be included in the contract unit price per cubic yard for "Clay Processing/Stockpiling at Hwy 61 Stockpile".”
NEW SECTION 31 05 19.04 12
Add the attached new Section 31 05 19.04 12.
SECTION 31 11 00.00 12
Delete this section in its entirety and substitute the attached revised Section 31 11 00.00 12 therefore.
SECTION 31 23 00.00 12
Delete this section in its entirety and substitute the attached revised Section 31 23 00.00 12
SECTION 31 24 00.00 12
Delete this section in its entirety and substitute the attached revised Section 31 24 00.00 12
NEW SECTION 32 15 00.00 12
Add the attached new Section 32 15 00.00 12.
DRAWINGS
1. SHEET IDENTIFICATION Nos. G-02, G-03, G-04, C-01, and C-03. Delete these drawings in their entirety and substitute the attached revised SHEET IDENTIFICATION Nos. G-02, G-03, G-04, C-01, and C-03 therefore.
2. Add the attached new drawings as: SHEET IDENTIFICATION Nos. C-02A and C-04.
SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS
The following have been added by full text:
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representations. The Offeror represents that--
(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--
It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (DEC
2019)
(a) Definitions. As used in this provision, “covered telecommunications equipment or services” has the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.
(c) Representation. The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
(End of provision)
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
(End of Summary of Changes)