This is a Questions and Answers (Q&A) document for federal contract W912P726RA020, Richmond Inner Harbor FY26 Maintenance Dredging, issued by the U.S. Army Corps of Engineers. The document addresses 14 clarifications submitted by prospective offerors regarding solicitation requirements and contract terms.

Key clarifications include: past performance information requirements were extended from three to five years to encourage small business participation; the Montezuma Upland Disposal Site operators—not the contractor—are responsible for depositing dredged materials, providing unloading methods, and maintaining bulkheads and related infrastructure; work hours are 24/7 at the location; small business prime contractors are exempt from subcontracting plan requirements under DFARS 252.219-7996; pre-award surveys are not mandatory at proposal submission but will be requested post-award if the contractor lacks a contract with the San Francisco, Sacramento, or Los Angeles Districts within the prior twelve months; and a printout of Representations and Certifications from SAM.gov constitutes sufficient evidence of completion. The solicitation uses a Lowest Price Technically Acceptable approach under FAR Part 15 (Request for Proposal), not sealed bidding. Amendment 0001 updated Section 00 22 00 regarding past performance timeframes and pre-award survey requirements, while Amendment 0002 extended the question deadline to August 14, 2026, and the proposal due date to August 28, 2026, both at 11:30 a.m. PDT. Cost Accounting Standards provisions (FAR 52.230-1 and 52.230-7) are potentially applicable pending determination of contract exemption status post-award. No limitation exists on the number of past performance examples required, provided they are similar in size, scope, and complexity to the project requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Question Response 1 In order to encourage more Small Business participation, it is requested that the past performance information for projects be extended to within the last ten years

Updated Section 00 22 00 to change "past performance within the last three (3) years" to "past performance within the last five (5) years". See Amendment 0001.

2 SECTION 35 20 23 - 3.2.6 Disposal of Excavated Material – states in part: The deposit of dredged materials in unauthorized places is forbidden.

In addition – SECTION 35 20 23 - 3.2.6.1 Method of Disposal – states:

Deposit dredged material at Montezuma Wetlands site by scow or barge, and using an appropriate method to unload scow/barge to place material within the upland site.

Further, SECTION 35 20 23 - Provide and maintain necessary bulkheads, dikes, ditches, weirs, spillways, and other construction necessary to confine and retain the fill in the dredge fill area.

Please confirm that the Government’s agreement with the Montezuma Upland Disposal Site INCLUDES the requirement for the Operators of the Montezuma Upland Disposal Site, and NOT the Contractor, to be responsible for:

oDeposiƟng of dredged materials in authorized areas;

oProviding an appropriate method to unload scow/barge to place material within the upland site;

oProvide and maintain necessary bulkheads, dikes, ditches, weirs, spillways, and other construction necessary to confine and retain the fill in the dredge fill area.

Montezuma will be responsible for:

- Depositing of dredged materials in authorized areas;

- Providing an appropriate method to unload scow/barge to place material within the upland site;

- Providing and maintaining necessary bulkheads, dikes, ditches, weirs, spillways, and other construction necessary to confine and retain the fill in the dredge fill area.

See Amendment 0001

3 Please confirm that the work hours for this location are 24/7. The work hours for this location are 24/7.

4 For the Small Business Subcontracting Plan requirements, it is clear that FAR 52.219-9 does not apply to Prime small businesses. Please confirm that DFAR 252.219-7996 is not also not applicable to Prime small businesses and a Small Business Subcontracting Plan is not required for Small Businesses.

DFARS 252.219-7996 does not apply the Small Business prime. Subcontracting Plan is not required for Small Business.

5 Please clarify what should be submitted under Tab 6: Contractor Responsibility, Pre-Award Survey Information for the Price Proposal.

The directions state that "The Government will request this information from the eligible contractor after receipt of offer if they have not had a contract with the San Francisco District within the last twelve months and the Government will set a due date for its submission." If the Pre-Award survey is provided after award, what should be submitted for the Price Proposal under Tab 6: Contractor Responsibility, Pre-Award Survey Information?

Pre-award survey is not mandatory with the submission package, but will be requested after solicitation due date if they have not had a contract with the San Francisco District, Sacramento District and Los Angeles District within the last twelve months. The rest of the documents listed are mandatory.

W912P726RA020 Richmond Inner Harbor FY26 Maintenance Dredging Revised: 14 Aug 2026

6 Within Tab 6: Contractor Responsibility, Pre-Award Survey Information of the Price Proposal it states "The Government will request this information from the eligible contractor after receipt of offer if they have not had a contract with the San Francisco District within the last twelve months and the Government will set a due date for its submission."

It is requested that if the Government consider amending this statement to read "The Government will request this information from the eligible contractor after receipt of offer if they have not had a contract with the San Francisco District or the Los Angeles District within the last twelve months and the Government will set a due date for its submission."

Section 00 22 00 updated. See Amendment 0001.

7 Within the Price Proposal, Tab 4: Annual Representations and Certifications the requirements state "The offeror must have electronically completed the annual representations and certifications on the “System for Award Management” (SAM) website in accordance with DFARS 252.204-7998. The offeror is responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete."

What is considered evidence of electronic completion - a printout of the Reps & Certs from SAM.gov or a screenshot of the expiration date in SAM.gov or is there something else that would satisfy this requirement if the Reps & Certs have been annually renewed in SAM.gov?

A printout of Reps and Certs from SAM.gov is sufficient.

8 Question Deadline Extension: Will the Government consider a one-week question deadline extension to allow additional time for review of the solicitation and to submit any technical or proposal-related questions?

See Amendment 0002. Question deadline extended to 14 Aug 2026 NLT 11:30am PDT.

9 Bid Date Extension: Will the Government consider a two-week bid date extension to allow additional time for review of the solicitation requirements and preparation of a complete and responsive proposal.

See Amendment 0002. Proposal due date extended to 28 Aug 2026 NLT 11:30am PDT.

10 Technical Proposal, Tab 1 Factor 1 Past Performance. How many past performance do we have to provide within in the last five years?

No limitation on number for past performance. Just ensure it's similar in size, scope, and complexity to this requirement.

11 For the Technical Proposal in general, would you like this be page numbered?

Page numbering is not mandatory.

12 Please confirm if this is applicable for this project.

Vol. II – Price; 00 45 00 Reps and Certs:

52.230-1 Cost Accounting Standards Notices and Certifications (Deviation 2026-O0038) 2026-02 52.230-7 Proposal Disclosure-Cost Accounting Practice Changes 2005-

FAR 52.230-1 and 52.230-7 are potentially applicable: if the resulting contract is exempt from CAS requirements according to 48 CFR 9903.201-1, then these provisions will not apply to the contract. Compliance with these provisions will only be required after receipt of proposals, should it be determined that they are applicable.

13 FAR 52.230-1 and FAR 52.230-7 are included in the solicitation.

However, 48 C.F.R. § 9903.201-1(b)(1) exempts sealed bid contracts from all CAS requirements. Does the Government consider the contemplated contract exempt under § 9903.201-1(b)(1) since it’s a seal bid contract? If not, please identify the basis for CAS applicability.

This is not sealed bid. Sealed Bidding is under RFO FAR Part 14 and issued as Invitation for Bids where award will be made to the responsible bidder who submitted the lowest responsive bid. This solicitation is a Request for Proposal (RFP) issued under RFO FAR Part 15 using the Lowest Price Technically Acceptable approach where award will be made to the offeror that submit a technically acceptable proposal with the lowest evaluated price. See also response to RFI #12.

14 Can you clarify and confirm the RFI Deadline based on the extended due date?

See response to RFI #8 and Page 3 of Amendment 0002.