This document is an amendment to a solicitation for maintenance dredging services. The U.S. Army Corps of Engineers Engineering District San Francisco is seeking bids to dredge six reaches of the Redwood City Channel in California to a depth of 30 feet below the Mean Lower Low Water level. Dredged materials will be disposed of at designated ocean disposal sites. The amendment updates the pricing schedule to include estimated quantities, unit prices, and totals for line items covering mobilization, dredging of each reach, and placement of materials. Bidders must complete and submit equipment schedules with their solicitation response for bid evaluation. The contract will be awarded to the lowest priced, responsive bidder.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the bid schedule.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P723B0012
X 9B. DATED (SEE ITEM 11)
15-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Oct-2023
CODE
USACE, SAN FRANCISCO DISTRICT
450 GOLDEN GATE
SAN FRANCISCO CA 94102
W912P7 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 00 10 00
PRICING SCHEDULE
REDWOOD CITY CHANNEL FY23 MAINTENANCE DREDGING
Contract Description of Supplies and *Estimated Unit Amount
Line Item Services Quantity Unit Price
No.(CLIN)
BASE BID ITEMS
Mobilization and Demobilization
Remove 100,000 CY from STA 00+00 to 100+00 and place at Eden Landing
Nearshore Site
Dredge Reach 2 to -30-ft MLLW with disposal at SF-11
Dredge Reach 3 to -30-ft MLLW
Dredge Reach 4 to -30-ft MLLW
Dredge Reach 5 to -30-ft MLLW
With disposal at SF-DODS
Dredge Reach 6 to -30-ft MLLW
With disposal at SF-DODS
7080,000
6045,000
200160,0
4030,000
3045,000
Job
Job
CY
Total Base (Item 0001 through 0007) 410,000 + 2 Jobs $
* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL
CONDITION) OF THE CONTRACT.
IMPORTANT NOTES:
1 To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids. Bidders must complete and submit attached “Dredging Plant and
Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.
2 The term "Job", which appears in the Pricing Schedule (Section 00 01 00) under
“Unit” for Bid Item No. 0001 and 0002 shall be considered as a Lump Sum. The
Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No. 0001 and 0002.
3 BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19
Contract Award – Sealed Bidding – Construction.
4 The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.
5 The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.
6 Dredged material placement shall be consistent with the requirements in specification Section 01 11 00 SUMMARY OF WORK, including the DMMO Suitability
Determination Memo (Attachment at the end of the specification package).
7 CLIN 0002 (material removed from STA 00+00 to 100+00) shall be considered a borrow area where no material shall remain above -30ft MLLW. Paragraph
1.5.1.5 “Allowable (Unpaid) Overdepth Prism” requirement of Specifications
Section 35 20 23 and the Typical Dredging Section requirement on Plan Sheet G-
002 do not apply to CLIN 0002 with the exception that dredging in excess of the allowable 2-foot overdepth is prohibited.
End of Document