Attach 1.a Submittal Register.pdf

PDF 330 KB Posted

Attached to
South San Francisco Bay Shoreline Reaches 1-3
Solicitation number
W912P721R0002
Issued by

About this file

This is a submittal register for a federal construction contract solicitation for the South San Francisco Bay Shoreline Reaches 1-3 project. The register lists over 100 submittal items required from the contractor organized by specification section. Required submittals include accident prevention plans, quality control plans, shop drawings, product data, test reports, certificates, and closeout documents. Key submittals include construction schedules, traffic control plans, environmental protection plans, hazardous waste management plans, safety programs, materials testing results, and as-built drawings. The solicitation number for the project is W912P721R0002 and was issued by the U.S. Army Corps of Engineers, San Francisco District. Important procurement dates include a virtual site visit on February 4, 2021, a request for information deadline of February 22, 2021, and an advertisement close date of March 23, 2021. The submittal register provides contractors with a comprehensive list of submittal requirements to prepare a responsive proposal for this shoreline restoration construction project prior to the specified closing date.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 21 PAGES

South San Francisco Bay Shoreline Reaches 1 and 2/3

01 11 00 SD-01 Preconstruction Submittals

Utility Outage Requests

Utility Connection Requests

Borrow Permits

Excavation Permits

Welding Permits

Burning Permits

GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.10 GCoordination Plan With USFWS

01 22 00.00 10 SD-03 Product Data

Weight Certificates

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 21 PAGES

01 35 26 SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-02 Shop Drawings

3.6.2.1 GPower And Lighting Single Line

Diagram

SD-05 Design Data

3.6.2.1 GGovernment Field Office

Electrical Calculations

3.6.10.1 GPhotometric Plan

01 50 01 SD-01 Preconstruction Submittals

GPFO Site Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1.3a l3eteek9 Highlight l3eteek9 Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 21 PAGES

01 50 01 GPFO Specifications Information

Standard Foundation Drawings

GPFO Furniture, Fixtures &

Equipment (FFE)

GIT Infrastructure Design/Shop

Drawings

GIT Equipment

GPlan for proposed PFO anchoring to foundation

GSample of Skirting Material product information for proposed insulation for floors, walls, and attic

Gproduct information for exterior & interior doors, door hardware, landings, stairs, and ramp product information for interior walls of restrooms and other areas

Gproduct information for the proposed water heater(s) for the restrooms and kitchenette

Gproduct information for the proposed security system product information for the interior signage for all rooms and cubicles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1.3b

2.2

2.3

2.3

2.1

2.1 l3eteek9 Highlight l3eteek9 Highlight l3eteek9 Highlight l3eteek9 Highlight l3eteek9 Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 21 PAGES

01 50 01 product information for the emergency lightings and exit signage IAW latest version of

NFPA 101

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.8 GLetter of Acknowledgement

1.12 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7 GEnvironmental Protection Plan

1.6.6 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications

1.6.5 GBiological Monitor Qualifications

1.6.8.1 GQuality Assurance Officer

(Quality Assurance Project Plan)

Qualifications

3.15City Of San José Conditional Use

Permit

3.1.2.3Endangered Species Survey

Report

SD-06 Test Reports

Inspection Reports

3.7.2.1 GSolid Waste Management Report

3.15Noise Monitoring Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 21 PAGES

01 57 19 1.6.6Employee Training Records

1.6.6.1Certificate of Competency

SD-11 Closeout Submittals

3.7.1 GWaste Determination

Documentation

3.7.3.5 GDisposal Documentation for

Hazardous and Regulated Waste

1.6.6Assembled Employee Training

Records

1.12 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.3.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

As-Built Topographic Survey

01 57 23.00 41 SD-01 Preconstruction Submittals

1.5.1 GSWPPP

1.5.2 GPRDs

SD-03 Product Data

BMP Product Data

SD-06 Test Reports

3.1.1SWPPP Amendment

1.5.2Sampling Results

3.2.2REAPs and Inspection Reports

Exceedance Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 21 PAGES

01 57 23.00 41 1.5.2Annual Report

SD-07 Certificates

1.4Erosion And Sediment Control

Inspector Qualifications

SD-10 Operation and Maintenance

Data

3.1.2 GPost-Construction Stormwater

Management Plan

3.1.2 GPost-Construction Stormwater

Management Plan

SD-11 Closeout Submittals

3.1.2 GFinal SWPPP

GStormwater Pollution Prevention

Plan Compliance Notebook

GStormwater Notice of Termination

(for NPDES coverage under the general permit for construction activities

3.1.2 GNOT Application

3.1.2 GNOT Application

01 58 00 SD-02 Shop Drawings

1.3.1 GSign Legend Orders

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 21 PAGES

01 78 00 SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.7.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.2.2 GSolid Waste Management Plan

1.9 GExisting Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

Receipts

03 31 30 SD-01 Preconstruction Submittals

1.8.2.2Concrete Curing Plan

1.6 GConcrete Quality Control Program

1.8.2.4Concrete Placement and

Compaction

1.8.2.1Curing Concrete Elements

1.8.2.3Form Removal Schedule

1.6.2 GLaboratory Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 21 PAGES

03 31 30 1.6.1 GQuality Control Personnel

SD-02 Shop Drawings

3.2.7 GJoints

1.8.1.1Formwork

1.8.1.3 GPrecast Elements

1.6.1.2 GReinforcing Steel

SD-03 Product Data

1.8.5.4 GAdmixtures

2.4.1 GAir Entraining

1.8.5.3 GAggregates

1.2 GCorrosion Inhibitors

2.8.3Joint Filler

2.8.4Joint Sealants

2.8.2Materials for Curing Concrete

1.8.2.8Safety Data Sheets

2.7.2 GMechanical Reinforcing Bar

Connectors

2.5Non-Shrink Grout

3.2.7Preformed Joint Filler

2.7.1 GReinforcing Bars

2.7.1.1 GReinforcement and Protective

Coating

3.2.2Reinforcement Supports

2.8.1Waterstops

SD-05 Design Data

1.8.5.1 GConcrete Mixture Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 21 PAGES

03 31 30 1.8.2.9Mixture Designs

SD-06 Test Reports

2.4.1Air Entraining

1.8.5.3Aggregates

1.8.5.4Admixtures

1.8.5.5Cement

1.7.1Concrete Mixture Proportions

1.8.5Concrete Test Reports

1.7.4.1Fresh Concrete Properties

1.7.4.2Hardened Concrete Properties

2.7.2Mechanical Reinforcing Bar

Connectors

2.7.1Reinforcing Bars

2.7.1.1Reinforcement and Protective

Coating

1.8.5.2Supplementary Cementing

Materials

2.3Water

SD-07 Certificates

1.8.5.4Admixtures

2.1Cementitious Materials

1.8.3.1Cementitious Material Mill

Certificates

1.6.1.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 21 PAGES

03 31 30 1.8.2.6Coatings

SD-11 Closeout Submittals

1.8.3.1Aggregate Moisture Content

1.8.3.1Aggregate Sampling

1.8.5Concrete Test Reports

1.8.4.3Quality Control Charts

1.8.4.1Daily Inspection Reports

1.8.4.4Quality Team Meetings

1.8.4.2Sampling Logs

05 12 00 SD-01 Preconstruction Submittals

1.3.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.3.2 GFabrication Drawings

SD-03 Product Data

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

2.2.1Recycled Content for Structural

Steel

SD-05 Design Data

GDesign Calculations for Steel

Connections

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 21 PAGES

05 12 00 3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 50 13 SD-02 Shop Drawings

2.3 GFloor Gratings

2.4 GAngles and Plates

SD-03 Product Data

2.3 GFloor Gratings

05 50 14 SD-02 Shop Drawings

1.3.1 GDetail Drawings

2.1.2.1.1 GWelding Procedures

2.2.4Welding Repair Plan

2.1.4Castings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 21 PAGES

05 50 14 SD-03 Product Data

2.1.2.1.3.1Filler Metal

2.1.5.3Lubricant

SD-06 Test Reports

2.2Tests, Inspections, and

Verifications

SD-07 Certificates

1.3.2Welding Qualifications

2.1.2.3.1 GApplication Qualification for Steel

Studs

2.2.3.1Weld Inspection Log

2.2.3.1Certified Welding Inspector

2.2.3.2.1Nondestructive Testing Personnel

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 21 PAGES

05 52 00 2.1.2 GProtective Coating

2.2.2 GSteel Railings and Handrails

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 13 33 SD-02 Shop Drawings

GTimberwork

SD-06 Test Reports

1.4.1 GPreservative Treatment

1.4.3 GDelivery Inspection List

SD-07 Certificates

1.4.2 GSDS and CIS

1.4.4 GBest Management Practices

(BMPs)

13 80 00 SD-01 Preconstruction Submittals

GContractor's Personnel Resumes

SD-03 Product Data

GVibrating Wire Piezometers

GSettlement Plates

GFactory/Manufacturer Information

SD-05 Design Data

GInstrumentation Installation Plan

GInstrumentation Monitoring Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 21 PAGES

13 80 00 GInstrumentation Testing

GPeriodic Monitoring Reports

GFinal Instrumentation Monitoring

Report

SD-07 Certificates

GInstrumentation Calibration

SD-11 Closeout Submittals

GAs-built Plans

31 05 19 SD-03 Product Data

2.2Manufacturing Quality Control

Sampling and Testing

SD-04 Samples

3.1Quality Assurance Samples and

Tests

SD-07 Certificates

2.1.1 GGeotextile

31 05 21.01 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

Manufacturer Specifications

SD-04 Samples

2.1 GGeogrid

SD-06 Test Reports

2.1 GGeogrid Reinforcement;

3.4Conformance Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) l3eteek9 Highlight l3eteek9 Highlight l3eteek9 Highlight l3eteek9 Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 21 PAGES

31 05 21.01 2.1Certificates of Compliance

31 05 21.02 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

Allowable Strength

Manufacturer Specifications

SD-04 Samples

2.1 GGeogrid

SD-06 Test Reports

2.1 GGeogrid

3.1.3Splices

3.4Conformance Testing

SD-07 Certificates

2.1Certificates of Compliance

31 23 19 SD-01 Preconstruction Submittals

1.2 GStormwater Pollution Prevention

Plan

1.4.1 GDewatering Plan

SD-02 Shop Drawings

1.4.2 GShop Drawings

SD-03 Product Data

1.4.3Product Data

SD-05 Design Data

1.4.4 GDesign Data

SD-06 Test Reports

1.4.5 Gpermits

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 21 PAGES

31 23 19 SD-07 Certificates

1.4.5 Gpermits

31 62 16.11 SD-02 Shop Drawings

3.1.3 GInstallation

SD-03 Product Data

3.1.1.3 GDriving Pile Equipment

SD-06 Test Reports

3.2 GInstallation Records

SD-07 Certificates

3.1.1.2Minimum Bearing Capacity

3.1Certified Calibration Reports

32 11 23 SD-03 Product Data

1.4 GPlant, Equipment, and Tools

SD-06 Test Reports

2.2.1 GInitial Tests

3.9.1 GIn-Place Tests

32 12 16 SD-02 Shop Drawings

Part 1 GPavement Plan

SD-03 Product Data

2.3 GMix Design

2.4 GLiquid Antistrip Treatment

3.3.1 GQuality Control Plan

3.4 GMaterial Acceptance

SD-06 Test Reports

2.4Liquid Antistrip Treatment

3.3.3 GQuality Control Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 21 PAGES

32 12 16 SD-07 Certificates

2.2 GAsphalt Binder

2.5 GTack Coat

3.1Asphalt Mixing Plant

3.3.2Testing Laboratory

32 15 00 SD-03 Product Data

1.4 GPlant, Equipment, and Tools

SD-06 Test Reports

2.2.1 GInitial Tests

3.11.1 GIn-Place Tests

32 17 23 SD-02 Shop Drawings

Part 1 GPavement Marking Plan

SD-07 Certificates

2.1.1Waterborne Paint

2.1.2Thermoplastic

2.1.3Glass Beads

SD-08 Manufacturer’s Instructions

2.1.1 GWaterborne Paint

2.1.2 GThermoplastic

32 31 13.00 10 SD-04 Samples

2.1.1 GFabric

2.1.2 GHog Rings

2.1.3 GEarth Anchors

SD-07 Certificates

1.3.1Certificates of Compliance

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 21 PAGES

32 31 13.00 10 2.1.3Earth Anchors

32 91 18.00 12 SD-01 Preconstruction Submittals

3.2 GSurface Preparation Plan

3.4 GHPTRM Installation Plan

1.5 GPull-Out Test Plan

SD-04 Samples

1.5 GHPTRM Samples

GSecuring Pins and Percussion

Driven Anchors

SD-07 Certificates

1.5 GHPTRM Manufacturer's

Certificate

32 92 19 SD-03 Product Data

2.5.1Wood Cellulose Fiber Mulch

2.4Fertilizer

2.7Erosion Control Materials

SD-06 Test Reports

2.2.2Topsoil Composition Tests

SD-07 Certificates

2.1Seed

33 40 00.01 SD-03 Product Data

2.2.2.2 GFlexible Watertight Gasketed

Joint

SD-04 Samples

2.1Pipe for Culverts and Storm

Drains

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 21 PAGES

33 40 00.01 SD-05 Design Data

3.2.1 GCLSM Mix

SD-07 Certificates

2.1.1Resin Certification

Oil Resistant Gasket

3.6.1.2Leakage Test

3.6.1.1Hydrostatic Test on Watertight

Joints

Determination of Density

Frame and Cover for Gratings

3.6.2.1.2Post-Installation Inspection

Report

3.3Placing Pipe

SD-11 Closeout Submittals

GLid Verification Report

33 40 00.02 SD-04 Samples

2.1Pipe for Culverts

SD-07 Certificates

2.3.2.1Oil Resistant Gasket

3.6.1.2Leakage Test

3.6.1.1Hydrostatic Test on Watertight

Joints

3.6.2.1.2Post-Installation Inspection

Report

3.3Placing Pipe

35 20 16.53 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 21 PAGES

35 20 16.53 2.3.1 GDetail Drawings

SD-03 Product Data

2.1Materials

2.3.2.1 GWelding

SD-06 Test Reports

2.4Tests, Inspections, and

Verifications

3.3Acceptance Trial Operation and

Test

35 41 00.01 SD-01 Preconstruction Submittals

3.8 GDewatering Plan

3.10 GDegrade Plan

1.3.2 GHaul Road Plan

3.19.1 GFill Placement and Compaction

Plan

1.3.5Drainage Requirements

3.23 GSurvey Control Plan

3.25 GFlood Contingency Plan

SD-03 Product Data

3.7 GShoring, Sheeting, and Bracing

3.10 GBorrow Areas

3.10 GFill Materials

3.24.3.2.2.6Nuclear Density Equipment Data

GChain link fabric mesh installation certification

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 21 PAGES

35 41 00.01 GVane Shear Testing Plan

SD-06 Test Reports

Measurement of Fill Material

35 41 00.02 SD-01 Preconstruction Submittals

GPlan Of Operations

1.3.1 GEmbankment And Backfill

Materials

3.9 GExcavation

3.8 GTemporary Siphon

3.17.1.1 GIntelligent Compaction

SD-02 Shop Drawings

1.3.5Drainage Requirements

SD-03 Product Data

3.6 GShoring, Sheeting, and Bracing

2.1.2 GFilter Sand

2.2.1 GNuclear Density

SD-06 Test Reports

3.18.3.7 GReporting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR