Amendment 0007 SF30.pdf

PDF 313 KB Posted

Attached to
Pier 36; demolition and removal Federal contract opportunity
Solicitation number
W912P7-11-B-0005
Issued by
Department of the Army Corps of Engineers Engineering District San Francisco

About this file

Amendment 0007 - Revised pricing schedule dated 26 Oct 2011

View the file

Other files for this federal contract opportunity

Other files attached to Pier 36; demolition and removal, newest first.
File Type Posted
Bid Results W912P7-11-B-0005 - Pier Demo.pdf PDF
Amendment 0008 SF30.pdf PDF
QA Responses Pier 36 3 Nov 2011 1115.pdf PDF
Summary of Docs required in the IFB —
QA Responses Pier 36 27 OCT 2011 1515.pdf PDF
QA Responses Pier 36 25 OCT 2011 1330.pdf PDF
Amendment 0006.pdf PDF
SF30 Amendment 0005 plus attachments.pdf PDF
QA Responses Pier 36 21 OCT 2011 0100.pdf PDF
Attendees list.pdf PDF
SF30 Amendment 0004.pdf PDF
Pier 36 Demolition Final Drawings 2011-09-16.pdf PDF
Pier 36 Demolition Final Drawings - Revision 1 - 11 OCT 2011.pdf PDF
8469-30-4 Piers 30thru38 Seawall Repairs 1973 —
Q A Responses Pier 36 10-11-11.pdf PDF
Amendment 0003.pdf PDF
Pier 36 - HAZMAT Survey Report —
Pier 36 - Environmental Assessment and FONSI —
Q A Responses Pier 36 10-6-11.pdf PDF
Pier 36 - Pier 36 As Builts —
Pier 36 - Extension of Shed 1.PDF PDF
Pier 36 - Biological Assessment —
Pier 36 - Water Quality Control Board Certification —
Clause SPN 14-4001 Inquiries —
Pier 36 - Extension of Shed 2.pdf PDF
SF30 As-Builts.pdf PDF
Pier 36 - BCDC Consistency Determination —
Pier 36 - Final Biological Opinion —
SF30 Amendment 0001.pdf PDF
P36 - Seawall As-Builts —
Q A Responses Pier 36 9-30-11.pdf PDF
Final Plans 2011-09-16.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

W912P7-11-B-0005, Pier 36 Demolition Project (All amendments must be acknowledged at time of bid opening)

- Revised pricing schedule dated 26 October 2011

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

See item 6US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

CODE

FACILITY CODE

0007 27 Oct 2011

W912P7-11-B-0005

15 Sep 2011

Section 00010 – Solicitation Contract

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Pier 36

Furnish all labor, materials and equipment necessary to perform the demolition and removal of the entire Pier 36 building and it’s supporting structures to a minimum of three (3) feet below mud line, including the Marginal Wharf and specified areas in accordance with the project specifications, plans, contract clauses and provisions.

PURCHASE REQUEST NUMBER: W62A2B10814814

NET AMT ___________________

0000AA 1 Lump Sum Non-Federal funds

NET AMT _____________________

0000AB 1 Lump Sum Federal funds

NET AMT _____________________

Amendment 0007

L3CT9RPV

Typewritten Text

L3CT9RPV

Typewritten Text Nothing goes here

L3CT9RPV

Typewritten Text Nothing goes here

L3CT9RPV

Typewritten Text

L3CT9RPV

Typewritten Text Nothing goes here

0001 1 Lump Sum Mobilization and Demobilization

NET AMT ________________________

0002 1 Lump Sum Safety and Traffic Control

0003 1 Lump Sum Environmental Protection/Monitoring

0004 36,075 Square Foot

Demolition/Deconstruction of (E) Pier 36 Structural Building

0005 86,095 Square

Demolition of (E) Pier 36 Decking, (E) Steel Ferry Ramp. See Reference Drawings-Sheet DP-111

0006 437 Each

Complete Removal/Demolition of Caissons and Piles down to a minimum three (3) Feet below mud-line located at Pier 36

0007 2 Each

Remove and Salvage (E) Fire Hydrants

36,075 Square

Pier 36 Building Hazmat Abatement

Total line items 0001 – 0008: ___________________________________________________

NOTE: Each optional Bid-Item from 0009 to 0013 individually includes the costs associated with environmental protection/monitoring plus safety and traffic control.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

OPTION

1420 TON

Complete Removal/Demolition of (E) Timbers Standing and Submerged including Debris from Collapsed pier down to a minimum three (3) feet below mud-line. See Reference Drawings-Sheet DP-112.

Assume the following: 535 tons of Deck Timber, 705 tons of AC Deck, 90 tons Brg Piles, 90 tons Fender Piles. Assumed totals: 715 Tons of Timber; All other Debris 705 Tons.

00010

OPTION

1 Lump Sum

Seawall: Phase 1; Exploratory work and Phase 2; Concrete Crack Repair.

See Reference Drawing-Sheet DP-113, and 503. For bid purposes 33 exploratory cores are assumed to determine actual crack length of seawall. (260 feet is the assumed length of cracked seawall). Phase 2, Stage 2, 225 vertical cored holes are assumed for reinforcing rods for bid quantity purposes.

OPTION

1 Lump Sum

Demolition of Marginal Wharf within Project Limits, Installation of Inclinometers along Seawall and Seawall Monitoring, Demolition and Removal of all (E) Utilities Protruding off the Seawall, Structural Patch Repairs on left over Orifices. Reference Drawings-DP-101, 111, 113, 114.

74 Each

Demolition of (E) 16” Dia. Piles at Marginal Wharf to a minimum three (3) Feet below mud-line.

10 Each

Complete Removal/Demolition of Caissons supporting the Marginal Wharf at the former Pier 34 footprint down to a minimum three (3) feet below mud-line.

Total line items 0009 – 0013: $____________________________________________________

Total bid, line items 0001 – 0013: $________________________________________________

NOTES

Notes to bidders:

1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may be cause for rejection of bids.

2. If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the Pricing Schedule.

3. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

4. The Government will evaluate bids and award a contract to a responsible bidder in the best interests of the Government.

5. Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.

– End of Document –