Amendment 0007 - Revised pricing schedule dated 26 Oct 2011
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
W912P7-11-B-0005, Pier 36 Demolition Project (All amendments must be acknowledged at time of bid opening)
- Revised pricing schedule dated 26 October 2011
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
MODIFICATION OF CONTRACTS/ORDER
NO.
E. IMPORTANT: Contractor
15B. CONTRACTOR/OFFEROR
is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
is extended, B.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
2. AMENDMENT/MODIFICATION NO.
6. ISSUED BY
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is required to sign this document and return
15A. NAME AND TITLE OF SIGNER (Type or print)
PAGE OF PAGES 1. CONTRACT ID CODE
5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
7. ADMINISTERED BY (If other than Item 6)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY
16C. DATE SIGNED
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10B. DATED (SEE ITEM 13)
CODE CODE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
is not ex-copies to the issuing office.
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
(Signature of person authorized to sign) (Signature of Contracting Officer)
USAPPC V2.00
10A.
30-105-02
See item 6US ARMY ENGINEER DISTRICT, SAN FRANCISCO
CONTRACTING DIVISION
1455 MARKET ST., 17TH FLOOR SUITE 1741
SAN FRANCISCO CA 94103-1398
CODE
FACILITY CODE
0007 27 Oct 2011
W912P7-11-B-0005
15 Sep 2011
Section 00010 – Solicitation Contract
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Pier 36
Furnish all labor, materials and equipment necessary to perform the demolition and removal of the entire Pier 36 building and it’s supporting structures to a minimum of three (3) feet below mud line, including the Marginal Wharf and specified areas in accordance with the project specifications, plans, contract clauses and provisions.
PURCHASE REQUEST NUMBER: W62A2B10814814
NET AMT ___________________
0000AA 1 Lump Sum Non-Federal funds
NET AMT _____________________
0000AB 1 Lump Sum Federal funds
NET AMT _____________________
Amendment 0007
L3CT9RPV
Typewritten Text
L3CT9RPV
Typewritten Text Nothing goes here
L3CT9RPV
Typewritten Text Nothing goes here
L3CT9RPV
Typewritten Text
L3CT9RPV
Typewritten Text Nothing goes here
0001 1 Lump Sum Mobilization and Demobilization
NET AMT ________________________
0002 1 Lump Sum Safety and Traffic Control
0003 1 Lump Sum Environmental Protection/Monitoring
0004 36,075 Square Foot
Demolition/Deconstruction of (E) Pier 36 Structural Building
0005 86,095 Square
Demolition of (E) Pier 36 Decking, (E) Steel Ferry Ramp. See Reference Drawings-Sheet DP-111
0006 437 Each
Complete Removal/Demolition of Caissons and Piles down to a minimum three (3) Feet below mud-line located at Pier 36
0007 2 Each
Remove and Salvage (E) Fire Hydrants
36,075 Square
Pier 36 Building Hazmat Abatement
Total line items 0001 – 0008: ___________________________________________________
NOTE: Each optional Bid-Item from 0009 to 0013 individually includes the costs associated with environmental protection/monitoring plus safety and traffic control.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
OPTION
1420 TON
Complete Removal/Demolition of (E) Timbers Standing and Submerged including Debris from Collapsed pier down to a minimum three (3) feet below mud-line. See Reference Drawings-Sheet DP-112.
Assume the following: 535 tons of Deck Timber, 705 tons of AC Deck, 90 tons Brg Piles, 90 tons Fender Piles. Assumed totals: 715 Tons of Timber; All other Debris 705 Tons.
00010
OPTION
1 Lump Sum
Seawall: Phase 1; Exploratory work and Phase 2; Concrete Crack Repair.
See Reference Drawing-Sheet DP-113, and 503. For bid purposes 33 exploratory cores are assumed to determine actual crack length of seawall. (260 feet is the assumed length of cracked seawall). Phase 2, Stage 2, 225 vertical cored holes are assumed for reinforcing rods for bid quantity purposes.
OPTION
1 Lump Sum
Demolition of Marginal Wharf within Project Limits, Installation of Inclinometers along Seawall and Seawall Monitoring, Demolition and Removal of all (E) Utilities Protruding off the Seawall, Structural Patch Repairs on left over Orifices. Reference Drawings-DP-101, 111, 113, 114.
74 Each
Demolition of (E) 16” Dia. Piles at Marginal Wharf to a minimum three (3) Feet below mud-line.
10 Each
Complete Removal/Demolition of Caissons supporting the Marginal Wharf at the former Pier 34 footprint down to a minimum three (3) feet below mud-line.
Total line items 0009 – 0013: $____________________________________________________
Total bid, line items 0001 – 0013: $________________________________________________
NOTES
Notes to bidders:
1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may be cause for rejection of bids.
2. If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the Pricing Schedule.
3. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
4. The Government will evaluate bids and award a contract to a responsible bidder in the best interests of the Government.
5. Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
– End of Document –