About this file

Amendment 0003 Pre-award Survey and Bid Bond requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Pier 36; demolition and removal, newest first.
File Type Posted
Bid Results W912P7-11-B-0005 - Pier Demo.pdf PDF
Amendment 0008 SF30.pdf PDF
QA Responses Pier 36 3 Nov 2011 1115.pdf PDF
Summary of Docs required in the IFB —
QA Responses Pier 36 27 OCT 2011 1515.pdf PDF
Amendment 0007 SF30.pdf PDF
QA Responses Pier 36 25 OCT 2011 1330.pdf PDF
Amendment 0006.pdf PDF
SF30 Amendment 0005 plus attachments.pdf PDF
QA Responses Pier 36 21 OCT 2011 0100.pdf PDF
Attendees list.pdf PDF
SF30 Amendment 0004.pdf PDF
Pier 36 Demolition Final Drawings 2011-09-16.pdf PDF
Pier 36 Demolition Final Drawings - Revision 1 - 11 OCT 2011.pdf PDF
8469-30-4 Piers 30thru38 Seawall Repairs 1973 —
Q A Responses Pier 36 10-11-11.pdf PDF
Pier 36 - HAZMAT Survey Report —
Pier 36 - Environmental Assessment and FONSI —
Q A Responses Pier 36 10-6-11.pdf PDF
Pier 36 - Pier 36 As Builts —
Pier 36 - Extension of Shed 1.PDF PDF
Pier 36 - Biological Assessment —
Pier 36 - Water Quality Control Board Certification —
Clause SPN 14-4001 Inquiries —
Pier 36 - Extension of Shed 2.pdf PDF
SF30 As-Builts.pdf PDF
Pier 36 - BCDC Consistency Determination —
Pier 36 - Final Biological Opinion —
SF30 Amendment 0001.pdf PDF
P36 - Seawall As-Builts —
Q A Responses Pier 36 9-30-11.pdf PDF
Final Plans 2011-09-16.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

W912P7-11-B-0005, Pier 36 Demolition Project (All amendments must be acknowledged at time of bid opening)

- Pre-award Survey information: Pre-award Survey must be submitted with your bid or your bid could be considered non-responsive.

- Full Text version of: FAR Clause 52.228-1, BID GUARANTEE (SEP 1996).

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

See item 6US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

CODE

FACILITY CODE

0003 9 OCT 2011

W912P7-11-B-0005

15 Sep 2011

PREAWARD SURVEY OF PROSPECTIVE CONTRACTORS

CONSTRUCTION CONTRACTS

It is the general policy of the Department of Defense that contracts shall be awarded only to contractors determined to be responsible in accordance with Part 9 of the Federal Acquisition Regulation (FAR).

No contract shall be awarded to any person or firm unless the Contracting Officer first makes an affirmative determination that the prospective contractor is responsible within the meaning of the FAR, Part 9.

Before making a determination of responsibility, the Contracting Officer shall have in his/her possession or obtain information sufficient to satisfy himself/herself that a prospective contractor currently meets the minimum FAR Part 9 standards.

In order to make the required determination and also to expedite the contract award, the following information must be submitted by the Contractor as directed (see Section 00100, SAACONS 52.0209-4501):

A. COMPLETED CONTRACTOR EXPERIENCE DATA FORM WITH SUPPLEMENTAL SCHEDULES A-D

(ATTACHED).

B. LATEST FINANCIAL STATEMENTS. IF THE FINANCIAL STATEMENT IS MORE THAN 60 DAYS

OLD, SUBMIT A CERTIFICATE STATING THAT THE FIRM'S FINANCIAL CONDITION IS

SUBSTANTIALLY THE SAME, OR, IF NOT THE SAME, STATE THE CHANGES THAT HAVE

TAKEN PLACE.

C. PROVIDE LETTERS FROM BANKS OR OTHER FINANCIAL INSTITUTIONS WITH WHICH THE

CONTRACTOR CONDUCTS BUSINESS. THE LETTERS SHOULD CONTAIN INFORMATION ABOUT

YOUR FIRM'S ACCOUNTS, LOANS, LINES OF CREDIT, ETC., PROVIDING INFORMATION

LEADING TO A DETERMINATION THAT YOUR FIRM IS "RESPONSIBLE" AS DEFINED IN THE

FEDERAL ACQUISITION REGULATION, PART 9, "HAS THE FINANCIAL RESOURCES TO

PERFORM THE CONTRACT OR THE ABILITY TO OBTAIN THEM". THE GOVT IS INTERESTED

IN FINANCIAL STABILITY, TIMELY PAYMENTS, THE LENGTH AND NATURE OF THE

RELATIONSHIP BETWEEN THE FIRM AND THE FINANCIAL INSTITUTION, ETC. WHICH

REVEALS THE FIRM'S FINANCIAL ABILITY TO PERFORM THE CONTRACT. THE LETTERS

SHOULD ALSO PROVIDE THE NAME AND TELEPHONE NUMBER OF THE BANK REPRESENTATIVE

THE GOVERNMENT MAY

CONTACT.

BE SURE TO INCLUDE IN YOUR PREAWARD SURVEY, INFORMATION ON ANY CONTRACTS YOU

HAVE HAD WITH THE SAN FRANCISCO DISTRICT, SACRAMENTO DISTRICT OR LOS ANGELES

DISTRICT, CORPS OF ENGINEERS, WITHIN THE LAST 12 MONTHS.

THESE DOCUMENTS SHALL BE TREATED BY THE GOVERNMENT AS CONFIDENTIAL.

-1-

CONSTRUCTION CONTRACTOR EXPERIENCE DATA

DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered Construction Design Consultant

Organization Individual Joint Venture Partnership Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below)

Remainder: Partners:

Officers:

Other Key:

Total:

Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

II—EQUIPMENT OWNED

III—FINANCIAL DATA AS OF

(DATE):

Present Value ($) Current Assets:

Current Liabilities: Acquisition Cost ($) Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION

WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE

(LIST MOST RECENT FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS

Avg. Annual Income

Contract Amount:

Date:

Description:

Owner:

Contract Amount:

Date:

Description:

Owner:

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING

SIGNATURE

NOTE: Use reverse side for explanations or detailed description of item(s) reported above.

-2-

The Contractor shall have successfully completed 3 marine demolition projects (in the past 5 years, which demonstrate demolition from barge mounted equipment).

Out of the 3 marine demolition projects requested, one project needs to have been performed in the state of California AND one project needs to be a pier-demolition project of comparable size and scope to the proposed Pier 36 project (an eligible comparable project would demonstrate the use of marine-based equipment, such as barge mounted equipment, in the demolition of a pier).

Furnish description of 3 marine demolition projects completed successfully to include:

a. Brief description of the project, not to exceed 2 pages per project, including project dates, estimated completion costs and final project costs.

b. POC’s with current phone numbers (if we cannot contact your references your bid could be considered non-responsive).

W912P7-11-B-0005, Amendment 0003

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

PREAWARD SURVEY - Pier 36.pdf
CONSTRUCTION CONTRACTOR EXPERIENCE DATA
II—EQUIPMENT OWNED
CONSTRUCTION CONTRACTOR EXPERIENCE DATA
AND AMOUNT DESCRIPTION OF WORK FOR WHOM PERFORMED* COMPLETE SUBLET
CONSTRUCTION CONTRACTOR EXPERIENCE DATA
CONTRACT NO. AMOUNT DESCRIPTION/LOCATION CONTACT PERSON/PHONE NO. SUBLET
CONSTRUCTION CONTRACTOR EXPERIENCE DATA
QUANTITY DESCRIPTION CONDITION SERVICE STATUS
CONSTRUCTION CONTRACTOR EXPERIENCE DATA
A. Each contract awarded within the preceding three-month period exceeding $1,OOO,OOO in value with brief description of the contract:
B. Each contract awarded within the preceding three-year period not already physically completed and exceeding $5,000,000 in value with brief description of the contract: