This solicitation seeks proposals for the Chicago Harbor Lock Power Distribution Upgrade project in Chicago, Illinois. The scope of work includes removing an existing generator and replacing it with a new 300KVA standby generator along with associated new conductors and conduits. Incompatible conduits will also be replaced and all related conductors. The project is located at the Chicago Harbor Lock. The estimated cost is between $250,000 to $500,000. The North American Industry Classification System code is 237130 with a small business size standard of $39.5M. Proposals are due in accordance with the solicitation issued by the Department of the Army Corps of Engineers Engineering District Chicago.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6611307068
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912P621B0015 for Chicago Harbor Lock Pow er Distribution Upgrade is hereby amended as follow s:
A. Solicitation, change the performance period to 395 calendar days.
B. Solicitation, updated clause 52.211-10 to reflect that the entire w ork ready for use not later than 395 calendar days after acknow ledgement of notice to proceed.
C. Updated Draw ing Sheets ES-001, ES-002, and ES-601.
D. Updated Specif ications section 01 11 00, in paragraph 1.2.1, added 220 gallon (8 hour) generator integral fuel tank, paragraph 1.3 to performance period to 395 calendar days on page 2, and in section 26 32 15.00 paragraph 2.6.4 added 220 gallon (8 hour) on page 22.
E. Updated Wage Determination to IL20210009 dated 09-03-2021.
F. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P621B0015
X 9B. DATED (SEE ITEM 11)
05-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2021
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P621B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 30 days from 365 days to 395 days.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 CALENDAR DAYS
FOLLOWING ITS ACKNOWLEDGEMENT OF THE NOTICE TO PROCEED, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 395 CALENDAR DAYS
FOLLOWING THE CONTRACTOR’S ACKNOWLEDGEMENT OF THE NOTICE TO PROCEED. The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes)
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P
R O J E
C T I
D
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W P -2
-B -0
1:13:09 PM 9/2/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-001.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
C H
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
-6
G B
E
S -0
.d g n
ADVANCE.
THE ENERGIZED WORK REQUEST MUST BE PREPARED IN D.
PROTECTIVE EQUIPMENT.
EQUIPMENT AND ENSURE PROPER USE OF PERSONAL
MUST APPROVE ANY PLAN TO WORK ON ENERGIZED
A QUALIFIED SUPERVISOR MUST BE CONSULTED AND C.
USE TWO -PERSON TEAMS TO PERFORM WORK.B.
WORK IN ADVANCE.
CONTRACTING OFFICER. THE CO MUST APPROVE ENERGIZED
SUBMIT A REQUEST FOR LIVE WORK THROUGH THE A.
COMPLETED THE CONTRACTOR SHALL:
LIVE PARTS EXPOSED. IN THE EVENT THAT LIVE WORK MUST BE
WORK AREA SHALL BE PLACED IN A SAFE CONDITION WITH NO
DE-ENERGIZED PRIOR TO ENERGIZING THE EQUIPMENT, THE
ALL WORK SHALL BE COMPLETED WHILE THE FEEDERS ARE 5.
EQUIPMENT (PPE) REQUIRED TO PERFORM WORK.
CONTRACTOR SHALL FURNISH ALL PERSONAL PROTECTIVE 4.
COMPLYING WITH THE ENERGIZED WORK PERMIT.
SAFE WORKING POSITIONS, HANDLING TOOLS SAFELY, AND
CHECKING THEM CONSTANTLY TO MAKE SURE THEY ARE IN
SUPERVISOR MUST CLOSELY SUPERVISE THE WORKERS,
WHILE THE JOB IS IN PROGRESS, AN ON -SITE C.
WRITTEN SAFE CLEARANCE FORM.
OF THIS PARAGRAPH, COR APPROVAL IS GRANTED THROUGH A
ABOVE SHALL BE FOLLOWED; HOWEVER, FOR THE PURPOSES
PERFORMING "ENERGIZED WORK" AND ALL THE PROCEDURES
PURPOSE OF ISOLATING CIRCUITS IS CONSIDERED
OPERATING CIRCUIT BREAKERS/DISCONNECTS) FOR THE
OFF/ON A SWITCH, OPENING AND CLOSING SWITCHES, OR
DE-ENERGIZING/RE-ENERGIZING METHODS (I.E., TURNING
CONVENTIONAL CIRCUIT B.
ENSURE SAFETY.
SUPERVISION, TRAINING, AND PLANNING ARE PARAMOUNT TO
EQUIPMENT AND APPROPRIATE SUPERVISION. PROPER
PLACE SPECIAL EMPHASIS ON PERSONAL PROTECTIVE A.
WITHOUT MEETING THE FOLLOWING REQUIREMENTS:
STARTING. ENERGIZED WORK SHALL NOT BE ALLOWED
REVIEWED WITH ALL PERSONNEL IMMEDIATELY BEFORE
WORK PROCEDURES LISTED IN AFI 32-1064 ARE FOLLOWED AND
EXTREME CAUTION AND ONLY WHEN THE BASIC ENERGIZED
ABSOLUTELY NECESSARY, IT SHOULD BE ACCOMPLISHED WITH
ENERGIZED CIRCUITS: WHEN ENERGIZED WORK IS DEEMED 3.
PARAGRAPH 11.A.02.C. REFERENCE NFPA70E.
CONTAIN INFORMATION REQUIRED BY USACE EM 385-1-1
VIA THE CONTRACTING OFFICER FOR ACCEPTANCE AND SHALL
WORK REQUEST SHALL BE SUBMITTED TO THE GOVERNMENT
WORKED ON IN AN ENERGIZED CONDITION, AN ENERGIZED
EXIST. IF IT IS DETERMINED THAT EQUIPMENT MUST BE
CIRCUITS UNLESS PROOF IS PROVIDED THAT NO OTHER MEANS
NO WORK SHALL BE PERFORMED ON ENERGIZED ELECTRICAL 2.
BE COMPLIED WITH BY THE CONTRACTOR.
WITH EM 385-1-1 AND THE LATEST EDITION OF NFPA 70E SHALL
LOCAL ''LOCKOUT/TAG OUT' PROCEDURES IN ACCORDANCE 1.
COST TO THE GOVERNMENT.
COMPLETION OF THE PROJECT AT NO ADDITIONAL
EQUIPMENT TO ITS ORIGINAL CONDITION AT THE
SHALL BE RESPONSIBLE FOR RETURNING THE
THE CONTRACTING OFFICER. THE CONTRACTOR
THE EQUIPMENT'S OPERABILITY IN THE PRESENCE OF
SHALL DEMONSTRATE AND DOCUMENT IN A REPORT
DESIGN. PRIOR TO REMOVAL, THE CONTRACTOR
STORED, AND RE- INSTALLED AS DESCRIBED IN THE
NOTED IN THE DESIGN SHALL BE REMOVED, SAFELY
EXISTING EQUIPMENT THAT IS TO BE RE-USED AS 24.
REPLACED AT THE CONTRACTOR'S EXPENSE.
DOCUMENTS SHALL BE COMPLETELY REMOVED AND
ANY ITEMS INSTALLED INCORRECTLY PER CONTRACT 23.
MEETINGS FOR THE DURATION OF THE PROJECT.
CONTRACTOR SHALL ATTEND ALL CONSTRUCTION 22.
CONTRACT.
(PLANS), SPECIFICATIONS, AND TERMS OF THE
THE WORK IN ACCORDANCE WITH THE DRAWINGS
TESTING AND INCIDENTALS REQUIRED TO COMPLETE
EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES,
FURNISH ALL LABOR, SUPERVISION, MATERIALS,
FURTHER INTENDED THAT THE CONTRACTOR SHALL
DESCRIBED, UNLESS OTHERWISE NOTED. IT IS
COMPLETION IN EVERY DETAIL OF THE WORK
EQUIPMENT FOR THE CONSTRUCTION AND
THE CONTRACTOR SHALL FURNISH AND INSTALL ALL 21.
CUTTING AND PATCHING FOR THEIR WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 20.
PRIOR TO INITIATING THE WORK.
CONTRACTING OFFICER FOR REVIEW AND APPROVAL
METHODS SHALL BE SUBMITTED TO THE
SATISFACTION OF THE GOVERNMENT. ALL REPAIR
IMMEDIATELY REPAIRED WITHIN 24 HOURS TO THE
GOVERNMENT. ALL DAMAGED SYSTEMS SHALL BE
REMAIN SHALL BE AT NO ADDITIONAL COST TO THE
ANY DAMAGED EXISTING SYSTEMS/UTILITIES TO
BE PROTECTED FROM DAMAGE. REPLACEMENT OF
ALL EXISTING SYSTEMS/UTILITIES TO REMAIN SHALL 19.
OTHER GROUPS.
INSURE THAT THE WORK DOES NOT INTERFERE WITH
OTHER DISCIPLINES BEFORE BEGINNING WORK TO
THIS CONTRACT. COORDINATE THE WORK WITH ALL
PROPER SUPPORT OF EQUIPMENT FURNISHED UNDER
STRUCTURAL SUPPORTS, AND ACCESSORIES FOR
MOUNTED. PROVIDE ALL BOLTS, INSERTS, BRACKETS,
RELATED ITEMS ARE TO BE SUPPORTED OR
DETERMINE HOW EQUIPMENT, ACCESSORIES, AND
DRAWINGS, SHOP DRAWINGS, AND CATALOG DATA TO
INSTALLED UNDER THIS CONTRACT. STUDY ALL
PROPERLY SUPPORT ALL WORK AND EQUIPMENT 18.
POINT CONCERNED.
PRIOR TO THE PROGRESS OF THE WORK BEYOND THE
DISCREPANCY OR POINTS OF CONFLICT IN WRITING
CONTRACTING OFFICER WILL CLARIFY SUCH
NOTIFY THE CONTRACTING OFFICER IN WRITING .THE
DRAWINGS OR THE SPECIFICATIONS, IMMEDIATELY
DISCREPANCY OR POINTS OF CONFLICT IN THE
WITH ANY WORK. UPON DISCOVERY OF ANY
AND EXISTING CONDITIONS PRIOR TO PROCEEDING
CONTRACTOR WILL FIELD VERIFY ALL DIMENSIONS 17.
UTILITIES.
INTERFERENCE WITH OTHER EQUIPMENT AND
ADJUST EQUIPMENT AND FIXTURES TO AVOID 16.
ARRANGEMENT BEFORE INSTALLING THE EQUIPMENT.
APPROVAL WITH A PROPOSED REVISED
DRAWING TO THE CONTRACTING OFFICER FOR
NOT FIT AS SHOWN ON THE DRAWINGS, PROVIDE A
SHOWN ON THE DRAWINGS. WHERE EQUIPMENT WILL
EQUIPMENT FURNISHED WILL FIT INTO THE SPACE AS
MEASUREMENTS TO INSURE THAT ALL ITEMS OF
BEFORE INSTALLING EQUIPMENT, MAKE FIELD 15.
THE GOVERNMENT, PRIOR TO STARTING WORK.
SERVICE SHALL BE COORDINATED AND APPROVED BY
INTERRUPTION OF AN EXISTING SYSTEM OR UTILITY
LOCATION OF ALL EXISTING UTILITIES. ANY
WORK. THE CONTRACTOR SHALL STAKE/MARK THE
WORK WITH THE GOVERNMENT PRIOR TO STARTING
CONTRACTORS RESPONSIBILITY TO COORDINATE ALL
FOR EXACT LOCATIONS. IT SHALL BE THE
PLANS ARE APPROXIMATE AND SHALL NOT BE SCALED
THE EXISTING UTILITY LOCATIONS SHOWN ON THE 14.
F A
Y E L
E F F
L E
R P
E
G E
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
K P
C
J E
R E
M
IA
H H
A L E
Y
A N
S I
D
F A
Y E L
E F F
L E
R P
E
G E
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
K P
C
J E
R E
M
IA
H H
A L E
Y
A N
S I
D
F A
Y E L
E F F
L E
R P
E
G E
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
K P
C
J E
R E
M
IA
H H
A L E
Y
GENERAL SITE NOTES ELECTRICAL SAFETY NOTES
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
A U
G U
S T
CERTIFIED FINAL DOCUMENTS - RTA
A U
G U
S T
ES-001
/0
/2
N
O T
E C
H A
N G
E S
NOTED.
THE PROJECT BE REMOVED UNLESS OTHERWISE
ARE NO LONGER REQUIRED AS A RESULT OF
WIRING MATERIALS, AND SYSTEMS, ETC., WHICH
THAT ALL EQUIPMENT, DEVICES, FIXTURES,
THE INTENT OF THE DEMOLITION DRAWINGS
BUILT' DRAWINGS OF THE AREAS AFFECTED. IT IS
EXISTING CONDITIONS AND ON EXISTING ''AS-
BASED ON FIELD OBSERVATION OF THE ACTUAL
CONDITIONS AND DEMOLITION DRAWINGS ARE
ALL WORK SHOWN ON THE EXISTING 13.
AND ACCESSORIES AS MAY BE REQUIRED.
CONDITIONS AND PROVIDE SUCH EQUIPMENT
ARRANGE THE WORK TO MEET THESE
INVESTIGATED. THE CONTRACTOR SHALL
STRUCTURAL AND FINISH CONDITIONS
SHALL BE CHECKED AT THE SITE AND ALL
AND LOCATION OF EQUIPMENT. ALL DIMENSIONS
AS POSSIBLE IN THE GENERAL ARRANGEMENT
SHOULD HOWEVER BE FOLLOWED AS CLOSELY
REQUIRED FOR THE COMPLETE SYSTEM. THEY
DRAWINGS DO NOT SHOW ALL DETAILS
CONDITIONS PRIOR TO STARTING WORK. THESE
CONTRACTOR SHALL VERIFY EXISTING 12.
ENVIRONMENTAL CONDITIONS.
PROPERTIES AGAINST FIRE, THEFT, AND
RESPONSIBILITY FOR PROTECTION OF
THE JOB SITE. OWNER ASSUME NO
THE SAFEKEEPING OF HIS OWN PROPERTY ON
THE CONTRACTOR WILL BE RESPONSIBLE FOR 11.
SPRING THROUGH EARLY SUMMER.
THE PUMPING SEASON WHICH OCCURS FROM
ACCESS TO SHUT DOWN EQUIPMENT DURING
CONTRACTOR SHOULD PLAN FOR LIMITED
AND FOR HOW LONG A PERIOD OF TIME. THE
WHEN THE PROPOSED SHUTDOWN WILL OCCUR,
INDICATING WHICH AREAS WILL BE AFFECTED,
NOTICE MUST BE GIVEN TO THE OWNER
OR DISCONNECTION, SUFFICIENT ADVANCED
ARE AFFECTED BY ANY SHUTDOWN, REMOVAL
IF ANY AREAS NOT WITHIN THE SCOPE OF WORK
REMAIN IN OPERATION WILL NOT BE AFFECTED.
AND/OR ENGINEER. CONFIRM THAT AREAS TO
WITHOUT PRIOR REVIEW WITH THE OWNER
REMOVED, DISCONNECTED, OR SHUT DOWN
NO WIRING, EQUIPMENT, ETC. WILL BE 10.
WIRE.
DEDICATED NEUTRALS AND SEPARATE GROUND
ALL NEW CIRCUITS WILL BE PROVIDED WITH 9.
WILL BE BASED ON CHAPTER 9 OF THE NEC.
UNLESS OTHERWISE INDICATED, CONDUIT SIZES 8.
ELECTRICAL CODE.
CURRENT EDITION OF NFPA 70 - NATIONAL
ALL WIRING METHODS WILL COMPLY WITH THE 7.
BEEN AFFECTED.
BY THE CONTRACTOR WHERE FINISHES HAVE
ALL PATCHING AND FINISHING SHALL BE DONE
ALL ELECTRICAL EQUIPMENT AND MATERIALS.
NECESSARY FOR THE PROPER INSTALLATION OF
THE CONTRACTOR WILL DO ALL WORK 6.
BE USED.
WHERE CONDUIT WILL BE EXPOSED, RGS WILL
WIRING WILL BE RUN IN EMT CONDUIT. IN AREAS
BRANCH, CONTROL, AND COMMUNICATIONS
UNLESS OTHERWISE INDICATED FEEDERS, 5.
TYPE 1 (INDOOR), NEMA TYPE 3R (OUTDOOR).
ENCLOSURES FOR EQUIPMENT WILL BE NEMA
UNLESS OTHERWISE INDICATED, ALL 4.
WORK.
SURVEY THE SPACE BEFORE PERFORMING THE
REQUIRING THE CONTRACTOR TO INSPECT AND
AND/OR HIDDEN, THAT MAY EXIST; THUS
INTERFERENCES AND CONDITIONS, VISIBLE
PLANS AND DETAILS DO NOT SHOW ALL 3.
AND LOCAL GOVERNING AUTHORITIES.
WORKMEN IN ACCORDANCE WITH THE STATE
ALL WORK WILL BE DONE WITH LICENSED 2.
ACCORDANCE WITH THEIR LISTING.
LABELED AND LISTED AND PROVIDED IN
ALL EQUIPMENT AND MATERIAL WILL BE 1.
MITIGATION PROCEDURES.
THE BUBBLER SYSTEMS TO AVOID IMPACTING ICE
HOUSE PERSONNEL PRIOR TO BEGINNING WORK ON
WITH LOCK THE CONTRACTOR SHALL COORDINATE 31.
SHUTDOWN FOR A MAXIMUM OF 24 HOURS.
HARBOR LOCK. CHICAGO LOCK OPERATIONS CAN BE
BEGINNING THE WORK CONDUCTED AT THE CHICAGO
POWER PLAN FOR GOVERNMENT APPROVAL PRIOR TO
THE CONTRACTOR SHALL SUBMIT A TEMPORARY 30.
PERSONNEL PRIOR TO BEGINNING ALL WORK.
DE-ENERGIZING WITH CHICAGO HARBOR LOCK
THE CONTRACTOR SHALL COORDINATE 29.
(I.G. PIPES DO NOT FREEZE DURING WINTER ETC).
INTEGRITY OF BUILDING SYSTEMS WHILE SHUTDOWN,
CONTRACTOR IS RESPONSIBLE FOR ENSURING THE 28.
MATERIALS EQUIVALENT TO THE ORIGINAL.
SHALL REPAIR THE GROUNDING SYSTEM WITH
ASSOCIATED WITH THE PROJECT, THE CONTRACTOR
SYSTEM IS COMPROMISED BY THE WORK
IN ANY LOCATIONS THAT THE EXISTING GROUNDING 27.
SITE.
SHALL BE DISPOSED OF BY THE CONTRACTOR OFF
EXISTING EQUIPMENT SLATED TO BE REPLACED 26.
AND MATERIALS PROVIDED TO THE OWNER.
ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT
THE CONTRACTOR SHALL TURN OVER TO THE OWNER 25.
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
P -2
-B -0
10:08:52 AM 9/3/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-002.dgn
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
-6
G B
E
S -0
.d g n
F A
Y E L
E F F
L E
R P
E
K P
C
J E
R E
M
IA
H H
A L E
Y
A N
S I
D
F A
Y E L
E F F
L E
R P
E
K P
C
J E
R E
M
IA
H H
A L E
Y
A N
S I
D
F A
Y E L
E F F
L E
R P
E
K P
C
J E
R E
M
IA
H H
A L E
Y
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
W
IR
E S
C H
E D
U L E
W
IR
E S
C H
E D
U L E
W
IR
E S
C H
E D
U L
C1
WIRE SCHEDULE
A U
G U
S T
CERTIFIED FINAL DOCUMENTS - RTA
A U
G U
S T
ES-002
/0
/2
S
H E
D U
L E U
P D
A T
E D
#2 GROUND, 4"C
3 #2/0, #2/0 NEUTRAL
1 #4/0 GROUND, 4" RGS CONDUIT
4 SETS, 3 #600KCMIL, 1 #700KCMIL NEUTRAL,
SUPPRESSOR
SURGE
VOLTAGE
TRANSIENT
BUBBLER MANUFACTURER
STEEL ENCLOSURE BY
IN NEMA 4X STAINLESS
BUBBLER CONTROLLER
200A DISCONNECT SWITCH
NEMA 4X STAINLESS STEEL
NORTH WALL OF THE LOCK, ONE SPARE
2 - 5" RGS CONDUITS FROM THE NORTH PIER TO
EXISTING MCC-P2
ARE NOT SHOWN ON THIS DIAGRAM.
ADDITIONAL MCC LOADS
SHORT TIME, INSTANTANEOUS AND GROUND FAULT)"
NEW BREAKER "ELECTRONIC TRIP, LSIG TYPE (LONG TIME,
4 POLE ATS
NEW
AND RECONNECTED UNSPLICED TO NEW CB IN MCC-P2
THIS FEEDER WILL BE REMOVED FROM SWITCHBOARD
NEW XHHW, #16 AWG, IN EXISTING 2"C
(NEUTRAL), 1#1/0 (GROUND) IN EXISTING 4"C, AND
NEW XHHX, 6#400KCMIL (L1, L2, L3), 2#250KCMIL
IN EXISTING 4"C
(NEUTRAL). 1#2/0 (GROUND)
(L1, L2, L3), 4#2/0
NEW XHHW, 12#400KCMIL
EXISTING 2.5"C
(L1, L2, L3), 1#2/0 (GROUND), IN
UTILIZE EXISTING XHHW, 3#250KCMIL
SWITCHBOARD
BE INSTALLED FROM A-HOUSE TO
(GROUND), 2.5"C. NEW CONDUCTOR WILL
XHHW, 3#250KCMIL (L1, L2, L3), 1#2/0
REROUTED TO BE FED FROM MCC-P2.
FEEDER TO SE BUBBLER COMPRESSOR IS
250A 3P CB WILL BECOME SPARE AFTER
NEUTRAL
700KCMIL
4/0, IN 2"C
4/0, IN 2"C
NEW 4"C
L3), 2#2/0 (GROUND),
6#500KCMIL (L1, L2,
NEW XHHW,
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
T
NW CONTROL HOUSE
CABINET BEHIND THE
SLUICE GATE METER
TO EXISTING COMED
M
G
R
MONITOR
POWER LOGIC
TVSS
G
N
N E
L
C211 C211A
C311A
G
GFI TYPE
1600A/3P
SPARE
SPARE
SPACE
SPACE
SPACE
SW BUBBLER
SE BUBBLER
250A/3P
800A/3P
200A/3P
100A/3P
375kVA pf.8 (300kw)
STEEL SWITCHBOARD
NEMA 4X STAINLESS
LOOP
GROUND
EXISTING
TO
LOOP
GROUND
EXISTING
TO
V /2
V -P
H
W
A
K A
IC
NEW GENERATOR LOCATION
SEE ES-101 FOR
NEW GENERATOR
SERVICE
COMED
12.47KV
TRANSFORMER
COMED
SPARE
1600A
250A/3P
800A/3P
MAIN MCC
B
IA
N P
O R
T E
R P .E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
IA
N P
O R
T E
R P .E
P -2
-B -0
IA
N P
O R
T E
R P .E
10:00:57 AM 9/3/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-601.dgn
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
-6
G B
E
S -6
.d g n
GENERAL NOTES
B3
SCALE: NTS
P R
O J E
C T P
A R
T
IA
L O
N E L
IN
E D
IA
G R
A M
A N
S I
D
P R
O J E
C T P
A R
T
IA
L O
N E L
IN
E D
IA
G R
A M
A N
S I
D
P R
O J E
C T P
A R
T
IA
L O
N E L
IN
E D
IA
G R
A M
CABLE/CONDUIT ROUTING.
SEE DRAWING E-101 FOR STANDBY GENERATOR LOCATION AND 2.
CONTRACTOR SHALL PULL IN AND CONNECT ALL GENERATOR WIRING.1.
A U
G U
S T
CERTIFIED FINAL DOCUMENTS - RTA
A U
G U
S T
F A
Y E L
E F F
L E
R P
E
K P
C
F A
Y E L
E F F
L E
R P
E
K P
C
F A
Y E L
E F F
L E
R P
E
K P
C
ES-601
NEW PARTIAL ONE LINE DIAGRAM
/2
/2
O
N E L
IN
E D
IA
G R
A M C
H A
N G
E S
Chicago Harbor Lock Power Distribution Updgrade W912P621B0015
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes concrete work required to construct a foundation for a 375 kVA Stand-by Generator and associated concrete pad. The work also includes the furnishing and installation of a new 375 kva Stand-by Generator , 220 gallon (8 hour) generator integral fuel tank , and a new 1600A ATS. The Contractor shall furnish and install all conduits and wiring. The Contractor shall also remove the existing conduits that are incompatible and separate from new conduits and conductors, as required.
The Contractor shall also provide all documentation related to incidental work not listed above.
1.2.2 Location
The work is located at the Chicago Lock in Chicago, Illinois, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Contract is scheduled for 3 965 calendar days and will be awarded at end of September. The Contractor shall coordinate with other Contractors on site. The Contractor is hereby notified that any work taking place during winter/early spring will be during the same timeframe as major construction activities for a separate project on site.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches.
1.4 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
SECTION 01 11 00 Page 2
AMD#0003 - 09/07/21
Chicago Harbor Lock Power Distribution Updgrade W912P621B0015
2.6 FUEL SYSTEM
Provide fuel system conforming to the requirements of NFPA 30 and NFPA 37 and containing the following elements.
2.6.1 Pumps
Fuel transfer pumps may be mounted on the day tank. Pump(s) must be horizontal, positive displacement. Direct-connect pump to motor through a flexible coupling. Equip each pump with a bypass relief valve, if not provided with an internal relief valve. Provide motor and controller in accordance with the paragraphs ELECTRIC MOTORS and MOTOR CONTROLLERS, respectively.
2.6.1.1 Main Pump
Provide engines with an engine driven pump. The pump must supply fuel at a minimum rate sufficient to provide the amount of fuel required to meet the performance indicated within the parameter schedule. Base the fuel flow rate on meeting the load requirements and all necessary recirculation.
2.6.2 Fuel Filter
Provide a minimum of one full-flow fuel filter for each engine. The filter must be readily accessible and capable of being changed without disconnecting the piping or disturbing other components. Mark the inlet and outlet connections of the filter.
Provide intake filter assemblies for each engine of the oil bath or dry type, as standard with the manufacturer. Filters must be capable of removing a minimum of 92 percent of dirt and abrasive 3 microns and larger from intake air. Size filters to suit engine requirements at 100 percent of rated full load. Design unit for field access for maintenance purposes.
2.6.3 Relief/Bypass Valve
Provide a relief/bypass valve to regulate pressure in the fuel supply line, return excess fuel to a return line and prevent the build-up of excessive pressure in the fuel system.
2.6.4 Integral Main Fuel Storage Tank
Provide each engine with a n 220 gallon (8 hour) integral main fuel tank.
Each tank must be factory installed and provided as an integral part of the generator manufacturer's product. Provide each tank with connections for fuel supply line, fuel return line, local fuel fill port, gauge, vent line, and float switch assembly. Provide a fuel return line cooler as recommended by the manufacturer and assembler. The temperature of the fuel returning to the tank must be below the flash point of the fuel.
Mount the tank within the enclosure for each engine-generator set provided with weatherproof enclosures. The fuel fill line must be accessible without opening the enclosure.
a. All Tanks: UL 142 . Provide integral in skid double wall (110 percent containment) fuel tanks with a minimum capacity of 24 hours of engine-generator set operation at full-rated load capacity as indicated. Epoxy coat day tanks inside and prime and paint outside.
Construct tanks of not less than 3/16 inch steel plate with welded joints and necessary stiffeners on exterior of tank. Provide a braced
SECTION 26 32 15.00 Page 22
AMD#0003 - 09/07/21
9/8/21, 5:51 PM SAM.gov https://sam.gov/wage-determination/IL20210009/10 1/14
"General Decision Number: IL20210009 09/03/2021
Superseded General Decision Number: IL20200009
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
County: Cook County in Illinois.
BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 02/19/2021 3 04/23/2021 4 06/04/2021 5 06/11/2021 6 06/25/2021 7 07/02/2021 8 07/30/2021 9 08/13/2021 10 09/03/2021
ASBE0017-001 06/01/2021
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 51.80 30.60 https://sam.gov/wage-determination/IL20210009/10 2/14
Fire Stop Technician.............$ 41.44 27.85
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 38.85 27.85
BOIL0001-001 05/01/2017
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-004 06/01/2017
Rates Fringes
Marble Mason.....................$ 44.63 26.83
BRIL0021-006 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.84
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 25.72
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0021-012 06/01/2017
Rates Fringes
Pointer, cleaner and caulker.....$ 45.42 24.06
CARP0555-001 06/01/2021
BUILDING, HEAVY, AND HIGHWAY
Rates Fringes
CARPENTER
Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 50.86 37.34 Heavy & Highway............$ 50.86 37.34
CARP0555-002 10/01/2020
RESIDENTIAL CONSTRUCTION
https://sam.gov/wage-determination/IL20210009/10 3/14
Rates Fringes
CARPENTER........................$ 41.11 32.93
ELEC0009-003 05/30/2021
Rates Fringes
Line Construction Groundman...................$ 44.11 62.32% Lineman and Equipment Operator....................$ 56.55 62.32%
ELEC0134-001 06/07/2021
Rates Fringes
ELECTRICIAN......................$ 51.00 37.39
ELEC0134-003 06/07/2021
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 46.26 28.23
The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.
ELEV0002-001 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 60.42 35.825+a+b
FOOTNOTES:
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
* ENGI0150-006 06/01/2020
https://sam.gov/wage-determination/IL20210009/10 4/14
Building and Residential Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 52.10 42.90
GROUP 2....................$ 50.80 42.90
GROUP 3....................$ 48.25 42.90
GROUP 4....................$ 46.50 42.90
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36"" and Over)*; Roto Mill Grinder (Less Than 36"")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);
Conveyor, Portable; Forklift Trucks; Greaser Engineer;
Highlift Shovels or Front End loaders under 2 1/4 cu yd;
Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;
Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;
Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);
Winch Trucks with ""A"" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3"" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers https://sam.gov/wage-determination/IL20210009/10 5/14
*-Requires Oiler
* ENGI0150-025 06/01/2020
Heavy and Highway Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 50.30 42.90
GROUP 2.....................$ 49.75 42.90
GROUP 3.....................$ 47.70 42.90
GROUP 4.....................$ 46.30 42.90
GROUP 5.....................$ 45.10 42.90
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36"" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
https://sam.gov/wage-determination/IL20210009/10 6/14
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring
*Requires Oiler
IRON0001-026 06/01/2020
Rates Fringes
IRONWORKER
Sheeter.....................$ 52.76 40.48 Structural and Reinforcing..$ 52.51 40.48
IRON0063-001 06/01/2021
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 52.13 39.47
IRON0063-002 06/01/2020
Rates Fringes
IRONWORKER
Fence Erector...............$ 44.42 29.73
IRON0136-001 07/01/2020
Rates Fringes
IRONWORKER
https://sam.gov/wage-determination/IL20210009/10 7/14
Machinery Movers; Riggers;
Macinery Erectors...........$ 44.00 37.24 Master Riggers..............$ 46.50 37.24
LABO0002-006 06/01/2018
Rates Fringes
LABORER (BUILDING &
RESIDENTIAL)
GROUP 1....................$ 42.72 28.19
GROUP 2....................$ 42.72 28.19
GROUP 3....................$ 42.80 28.19
GROUP 4....................$ 42.82 28.19
GROUP 5....................$ 42.87 28.19
GROUP 6....................$ 42.92 28.19
GROUP 7....................$ 42.95 28.19
GROUP 8....................$ 43.05 28.19
GROUP 9....................$ 43.07 28.19
GROUP 10....................$ 43.17 28.19
GROUP 11....................$ 43.00 28.19
GROUP 12....................$ 43.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.
GROUP 2: Fireproofing and Fire Shop laborers.
GROUP 3: Cement Gun.
GROUP 4: Chimney over 40 ft.; Scaffold Laborers.
GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.
GROUP 6: Stone Derrickmen & Handlers.
GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.
GROUP 8: Firebrick & Boiler Laborers.
GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.
GROUP 10: Boiler Setter Plastic Laborers.
GROUP 11: Jackhammermen on fire brick work only.
GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.
LABO0002-007 06/01/2018
Rates Fringes
LABORER (HEAVY & HIGHWAY)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.80 28.19
GROUP 3.....................$ 42.87 28.19
GROUP 4.....................$ 43.00 28.19
https://sam.gov/wage-determination/IL20210009/10 8/14
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned
GROUP 2: Asphalt tampers & smoothers; Cement gun laborers
GROUP 3: Cement Gun Nozzle (laborers), Gunite
GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;
Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;
Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);
Power drive concrete saws; other power tools.
GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure
LABO0002-008 06/01/2018
Rates Fringes
LABORER (Compressed Air)
0 - 15 POUNDS...............$ 43.72 28.19
16 - 20 POUNDS..............$ 44.22 28.19
21 - 26 POUNDS..............$ 44.72 28.19
27 - 33 POUNDS..............$ 45.72 28.19
34 - AND OVER...............$ 46.72 28.19
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.85 28.19
GROUP 3.....................$ 42.95 28.19
GROUP 4.....................$ 43.07 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure https://sam.gov/wage-determination/IL20210009/10 9/14
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0225-001 06/01/2018
Rates Fringes
LABORER (DEMOLITION/WRECKING)
GROUP 1.....................$ 37.52 28.19
GROUP 2.....................$ 42.72 28.19
GROUP 3.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1 - Complete Demolition
GROUP 2 - Interior Wrecking and Strip Out Work
GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or Strip Out Work
PAIN0014-001 06/01/2020
Rates Fringes
PAINTER (including taper)........$ 48.30 28.72
PAIN0027-001 06/01/2021
Rates Fringes
GLAZIER..........................$ 47.73 39.84
PLAS0005-002 07/01/2015
Rates Fringes
PLASTERER........................$ 42.25 26.65
PLAS0502-001 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 45.25 33.48
PLUM0130-001 06/01/2021
https://sam.gov/wage-determination/IL20210009/10 10/14
Rates Fringes
PLUMBER..........................$ 52.80 34.67
PLUM0597-002 06/01/2021
Rates Fringes
PIPEFITTER.......................$ 52.00 36.37
ROOF0011-001 12/01/2020
Rates Fringes
ROOFER...........................$ 45.75 25.75
SFIL0281-001 07/01/2021
Rates Fringes
SPRINKLER FITTER.................$ 51.75 32.65
* SHEE0073-001 06/01/2021
Rates Fringes
Sheet Metal Worker...............$ 47.50 41.67
SHEE0073-002 06/08/2018
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 31.32 37.02
TEAM0731-001 06/01/2017
COOK COUNTY - HEAVY AND HIGHWAY
Rates Fringes
TRUCK DRIVER
2 or 3 Axles................$ 35.60 22.10 4 Axles.....................$ 35.85 22.10 5 Axles.....................$ 36.05 22.10 6 Axles.....................$ 36.25 22.10
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
TEAM0731-002 04/01/2021
Rates Fringes https://sam.gov/wage-determination/IL20210009/10 11/14
Traffic Control Device Monitor
TRAFFIC SAFETY WORKER:
Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, barricade and sign fabrication equipment.......$ 38.50 18.70
TEAM0786-001 06/01/2017
COOK COUNTY - BUILDING AND RESIDENTIAL
Rates Fringes
TRUCK DRIVER
2 & 3 Axles.................$ 39.942 0.25+a 4 Axles.....................$ 39.75 0.25+a 5 Axles.....................$ 39.967 0.25+a 6 Axles.....................$ 40.184 0.25+a
FOOTNOTES:
a. $719.00 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons https://sam.gov/wage-determination/IL20210009/10 12/14 resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers https://sam.gov/wage-determination/IL20210009/10 13/14
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .