114419-6073GB_Chicago Harbor Lock Power Distribution Upgrade FY21_RTA_DRAWINGS_(09-Aug-2021).pdf

PDF 44 MB Posted

Attached to
W912P621B0015 CHICAGO HARBOR LOCK POWER DISTRIBUTION UPGRADE, CHICAGO HARBOR, CHICAGO, IL
Solicitation number
W912P621B0015
Issued by

About this file

This document outlines a federal contract opportunity for power distribution upgrades at the Chicago Harbor Lock in Chicago, Illinois. The U.S. Army Corps of Engineers seeks to replace an existing 300 KVA standby generator and associated conductors and conduits. The project also involves replacing incompatible conduits and conductors. The solicitation number is W912P621B0015. The estimated value is between $250,000 and $500,000. The North American Industry Classification System code is 237130, with a small business size standard of $39.5 million. The solicitation is restricted to small business concerns. The applicable wage rates are General Decision Number IL20210009 from July 2, 2021.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT AREA

PROJECT AREA

ACCESS ROUTE

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

P

R O J E

C T I

D

F

IL

E N

A M

E

F

IL

E N

A M

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

CHICAGO DISTRICT

3:35:59 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_G-001.dgn

PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

A N

S I

D

G-001

K P

C

G-001

K P

C

ALL DRAWINGS IN THIS SET.

INDICATE OFFICIAL RECOMMENDATION OF

REQUIRED BY ER 1110-1-8152. SIGNATURES

THE SCOPE OF THEIR EMPLOYMENT AS

ON THESE PROJECT DOCUMENTS WITHIN

TION DESIGNATIONS OF INDIVIDUALS APPEAR

INITIALS OR SIGNATURES AND REGISTRA-

CHICAGO DISTRICT CORPS OF ENGINEERS. THE

THIS PROJECT WAS DESIGNED BY THE

REVIEWED BY:

DRAWINGS CONTAINED IN THE SHEET INDEX.

RECOMMENDATION AND APPROVAL FOR ALL

SIGNATURE AFFIXED BELOW INDICATE OFFICIAL

APPROVED BY:

APPROVAL RECOMMENDED BY:

DATE

JOHN GROBOSKI

DATE DATE

CHIEF, DESIGN SECTION

JOHN GROBOSKI, P.E.

N/A

ATR TEAM LEADER

N/A, P.E.

N/A

PROJECT MANAGER

N/A

W P -2

-C -0

X

X

W912P6-21-C-00XX

C H

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-B -0

CHICAGO, ILLINOIS

POWER DISTRIBUTION UPGRADE

CHICAGO HARBOR LOCK

W912P6-21-B-0015

G -0

.d g n

-6

G B

Y

E L

E F F

L E

R P

E F

A Y

E L

E F F

L E

R

O

V E

R S

H E

E T S

C O

V E

R S

H E

E T S

NN NN

LOCATION MAP VICINITY MAP

(N.T.S.) (N.T.S.)

SHEET INDEX

SHEET SHEET TITLE

NUMBER REFERENCE

1. G-001 LOCATION, VICINITY MAP AND SHEET INDEX

2. G-002 LEGEND, ABBREVIATIONS AND SYMBOLS

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13. ES-102

ES-301

ES-104

ED-101

ED-102

CS-001

G-003 LEGEND AND SYMBOLS

ELECTRICAL SITE PLAN 2 OF 4

ES-103 ELECTRICAL SITE PLAN 3 OF 4

ELECTRICAL SITE PLAN 4 OF 4

DUCT BANK SECTIONS

OVERALL SITE PLAN

ELECTRICAL DEMOLITION PLAN 1 OF 3

ELECTRICAL DEMOLITION PLAN 2 OF 3

ES-601 PROJECT PARTIAL ONE LINE DIAGRAM

ES-101 ELECTRICAL SITE PLAN 1 OF 4

STRUCTURAL CONCRETE PAD DETAILSSS-501

ED-103 ELECTRICAL DEMOLITION PLAN 3 OF 3

14.

15.

16.

CS-002 OVERALL SITE PLAN - WORK LIMITS AND STAGING

ES-901

ES-902

ROUTING PLAN PICTURES 1

ROUTING PLAN PICTURES 2

17.

18.

19.

of Engineers

US Army Corps

ES-001 GENERAL NOTES

T

IM

M

O Y

A T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G L

A U

R A V

A N

D E

N B

E R

G

V-001 SURVEY CONTROL AND BENCHMARKS

ES-302 EXISTING CONDITIONS

20.

ES-002 WIRE SCHEDULE

21.

A U

G U

S T

AUGUST 2021

CERTIFIED FINAL DOCUMENTS - RTA

S

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg3:39:10 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_G-002.dgn

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

S I

D

G-002

G-002

K P

C

T

IM

M

O Y

A

A N

S I

D

G-002

K P

C

T

IM

M

O Y

A

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

T

IM

M

O Y

A

ABBREVIATIONS

COURSE(S)CRS

CROSS GRAINCRG

CORROSIVE RESISTANT STEELCRES

CIRCUMFERENCECRCMF

CARPETCPT

COMPRESSIBLECPRS

COVERCOV

CORRIDORCORR

CONTRACTORCONTR

CONTINUE CONT

CONSTRUCTIONCONSTR

CONNECTCONN

CONCRETECONC

COMPARTMENTCOMPT

COMBUSTIONCOMB

COMMONCOM

COLUMNCOL

CARBON DIOXIDECO2

CLEANOUTCO

COUNTERCNTR

CORNERCNR

CONDUCTIVE NEOPRENE LATEXCNL

CONDUITCND

CONCRETE MASONRY UNITCMU

COMPOSITECMPST

CORRUGATED METAL PIPECMP

CENTIMETER(S)cm

CLEAR WIRED GLASSCLWG

CLEAR(ANCE)CLR

CLOSURECLOS

CLOSETCLO

CONTRACT LIMIT LINECLL

CLEAR GLASSCLGL

CEILING HEIGHTCLG HT

CEILINGCLG

CENTER LINECL

CIRCUIT BREAKERCKT BRKR

CIRCUITCKT

CONSTRUCTION JOINTCJ

CONTROL JOINTCJ

CIRCULARCIRC

CAST-IN-PLACECIP

CURB INLETCI

CAST IRONCI

CHROME PLATEDCHR PL

CHECKCHK

CHIMNEYCHIM

CHAMFERCHFR

CHALKBOARDCH BD

CORNER GUARDCG

CUBIC FEET PER MINUTECFM

COUNTERFLASHINGCFLG

CONDUCTIVE FLOORINGCFI

CERAMICCER

CEMENT PLASTERCEM PLAS

CEMENTCEM

COVER ELEVATIONCE

CLOSED CIRCUIT TELEVISIONCCTV

CUBICLE CURTAIN TRACKCCT

CATCH BASINCB

CAPACITYCAP

CABINETCAB

BOTH WAYSBW

BUILT-UP ROOFINGBUR

BETWEENBTWN

BTU PER HOURBtuH

BRITISH THERMAL UNITBtu

BASEMENTBSMT

BOTH SIDESBS

BRONZEBRZ

BRACKETBRKT

BRICKBRK

BEARING PLATEBRG PL

BEARINGBRG

BRIDGINGBRDG

BRACINGBRCG

BACK PLASTER(ED)BP

BOTTOMBOT

BOTTOM OFBO

BENCHMARKBM

BELOWBLW

BUILDINGBLDG

BUILDING LINEBL

BED JOINTBJT

BITUMINOUSBITUM

BEVELBEV

BRICK EXPANSION JOINTBEJ

BOUNDARYBDRY

BOARDBD

BOOKCASEBC

BULLETIN BOARDBB

ACOUSTICAL WALL TREATMENTAWT

AMERICAN WIRE GAUGEAWG

AVERAGEAVG

AUTOMATICAUTO

ACOUSTICAL TILE CEILINGATC

ASPHALTASPH

ABOVE SUSPENDED CEILINGASC

ASBESTOSASB

AMERICAN REFRIGERATION INSTITUTEARI

ARCHITECTARCH

APPROXIMATEAPPROX

APPROVEDAPPD

AMERICAN NATIONAL STANDARDS INSTITUTEANSI

ANODIZEANOD

AMPEREAMP

AMBIENTAMB

ALUMINUMALUM

ALTERNATEALT

ACTIVE LEAFA.L.

AMERICAN INSTITUTE OF STEEL CONSTRUCTIONAISC

AMPERE INTERRUPTING CAPACITYAIC

AREA INLETAI

AIR HANDLING UNITAHU

ANCHOR AHR

AGGREGATEAGGR

ABOVE FINISHED FLOORAFF

AUTOMATIC DOOR OPERATORADO

ADJACENT, ADJOINING, ADJUSTABLEADJ

ADHESIVEADH

ADDENDUMADDM

ACOUSTICAL CEILING TILEACT

ACOUSTICACST

ALUMINUM CABLE STEEL REINFORCEDACSR

ACCESS PANELACS PNL

ACCESS DOORACS DR

ACRYLIC PLASTICACR

AMERICAN CONCRETE INSTITUTEACI

ACCESSIBLEACC

ALTERNATING CURRENTAC

ABOVEABV

ANCHOR BOLTAB

AIR CONDITIONING UNITA/C UNIT

AIR CONDITIONINGA/C

ANGLEL

FRAMINGFRMG

FORGEDFRG

FRAMEFR

FIRE RESISTANT FR

FEET PER MINUTEFPM

FIREPROOFFP

FIRE PARTITIONFP

FACE OF STUDFOS

FACE OF MASONRYFOM

FACE OF FINISHFOF

FACE OF CONCRETEFOC

FENCEFN

FLUORESCENTFLUOR

FLOOR PLATEFLR PL

FLOORINGFLG

FLEXIBLEFLEX

FLOORFLR

FLASHINGFLASH

FLUSH JOINTFJT

FIXTUREFIXT

FINISH FLOORFIN FLR

FINISHFIN

FIGUREFIG

FLAT HEAD WOOD SCREWFHWS

FIRE HOSE STATIONFHS

FIRE HOSE RACKFHR

FLAT HEAD MACHINE SCREWFHMS

FIRE HOSE CABINETFHC

FLAT HEADFH

FIRE HYDRANTFH

FIBERGLASSFGL

FACTORY FINISHFF

FIRE EXTINGUISHER CABINETFEC

FIRE EXTINGUISHER BRACKETFEB

FIRE EXTINGUISHERFE

FOUNDATIONFDTN

FIRE DAMPERFDMPR

FLOOR DRAINFD

FAN COIL UNITFCU

FLOOR CLEANOUTFCO

FLOOR CONSTRUCTION JOINTFCJ

FACINGFCG

FACE BRICKFC BRK

FOOT CANDLEFC

FIRE BRICKF BRK

FRESH AIR INTAKEFAI

FIRE APPARATUS CLOSETFAC

FRESH AIRFA

FIRE ALARMFA

FAHRENHEITF

EXTERIOREXT

EXPANSION BOLTEXP BT

EXPOSEDEXP

EXPANSIONEXP

EXISTINGEXST

EXHAUST AIREXH A

EXHAUSTEXH

EXCAVATEEXC

ENTERING WATER TEMPERATUREEWT

ELECTRIC WATER COOLEREWC

ESTIMATE(D)EST

ESCALATORESCAL

EQUIPMENTEQUIP

EQUALEQ

EPOXY COATINGEPY

EXPLOSION PROOFEPRF

ELECTRICAL PANELBOARDEP

ENTRANCE, ENTERINGENTR

ENCLOSE(URE)ENCL

EMERGENCYEMER

ESTIMATED MAXIMUM DEMANDEMD

EXPANDED METAL EM

ELECTRICELEC

ELEVATION - GRADE OR BUILDINGEL

EXPANSION JOINTEJ

EACH FACEEF

ENTERING AIR TEMPERATUREEAT

EACHEA

EASTE

DIRECT EXPANSIONDX

DUMBWAITERDWTR

DRAWERDWR

DOWELSDWLS

DRAWINGDWG

DOVETAIL DVTL

DRAIN TILEDT

DOWNSPOUTDS

DOUBLE STRENGTH (GLASS)DS

DOOR CLOSERDR CL

DRAINBOARDDRB

DRAINDR

DOORDR

DOWNDN

DEMOUNTABLEDMT

DAMPERDMPR

DAMPPROOFINGDMPF

DEAD LOADDL

DIVISIONDIV

DISTRIBUTION PANELDISTR PNL

DISPENSERDISP

DISCONNECTDISC

DIMENSIONDIM

DIAGONALDIAG

DIAMETERDIA

DUCT HEATERDH

DOUBLE HUNGDH

DRINKING FOUNTAINDF

DETAILDET

DEPARTMENTDEPT

DEPRESSIONDEPR

DEMOLITIONDEMO

DEGREEDEG

DUMMY CONTROL JOINTDCJT

DOWELED CONTROL JOINTDCJ

DOUBLE ACTING DOORDBL ACT DR

DOUBLEDBL

DRY BULBDB

DATUMDAT

PENNY (AS IN NAIL - 10D)d

CYLINDERCYL

COLD WATERCW

CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)CVH

CEILING VENTCV

CUBIC YARDSCU YD

CABINET UNIT HEATERCUH

CUBIC FEETCU FT

COPPERCu

CONDENSING UNITCU

CENTERCTR

CENTER TO CENTERC TO C

CURRENT TRANSFORMERCT

CERAMIC TILECT

CASEMENTCSMT

COUNTERSUNKCSK

CAST STONECS

LIGHTINGLTG

LIGHTWEIGHTLT WT

LIGHTLT

LAWN SPRINKLERLS

LIVING ROOMLR

LOW POINTLPT

LIGHTPROOF LOUVERLPL

LIGHTPROOF DOORLPD

LIGHTPROOFLP

LONGITUDINALLONG

LINTELLNTL

LIMESTONELMST

LUMENLM

LEAD-LINED DOORLLD

LIVE LOADLL

LOCKERLKR

LINEARLIN

LEFT HAND(ED)LH

LENGTHLG

LOADINGLDG

LOADLD

LIGHT CONTROLLC

LUMBERLBR

LABELLBL

POUNDLB

LAG BOLTLB

LAVATORYLAV

LAUNDRYLAU

LEAVING AIR TEMPERATURELAT

LAMINATELAM

LADDERLAD

LABORATORYLAB

KEYWAYKWY

KILOWATTkW

KILOVOLT AMPERES REACTIVEkVAR

KILOVOLT AMPERESkVA

KILOVOLTSkV

KICKPLATEKPL

KNOCKOUT PANELKOP

KITCHENKIT

KILOPOUND (1000 POUNDS)KIP

JOINTJT

JOISTJST

JUNCTIONJCT

JUNCTION BOXJ-BOX

JANITOR’S CLOSETJAN CLO

INSIDE PIPE SIZEI.P.S.

IRON PIPE SIZEIPS

IRON PIPEIP

INVERTINV

INTERMEDIATEINTM

INTERIORINT

INSULATIONINSUL

INSULATING FILLINSF

INCLUDEDINCL

INCINERATORINCIN

INCHIN

INTERLOCKILK

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICAIESNA

INSIDE DIAMETERID

INTERCOMIC

HERTZHz

HYDRAULICHYDR

HEATING, VENTILATING AND AIR CONDITIONINGHVAC

HEATERHTR

HEATINGHTG

HEIGHTHT

HOUSEKEEPINGHSKPG

HIGH-STRENGTH GYPSUM PLASTERHSGYP

HIGH STRENGTHHS

HOURHR

HIGH POINTHPT

HORSEPOWERHP

HIGH PRESSUREHP

HORIZONTALHORIZ

HANDRAILHNDRL

HOLLOW METALHM

HOOK(S)HK

HANDHOLEHH

HEXAGONHEX

HIGH EARLY-STRENGTH CEMENTHES

HARDWOODHDWD

HARDWAREHDW

HEADERHDR

HEAD JOINTHD JT

HARDBOARDHDBD

HEAVY DUTYHD

HEADHD

HANDICAPPEDHCP

HALON CONTAINMENT DAMPERHCD

HOLLOW COREHC

HOSE BIBBHB

GYPSUM PLASTERGYP PLAS

GYPSUM BOARDGYP BD

GYPSUMGYP

GLAZED WALL TILEGWT

GROUTGT

GLAZED STRUCTURAL UNITSGSU

GLAZED STRUCTURAL TILEGST

GRATINGGRTG

GRADE LINEGR LN

GRANITEGRAN

GYPSUM TILEGPT

GALLONS PER MINUTEGPM

GOVERNMENTGOVT

GROUNDG

GLAZED CONCRETE MASONRY UNITSGLZ CMU

GLAZINGGLZ

GLASS FIBERGLF

GLASS BLOCKGL BLK

GLASSGL

GASKET(ED)GKT

GALVANIZED IRON PIPEGIP

GALVANIZED IRONGI

GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLEDGFE/CI

GOVERNMENT-FURNISHED EQUIPMENTGFE

GROUND FAULT CIRCUIT INTERRUPTERGFCI

GROUND FACEGF

GENERALGEN

GENERAL CONTRACTORGC

GRAB BARGB

GALVANIZED STEELGALV STL

GALVANIZEDGALV

GALLON(S)GAL

GAGEGA

NATURAL GASG

FABRIC WALL COVERINGFWC

FIRE WATERFW

FUTUREFUT

FURRINGFURG

FOOTINGFTG

FEETFT

FASTEN(ER)FSTNR

FULL SIZEFS

FIRE-RETARDANTFRT

PRESTRESSED CONCRETEPS CONC

PRESSED STEELP.S.

PIPE SPACEPS

PRESSURE-REGULATING VALVEPRV

PROJECTPROJ

PARKINGPRKG

PREFORMEDPREFMD

PREFINISHEDPREFIN

PREFABRICATE(D)PREFAB

PAIRPR

PARTS PER MILLIONPPM

POLISHED PLATE GLASSPPGL

PORTABLEPORT

PORCELAINPORC

POLISHEDPOL

PAINT(ED)PT

PANELPNL

PLYWOODPLYWD

PLATE GLASSPL GL

PILINGPLG

POUNDS PER LINEAR FOOTPLF

PLUMBINGPLBG

PLATFORMPLAT

PLASTERPLAS

PLASTIC LAMINATEPLAM

PROPERTY LINEPL

PLATEPL

POST INDICATING VALVEPIV

PREFAB ISOLATION POWER UNITPIPU

POINT OF INTERSECTIONPI

PHARMACYPHAR

PHASEPH

PERIMETERPERIM

PERFORATE(D)PERF

PEDESTALPED

PAVEMENT DRAINPD

CEMENT PLASTER (PORTLAND)PCP

POUNDS PER CUBIC FOOTPCF

PRECAST CONCRETEPCC

PIECEPC

PUSH BUTTON STATIONPBS

PARTICLE BOARDPBD

PANIC BARPB

PARALLELPAR

PUBLIC ADDRESSPA

POLEP

OBSCURE WIRED GLASSOWGL

OUTSIDE SCREW AND YOKEOS & Y

OPERATIONSOPS

OPAQUEOPQ

OPPOSITEOPP

OPENINGOPNG

OPPOSITE HANDOPH

OVALHEAD WOOD SCREWOHWS

OVALHEAD MACHINE SCREWOHMS

OVERHEADOH

OBSCURE GLASSOGL

OFFICEOFC

OUTSIDE DIAMETEROD

ON CENTER EACH WAYOCEW

ON CENTEROC

OBSERVATION WINDOWOBW

OBSCUREOBSC

OUTSIDE AIROA

NOT TO SCALENTS

NOT REQUIREDN’’REQD

NOISE REDUCTION COEFFICIENTNRC

NOISE REDUCTIONNR

NOMINALNOM

NUMBERNO

NORMALLY OPENNO

NONMETALLICNM

NEOPRENE LATEXN.L.

NAILABLENL

NOT IN CONTRACTNIC

NICKELNi

NATIONAL FIRE PROTECTION ASSOCIATIONNFPA

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNEMA

NATIONAL ELECTRICAL CODENEC

NORMALLY CLOSEDNC

NATURALNAT

NORTHN

MULLIONMULL

MOVABLEMVBL

METALMTL

METAL FURRINGMTFR

MOUNTEDMTD

MOUNTMT

METAL THRESHOLDMT

MACHINE SCREWSMS

METAL ROOF DECKINGMRD

MARBLE BASEMRB

MOP RECEPTORMR

MOVABLE PARTITIONMP

MOTORMOT

MODIFIEDMOD.

MODULARMOD

MASONRY OPENINGMO

MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)MNIC

MILLIMETER(S)mm

MILLWORKMLWK

MOULDINGMLDG

MONOLITHICML

METAL LATHML

MISCELLANEOUSMISC

MIRRORMIRR

MINIMUMMIN

MALLEABLE IRONMI

MANHOLEMH

MATTE-GLAZED TILEMGT

MOTOR GENERATORMG

MANUFACTURERMFR

MANUFACTURINGMFG

METAL FLOOR DECKINGMFD

METAL EDGE STRIPMES

MEMBRANEMEMB

MEDIUMMED

MECHANICAL ROOMMECH RM

MECHANICALMECH

METAL DIVIDER STRIPMDS

METAL-CASED OPENINGMCO

MASONRY CONTROL JOINTMCJ

MEDICINE CABINETMC

MEMBERMBR

MACHINE BOLTSMB

MAXIMUMMAX

MATERIAL(S)MATL

MASONRYMAS

MACHINEMACH

MATCHED AND BEADEDM&B

METER(S)m

LEAVING WATER TEMPERATURELWT

LIGHTWEIGHT CONCRETELWC

LOUVERLVR

LIGHTNINGLTNG

THICK(NESS)THK

TRUSS HEADTH

TOGGLETGL

TONGUE AND GROOVET&G

TERMINALTERM

TERRAZZOTER

TEMPORARYTEMP

TEMPERATURETEMP

TELEPHONETEL

TERRA COTTATC

TOWEL BARTB

TANGENTTAN

TREADT

SYSTEMSYS

SYNTHETICSYNTH

SYMMETRICALSYMM

SWITCHBOARDSWBD

SWITCHSW

SHEET VINYL SV

SUSPENDEDSUSP

SUBFLOORSUB FL

STAIRWAYSTWY

STRUCTURALSTRUCT

STRINGERSTR

STATIC PRESSUREST PR

STORAGESTOR

STEELSTL

SEATINGSTG

STANDARDSTD

STATIONSTA

STAINLESS STEELSST

STANDING SEAM (ROOF)SS

SERVICE SINKSS

SHELF AND RODS&R

SQUARE HEADSQHD

SQUARESQ

SPEAKERSPKR

SPACE HEATERSPH

SPECIAL FINISHSP FIN

SOUNDPROOFSPF

SPECIFICATIONSPEC

SOUNDPROOF DOORSPD

SPECIALSPCL

SPACERSPC

SHUT OFF VALVESOV

SHEET METAL SCREWSSMS

SHEET METALSM

SLEEVESLV

SEALANTSLNT

SKYLIGHTSKLT

STEEL JOIST INSTITUTESJI

SIMILARSIM

SHELVINGSHV

SHEATHINGSHTHG

SHEETSHT

SHOULDERSHLDR

SHEET GLASSSG

STRUCTURAL FACING UNITSFU

STRUCTURAL FACING TILE UNITSFTU

SAFETY GLASSSFGL

SEQUENCESEQ

SECTIONSECT

STEEL DOOR INSTITUTESDI

STORM DRAINSD

STRUCTURAL CLAY TILESCT

SCREENSCRN

SCHEDULESCHED

SOLID CORESC

SECURITY BARSS.B.

SPLASH BLOCKSB

SUPPLY AIRSA

SOUTHS

RAINWATER CONDUCTORRWC

RIVETRVT

REVERSERVS

RUBBER TILE FLOORRTF

RAISED PATTERN RUBBER TILERPRT

REVOLUTIONS PER MINUTERPM

RETRACTABLE PARTITIONRP

RIGHT OF WAYROW

ROUGH OPENINGRO

ROUNDRND

ROOMRM

RAILINGRLG

RACKRK

ROOF HATCHRH

RIGHT HANDRH

RELATIVE HUMIDITYRH

ROOFINGRFG

REVISIONREV

RETURNRET

RESILIENTRESIL

REQUIREDREQD

REMOVE(ABLE)REM

REINFORCEREINF

REGLETREG

REGISTERREG

REFRIGERATIONREFR

REFLECTREFL

REFERENCEREF

RECTIFIERRECT

RECREATION ROOMREC ROOM

RECEPTACLERECPT

RIGID INSULATIONRDG INS

ROOF DRAINRD

RECEIVERRCVR

REINFORCED CONCRETE PIPERCP

REMOTE CONTROLRC

RUBBERRBR

RUBBLE STONERBL

RUBBER BASE, RESILIENT BASERB

RETURN AIR REGISTERRAR

RETURN AIR GRILLERA GR

RABBETEDRAB

RETURN AIRRA

RISERR

RANGER

RADIUSR

QUANTITYQTY

QUARTER ROUND1/4 RND

QUARTERQTR

QUARTQT.

QUARRY TILEQT

PASS WINDOWPW

PAVINGPVG

POLYVINYL CHLORIDEPVC

PAVEDPV

PAPER TOWEL RECEPTACLEPTR

PARTITIONPTN

PAPER TOWEL DISPENSERPTD

POST-TENSIONED CONCRETEPT CONC

POINTPT.

PNEUMATIC TUBEPT

POUNDS PER SQUARE INCHPSI

POUNDS PER SQUARE FOOTPSF

YARD DRAINYD

YARDYD

TRANSFORMERXFMR

WELDED WIRE REINFORCEMENTWWR

WELDED WIRE MESHWWM

WELDED WIRE FABRICWWF

WALL TO WALLW/W

WIDTHWTH

WEIGHTWT

WAINSCOTWSCT

WASTE STACKW.S.

WATERSTOPWS

WARDROBEWRB

WASTE RECEPTACLEWR

WORKING POINTWP

WEATHERPROOFWP

WATERPROOF(ING)WP

WITHOUTW/O

WIRE MESHWM

WORK SHOPWKSH

WROUGHT IRONWI

WATT-HOUR METERWHM

WHEEL BUMPERWHB

WATER HEATERWH

WALL HUNGWH

WIRED GLASSWGL

WIDE FLANGEWF

WINDOWWDW

WASTE DISPOSERWDSP

WOOD DOORWD

WOODWD

WOOD-CASED OPENINGWCO

WHEELCHAIRW/C

WATER CLOSETWC

WOOD BLOCKINGWBL

WET BULBWB

WITHW/

WESTW

VINYL WALL COVERINGVWC

VENT THRU ROOFVTR

VOLTAGE TRANSFORMERV.T.

VENT STACKVS

VERMICULITEVRM

VAPOR RETARDERVR

VOLUMEVOL

VENEERVNR

V-JOINT(ED)VJ

VINYL HOMOGENEOUSVH

VERTICAL GRAINVG

VINYL FABRICVF

VESTIBULEVEST

VERTICALVERT

VENTILATOR(TION)VENT

VAULT DOORVD

VITRIFIED CLAY TILEVCT

VINYL COMPOSITION TILEVCT

VINYL BASEVB

VARNISHVAR

VOLTV

UNIT VENTILATORUV

UTILITYUTIL

URINALUR

UNINTERRUPTABLE POWER SUPPLYUPS

UNFINISHEDUNFIN

UNEXCAVATEDUNEX

UNDERWRITERS LABORATORIESUL

UNIT HEATERUH

UNDERGROUNDUGND

UNIT COOLERUC

TYPICALTYP

TELEVISIONTV

THERMOSTATTSTAT

TRANSVERSETRANS

TRANSOMTRANS

TOILET PARTITIONTPTN

TOILET PAPER DISPENSERTPD

TOP OF WALLTOW

TOP OF STEELTOS

TOP OF SLABTOS

TOPOGRAPHYTOPO

TOLERANCETOL

TOP OFTO

TACKSTRIPTKS

TACKBOARDTK BD

THRESHOLDTHRES

A B

B R

E V

IA

T

IO

N S

A B

B R

E V

IA

T

IO

N S

W P -2

-C -0

X

X

F A

Y E L

E F F

L E

R

L

U R

A V

A N

D E

N B

E R

G

F A

Y E L

E F F

L E

R

L

U R

A V

A N

D E

N B

E

G

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-B -0

F A

Y E L

E F F

L E

R

B R

E V

IA

T

IO

N S

G -0

.d g n

-6

G B

L A

U R

A V

A N

D E

N B

E R

G A

U G

U S

T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

DIRECTION OF CUT

DETAIL IS SHOWN

SHEET WHERE

SECTION IS SHOWN

SHEET WHERE

OF DETAIL

GRID LETTER/NUMBER

SECTION

GRID LETTER/NUMBER OF

GRID LETTER/NUMBER

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

3:40:53 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_G-003.dgn

PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

G-003G-003

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

G-003

LEGEND

STORM MANHOLE

WATER MANHOLE

FENCE

STANDARD ABBREVIATIONS

MONITORING WELL

WATER VALVE VAULT

FIRE HYDRANT

CATCH BASIN

WATER LEVEL

ELECTRIC HANDHOLE

GUY WIRE

WORK POINTWP

WORK LIMITWL

WELL POINTSWLP

VERTICALV

VERIFY IN FIELDVIF

TYPICALTYP.

STEEL SHEET PILESSP

REINFORCED CONCRETE PIPERCP

PIPE SLOPES

OCEAN SURVEYS, INC.OSI

NOT TO SCALENTS

NORTH AMERICAN VERTICAL DATUMNAVD

NATURAL WATER LINENWL

NATIONAL GEODETIC VERTICAL DATUMNGVD

MONITORING WELLMW

MINIMUMMIN

MANHOLEMH

LOCAL CONTROL PANELLCP

ILLINOIS DEPARTMENT OF TRANSPORTATIONIDOT

HORIZONTALH

HIGH WATER ELEVATIONHWL

GRATED MANHOLEG.M.H.

GRATE DRAING.D.

GRADE AT FOUNDATIONGF

FIRE HYDRANTFH

FINISH FLOORFF

EXTRACTION WELLEN

EXPANSION JOINTEJ

ELEVATIONELEV

ELECTRICAL MAN HOLEEMH

ELECTRICAL HAND HOLEEHH

DUCTILE IRON PIPED.I.P.

DIGITAL TERRAIN MODELDTM

DIAMETER AT BREAST HEIGHTDBH

DIAMETERDIA.

CORRUGATED METAL PIPECMP

CORPS OF ENGINEERSCOE

CONTRACTING OFFICER'S REPRESENTATIVECOR

CONSTRUCTION JOINTCJ

CENTERLINECL

CATCH BASINCB

ARMY CORPS OF ENGINEERSACOE

TREE

TELEPHONE LINE

LINE STYLES

SYMBOLS

WATER DOMESTIC MAIN

STORM DRAIN

-10 DESIGN CONTOUR

EXISTING CONTOUR-11

ELECTRICAL MANHOLE UTILITY POLE

CATCH BASIN ROUND

DETAIL INDICATOR

X# SCALE:

DRAWING AREA TITLE

TRIANGULATION POINT

SECTION INICATOR

W.L. AT '( )

ELECTRICAL PRIMARY

ELECTRICAL SECONDARY

DRAWING AREA TITLE INDICATOR

GAS LINE

CONDUITS

GENERAL NOTES

SANITARY FORCE MAIN

WATER MAIN

TELECOMFIBER OPTIC

LIGHT FIXTURE

WATER (PUBLIC MAIN)

RIPRAP GRAVEL PATH

EXISTING EASEMENT

CONSTRUCTION WORK LIMITS

F A

Y E L

E F F

L E

R P

E

L E

G E

N D

S A

N D S

Y M

B O

L S

K P

C

A N

S I

D

F A

Y E L

E F F

L E

R P

E

L E

G E

N D

S A

N D S

Y M

B O

L S

K P

C

W P -2

-C -0

X

X

A N

S I

D

F A

Y E L

E F F

L E

R P

E

L E

G E

N D

S A

N D S

Y M

B O

L S

K

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-B -0

-6

G B

G -0

.d g n

CONDITIONS AT THE COMPLETION OF WORK.

13. ALL STAGING, STORAGE AND TEMPORARY EASEMENT AREAS SHALL BE RESTORED TO PRE-CONSTRUCTION GRADE AND

12. NO BURNING OR INCINERATION OF RUBBISH WILL BE PERMITTED ON THE SITE

11. ALL WORK SHALL BE PERFORMED IN ACCORDACE WITH EM 385-1-1, DATED 30 NOVEMBER 2014.

BE REPLACED IN KIND AT NO COST TO THE GOVERNMENT.

FACILITY WHICH IS REMOVED TO ACCOMMODATE CONSTRUCTION ACTIVITIY OR DAMAGED DURING CONSTRUCTION ACTIVITIY SHALL

SHALL BE REPLACED TO THE SATISFACTION OF THE OWNER AND AT NO COST TO THE GOVERNMENT. ANY PAVEMENT, UTILITY, OR OTHER

10. EXISTING STRUCTURES, SIGNAGE, AND OTHER FACILITIES TO REMAIN SHALL BE PROTECTED FROM DAMAGE AND IF DAMAGED, WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL LAWS AT NO ADDITIONAL COST TO THE GOVERNMENT.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSING OF EXCAVATED MATERIALS AND CONSTRUCTION DEBRIS OFF-SITE IN STRICT ACCORDANCE

DURING CONSTRUCTION.

8. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT OF ANY SUBSURFACE UTILITY OR OTHER PIPE NOT SHOWN ON THE DRAWINGS THAT IS ENCOUNTERED

REPLACEMENT COSTS OF UTILITIES DAMAGED DURING CONSTRUCTION WHETHER ABOVE OR BELOW GRADE AT NO ADDITIONAL COST TO THE GOVERNMENT.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORT AND PROTECTION OF EXISTING UTILITIES AND STRUCTURES, AS WELL AS REPAIR AND/OR

ON THAT ACCOUNT SHOULD THERE BE OTHER THAN SHOWN.

LINES SHOWN ON THESE PLANS ARE NOT WARRENTED TO BE EXACT, NOR IS IT WARRENTED THAT ALL ARE SHOWN. THE CONTRACTOR SHALL HAVE NO CLAIM

6. THE LOCATION, SIZE, AND MATERIAL OF EXISTING PIPES, DUCTS, CONDUITS AND OTHER UNDERGROUND STRUCTURES AND THE LOCATION OF PROPERTY

TO PROCEED VIA THE FOLLOWING INFORMATION

LOCATIONS AT LEAST TWO (2) BUSINESS DAYS, BUT NOT MORE THAN FOURTEEN (14) BUSINESS DAYS PRIOR TO CONSTRUCTION AND AFTER NOTICE

5. THE CONTRACTOR SHALL CONSULT WITH ALL UTILITY SYSTEM OWNERS ON SITE. CONTRACTOR SHALL VERIFY PIPELINE

4. HORIZONTAL DATUM AND DISTANCES ARE REFERENCED TO TEXAS STATE PLANE, NAD83, ILLINOIS STATE PLANE EAST, U.S. SURVEY FEET.

3. ELEVATIONS ARE REFERENCED TO NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) USING GEOID12B, U.S. SURVEY FEET.

CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER’S AUTHORIZED REPRESENTATIVE OF ANY SIGNIFICANT DISCREPANCIES.

2. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRCTOR SHALL FIELD VERIFY ALL DIMENSIONS, LOCATIONS AND ELEVATIONS.

PERMITS SHALL BE OBTAINED AS REQUIRED PRIOR TO COMMENCING WITH CONSTRUCTION.

1. THE CONTRACTOR SHALL FOLLOW ALL GOVERNING REGULATIONS AND SHALL OBTAIN ALL NECESSARY PUBLIC AGENCY PERMITS.

L A

U R

A V

A N

D E

N B

E R

G

T

IM

M

O Y

A T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G

T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G A

U G

U S

T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

X-###

X#

X-###

X#

MW

H

W CB

D

W

CB

LOCK PARKING LOT

CHICAGO HARBOR

GATE

WEST SECTOR

CONTROL HOUSE

CHICAGO LOCK

GATE

EAST SECTOR

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

3:43:39 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_V-001.dgn

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

NAVD88

IL EAST NAD83 STATEPLANE COORDINATES

BRASS DISK

BRASS DISK

HORIZONTAL & VERTICAL CONTROL POINTS

POINT

NORTHING (Y) EASTING (X)

DESCRIPTION

ELEV.

C-7 1,903,091.14 1,181,013.77

MSD-2 1,903,071.19 1,180,873.46

GENERAL NOTES

N

NAVY PIER

ILLINOIS STREET

L A

K E S

H O

R E D

R

IV

E

C-7

100 0 100 200

SCALE IN FEET

GRAND AVE.

MSD-2

5. CONVERSION FROM NAVD88 - 579.18 = CCD

TO NGS PIDS ME3251 (A.K.A. C-7), ME3260 (A.K.A. MSD-2).

4. ALL HORIZONTAL AND VERTICAL CONTROL POINTS ARE REFERENCED

VERTICAL DATUM OF 1988 (NAVD88) U.S. FEET.

3. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE NORTH AMERICAN

OF 1983 (NAD83) U.S. FEET.

PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM

2. ALL COORDINATES SHOWN ARE REFERENCED TO THE ILLINOIS STATE

TIME OF BIDDING, AND INCLUDE COST ACCORDINGLY IN THE BID.

NECESSARY ACTIONS TO ASSESS THE EXISTING CONDITIONS AT THE

DIFFER FROM THOSE SHOWN. THE CONTRACTOR SHALL TAKE ALL

TIME. EXISTING CONDITIONS DURING CONSTRUCTION MAY VARY AND

CHICAGO DISTRICT AND REPRESENTS CONDITIONS EXISTING AT THAT

2015 SURVEY PERFORMED BY US ARMY CORPS OF ENGINEERS,

1. THE CONTROL POINTS SHOWN ON THIS SHEET ARE FROM AN JUNE

588.024

582.576

CHI-LOCK-8

1,181,818.99 586.100 BRASS DISKCHI-LOCK-8 1,902,805.29

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-B -0

-6

G B

V -0

.d g n

A N

S I

D A

N S I

D

S U

R V

E Y C

O N

T R

O L A

N D B

E N

C H

M A

R K

S

V-001

S U

R V

E Y C

O N

T R

O L A

N D B

E N

C H

M A

R K

S

V-001

S U

R V

E Y C

O N

T R

O L A

N D B

E N

C H

M A

R K

S

V-001

J O

H N E

N N

IS

K E

N N

E T

H C

L A

IR

S C

O T

T M

A R

S H

A L L

J O

H N E

N N

IS

J O

H N E

N N

IS

K E

N N

E T

H C

L A

IR

J O

H N E

N N

IS

S C

O T

T M

A R

S H

A L L

J O

H N E

N N

IS

K E

N N

E T

H C

L A

IR

J O

H N E

N N

IS

S C

O T

T M

A R

S H

A L L

A U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

RIVER WALL

LIGHT POLE

CONDUCTORS

CONDUCTORS AND CONTROL

NEW GENERATOR POWER

EXISTING 1-4", 1-2" RIGID CONDUIT FOR

TO BE REMOVED

EXISTING GENERATOR

SEE NOTE 1.

W/ NEW CONCRETE PAD.

INTEGRAL FUEL TANK SET

NEW GENERATOR &

MANHOLE TO WELDHOUSE

REROUTE CONDUIT FROM

LOCK CONTROL BUILDING PER ELECTRICAL PLANS

REMOVE AND REPLACE CONDUITS AND WIRING TO

EXACAVATION AND BACKFILL AS NECESSARY

EXISTING ATS TO BE REMOVED, ASSOCIATED

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

CHICAGO RIVER

LAKE MICHIGAN

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_CS-001.dgn

3:47:21 PM 8/9/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

E N

A M

GENERAL NOTES

A1

SITE PLAN

S I

D

W P -2

-B -0

O J E

C T I

C S -0

.d g n

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

CS-001

K P

C

-6

G B

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

O V

E R

A L L S

IT

E P

L A

N

SCALE: N.T.S.

T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G

R A

N A M

IS

H

R A P

E

PARALLEL TO LAKE WALL.

CONCRETE PAD. PAD SHALL BE ALIGNED WITH LONG EDGE

1. REFER TO STRUCTURAL SHEET SS-501 FOR DETAILS OF NEW

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

LAKE MICHIGAN

CHICAGO RIVER

N STREETER DR

LAKEFRONT TRAIL

P A

R K D

R

P A

R K D

R

E GRAND AVE

CHICAGO MARINE

SAFTEY STATION

LAKE MICHIGAN

NAVY PIER

CHICAGO HARBOR LOCK CHAMBER

E ILLINOIS ST

GATE ACCESS

ACCESS ROUTE TO STAGING AREA

PARKING LOT

CHICAGO LOCK

STAGING AREA/

WORK LIMITS

TO CHICAGO LOCK CHAMBER

LAND BASE ACCESS ROUTE

GRAVEL ROAD

NORTH PIER

SLUICE GATES

SL01 SL02

SL03

SL04

WL02

WL03

WL01

WL04

WL05

WL06

C-7

MSD-2

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

3:49:06 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_CS-002.dgn

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

A1

SCALE: 1" = 100'

NORTH

PLAN

100' 200'0

SITE ACCESS, STAGING & MOORING AREAS

GENERAL NOTES

ILLINOIS STATE PLANE EAST NAD83

WORK LIMITS

CHICAGO LOCK CHAMBER

WL06

WL05

WL04

WL03

WL02

WL01

POINT

W P -2

-B -0

COORDINATES

ILLINOIS STATE PLANE EAST NAD83

STAGING LIMITS

CHICAGO LOCK CHAMBER

SL04

SL03

SL02

SL01

POINT

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

-6

G B

C S -0

.d g n

W O

R K L

IM

IT

S A

N D A

C C

E S

S W

O R

K L

IM

IT

S A

N D A

C C

E S

S W

O R

K L

IM

IT

S A

N D A

C C

E S

S

CS-002CS-002CS-002

R A

N A M

IS

H

R A P

E

S

IT

E P

L A

N

K P

C

A N

S I

D

R A

N A M

IS

H

R A P

E

S

IT

E P

L A

N

K P

C

A N

S I

D

R A

N A M

IS

H

R A P

E

S

IT

E P

L A

N

K P

C

1,903,137.6675

1,902,783.8352

1,902,869.5190

1,902,778.9424

1,902,863.7910

1,902,852.3148

NORTHING

1,182,341.3610

1,182,529.7110

1,182,526.3912

1,181,842.3634

1,181,726.2686

1,181,734.4028

EASTING

1,903,122.5999

1,903,122.5999

1,903,186.4819

1,903,186.4819

NORTHING

1,181,176.2398

1,181,319.1556

1,181,319.1556

1,181,176.2398

EASTING

NORTH BASIN WALL.

LOADS SHALL BE LIMITED TO 150 PSF ON ANY OF THE LOCK WALLS AND THE

PIER TUNNEL EXISTING RIVERSIDE SHEET PILE WALL, AND CONSTRUCITON

ADDITIONALLY, NO LOADS MAY BE APPLIED WITHIN 50 FEET OF THE NORTH

AND CHICAGO LOCK OPERATIONS TEAM FOR ACCESS LOAD LIMITS.

WORK LIMITS. HOWEVER CONTRACTOR MUST COORDINATE WITH THE COR

THE CONTRACTOR IS ALLOWED LAND BASED ACCESS WITHIN & OUT OF THE 2.

SHARING THE STAGING SPACE IN THE PARKING LOT.

PARKING LOT. THERE MAY BE OTHER CONTRACTORS IN THE VICINITY

HOWEVER, THE CONTRACTOR DOES NOT HAVE RIGHTS TO THE ENTIRE

BE USED BY THE CONTRACTOR TO PLACE EQUIPMENT, MATERIALS, ETC.

THE EXTENTS OF THE PARKING LOT, CALLED OUT AS THE STAGING AREA MAY 1.

L A

U R

A V

A N

D E

N B

E R

G

T

IM

M

O Y

A T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G

T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G A

U G

U S

T

A U

G U

S T

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:06:15 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-101.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

D -1

.d g n

E

D -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

0 8' 32'16'A1

ELECTRICAL SITE PLAN - DEMOLITION

SCALE: 3/32"=1'-0"

ED-101ED-101

NORTH

PLAN

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

O

F

O

F

C H

IC

A G

O H

A R

B O

R L

O C

K

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L A

N E

L E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L A

N

J E

R E

M

IA

H H

A L E

Y J E

R E

M

IA

H H

A L E

Y

F A

Y E L

E F F

L E

R P

E -6

G B

W P -2

-C -0

X

X

W P -2

-B -0

B R

IA

N P

O R

T E

R P .E

CONDUITS.

DISCONNECT AND REMOVE EXISTING ATS AND ASSOCIATED CABLES AND 3.

CONDUITS. REMOVE THE 4" MISALIGNED CONDUITS FROM END TO END.

REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 2.

ASSOCIATED CONDUITS, AND ENCLOSURE.

DISCONNECT AND REMOVE EXISTING GENERATOR, THE GENERATORS 1.

SHEET KEYNOTES

GENERAL NOTES

MCC LOCATED INSIDE OF THE LOCKHOUSE.

THE CONDUIT SHALL BE REMOVED END TO END FROM THE SWITCHBOARD TO THE

CONDUIT AND ASSOCIATED CONDUCTOR. SHOWN ON SHEET ES-301 IN DETAIL A6.

THE CONTRACTOR SHALL REMOVE THE SOUTHEAST BUBBLER COMPRESSOR 1.

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

M A

T C

H L

IN

E T

O E

D -1

PULLBOX

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg3:55:45 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-102.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

D -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

A1 0 8' 32'16'

SHEET KEYNOTES

ED-102ELECTRICAL SITE PLAN - DEMOLTION

SCALE: 3/32"=1'-0"

M A

T C

H L

IN

E T

O E

D -1

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

O

F

O

F

C H

IC

A G

O H

A R

B O

R L

O C

K

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L A

N

J E

R E

M

IA

H H

A L E

Y

F A

Y E L

E F F

L E

R P

E

W P -2

-C -0

X

X

W P -2

-B -0

-6

G B

M A

T C

H L

IN

E T

O E

D -1

B R

IA

N P

O R

T E

R P .E

NORTH

PLAN

SWITCHBOARD TO THE MCC LOCATED INSIDE OF THE LOCKHOUSE

DETAIL A6. THE CONDUIT SHALL BE REMOVED END TO END FROM THE

CONDUIT AND ASSOCIATED CONDUCTOR. SHOWN ON SHEET ES-301 IN

THE CONTRACTOR SHALL REMOVE THE SOUTHEAST BUBBLER COMPRESSOR 3.

CONDUITS. REMOVE THE 4" MISALIGNED CONDUITS FROM END TO END.

REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 2.

ASSOCIATED CONDUITS, AND ENCLOSURES.

DISCONNECT AND REMOVE EXISTING GENERATOR, THE GENERATORS 1.

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

A1

ES-302

LAKE MICHIGAN

WATER DEPTH ~20 FEET

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:08:23 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-103.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

D -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

A1 0 8' 32'16'

SHEET KEYNOTES

ED-103ELECTRICAL SITE PLAN - DEMOLTION

SCALE: 3/32"=1'-0"

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

O

F

O

F

C H

IC

A G

O H

A R

B O

R L

O C

K

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L A

N F

L

J E

R E

M

IA

H H

A L E

Y

F A

Y E L

E F F

L E

R P

E

W P -2

-C -0

X

X

W P -2

-B -0

-6

G B

M A

T C

H L

IN

E T

O E

D -1

LOCKHOUSE.

END FROM THE SWITCHBOARD TO THE MCC LOCATED INSIDE OF THE

SHEET ES-301 IN DETAIL A6. THE CONDUIT SHALL BE REMOVED END TO

COMPRESSOR CONDUIT AND ASSOCIATED CONDUCTOR. SHOWN ON

THE CONTRACTOR SHALL REMOVE THE SOUTHEAST BUBBLER 2.

CONDUITS. REMOVE THE 4" MISALIGNED ONDUITS FROM END TO END.

REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 1

NORTH

PLAN

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

C5

ES-104

C1

ES-104

MCC-P2

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

W P -2

-B -0

4:12:26 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-001.dgn

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

-6

G B

E

S -0

.d g n

ADVANCE.

THE ENERGIZED WORK REQUEST MUST BE PREPARED IN D.

PROTECTIVE EQUIPMENT.

EQUIPMENT AND ENSURE PROPER USE OF PERSONAL

MUST APPROVE ANY PLAN TO WORK ON ENERGIZED

A QUALIFIED SUPERVISOR MUST BE CONSULTED AND C.

USE TWO -PERSON TEAMS TO PERFORM WORK.B.

WORK IN ADVANCE.

CONTRACTING OFFICER. THE CO MUST APPROVE ENERGIZED

SUBMIT A REQUEST FOR LIVE WORK THROUGH THE A.

COMPLETED THE CONTRACTOR SHALL:

LIVE PARTS EXPOSED. IN THE EVENT THAT LIVE WORK MUST BE

WORK AREA SHALL BE PLACED IN A SAFE CONDITION WITH NO

DE-ENERGIZED PRIOR TO ENERGIZING THE EQUIPMENT, THE

ALL WORK SHALL BE COMPLETED WHILE THE FEEDERS ARE 5.

EQUIPMENT (PPE) REQUIRED TO PERFORM WORK.

CONTRACTOR SHALL FURNISH ALL PERSONAL PROTECTIVE 4.

COMPLYING WITH THE ENERGIZED WORK PERMIT.

SAFE WORKING POSITIONS, HANDLING TOOLS SAFELY, AND

CHECKING THEM CONSTANTLY TO MAKE SURE THEY ARE IN

SUPERVISOR MUST CLOSELY SUPERVISE THE WORKERS,

WHILE THE JOB IS IN PROGRESS, AN ON -SITE C.

WRITTEN SAFE CLEARANCE FORM.

OF THIS PARAGRAPH, COR APPROVAL IS GRANTED THROUGH A

ABOVE SHALL BE FOLLOWED; HOWEVER, FOR THE PURPOSES

PERFORMING "ENERGIZED WORK" AND ALL THE PROCEDURES

PURPOSE OF ISOLATING CIRCUITS IS CONSIDERED

OPERATING CIRCUIT BREAKERS/DISCONNECTS) FOR THE

OFF/ON A SWITCH, OPENING AND CLOSING SWITCHES, OR

DE-ENERGIZING/RE-ENERGIZING METHODS (I.E., TURNING

CONVENTIONAL CIRCUIT B.

ENSURE SAFETY.

SUPERVISION, TRAINING, AND PLANNING ARE PARAMOUNT TO

EQUIPMENT AND APPROPRIATE SUPERVISION. PROPER

PLACE SPECIAL EMPHASIS ON PERSONAL PROTECTIVE A.

WITHOUT MEETING THE FOLLOWING REQUIREMENTS:

STARTING. ENERGIZED WORK SHALL NOT BE ALLOWED

REVIEWED WITH ALL PERSONNEL IMMEDIATELY BEFORE

WORK PROCEDURES LISTED IN AFI 32-1064 ARE FOLLOWED AND

EXTREME CAUTION AND ONLY WHEN THE BASIC ENERGIZED

ABSOLUTELY NECESSARY, IT SHOULD BE ACCOMPLISHED WITH

ENERGIZED CIRCUITS: WHEN ENERGIZED WORK IS DEEMED 3.

PARAGRAPH 11.A.02.C. REFERENCE NFPA70E.

CONTAIN INFORMATION REQUIRED BY USACE EM 385-1-1

VIA THE CONTRACTING OFFICER FOR ACCEPTANCE AND SHALL

WORK REQUEST SHALL BE SUBMITTED TO THE GOVERNMENT

WORKED ON IN AN ENERGIZED CONDITION, AN ENERGIZED

EXIST. IF IT IS DETERMINED THAT EQUIPMENT MUST BE

CIRCUITS UNLESS PROOF IS PROVIDED THAT NO OTHER MEANS

NO WORK SHALL BE PERFORMED ON ENERGIZED ELECTRICAL 2.

BE COMPLIED WITH BY THE CONTRACTOR.

WITH EM 385-1-1 AND THE LATEST EDITION OF NFPA 70E SHALL

LOCAL ''LOCKOUT/TAG OUT' PROCEDURES IN ACCORDANCE 1.

COST TO THE GOVERNMENT.

COMPLETION OF THE PROJECT AT NO ADDITIONAL

EQUIPMENT TO ITS ORIGINAL CONDITION AT THE

SHALL BE RESPONSIBLE FOR RETURNING THE

THE CONTRACTING OFFICER. THE CONTRACTOR

THE EQUIPMENT'S OPERABILITY IN THE PRESENCE OF

SHALL DEMONSTRATE AND DOCUMENT IN A REPORT

DESIGN. PRIOR TO REMOVAL, THE CONTRACTOR

STORED, AND RE- INSTALLED AS DESCRIBED IN THE

NOTED IN THE DESIGN SHALL BE REMOVED, SAFELY

EXISTING EQUIPMENT THAT IS TO BE RE-USED AS 25.

REPLACED AT THE CONTRACTOR'S EXPENSE.

DOCUMENTS SHALL BE COMPLETELY REMOVED AND

ANY ITEMS INSTALLED INCORRECTLY PER CONTRACT 24.

MEETINGS FOR THE DURATION OF THE PROJECT.

CONTRACTOR SHALL ATTEND ALL CONSTRUCTION 23.

CONTRACT.

(PLANS), SPECIFICATIONS, AND TERMS OF THE

THE WORK IN ACCORDANCE WITH THE DRAWINGS

TESTING AND INCIDENTALS REQUIRED TO COMPLETE

EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES,

FURNISH ALL LABOR, SUPERVISION, MATERIALS,

FURTHER INTENDED THAT THE CONTRACTOR SHALL

DESCRIBED, UNLESS OTHERWISE NOTED. IT IS

COMPLETION IN EVERY DETAIL OF THE WORK

EQUIPMENT FOR THE CONSTRUCTION AND

THE CONTRACTOR SHALL FURNISH AND INSTALL ALL 22.

CUTTING AND PATCHING FOR THEIR WORK.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 21.

PRIOR TO INITIATING THE WORK.

CONTRACTING OFFICER FOR REVIEW AND APPROVAL

METHODS SHALL BE SUBMITTED TO THE

SATISFACTION OF THE GOVERNMENT. ALL REPAIR

IMMEDIATELY REPAIRED WITHIN 24 HOURS TO THE

GOVERNMENT. ALL DAMAGED SYSTEMS SHALL BE

REMAIN SHALL BE AT NO ADDITIONAL COST TO THE

ANY DAMAGED EXISTING SYSTEMS/UTILITIES TO

BE PROTECTED FROM DAMAGE. REPLACEMENT OF

ALL EXISTING SYSTEMS/UTILITIES TO REMAIN SHALL 20.

OTHER GROUPS.

INSURE THAT THE WORK DOES NOT INTERFERE WITH

OTHER DISCIPLINES BEFORE BEGINNING WORK TO

THIS CONTRACT. COORDINATE THE WORK WITH ALL

PROPER SUPPORT OF EQUIPMENT FURNISHED UNDER

STRUCTURAL SUPPORTS, AND ACCESSORIES FOR

MOUNTED. PROVIDE ALL BOLTS, INSERTS, BRACKETS,

RELATED ITEMS ARE TO BE SUPPORTED OR

DETERMINE HOW EQUIPMENT, ACCESSORIES, AND

DRAWINGS, SHOP DRAWINGS, AND CATALOG DATA TO

INSTALLED UNDER THIS CONTRACT. STUDY ALL

PROPERLY SUPPORT ALL WORK AND EQUIPMENT 19.

POINT CONCERNED.

PRIOR TO THE PROGRESS OF THE WORK BEYOND THE

DISCREPANCY OR POINTS OF CONFLICT IN WRITING

CONTRACTING OFFICER WILL CLARIFY SUCH

NOTIFY THE CONTRACTING OFFICER IN WRITING .THE

DRAWINGS OR THE SPECIFICATIONS, IMMEDIATELY

DISCREPANCY OR POINTS OF CONFLICT IN THE

WITH ANY WORK. UPON DISCOVERY OF ANY

AND EXISTING CONDITIONS PRIOR TO PROCEEDING

CONTRACTOR WILL FIELD VERIFY ALL DIMENSIONS 18.

UTILITIES.

INTERFERENCE WITH OTHER EQUIPMENT AND

ADJUST EQUIPMENT AND FIXTURES TO AVOID 17.

ARRANGEMENT BEFORE INSTALLING THE EQUIPMENT.

APPROVAL WITH A PROPOSED REVISED

DRAWING TO THE CONTRACTING OFFICER FOR

NOT FIT AS SHOWN ON THE DRAWINGS, PROVIDE A

SHOWN ON THE DRAWINGS. WHERE EQUIPMENT WILL

EQUIPMENT FURNISHED WILL FIT INTO THE SPACE AS

MEASUREMENTS TO INSURE THAT ALL ITEMS OF

BEFORE INSTALLING EQUIPMENT, MAKE FIELD 16.

THE GOVERNMENT, PRIOR TO STARTING WORK.

SERVICE SHALL BE COORDINATED AND APPROVED BY

INTERRUPTION OF AN EXISTING SYSTEM OR UTILITY

LOCATION OF ALL EXISTING UTILITIES. ANY

WORK. THE CONTRACTOR SHALL STAKE/MARK THE

WORK WITH THE GOVERNMENT PRIOR TO STARTING

CONTRACTORS RESPONSIBILITY TO COORDINATE ALL

FOR EXACT LOCATIONS. IT SHALL BE THE

PLANS ARE APPROXIMATE AND SHALL NOT BE SCALED

THE EXISTING UTILITY LOCATIONS SHOWN ON THE 15.

NOTED.

THE PROJECT BE REMOVED UNLESS OTHERWISE

ARE NO LONGER REQUIRED AS A RESULT OF

WIRING MATERIALS, AND SYSTEMS, ETC., WHICH

THAT ALL EQUIPMENT, DEVICES, FIXTURES,

THE INTENT OF THE DEMOLITION DRAWINGS

BUILT' DRAWINGS OF THE AREAS AFFECTED. IT IS

EXISTING CONDITIONS AND ON EXISTING ''AS-

BASED ON FIELD OBSERVATION OF THE ACTUAL

CONDITIONS AND DEMOLITION DRAWINGS ARE

ALL WORK SHOWN ON THE EXISTING 14.

AND ACCESSORIES AS MAY BE REQUIRED.

CONDITIONS AND PROVIDE SUCH EQUIPMENT

ARRANGE THE WORK TO MEET THESE

INVESTIGATED. THE CONTRACTOR SHALL

STRUCTURAL AND FINISH CONDITIONS

SHALL BE CHECKED AT THE SITE AND ALL

AND LOCATION OF EQUIPMENT. ALL DIMENSIONS

AS POSSIBLE IN THE GENERAL ARRANGEMENT

SHOULD HOWEVER BE FOLLOWED AS CLOSELY

REQUIRED FOR THE COMPLETE SYSTEM. THEY

DRAWINGS DO NOT SHOW ALL DETAILS

CONDITIONS PRIOR TO STARTING WORK. THESE

CONTRACTOR SHALL VERIFY EXISTING 13.

ENVIRONMENTAL CONDITIONS.

PROPERTIES AGAINST FIRE, THEFT, AND

RESPONSIBILITY FOR PROTECTION OF

THE JOB SITE. OWNER ASSUME NO

THE SAFEKEEPING OF HIS OWN PROPERTY ON

THE CONTRACTOR WILL BE RESPONSIBLE FOR 12.

SPRING THROUGH EARLY SUMMER.

THE PUMPING SEASON WHICH OCCURS FROM

ACCESS TO SHUT DOWN EQUIPMENT DURING

CONTRACTOR SHOULD PLAN FOR LIMITED

AND FOR HOW LONG A PERIOD OF TIME. THE

WHEN THE PROPOSED SHUTDOWN WILL OCCUR,

INDICATING WHICH AREAS WILL BE AFFECTED,

NOTICE MUST BE GIVEN TO THE OWNER

OR DISCONNECTION, SUFFICIENT ADVANCED

ARE AFFECTED BY ANY SHUTDOWN, REMOVAL

IF ANY AREAS NOT WITHIN THE SCOPE OF WORK

REMAIN IN OPERATION WILL NOT BE AFFECTED.

AND/OR ENGINEER. CONFIRM THAT AREAS TO

WITHOUT PRIOR REVIEW WITH THE OWNER

REMOVED, DISCONNECTED, OR SHUT DOWN

NO WIRING, EQUIPMENT, ETC. WILL BE 11.

WIRE.

DEDICATED NEUTRALS AND SEPARATE GROUND

ALL NEW CIRCUITS WILL BE PROVIDED WITH 10.

WILL BE BASED ON CHAPTER 9 OF THE NEC.

UNLESS OTHERWISE INDICATED, CONDUIT SIZES 9.

UNLESS OTHERWISE NOTED. SEE SPECS.

ALL CONDUCTORS WILL BE COPPER THHN/THWN, 8.

ELECTRICAL CODE.

CURRENT EDITION OF NFPA 70 - NATIONAL

ALL WIRING METHODS WILL COMPLY WITH THE 7.

BEEN AFFECTED.

BY THE CONTRACTOR WHERE FINISHES HAVE

ALL PATCHING AND FINISHING SHALL BE DONE

ALL ELECTRICAL EQUIPMENT AND MATERIALS.

NECESSARY FOR THE PROPER INSTALLATION OF

THE CONTRACTOR WILL DO ALL WORK 6.

BE USED.

WHERE CONDUIT WILL BE EXPOSED, RGS WILL

WIRING WILL BE RUN IN EMT CONDUIT. IN AREAS

BRANCH, CONTROL, AND COMMUNICATIONS

UNLESS OTHERWISE INDICATED FEEDERS, 5.

TYPE 1 (INDOOR), NEMA TYPE 3R (OUTDOOR).

ENCLOSURES FOR EQUIPMENT WILL BE NEMA

UNLESS OTHERWISE INDICATED, ALL 4.

WORK.

SURVEY THE SPACE BEFORE PERFORMING THE

REQUIRING THE CONTRACTOR TO INSPECT AND

AND/OR HIDDEN, THAT MAY EXIST; THUS

INTERFERENCES AND CONDITIONS, VISIBLE

PLANS AND DETAILS DO NOT SHOW ALL 3.

AND LOCAL GOVERNING AUTHORITIES.

WORKMEN IN ACCORDANCE WITH THE STATE

ALL WORK WILL BE DONE WITH LICENSED 2.

ACCORDANCE WITH THEIR LISTING.

LABELED AND LISTED AND PROVIDED IN

ALL EQUIPMENT AND MATERIAL WILL BE 1.

F A

Y E L

E F F

L E

R P

E

G E

N E

R A

L E

L E

C T

R

IC

A L N

O T

E S

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

G E

N E

R A

L E

L E

C T

R

IC

A L N

O T

E S

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

G E

N E

R A

L E

L E

C T

R

IC

A L N

O T

E S

K P

C

J E

R E

M

IA

H H

A L E

Y

GENERAL SITE NOTES ELECTRICAL SAFETY NOTES

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

OPERATIONS PERSONEL.

LOCK DOWN-TOWN WITH CHICAGO HARBOR LOCK

DE-ENERGIZING AS WELL AS ALL CHICAGO HARBOR

CONTRACTOR SHALL STILL COORDINATE

SHUTDOWN DURING THIS TIME, HOWEVER THE

14,2022. THE CHICAGO HARBOR LOCK WILL BE

DURING THE WINDOW OF NOVEMBER 16,2021- APRIL

31. CONTRACTOR IS TO COMPLETE CONSTRUCTION

(I.G. PIPES DO NOT FREEZE DURING WINTER ETC).

INTEGRITY OF BUILDING SYSTEMS WHILE SHUTDOWN,

CONTRACTOR IS RESPONSIBLE FOR ENSURING THE 30.

UTILITY.

AND COORDINATE FINAL RESPONSIBILITIES WITH

SEE "DIVISION OF RESPONSIBILITY" MATRIX BELOW 29.

EQUIVALENT TO THE ORIGINAL.

THE GROUNDING SYSTEM WITH MATERIALS

WITH THE PROJECT, THE CONTRACTOR SHALL REPAIR

SYSTEM IS COMPROMISED BY THE WORK ASSOCIATED

IN ANY LOCATIONS THAT THE EXISTING GROUNDING 28.

SITE.

SHALL BE DISPOSED OF BY THE CONTRACTOR OFF

EXISTING EQUIPMENT SLATED TO BE REPLACED 27.

AND MATERIALS PROVIDED TO THE OWNER.

ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT

THE CONTRACTOR SHALL TURN OVER TO THE OWNER 26.

A U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

ES-001

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

P -2

-B -0

4:14:47 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-002.dgn

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

-6

G B

E

S -0

.d g n

F A

Y E L

E F F

L E

R P

E

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

K P

C

J E

R E

M

IA

H H

A L E

Y

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

W

IR

E S

C H

E D

U L E

W

IR

E S

C H

E D

U L E

W

IR

E S

C H

E D

U L

C1

WIRE SCHEDULE

U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

ES-002

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

H2RB9TMB

Highlight

T T

2" CONDUIT FOR GENERATOR SIGNAL

4" CONDUIT FOR GENERATOR POWER

SEE DETAIL E6

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:19:58 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-101.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

W P -2

-B -0

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A1

SCALE: 1/8" = 1' 0 8'4' 16'

ELECTRICAL SITE PLAN

E6

SCALE: NTS

R

IA

N P

O R

T E

R P .E

MATCHLINE TO ES-102

ES-101

EXISTING CONDUITS FOR NEW GENERATOR

GENERATOR

4. CONTRACTOR SHALL FURNISH A NEW 375KVA(300KW, .8PF) STANDBY

SEE SS-501 FOR DETAILS.

CONTRACTOR SHALL FURNISH A CONCRETE PAD FOR THE 300KVA GENSET. 3.

CONTRACTOR TO FIELD VERFIY ALL COMPONENTS OF THE SITE DETAILS.2.

CONNECT THOSE CABLES TO THE NEW ATS.

GENERATOR. THE CONTRACTOR SHALL THEN CONNECT ROUTE AND

CONDUCTORS LOCATED IN 2" CONDUIT TO NEW 375KVA STAND-BY

CONTRACTOR SHALL CONNECT GENERATOR POWER 4" AND SIGNAL 1.

GENERAL NOTES

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

D5

ES-102

NEW GENERATOR

LOCATION OF

2'' CONDUIT FOR GENERATOR SIGNAL

4''CONDUIT FOR GENERATOR POWER

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:25:48 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-102.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

W P -2

-B -0

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A1

SCALE: 1/8" = 1' 0 8'4' 16'

ELECTRICAL SITE PLAN

B R

IA

N P

O R

T E

R P .E

MATCHLINE TO ES-103

MATCHLINE TO ES-101

ES-102

D5

EXISTING GENERATOR TO ATS ROUTING

U

G U

S T

SHEET KEYNOTES

EXISTING CONDUITS.

CONNECT NEW GENERATOR AND NEW ATS TO NEW CONDUCTORS UTILIZING

CONDUITS ARE CURRENTLY CAPPED. CONTRACTOR SHALL PULL WIRE AND 1.

B2

ES-301

D5

ES-102

WELD SHOP

2.5" CONDUIT TO COMPLETE ROUTING TO ROOF

ROOF UTILIZING AND NEW LB CONNECTOR AND ADDED NEW

2.5" CONDUIT FROM OUT OF MANHOLE 4 TO WELDHOUSE

CONTRACTOR SHALL FIELD VERIFY AND RE-ROUTE EXISTING

EXISTING MANHOLE

A-HOUSE

WELD SHOP

500MCIL, COPPER FEEDERS

THE LOCK CONTROL BUILDING PARALLEL

MANUFACTURER. PULL IN NEW FEEDER TO

RECOMMENDED BY THE CONDUIT

CONDUITS WITH EXPANSION FITTINGS AS

END. INSTALL NEW 4", PVC COATED STEEL

THE 4" MISALIGNED CONDUITS FROM END TO

BUILDING FROM TWO, 4" CONDUITS. REMOVE

REMOVE FEEDER TO THE LOCK CONTROL

TO BE REMOVED

EXISTING GENERATOR

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:32:46 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-103.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

SHEET KEYNOTES

A1

SCALE: 3/32" = 1' 0 8' 32'16'

ELECTRICAL SITE PLAN

W P -2

-C -0

X

X

W P -2

-B -0

MATCH LINE TO ES-102

M A

T C

H L

IN

E T

O E

S -1

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

C6

ES-103

G3

B R

IA

N P

O R

T E

R P .E

ES-103

SOUTHWEST GATE BUBBLER COMPRESSOR CONDUIT ROUTING

ROUTED BETWEEN THE SWITCHBOARD AND ATS.

TRENCHING AND BACKFILL FOR ALL CONDUITS AND CONDUCTORS

BACK TO THE ATS. THE CONTRACTOR SHALL ACCOMODATE

400KCMILL IN 4 NEW CONDUITS ROUTED FROM THE SWITCHBOARD

SWITCHBOARD. ALOND WITH AN ADDITIONAL SET OF 4 SETS OF

OF 400KCMIL IN 4 NEW CONDUITS ROUTED FROM THE ATS TO THE

NEW ASSOCIATED CONDUCTORS TO BE INSTALLED SHALL BE 4 SETS

CONTRACTOR SHALL FURNISH AND INSTALL NEW 1600A ATS AND 2.

PLC CABINET. ALL ROUTING SHALL BE COORDINATED WITH COR.

ROUTE INSIDE OF THE WELD SHOP AND ROUTE INTO THE EXISTING

ROOF THE CONDUIT WILL ROUTE TO A NEW LV CONNECTOR AND

OUT OF MANHOLE 4 TO WELD SHOP ROOF. FROM THE WELD SHOP

CONTRACTOR SHALL REROUTE EXISTING CONDUIT AND CONDUCTOR 1.

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

C6

ES103

A6

ES-302

B7

ES-901

C1

ES-901

C3

ES-104

LOCK CHAMBER

WATER DEPTH ~22 FEET

CONDUITS TO BE REPLACED

ENTRANCE OF BUBBLER CONDUIT

JUNCTION BOX TO BE UTILIZED FOR

REPLACED.)

OF CONDUIT TO BE

DISPLAYS THE LENGTH

(THIS PICTURE

CATWALK

CONDUITS RUN UNDER

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:36:33 PM 8/9/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-104.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

SHEET KEYNOTES

A1

SCALE: 3/32" = 1' 0 8' 32'16'

ELECTRICAL SITE PLAN

W P -2

-C -0

X

X

W P -2

-B -0

M A

T C

H L

IN

E T

O E -1

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

C1

C3

C5

ALIGNMENT.

COORDINATE WITH COR AND FACILITY MANAGER ON THE MOUNT

1. ROUTE CONDUIT AND MOUNT ON EXISTING RACE WAY RACK.

GENERAL NOTES

B R

IA

N P

O R

T E

R P .E

ES-104

CONDUIT ENTRANCES INTO LOCKHOUSE CONDUITS UNDER GRATING OUTSIDE CONDUIT ENTRANCE INTO LOCKHOUSE

SOUTHEAST BUBBLER CONDUIT TO THE NEW 250A BREAKER.

THE MCC-P2 LOCATED IN THE LOCKHOUSE BUILDING AND ROUTE THE

THE CONTRACTOR SHALL INSTALL A NEW 250A BREAKER INSIDE OF 6.

THE 2.5" CONDUIT.

THE CONTRACTOR SHALL FIELD ADJUST THE PENETRATION TO FIT 5.

FROM THE LOCKHOUSE MCC,NO LONGER FROM THE SWITCHBOARD.

COMPRESSOR SO THAT THE BUBBLER COMPRESSOR IS NOW FED

AND CONNECT IT TO A NEW CKT. BKR FOR THE BUBBLER

AND THE EXISTING, UNSPLICED WIRING,INTO THE LOCKHOUSE MCC

OUTSIDE THE LOCKHOUSE SO THAT THEY CAN RUN NEW CONDUIT

SOUTHEAST BUBBLER COMPRESSOR AT A POINT ON THE WALL

THE CONTRACTOR SHALL DISCONNECT THE 2 1/2'' CONDUIT FOR THE 4.

IN THE LOCKHOUSE MCC.

THE EXISTING SWITCHBOARD AND RECONNECT IT TO A NEW CKT BRK

BUBBLER COMPRESSOR FEEDER FROM THE EXISTING BREAKER IN

CONTRACTOR SHALL DISCONNECT THE EXISTING SOUTHEAST 3.

DISPLAYED IN THE FOLLOWING DETAILS TBD.

WALL UNDERNEATH THE CATWALK INTO THE LOCKHOUSE. AS

THE CONDUIT WILL ROUTE FROM THE ATS TO THE LAKESIDE PIER 2.

WHICH IS LOCATED INSIDE OF THE LOCKHOUSE.

AND NEW XLP WIRE FROM THE ATS TO THE MAIN CKT BRK IN THE MCC

THE CONTRACTOR SHALL INSTALL NEW PVC COATED RMC CONDUIT 1.

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

C1

ES-104

C5

ES-1031

PIER WALL

EXISTING 2" CONDUIT FOR NEW GENERATOR SIGNAL

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-301.dgn

4:59:48 PM 8/9/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

E N

A M

C

E

S -3

.d g n

A N

S I

D

W P -2

-B -0

O J E

C T I

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

E L E

C T

R

IC

A L R

E V

IS

IO

N S

/2

F A

Y E L

E F F

L E

R P

E

J E

R E

M

IA

H H

A L E

Y

-6

G B

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A4

PIER WALL SECTION

SCALE: 3" = 1' 6"0 3" 1'

P

IE

R W

A L L S

E C

T

IO

N B

R

IA

N P

O R

T E

R P .E

NOTES

CABLES TO THE EXISTING 800A ATS.

THE CONTRACTOR SHALL THEN CONNECT ROUTE AND CONNECT THOSE

CONDUCTORS LOCATED IN 2" CONDUIT TO NEW 300KVA STAND-BY GENERATOR.

CONTRACTOR SHALL CONNECT GENERATOR POWER 4" AND SIGNAL 1.

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

ES-301

UNISTRUT

LOT LOW VOLTAGE

2" CONDUIT; 480V PARKING

INNERDUCT & PULLROPE

3" CONDUIT-24 STRAND WITH

COMED 12kV

2, 5" CONDUIT; HIGH VOLTAGE

EXISTING 4" CONDUIT FOR NEW GENERATOR POWER

2" CONDUIT 480V HEAT TRACE

2" CONDUIT 12 STRAND FIBER TO H-FRAME

SOUTHEAST BUBBLER COMPRESSOR CONDUIT

CONTRACTOR TO REPLACE BOTH CONDUITS END TO END.

COMPRESSOR""

CKT. BKR. AND NAMEPLATE STYLES, INSCRIBED WITH "SOUTHEAST BUBBLER

BKR INCLUDING NEW MCC BUCKET, DOOR WITH EXTERNAL OPERATOR FOR THE

"CONTRACTOR SHALL FURNISH AND INSTALL A NEW,250A,480VAC, 3 PHASE CKT.

A6

SCALE: N.T.S.

E1

SCALE: N.T.S.

BUBBLER CONDUITS

LOCKHOUSE MCC-P2

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-302.dgn

5:01:30 PM 8/9/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

E N

A M

C

E

S -3

.d g n

A N

S I

D

W P -2

-B -0

O J E

C T I

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

E L E

C T

R

IC

A L R

E V

IS

IO

N S

/2

F A

Y E L

E F F

L E

R P

E

J E

R E

M

IA

H H

A L E

Y

-6

G B

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A1

B R

IA

N P

O R

T E

R P .E

E X

IS

T

IN

G C

O N

D

IT

IO

N S

INCOMPATIBLE/SEPERATING CONDUITS

SCALE: N.T.S.

SOUTHWEST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .