This document includes a solicitation for the Chicago Harbor Lock Power Distribution Upgrade project. The project scope involves removing an existing 300 KVA generator and replacing it with a new standby generator, along with installing new conductors and conduits. Incompatible conduits will also be replaced. The work location is the Chicago Harbor Lock in Chicago, Illinois. The North American Industry Classification System code is 237130, with a small business size standard of $39.5M. The estimated contract value is between $250,000 and $500,000. The applicable wage determination is IL20210009 dated July 2, 2021. Responses are due by September 22, 2021 at 10:00 AM Central Time. The agency is the Department of the Army Corps of Engineers Engineering District Chicago.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6611307068
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912P621B0015 for Chicago Lock Pow er Distribution Upgrade is hereby amended as follow s:
See the SF30 Continuation Sheet.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P621B0015
X 9B. DATED (SEE ITEM 11)
05-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2021
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P621B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES - AMDT 0002
SF30, Continuation from Block 14
The purposes of Amendment 0002 are as follows:
A. Updated Solicitation Section 00 10 00 with the following changes; Bid due date to 22 Sep 2021 @ 10:00
AM Central Time; modified CLIN structure so GENSET Replacement & Wiring and GENSET Removal &
Disposal are now a Base Bid Items and the only option CLINs are now 0006, 0007, and 0008;
B. Updated Summation of Bid Price Schedule, all changes highlighted in yellow.
C. Solicitation, updated section 00 22 13, updated date questions are due, updated date and time that Bids are
Due, when Bids will be opened and added a Pre-Bid Meeting. All changes highlighted yellow.
D. Updated Wage Determination to IL20210009, dated 13 Aug 2021.
E. Replaced Specifications Document correct document [114419_FY21 Chi Lock Power Distribution
Upgrade_RTA_SPECS(10-Aug-21)] for AMDT 0001 into SAM.
F. Fifteen Drawing Sheets were changed (AUG30 W912P6-21-B-0015_14419-6073GB_Power Distribution
Upgrade FY21_Plans_AMD0002):
a. CS-001 Note Change/Title Block Change/Annotation Change
b. CS-002 Note Change/Title Block Change/Annotation Change
c. ED-102 Note Change/Title Block Change/Annotation Change
d. ED-103 Note Change/Title Block Change/Annotation Change
e. ES-001 Note Change/Title Block Change/Annotation Change
f. ES-002 Drawing Change to Add Clarity
g. ES-101 Note Change/Title Block Change/Annotation Change
h. ES-102 Note Change/Title Block Change/Annotation Change
i. ES-103 Note Change/Title Block Change/Annotation Change
j. ES-104 Note Change/Title Block Change/Annotation Change
k. ES-301 Note Change/Title Block Change/Annotation Change
l. ES-302 Note Change/Title Block Change/Annotation Change
m. ES-601 Drawing Change to Add Clarity
n. ES-901 Drawing Change to Add Clarity
o. ES-902 Note Change/Title Block Change/Annotation Change
G. Updated specifications section 01 22 00.00 10, restructured bid items so Genset Replacement & Wiring and
Genset Removal & Disposal are part of the base bid items in specifications document 114419_FY21 Chi
Lock Power Distribution Upgrade_AMD#0002_SPECS(27-Aug-21).
H. Updated specifications section 26 05 00.00 40, removed redundant 600-Volt Wiring Test; G, DT, updated paragraph 2.2.1.1 in specifications document 114419_FY21 Chi Lock Power Distribution
Upgrade_AMD#0002_SPECS(27-Aug-21).
I. Updated specifications section 26 05 19.10 10, paragraph 2.1.3.1, updated Type to XHHW in specifications document 114419_FY21 Chi Lock Power Distribution Upgrade_AMD#0002_SPECS(27-Aug-21).
J. Updated specifications section 26 08 00, added Test Report; G, DT as submittals and added 3.1.1 Megger
Testing in specifications document 114419_FY21 Chi Lock Power Distribution
Upgrade_AMD#0002_SPECS(27-Aug-21).
K. Added Questions and Answers from interested parties:
1. How is 1600A ATS Replacement and wire going to be installed if the generator option is not selected?
Please provide a one-line diagram.
o USACE Response Q1: The Contractor shall see Specification 01 22 00.00. 10 Price and Payment
Procedure and Section 00 10 00 of the solicitation. These specifications have been revised to include the
ATS and Generator as base options. They will both be awarded in this contract.
2. The specs on the generator state the size to be 375 KVA, however the plans state 300 KVA. Please advise.
o USACE Response Q2: The contractor shall install a 300KW/375 KVA standby generator. The Drawings have been revised to reflect this information in on sheets ES-101 and ES-601.
3. What is the heaviest truck that can be driven on the promenade road?
o USACE Response Q3: Drawing sheet CS-002 has been revised to reflect the requirements for trucks that can be driven on the promenade road.
4. If the Item 0005 Generator option is selected and since there is only 1-4” conduit, will there be a requirement to install additional 3-4” conduits and wiring to handle the increased load? If so, please provide a detail on the additional attached conduits.
o USACE Response Q4: The contractor shall utilize the existing 4” Conduit. The drawings have been revised to show that the generator conductors shall be XHHW, 2 SETS OF L1,L2, L3 AT #400KCMIL, 1
#250KCMIL NEUTRAL, 1 #1/0 GROUND. The Conduit has been sized to handle these conductors and maintain being below the 40% fill requirement. The desired cabling is listed on drawing sheet ES-002 and
ES-101.
5. We have the following questions on Sheet ES-601: a. We cannot distinguish between what is existing and which items are to be installed. Please revise to show any new item in bold.
b. Is there a new meter cabinet to be installed? If so, please provide a detail and specification.
USACE Response Q5 b. No.
c. Which new breakers are to be installed in the NEMA 4X switchboard?
USACE Response Q5 c. No New Breakers.
d. Is there any new Bubbler equipment or disconnects to be installed? If so, please provide a detail and specification.
USACE Response Q5 d. No new bubbler equipment o USACE Response Q5: Drawing sheet ES-601 has been revised to reflect all new items as bold. The work shown in this contract does not include the installment of new a meter nor a NEMA 4X switchboard.
There is no additional electrical equipment (disconnects, etc) associated with the rerouting of the bubbler conductors. The contractor shall utilize the existing conduits and only add new conduits, conductors, and
LB connectors as prompted in sheet ES-002, and ES-103.
6. Are there any provisions in the contract for increases in material costs due to market fluctuations?
o USACE Response Q6: The contractor shall note that there are no provisions included in this contract for the increase in materials cost due to the markets fluctuations.
7. How long will the prices be required to be held from the date the solicitation is due until an award is made on any option?
o USACE Response Q7: The contractor shall note that all prices are required to be held until the period to exercise the option expires.
8. Item No. 0006 Incompatible conduit and wiring. Please provide a plan sheet that clearly identifies the work that is included for this item. We cannot determine the work included for this item.
o USACE Response Q8: The contractor shall see drawing sheets ES-102 and ES-104 for the details and notes that state the requirements for the replacement of the incompatible conduits and conductors. The contractor shall also see drawing sheets ES-102 and ES-104 for pictures of the incompatible conduits that will be replaced in whole. The work is also highlighted in sheet CS-001.
9. On Sheet ED-1-1, please advise the requirements for removing the feeder to the Lock control building since we are supposed to install the new 4” GS PVC Ctd conduits in the exact same location.
o USACE Response Q9: The 4” conduit that is connected to the existing MCC and located inside of the lock-house is not included in the work for this contract. The contractor shall only replace the exterior portion of the incompatible conduits as shown in drawing sheet ES-102. In addition, the contractor shall sequence and coordinate all work with Chicago Lock Personnel before beginning the work. The Chicago
Lock Operations can be shut down for a maximum of 24 hours. If more time is needed, the contractor shall provide temporary power to the facility. As stated on sheet ES-001 The contractor shall submit a
Temporary Power Plan for government approval before beginning the work.
10. The plans state the cable type to be XLP, however the specifications state XHHW. Please advise/correct either the plan/specification.
o USACE Response Q10: The specifications and plans have been revised to state that the cable type required will be XHHW. See specification 26 05 19.10 10 INSULATED WIRES AND CABLE and 26 05
00.00 40 Common Electrical work and Drawing Sheet ES-002.
11. Sheet ES-002 shows only 1-4” conduit feed, however the existing generator has 2-4” conduits and the new generator will need to have 4-4” conduits to meet the capacity. Please advise what is required.
o USACE Response Q11: The contractor shall use the existing 4” Conduit to install 2 parallel 400KCMIL cables. Drawings ES-101 and ES-601 have been revised to reflect this change.
12. What are the requirements for shutting down the bubbler?
o USACE Response Q12: Drawing sheet ES-001 has been revised to provide the requirements for shutting down the bubbler. The bubbler systems shut down requirements are temperature-dependent. The contractor shall coordinate with Chicago Lock Personnel prior to beginning the work to sequence the work to avoid impacting ice mitigation procedures.
13. On Sheet ES-104, we cannot understand the Notes 4 and 6 seem to contradict each other. Please clarify.
o USACE Response Q13: General notes 4 and 6 on sheet ES-104, has been revised to provide more clarity.
14. I came across you project in SAM. I looked through the files provided, but I wanted to verify if you are anticipating a need for temporary utilities, on this project?
o USACE Response Q14: Please see response to question 9.
L. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 07-Sep-2021 02:00 PM to 22-Sep-2021 10:00 AM.
CLIN 0003
This CLIN has been renumbered to CLIN 0005.
The CLIN extended description has changed from:
This item is for performance and payment bonds, which is applicable to line items 0001 and 0002. Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (DEV) (Payments under Fixed
Price Construction Contracts). Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV), Performance and Payment Bonds Construction).
To:
This item is for performance and payment bonds, which is applicable to line items 0001, 0002, 0003, and 0004.
Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (DEV) (Payments under Fixed Price Construction Contracts). Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV), Performance and Payment Bonds Construction).
CLIN 0004
The CLIN description has changed from GENSET Removal and Disposal Option to GENSET Removal and Disposal.
At the discretion of the government, this Option Item may be awarded via a formal contract modification under the
Contract. If awarded, the option will be exercised within 8 months following the Contractor's acknowledgment of the Notice to Proceed. Permitting the award of this option, the Contractor will be required to increase its bonding coverage, re: FAR Clause 52.228-15 (DEV) at Section 00 70 00 of the solicitation and resulting contract.
The option status has changed from Option to No Status.
CLIN 0005
This CLIN has been renumbered to CLIN 0003.
The CLIN description has changed from Genset Replacement and Wiring Option to Genset Replacement and Wiring.
At the discretion of the government, this option item may be awarded via a formal contract modification under the contract. If awarded, the option will be exercised within 8 (eight) months following the Contractor's acknowledgment of the Notice to Proceed. Permitting the award of this option, the Contractor will be required to increase its bonding coverage, re: FAR Clause 52.228-15 (Dev) at Section 00 70 00 of this solicitation and resulting contract.
The option status has changed from Option to No Status.
CLIN 0008
This item is for performance and payment bonds, which is applicable to line items 0004, 0005, 0006 and 0007.
Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (DEV) (Payments under Fixed Price Construction Contracts). Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV), Performance and Payment Bonds Construction).
This item is for performance and payment bonds, which is applicable to line items 0006 and 0007. Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (DEV) (Payments under Fixed
Price Construction Contracts). Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV), Performance and Payment Bonds Construction).
The following have been modified:
BID SCHEDULE
THE BELOW SECTION OF THIS SOLICITATION SHALL BE USED BY BIDDERS TO ENTER THEIR BID PRICES; IT IS ALSO CONSIDERED THE “BID SCHEDULE” AS TERMED THROUGHOUT THE SOLICITATION. The page numbering may be off due to inserted documents.
SUMMATION OF BID PRICE:
Base Bid Items Line Item 0001 $__________________________
Line Item 0002 $__________________________
Line Item 0003 $__________________________
Line Item 0004 $__________________________
Line Item 0005 $__________________________
Total for Line Items 0001, 0002, 0003, 0004 and 0005: $__________________________
Option Bid Items Option Line Item 0006 $__________________________
Option Line Item 0007 $__________________________
Option Line Item 0008 $__________________________
OPTION LINE ITEMS 0006, 0007 and 0008: $__________________________
OVERALL BID PRICE
(ALL ABOVE MENTIONED LINE ITEMS,
TO INCLUDE THE OPTIONS): $________________________________________
SECTION 00 22 13 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
The following have been modified:
IMPORTANT BID NOTES
1. BID CONDITIONS:
a. The Contractor shall bid ALL items that are contained in the Bid Schedule, with no exceptions. Should a
Contractor fail to fully complete the bid schedule, its bid will not be considered responsive to the solicitation and eligible for the resultant contract award. Therefore, the bidder’s total price for the work shall be based on the TOTAL of all items included in the Bid Schedule. The Contractor shall enter both its unit price and extended price for each Bid Item. AT THE SUMMATION OF BIDS SECTION, contractors shall ensure their total bid price is summed correctly. The Contracting Officer reserves authority to correct math mistakes in accordance with the Federal Acquisition Regulation Subpart provisions at 14.407-2, “Apparent clerical mistakes.”
b. From this Solicitation, the Government intends to award one firm-fixed price contract to the responsive, responsible bidder submitting the lowest aggregate price for all Base and Option Items. The intent is immediately award the base items at the time of award.
c. Split or multiple awards will not result from this Solicitation.
d. Bidders are required to acknowledge the receipt of all amendments to the Solicitation on the Standard
Form 1442 in the space provided OR, by completing Blocks 8 and 15 of the Amendment Form itself
(Standard Form 30) and emailing the acknowledgement to Tina Brock at tina.m.brock@usace.army.mil.
e. SF 1442 BACK (Page 2 of the Solicitation): Bidders shall fully complete all the required areas located on
Page 2 of the Solicitation document (SF 1442 Back) - refer to Block’s 14 through 20C.
f. Section 00 45 00 (Representations and Certifications): The bidder must complete the applicable boxes found at Section 00 45 00 of this Solicitation and submit the completed Section along with all other documents required by this Solicitation. In order to place a bid in response to this Solicitation, the bidder must be registered in an “active status” at the System for Award Management (SAM) (registration can be completed on line for free at www.sam.gov). Accordingly, any bid furnished from contractor without an active registration at SAM may be considered non-responsive to the material requirements of this
Solicitation and ineligible for award. Contractors must comply with 52.204-7, 52.204-8, 52.232-33 and any other requirements in this solicitation through SAM.
2. BID SUBMISSION:
a. Bids shall be submitted by EMAIL to Tina Brock at tina.m.brock@usace.army.mil WITH A
COPY FURNISHED to Michael Jones at michael.t.jones@usace.army.mil.
b. In consideration of the provisions of Subpart 14.301 of the Federal Acquisition Regulation, wherein the “responsiveness of bids” is provisioned, bidders must comply with all material respects of this Solicitation (Invitation for Bids) to be considered for the resulting award.
Accordingly, bids must be in compliance with the submission requirements discussed below.
c. METHOD OF BID SUBMISSION: ALL BIDS IN RESPONSE TO THIS SOLICITATION
SHALL BE SUBMITTED BY ELECTRONIC MAIL (EMAIL). THE SUBJECT LINE OF
YOUR EMAIL SHALL INCLUDE THE SOLICITATION AND PROJECT TITLE.
(1) Emailed Bids shall be transmitted and accompanied by all other required documents (re:
“Important Bid Notes,” Solicitation Section 00 22 13). The Bidder’s bid and all required documents shall be attached therein the Email. The subject line of the Email shall contain the Solicitation Number and Project title. The Bidder shall verify all contents of its attachments to ensure they are readable and in full compliance with the Solicitation requirements. Therefore, prior to submitting the bid, the Bidder shall ensure all bid documents are in conformance and enclosed for bidding purposes. The date and time stamp provided via the government’s email will constitute the time of receipt of a bid package. The government will acknowledge receipt of the Bidder’s email. The government will not review the Bid or any of the attachments provided via the Bidder’s email until the Bid Opening. All electronically submitted files by Email CANNOT
EXCEED this Agency's size limit of 20MB (includes email and its attachment); files exceeding this size will be denied access to the aforementioned email inboxes. It is the responsibility of the contractor to determine the size of its electronic file. Should the Bidder need to break up its submittal, it may provide its attachment under separate emails to mailto:tina.m.brock@usace.army.mil mailto:michael.t.jones@usace.army.mil avoid exceeding the size limit. The last email received will constitute the full submission of the Bid, e.g. the time received by the government.
(2) TIME OF SUBMISSION: Bids are required prior to 10:00 a.m. (Central Time) on 22 Sep 21.
Please note, FAR Subpart 14.302 Bid submission; “Bids shall be submitted so that they will be received in the office designated in the invitation for bids not later than the exact time set for opening of bids.”
(3) AUDIO BID OPENING: For this procurement, Contracting will conduct an Audio Bid
Opening in accordance with the below provisions. These procedures are being used because of the current public health concerns affiliated with COVID-19.
(4) AUDIO BID OPENING PROVISIONS/ PARTICIPATION:
THE AUDIO BID OPENING WILL BEGIN AT 11:00 A.M. (CENTRAL TIME) on
22 Sep 21. - THE AUDIO INFORMATION FOR THE BID OPENING FOLLOWS:
Dial into 1-844-800-2712 Access Code: 1992436696
(5) BID GUARANTEE:
Bidders are required to submit a Bid Guarantee for this project in accordance with the
Federal Acquisition Regulation Clause 52.228-1, “Bid Guarantee” – Refer to Solicitation
Section 00 21 13 for the full text of this Clause.
A bid guarantee shall be submitted at 20% of the bid price or $3M whichever is the lesser.
Any bidder failing to submit a Bid Guarantee will be considered non- responsive to the
Solicitation and ineligible for award.
Emailed Bids: When submitting your Bid by email, the bid guarantee must be included in your emailed attachment(s).
(6) ATTACHMENT A – PREAWARD SURVEY FORM – The bidder shall complete the enclosed Attachment A and submit it along with iyour bid (if emailing your bid, this form must be included in your attachments). The preaward survey form is to aid in expediting the award of this project. Only the winning bidder’s information will be surveyed.
(7) QUESTIONS SHALL BE SUBMITTED BY 10 Sep 21 @ 10:00 AM CENTRAL TIME IN
ORDER TO ALLOW SUFFICIENT TIME FOR QUESTIONS TO BE ANSWERED VIA
AN AMENDMENT PRIOR TO THE BID OPENING DAY AND TIME (Re: 52.214-6
Explanation to Prospective Bidders). Please include the solicitation number and project title in the subject line of your email.
3. Pre-Bid Meeting will be held virtually on 8 Sep 21 @ 10:00 AM Central Time.
Webex Meeting link:
https://usace1.webex.com/usace1/j.php?MTID=mc375a9c10a8fbaea2f5dd23099818c51
Meeting number:
199 994 7435
Password:
CHLPDUProject1!
https://usace1.webex.com/usace1/j.php?MTID=mc375a9c10a8fbaea2f5dd23099818c51
(End of Summary of Changes) file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
"General Decision Number: IL20210009 08/13/2021
Superseded General Decision Number: IL20200009
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
County: Cook County in Illinois.
BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 02/19/2021 3 04/23/2021 4 06/04/2021 5 06/11/2021 6 06/25/2021 7 07/02/2021 8 07/30/2021 9 08/13/2021
ASBE0017-001 06/01/2021
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 51.80 30.60 Fire Stop Technician.............$ 41.44 27.85
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 38.85 27.85
BOIL0001-001 05/01/2017
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-004 06/01/2017
Rates Fringes
Marble Mason.....................$ 44.63 26.83
BRIL0021-006 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.84
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 25.72
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0021-012 06/01/2017
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
Pointer, cleaner and caulker.....$ 45.42 24.06
CARP0555-001 06/01/2021
BUILDING, HEAVY, AND HIGHWAY
Rates Fringes
CARPENTER
Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 50.86 37.34 Heavy & Highway............$ 50.86 37.34
CARP0555-002 10/01/2020
RESIDENTIAL CONSTRUCTION
Rates Fringes
CARPENTER........................$ 41.11 32.93
ELEC0009-003 05/30/2021
Rates Fringes
Line Construction Groundman...................$ 44.11 62.32% Lineman and Equipment Operator....................$ 56.55 62.32%
* ELEC0134-001 06/07/2021
Rates Fringes
ELECTRICIAN......................$ 51.00 37.39
* ELEC0134-003 06/07/2021
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 46.26 28.23
The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM] transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.
ELEV0002-001 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 60.42 35.825+a+b
FOOTNOTES:
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
* ENGI0150-006 06/01/2020
Building and Residential Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 52.10 42.90
GROUP 2....................$ 50.80 42.90
GROUP 3....................$ 48.25 42.90
GROUP 4....................$ 46.50 42.90
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36"" and Over)*; Roto Mill Grinder (Less Than 36"")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);
Conveyor, Portable; Forklift Trucks; Greaser Engineer;
Highlift Shovels or Front End loaders under 2 1/4 cu yd;
Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;
Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;
Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);
Winch Trucks with ""A"" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3"" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers
*-Requires Oiler
* ENGI0150-025 06/01/2020
Heavy and Highway Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 50.30 42.90
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
GROUP 2.....................$ 49.75 42.90
GROUP 3.....................$ 47.70 42.90
GROUP 4.....................$ 46.30 42.90
GROUP 5.....................$ 45.10 42.90
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36"" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring
*Requires Oiler
IRON0001-026 06/01/2020
Rates Fringes
IRONWORKER
Sheeter.....................$ 52.76 40.48 Structural and Reinforcing..$ 52.51 40.48
IRON0063-001 06/01/2021
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 52.13 39.47
IRON0063-002 06/01/2020
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
IRONWORKER
Fence Erector...............$ 44.42 29.73
IRON0136-001 07/01/2020
Rates Fringes
IRONWORKER
Machinery Movers; Riggers;
Macinery Erectors...........$ 44.00 37.24 Master Riggers..............$ 46.50 37.24
LABO0002-006 06/01/2018
Rates Fringes
LABORER (BUILDING &
RESIDENTIAL)
GROUP 1....................$ 42.72 28.19
GROUP 2....................$ 42.72 28.19
GROUP 3....................$ 42.80 28.19
GROUP 4....................$ 42.82 28.19
GROUP 5....................$ 42.87 28.19
GROUP 6....................$ 42.92 28.19
GROUP 7....................$ 42.95 28.19
GROUP 8....................$ 43.05 28.19
GROUP 9....................$ 43.07 28.19
GROUP 10....................$ 43.17 28.19
GROUP 11....................$ 43.00 28.19
GROUP 12....................$ 43.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.
GROUP 2: Fireproofing and Fire Shop laborers.
GROUP 3: Cement Gun.
GROUP 4: Chimney over 40 ft.; Scaffold Laborers.
GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.
GROUP 6: Stone Derrickmen & Handlers.
GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.
GROUP 8: Firebrick & Boiler Laborers.
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.
GROUP 10: Boiler Setter Plastic Laborers.
GROUP 11: Jackhammermen on fire brick work only.
GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.
LABO0002-007 06/01/2018
Rates Fringes
LABORER (HEAVY & HIGHWAY)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.80 28.19
GROUP 3.....................$ 42.87 28.19
GROUP 4.....................$ 43.00 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned
GROUP 2: Asphalt tampers & smoothers; Cement gun laborers
GROUP 3: Cement Gun Nozzle (laborers), Gunite
GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;
Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;
Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);
Power drive concrete saws; other power tools.
GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure
LABO0002-008 06/01/2018
Rates Fringes
LABORER (Compressed Air)
0 - 15 POUNDS...............$ 43.72 28.19
16 - 20 POUNDS..............$ 44.22 28.19
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
21 - 26 POUNDS..............$ 44.72 28.19
27 - 33 POUNDS..............$ 45.72 28.19
34 - AND OVER...............$ 46.72 28.19
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.85 28.19
GROUP 3.....................$ 42.95 28.19
GROUP 4.....................$ 43.07 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0225-001 06/01/2018
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
LABORER (DEMOLITION/WRECKING)
GROUP 1.....................$ 37.52 28.19
GROUP 2.....................$ 42.72 28.19
GROUP 3.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1 - Complete Demolition
GROUP 2 - Interior Wrecking and Strip Out Work
GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or Strip Out Work
PAIN0014-001 06/01/2020
Rates Fringes
PAINTER (including taper)........$ 48.30 28.72
PAIN0027-001 06/01/2021
Rates Fringes
GLAZIER..........................$ 47.73 39.84
PLAS0005-002 07/01/2015
Rates Fringes
PLASTERER........................$ 42.25 26.65
PLAS0502-001 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 45.25 33.48
PLUM0130-001 06/01/2021
Rates Fringes
PLUMBER..........................$ 52.80 34.67
PLUM0597-002 06/01/2021
Rates Fringes
PIPEFITTER.......................$ 52.00 36.37
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
ROOF0011-001 12/01/2020
Rates Fringes
ROOFER...........................$ 45.75 25.75
SFIL0281-001 07/01/2021
Rates Fringes
SPRINKLER FITTER.................$ 51.75 32.65
SHEE0073-001 07/01/2020
Rates Fringes
Sheet Metal Worker...............$ 46.50 39.96
SHEE0073-002 06/08/2018
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 31.32 37.02
TEAM0731-001 06/01/2017
COOK COUNTY - HEAVY AND HIGHWAY
Rates Fringes
TRUCK DRIVER
2 or 3 Axles................$ 35.60 22.10 4 Axles.....................$ 35.85 22.10 5 Axles.....................$ 36.05 22.10 6 Axles.....................$ 36.25 22.10
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
TEAM0731-002 04/01/2021
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
Traffic Control Device Monitor
TRAFFIC SAFETY WORKER:
Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, barricade and sign fabrication equipment.......$ 38.50 18.70
TEAM0786-001 06/01/2017
COOK COUNTY - BUILDING AND RESIDENTIAL
Rates Fringes
TRUCK DRIVER
2 & 3 Axles.................$ 39.942 0.25+a 4 Axles.....................$ 39.75 0.25+a 5 Axles.....................$ 39.967 0.25+a 6 Axles.....................$ 40.184 0.25+a
FOOTNOTES:
a. $719.00 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM]
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing file:///O/...ask%20Assignment/W912P621B0015%20Chicago%20Lock%20Power%20Distribution%20Upgrades/IL20210009%208-13-21.txt[8/20/2021 8:02:34 AM] this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .