AUG30 W912P6-21-B-0015_14419-6073GB_Power Distribution Upgrade FY21_Plans_AMD0002.pdf

PDF 28 MB Posted

Attached to
W912P621B0015 CHICAGO HARBOR LOCK POWER DISTRIBUTION UPGRADE, CHICAGO HARBOR, CHICAGO, IL
Solicitation number
W912P621B0015
Issued by

About this file

This solicitation is for a power distribution upgrade project at the Chicago Harbor Lock in Chicago, Illinois. The project scope includes removing an existing 300 KVA generator and replacing it with a new standby generator along with associated new conductors and conduits. Incompatible conduits will also be replaced and all associated conductors. The estimated construction costs range from $250,000 to $500,000. The North American Industry Classification System code is 237130, with a small business size standard of $39.5 million. Competition is restricted to small business concerns. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Chicago. The general decision number for applicable wage rates is IL20210009. The response due date is not provided.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIVER WALL

LIGHT POLE

CONDUCTORS

CONDUCTORS AND CONTROL

NEW GENERATOR POWER

EXISTING 1-4", 1-2" RIGID CONDUIT FOR

TO BE REMOVED

EXISTING GENERATOR

SEE NOTE 1.

W/ NEW CONCRETE PAD.

INTEGRAL FUEL TANK SET

NEW GENERATOR &

LOCK CONTROL BUILDING PER ELECTRICAL PLANS

REMOVE AND REPLACE CONDUITS AND WIRING TO

FOR SW BUBBLER AIR COMPRESSOR

MANHOLE TO WELDHOUSE

REROUTE CONDUIT FROM

EXCAVATION AND BACKFILL AS NECESSARY

EXISTING ATS TO BE REMOVED, ASSOCIATED

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

CHICAGO RIVER

LAKE MICHIGAN

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_CS-001.dgn

1:12:28 PM 8/20/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

F

IL

E N

A M

E

GENERAL NOTES

A1

N

SITE PLAN

A N

S I

D

W P -2

-B -0

P

R O J E

C T I

D

C S -0

.d g n

C H

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

CS-001

K P

C

-6

G B

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

O V

E R

A L L S

IT

E P

L A

N

SCALE: N.T.S.

T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G

R A

N A M

IS

H

R A P

E

PARALLEL TO LAKE WALL.

CONCRETE PAD. PAD SHALL BE ALIGNED WITH LONG EDGE

1. REFER TO STRUCTURAL SHEET SS-501 FOR DETAILS OF NEW

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

N O

T E C

H A

N G

E S

/2

/2

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

O J E

C T I

D

F

IL

E N

A M

LAKE MICHIGAN

CHICAGO RIVER

N STREETER DR

LAKEFRONT TRAIL

P A

R K D

R

P A

R K D

R

E GRAND AVE

CHICAGO MARINE

SAFTEY STATION

LAKE MICHIGAN

NAVY PIER

CHICAGO HARBOR LOCK CHAMBER

E ILLINOIS ST

GATE ACCESS

ACCESS ROUTE TO STAGING AREA

PARKING LOT

CHICAGO LOCK

STAGING AREA/

WORK LIMITS

TO CHICAGO LOCK CHAMBER

LAND BASE ACCESS ROUTE

SLUICE GATES

SL01 SL02

SL03

SL04 SEE NOTE 5

NORTH BASIN WALL,

SEE NOTE 3

EXISTING NORTH PIER TUNNEL,

SEE NOTE 4

GRAVEL ROAD

NORTH PIER

WL02

WL03

WL01

WL04

WL05

WL06

C-7

MSD-2

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

4:26:07 PM 8/25/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_CS-002.dgn

PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

A1

SCALE: 1" = 100'

NORTH

PLAN

100' 200'0

SITE ACCESS, STAGING & MOORING AREAS

GENERAL NOTES

ILLINOIS STATE PLANE EAST NAD83

WORK LIMITS

CHICAGO LOCK CHAMBER

WL06

WL05

WL04

WL03

WL02

WL01

POINT

W P -2

-B -0

COORDINATES

ILLINOIS STATE PLANE EAST NAD83

STAGING LIMITS

CHICAGO LOCK CHAMBER

SL04

SL03

SL02

SL01

POINT

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

-6

G B

C S -0

.d g n

W O

R K L

IM

IT

S A

N D A

C C

E S

S W

O R

K L

IM

IT

S A

N D A

C C

E S

S W

O R

K L

IM

IT

S A

N D A

C C

E S

S

CS-002CS-002CS-002

R A

N A M

IS

H

R A P

E

S

IT

E P

L A

N

K P

C

A N

S I

D

R A

N A M

IS

H

R A P

E

S

IT

E P

L A

N

K P

C

A N

S I

D

R A

N A M

IS

H

R A P

E

S

IT

E P

L A

N

K P

C

1,903,137.6675

1,902,783.8352

1,902,869.5190

1,902,778.9424

1,902,863.7910

1,902,852.3148

NORTHING

1,182,341.3610

1,182,529.7110

1,182,526.3912

1,181,842.3634

1,181,726.2686

1,181,734.4028

EASTING

1,903,122.5999

1,903,122.5999

1,903,186.4819

1,903,186.4819

NORTHING

1,181,176.2398

1,181,319.1556

1,181,319.1556

1,181,176.2398

EASTING

L A

U R

A V

A N

D E

N B

E R

G

T

IM

M

O Y

A T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G

T

IM

M

O Y

A

L A

U R

A V

A N

D E

N B

E R

G A

U G

U S

T

A U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

-2

L O

A D L

IM

IT

S A

N D Z

O N

E S R

E F

IN

E D

-2

L O

A D L

IM

IT

S A

N D Z

O N

E S R

E F

IN

E D

-2

L O

A D L

IM

IT

S A

N D Z

O N

E S R

E F

IN

E D

FACILITIES.

IN NO CASE SHALL LOAD EXCEED 150 PSF ON ANY OF THE LOCK WALLS OR 6.

SHALL LOAD EXCEED 150 PSF.

LB AXLE LOAD WITH A MINIMUM 9 FT SPACING BETWEEN AXLES. IN NO CASE

ON THE NORTH BASIN WALL, LOADS SHALL BE LIMITED TO A MAXIMUM 3,000 5.

WITH A MINIMUM AXLE SPACING OF 14 FT BETWEEN AXLES.

MAXIMUM UNIFORM LOAD OF 250 PSF OR A 32,000 LB MAXIMUM AXLE LOAD

ON THE NORTH PIER GRAVEL ROAD, TRUCKS SHALL BE LIMITED TO A 4.

WALL AT THE EXISTING NORTH PIER TUNNEL.

THERE SHALL BE NO LOADS WITHIN 50 FEET OF THE RIVERSIDE SHEET PILE 3.

AND CHICAGO LOCK OPERATIONS TEAM FOR ACCESS LOAD LIMITS.

WORK LIMITS. HOWEVER CONTRACTOR MUST COORDINATE WITH THE COR

THE CONTRACTOR IS ALLOWED LAND BASED ACCESS WITHIN & OUT OF THE 2.

SHARING THE STAGING SPACE IN THE PARKING LOT.

PARKING LOT. THERE MAY BE OTHER CONTRACTORS IN THE VICINITY

HOWEVER, THE CONTRACTOR DOES NOT HAVE RIGHTS TO THE ENTIRE

MAY BE USED BY THE CONTRACTOR TO PLACE EQUIPMENT, MATERIALS, ETC.

THE EXTENTS OF THE PARKING LOT, CALLED OUT AS THE STAGING AREA 1.

PULLBOX

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg1:21:10 PM 8/20/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-102.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

D -1

.d g n

A N

S I

IC

A G

O

IL

L

IN

O

IS

A1 0 8' 32'16'

SHEET KEYNOTES

ED-102ELECTRICAL SITE PLAN - DEMOLTION

SCALE: 3/32"=1'-0"

M A

T C

H L

IN

E T

O E

D -1

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

O

F

O

F

C H

IC

A G

O H

A R

B O

R L

O C

K

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L A

N

J E

R E

M

IA

H H

A L E

Y

F A

Y E L

E F F

L E

R P

E

W P -2

-C -0

X

X

W P -2

-B -0

-6

G B

M A

T C

H L

IN

E T

O E

D -1

B R

IA

N P

O R

T E

R P .E

NORTH

PLAN

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

CONDUITS. REMOVE THE 4" MISALIGNED CONDUITS FROM END TO END.

REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 1.

N O

T E C

H A

N G

/2

/2

A1

ES-302

LAKE MICHIGAN

WATER DEPTH ~20 FEET

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg1:44:06 PM 8/20/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-103.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

D -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

A1 0 8' 32'16'

SHEET KEYNOTES

ED-103ELECTRICAL SITE PLAN - DEMOLTION

SCALE: 3/32"=1'-0"

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

O

F

O

F

C H

IC

A G

O H

A R

B O

R L

O C

K

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L A

N F

L

J E

R E

M

IA

H H

A L E

Y

F A

Y E L

E F F

L E

R P

E

W P -2

-C -0

X

X

W P -2

-B -0

-6

G B

M A

T C

H L

IN

E T

O E

D -1

NORTH

PLAN

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

LOCKHOUSE.

END FROM THE SWITCHBOARD TO THE MCC LOCATED INSIDE OF THE

SHEET ES-301 IN DETAIL A6. THE CONDUIT SHALL BE REMOVED END TO

COMPRESSOR CONDUIT AND ASSOCIATED CONDUCTOR. SHOWN ON

THE CONTRACTOR SHALL REMOVE THE SOUTHEAST BUBBLER 2.

MISALIGNED CONDUITS.

CONDUITS. REMOVE ONLY THE EXTERIOR PORTION OF THE 2 - 4"

REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 1

N O

T E C

H A

N G

E S

/2

/2

C5

ES-104

MCC-P2

O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

W P -2

-B -0

2:25:22 PM 8/27/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-001.dgn

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

-6

G B

E

S -0

.d g n

ADVANCE.

THE ENERGIZED WORK REQUEST MUST BE PREPARED IN D.

PROTECTIVE EQUIPMENT.

EQUIPMENT AND ENSURE PROPER USE OF PERSONAL

MUST APPROVE ANY PLAN TO WORK ON ENERGIZED

A QUALIFIED SUPERVISOR MUST BE CONSULTED AND C.

USE TWO -PERSON TEAMS TO PERFORM WORK.B.

WORK IN ADVANCE.

CONTRACTING OFFICER. THE CO MUST APPROVE ENERGIZED

SUBMIT A REQUEST FOR LIVE WORK THROUGH THE A.

COMPLETED THE CONTRACTOR SHALL:

LIVE PARTS EXPOSED. IN THE EVENT THAT LIVE WORK MUST BE

WORK AREA SHALL BE PLACED IN A SAFE CONDITION WITH NO

DE-ENERGIZED PRIOR TO ENERGIZING THE EQUIPMENT, THE

ALL WORK SHALL BE COMPLETED WHILE THE FEEDERS ARE 5.

EQUIPMENT (PPE) REQUIRED TO PERFORM WORK.

CONTRACTOR SHALL FURNISH ALL PERSONAL PROTECTIVE 4.

COMPLYING WITH THE ENERGIZED WORK PERMIT.

SAFE WORKING POSITIONS, HANDLING TOOLS SAFELY, AND

CHECKING THEM CONSTANTLY TO MAKE SURE THEY ARE IN

SUPERVISOR MUST CLOSELY SUPERVISE THE WORKERS,

WHILE THE JOB IS IN PROGRESS, AN ON -SITE C.

WRITTEN SAFE CLEARANCE FORM.

OF THIS PARAGRAPH, COR APPROVAL IS GRANTED THROUGH A

ABOVE SHALL BE FOLLOWED; HOWEVER, FOR THE PURPOSES

PERFORMING "ENERGIZED WORK" AND ALL THE PROCEDURES

PURPOSE OF ISOLATING CIRCUITS IS CONSIDERED

OPERATING CIRCUIT BREAKERS/DISCONNECTS) FOR THE

OFF/ON A SWITCH, OPENING AND CLOSING SWITCHES, OR

DE-ENERGIZING/RE-ENERGIZING METHODS (I.E., TURNING

CONVENTIONAL CIRCUIT B.

ENSURE SAFETY.

SUPERVISION, TRAINING, AND PLANNING ARE PARAMOUNT TO

EQUIPMENT AND APPROPRIATE SUPERVISION. PROPER

PLACE SPECIAL EMPHASIS ON PERSONAL PROTECTIVE A.

WITHOUT MEETING THE FOLLOWING REQUIREMENTS:

STARTING. ENERGIZED WORK SHALL NOT BE ALLOWED

REVIEWED WITH ALL PERSONNEL IMMEDIATELY BEFORE

WORK PROCEDURES LISTED IN AFI 32-1064 ARE FOLLOWED AND

EXTREME CAUTION AND ONLY WHEN THE BASIC ENERGIZED

ABSOLUTELY NECESSARY, IT SHOULD BE ACCOMPLISHED WITH

ENERGIZED CIRCUITS: WHEN ENERGIZED WORK IS DEEMED 3.

PARAGRAPH 11.A.02.C. REFERENCE NFPA70E.

CONTAIN INFORMATION REQUIRED BY USACE EM 385-1-1

VIA THE CONTRACTING OFFICER FOR ACCEPTANCE AND SHALL

WORK REQUEST SHALL BE SUBMITTED TO THE GOVERNMENT

WORKED ON IN AN ENERGIZED CONDITION, AN ENERGIZED

EXIST. IF IT IS DETERMINED THAT EQUIPMENT MUST BE

CIRCUITS UNLESS PROOF IS PROVIDED THAT NO OTHER MEANS

NO WORK SHALL BE PERFORMED ON ENERGIZED ELECTRICAL 2.

BE COMPLIED WITH BY THE CONTRACTOR.

WITH EM 385-1-1 AND THE LATEST EDITION OF NFPA 70E SHALL

LOCAL ''LOCKOUT/TAG OUT' PROCEDURES IN ACCORDANCE 1.

COST TO THE GOVERNMENT.

COMPLETION OF THE PROJECT AT NO ADDITIONAL

EQUIPMENT TO ITS ORIGINAL CONDITION AT THE

SHALL BE RESPONSIBLE FOR RETURNING THE

THE CONTRACTING OFFICER. THE CONTRACTOR

THE EQUIPMENT'S OPERABILITY IN THE PRESENCE OF

SHALL DEMONSTRATE AND DOCUMENT IN A REPORT

DESIGN. PRIOR TO REMOVAL, THE CONTRACTOR

STORED, AND RE- INSTALLED AS DESCRIBED IN THE

NOTED IN THE DESIGN SHALL BE REMOVED, SAFELY

EXISTING EQUIPMENT THAT IS TO BE RE-USED AS 25.

REPLACED AT THE CONTRACTOR'S EXPENSE.

DOCUMENTS SHALL BE COMPLETELY REMOVED AND

ANY ITEMS INSTALLED INCORRECTLY PER CONTRACT 24.

MEETINGS FOR THE DURATION OF THE PROJECT.

CONTRACTOR SHALL ATTEND ALL CONSTRUCTION 23.

CONTRACT.

(PLANS), SPECIFICATIONS, AND TERMS OF THE

THE WORK IN ACCORDANCE WITH THE DRAWINGS

TESTING AND INCIDENTALS REQUIRED TO COMPLETE

EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES,

FURNISH ALL LABOR, SUPERVISION, MATERIALS,

FURTHER INTENDED THAT THE CONTRACTOR SHALL

DESCRIBED, UNLESS OTHERWISE NOTED. IT IS

COMPLETION IN EVERY DETAIL OF THE WORK

EQUIPMENT FOR THE CONSTRUCTION AND

THE CONTRACTOR SHALL FURNISH AND INSTALL ALL 22.

CUTTING AND PATCHING FOR THEIR WORK.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 21.

PRIOR TO INITIATING THE WORK.

CONTRACTING OFFICER FOR REVIEW AND APPROVAL

METHODS SHALL BE SUBMITTED TO THE

SATISFACTION OF THE GOVERNMENT. ALL REPAIR

IMMEDIATELY REPAIRED WITHIN 24 HOURS TO THE

GOVERNMENT. ALL DAMAGED SYSTEMS SHALL BE

REMAIN SHALL BE AT NO ADDITIONAL COST TO THE

ANY DAMAGED EXISTING SYSTEMS/UTILITIES TO

BE PROTECTED FROM DAMAGE. REPLACEMENT OF

ALL EXISTING SYSTEMS/UTILITIES TO REMAIN SHALL 20.

OTHER GROUPS.

INSURE THAT THE WORK DOES NOT INTERFERE WITH

OTHER DISCIPLINES BEFORE BEGINNING WORK TO

THIS CONTRACT. COORDINATE THE WORK WITH ALL

PROPER SUPPORT OF EQUIPMENT FURNISHED UNDER

STRUCTURAL SUPPORTS, AND ACCESSORIES FOR

MOUNTED. PROVIDE ALL BOLTS, INSERTS, BRACKETS,

RELATED ITEMS ARE TO BE SUPPORTED OR

DETERMINE HOW EQUIPMENT, ACCESSORIES, AND

DRAWINGS, SHOP DRAWINGS, AND CATALOG DATA TO

INSTALLED UNDER THIS CONTRACT. STUDY ALL

PROPERLY SUPPORT ALL WORK AND EQUIPMENT 19.

POINT CONCERNED.

PRIOR TO THE PROGRESS OF THE WORK BEYOND THE

DISCREPANCY OR POINTS OF CONFLICT IN WRITING

CONTRACTING OFFICER WILL CLARIFY SUCH

NOTIFY THE CONTRACTING OFFICER IN WRITING .THE

DRAWINGS OR THE SPECIFICATIONS, IMMEDIATELY

DISCREPANCY OR POINTS OF CONFLICT IN THE

WITH ANY WORK. UPON DISCOVERY OF ANY

AND EXISTING CONDITIONS PRIOR TO PROCEEDING

CONTRACTOR WILL FIELD VERIFY ALL DIMENSIONS 18.

UTILITIES.

INTERFERENCE WITH OTHER EQUIPMENT AND

ADJUST EQUIPMENT AND FIXTURES TO AVOID 17.

ARRANGEMENT BEFORE INSTALLING THE EQUIPMENT.

APPROVAL WITH A PROPOSED REVISED

DRAWING TO THE CONTRACTING OFFICER FOR

NOT FIT AS SHOWN ON THE DRAWINGS, PROVIDE A

SHOWN ON THE DRAWINGS. WHERE EQUIPMENT WILL

EQUIPMENT FURNISHED WILL FIT INTO THE SPACE AS

MEASUREMENTS TO INSURE THAT ALL ITEMS OF

BEFORE INSTALLING EQUIPMENT, MAKE FIELD 16.

THE GOVERNMENT, PRIOR TO STARTING WORK.

SERVICE SHALL BE COORDINATED AND APPROVED BY

INTERRUPTION OF AN EXISTING SYSTEM OR UTILITY

LOCATION OF ALL EXISTING UTILITIES. ANY

WORK. THE CONTRACTOR SHALL STAKE/MARK THE

WORK WITH THE GOVERNMENT PRIOR TO STARTING

CONTRACTORS RESPONSIBILITY TO COORDINATE ALL

FOR EXACT LOCATIONS. IT SHALL BE THE

PLANS ARE APPROXIMATE AND SHALL NOT BE SCALED

THE EXISTING UTILITY LOCATIONS SHOWN ON THE 15.

NOTED.

THE PROJECT BE REMOVED UNLESS OTHERWISE

ARE NO LONGER REQUIRED AS A RESULT OF

WIRING MATERIALS, AND SYSTEMS, ETC., WHICH

THAT ALL EQUIPMENT, DEVICES, FIXTURES,

THE INTENT OF THE DEMOLITION DRAWINGS

BUILT' DRAWINGS OF THE AREAS AFFECTED. IT IS

EXISTING CONDITIONS AND ON EXISTING ''AS-

BASED ON FIELD OBSERVATION OF THE ACTUAL

CONDITIONS AND DEMOLITION DRAWINGS ARE

ALL WORK SHOWN ON THE EXISTING 14.

AND ACCESSORIES AS MAY BE REQUIRED.

CONDITIONS AND PROVIDE SUCH EQUIPMENT

ARRANGE THE WORK TO MEET THESE

INVESTIGATED. THE CONTRACTOR SHALL

STRUCTURAL AND FINISH CONDITIONS

SHALL BE CHECKED AT THE SITE AND ALL

AND LOCATION OF EQUIPMENT. ALL DIMENSIONS

AS POSSIBLE IN THE GENERAL ARRANGEMENT

SHOULD HOWEVER BE FOLLOWED AS CLOSELY

REQUIRED FOR THE COMPLETE SYSTEM. THEY

DRAWINGS DO NOT SHOW ALL DETAILS

CONDITIONS PRIOR TO STARTING WORK. THESE

CONTRACTOR SHALL VERIFY EXISTING 13.

ENVIRONMENTAL CONDITIONS.

PROPERTIES AGAINST FIRE, THEFT, AND

RESPONSIBILITY FOR PROTECTION OF

THE JOB SITE. OWNER ASSUME NO

THE SAFEKEEPING OF HIS OWN PROPERTY ON

THE CONTRACTOR WILL BE RESPONSIBLE FOR 12.

SPRING THROUGH EARLY SUMMER.

THE PUMPING SEASON WHICH OCCURS FROM

ACCESS TO SHUT DOWN EQUIPMENT DURING

CONTRACTOR SHOULD PLAN FOR LIMITED

AND FOR HOW LONG A PERIOD OF TIME. THE

WHEN THE PROPOSED SHUTDOWN WILL OCCUR,

INDICATING WHICH AREAS WILL BE AFFECTED,

NOTICE MUST BE GIVEN TO THE OWNER

OR DISCONNECTION, SUFFICIENT ADVANCED

ARE AFFECTED BY ANY SHUTDOWN, REMOVAL

IF ANY AREAS NOT WITHIN THE SCOPE OF WORK

REMAIN IN OPERATION WILL NOT BE AFFECTED.

AND/OR ENGINEER. CONFIRM THAT AREAS TO

WITHOUT PRIOR REVIEW WITH THE OWNER

REMOVED, DISCONNECTED, OR SHUT DOWN

NO WIRING, EQUIPMENT, ETC. WILL BE 11.

WIRE.

DEDICATED NEUTRALS AND SEPARATE GROUND

ALL NEW CIRCUITS WILL BE PROVIDED WITH 10.

WILL BE BASED ON CHAPTER 9 OF THE NEC.

UNLESS OTHERWISE INDICATED, CONDUIT SIZES 9.

UNLESS OTHERWISE NOTED. SEE SPECS.

ALL CONDUCTORS WILL BE COPPER THHN/THWN, 8.

ELECTRICAL CODE.

CURRENT EDITION OF NFPA 70 - NATIONAL

ALL WIRING METHODS WILL COMPLY WITH THE 7.

BEEN AFFECTED.

BY THE CONTRACTOR WHERE FINISHES HAVE

ALL PATCHING AND FINISHING SHALL BE DONE

ALL ELECTRICAL EQUIPMENT AND MATERIALS.

NECESSARY FOR THE PROPER INSTALLATION OF

THE CONTRACTOR WILL DO ALL WORK 6.

BE USED.

WHERE CONDUIT WILL BE EXPOSED, RGS WILL

WIRING WILL BE RUN IN EMT CONDUIT. IN AREAS

BRANCH, CONTROL, AND COMMUNICATIONS

UNLESS OTHERWISE INDICATED FEEDERS, 5.

TYPE 1 (INDOOR), NEMA TYPE 3R (OUTDOOR).

ENCLOSURES FOR EQUIPMENT WILL BE NEMA

UNLESS OTHERWISE INDICATED, ALL 4.

WORK.

SURVEY THE SPACE BEFORE PERFORMING THE

REQUIRING THE CONTRACTOR TO INSPECT AND

AND/OR HIDDEN, THAT MAY EXIST; THUS

INTERFERENCES AND CONDITIONS, VISIBLE

PLANS AND DETAILS DO NOT SHOW ALL 3.

AND LOCAL GOVERNING AUTHORITIES.

WORKMEN IN ACCORDANCE WITH THE STATE

ALL WORK WILL BE DONE WITH LICENSED 2.

ACCORDANCE WITH THEIR LISTING.

LABELED AND LISTED AND PROVIDED IN

ALL EQUIPMENT AND MATERIAL WILL BE 1.

F A

Y E L

E F F

L E

R P

E

G E

N E

R A

L E

L E

C T

R

IC

A L N

O T

E S

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

G E

N E

R A

L E

L E

C T

R

IC

A L N

O T

E S

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

G E

N E

R A

L E

L E

C T

R

IC

A L N

O T

E S

K P

C

J E

R E

M

IA

H H

A L E

Y

GENERAL SITE NOTES ELECTRICAL SAFETY NOTES

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

A U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

ES-001

/2

/2

N

O T

E C

H A

N G

E S

MITIGATION PROCEDURES.

ON THE BUBBLER SYSTEMS TO AVOID IMPACTING ICE

LOCKHOUSE PERSONELL PRIOR TO BEGINNING WORK

WITH THE CONTRACTOR SHALL COORDINATE 32.

SHUTDOWN FOR A MAXIMUM OF 24 HOURS.

HARBOR LOCK. CHICAGO LOCK OPERATIONS CAN BE

BEGINNING THE WORK CONDUCTED AT THE CHICAGO

POWER PLAN FOR GOVERNMENT APPROVAL PRIOR TO

THE CONTRACTOR SHALL SUBMIT A TEMPORARY 31.

DE-ENERGIZING.

CONTRACTOR SHALL STILL COORDINATE

SHUTDOWN DURING THIS TIME, HOWEVER THE

14,2022. THE CHICAGO HARBOR LOCK WILL BE

DURING THE WINDOW OF NOVEMBER 16,2021- APRIL

CONTRACTOR IS TO COMPLETE CONSTRUCTION 30.

(I.G. PIPES DO NOT FREEZE DURING WINTER ETC).

INTEGRITY OF BUILDING SYSTEMS WHILE SHUTDOWN,

CONTRACTOR IS RESPONSIBLE FOR ENSURING THE 29.

MATERIALS EQUIVALENT TO THE ORIGINAL.

SHALL REPAIR THE GROUNDING SYSTEM WITH

ASSOCIATED WITH THE PROJECT, THE CONTRACTOR

SYSTEM IS COMPROMISED BY THE WORK

IN ANY LOCATIONS THAT THE EXISTING GROUNDING 28.

SITE.

SHALL BE DISPOSED OF BY THE CONTRACTOR OFF

EXISTING EQUIPMENT SLATED TO BE REPLACED 27.

AND MATERIALS PROVIDED TO THE OWNER.

ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT

THE CONTRACTOR SHALL TURN OVER TO THE OWNER 26.

O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

P -2

-B -0

9:29:32 AM 8/26/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-002.dgn

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

-6

G B

E

S -0

.d g n

F A

Y E L

E F F

L E

R P

E

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

K P

C

J E

R E

M

IA

H H

A L E

Y

A N

S I

D

F A

Y E L

E F F

L E

R P

E

K P

C

J E

R E

M

IA

H H

A L E

Y

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

W

IR

E S

C H

E D

U L E

W

IR

E S

C H

E D

U L E

W

IR

E S

C H

E D

U L

C1

WIRE SCHEDULE

U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

ES-002

/2

/2

S

H E

D U

L E U

P D

A T

E D

T T

2" CONDUIT FOR GENERATOR SIGNAL

4" CONDUIT FOR GENERATOR POWER

SEE DETAIL E6

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg9:36:44 AM 8/26/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-101.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

W P -2

-B -0

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A1

SCALE: 1/8" = 1' 0 8'4' 16'

ELECTRICAL SITE PLAN

E6

SCALE: NTS

B R

IA

N P

O R

T E

R P .E

MATCHLINE TO ES-102

ES-101

EXISTING CONDUITS FOR NEW GENERATOR

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

/2

/2

U

P D

A T

E D N

O T

E S

TRANSFORMER AND CONNECT IT TO THE EXISTING GROUNDING SYSTEM.

THE CONTRACTOR SHALL INSTALL A COPPER BARE GROUND AT THE 5.

GENERATOR.

4. CONTRACTOR SHALL FURNISH A NEW 375KVA(300KW, .8PF) STANDBY

SEE SS-501 FOR DETAILS.

CONTRACTOR SHALL FURNISH A CONCRETE PAD FOR THE 375KVA GENSET. 3.

CONTRACTOR TO FIELD VERFIY ALL COMPONENTS OF THE SITE DETAILS.2.

CONNECT THOSE CABLES TO THE NEW ATS.

GENERATOR. THE CONTRACTOR SHALL THEN CONNECT ROUTE AND

CONDUCTORS LOCATED IN 2" CONDUIT TO NEW 375KVA STAND-BY

CONTRACTOR SHALL CONNECT GENERATOR POWER 4" AND SIGNAL 1.

GENERAL NOTES

D5

ES-102

NEW GENERATOR

LOCATION OF

2'' CONDUIT FOR GENERATOR SIGNAL

4''CONDUIT FOR GENERATOR POWER

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg1:33:38 PM 8/26/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-102.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

W P -2

-B -0

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A1

SCALE: 1/8" = 1' 0 8'4' 16'

ELECTRICAL SITE PLAN

B R

IA

N P

O R

T E

R P .E

MATCHLINE TO ES-103

MATCHLINE TO ES-101

ES-102

D5

CERTIFIED FINAL DOCUMENTS - RTA

U

G U

S T

EXISTING CONDUITS FOR NEW CABLES FROM NEW GENERATOR TO NEW ATS

/2

/2

T

IT

L E C

H A

N G

E S

GENERAL NOTES

CONDUITS TO GENSET AND ATS AS REQUIRED.

EXISTING CONDUITS. THE CONTRACTOR SHALL EXTEND THE EXISTING

CONNECT NEW GENERATOR AND NEW ATS TO NEW CONDUCTORS UTILIZING

CONDUITS ARE CURRENTLY CAPPED. CONTRACTOR SHALL PULL WIRE AND 1.

B2

ES-301

D5

ES-102

WELD SHOP

2.5" CONDUIT TO COMPLETE ROUTING TO ROOF

ROOF UTILIZING AND NEW LB CONNECTOR AND ADDED NEW

2.5" CONDUIT FROM OUT OF MANHOLE 4 TO WELDHOUSE

CONTRACTOR SHALL FIELD VERIFY AND RE-ROUTE EXISTING

EXISTING MANHOLE

A-HOUSE

WELD SHOP

TO BE REMOVED

EXISTING GENERATOR

500KCMIL). COPPER FEEDERS.

THE LOCK CONTROL BUILDING (PARALLEL

CONTRACTOR SHALL PULL IN A NEW FEEDER TO

4" CONDUIT THAT IS ROUTED TO THE MCC. THE

MANUFACTURER AND CONNECT TO THE EXISTING

FITTING AS RECOMMENDED BY THE CONDUIT

COATED STEEL CONDUITS WITH EXPANSION

CONTRACTOR SHALL INSTALL NEW 4" PVC

EXTERIOR PORTION OF THE 2 - 4" CONDUITS. THE

THE CONTRACTOR SHALL ONLY REPLACE THE

BUILDING FROM 2 - 4" CONDUITS. FOR THIS WORK

REMOVE ENTIRE FEEDER TO THE LOCK CONTROL

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg9:12:34 AM 8/27/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-103.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

SHEET KEYNOTES

D1

SCALE: 3/32" = 1' 0 8' 32'16'

ELECTRICAL SITE PLAN

W P -2

-C -0

X

X

W P -2

-B -0

MATCH LINE TO ES-102

M A

T C

H L

IN

E T

O E

S -1

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A6

SCALE: NTS

ES-103

G3

B R

IA

N P

O R

T E

R P .E

ES-103

SOUTHWEST GATE BUBBLER COMPRESSOR CONDUIT ROUTING

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

N O

T E C

H A

N G

E S

/2

/2

SWITCHBOARD.

OF 400KCMIL IN 4 NEW CONDUITS ROUTED FROM THE ATS TO THE

NEW ASSOCIATED CONDUCTORS TO BE INSTALLED SHALL BE 4 SETS

CONTRACTOR SHALL FURNISH AND INSTALL NEW 1600A ATS AND 2.

THE EXISTING SW BUBBLER CONDUCTOR.

SPLICE THE NEW SW BUBBLER CONDUCTOR AND CONNECTOR WITH

INTO THE EXISTING CABLE TROUGH. THE CONTRACTOR SHALL THEN

CONNECTOR, ROUTE INSIDE OF THE A-HOUSE, AND THEN ROUTE

WELD SHOP ROOF THE CONDUIT WILL ROUTE TO A NEW LB

CONDUCTOR OUT OF MANHOLE 4 TO WELD SHOP ROOF. FROM THE

THE CONTRACTOR SHALL REROUTE THE EXISTING CONDUIT AND 1.

A6

ES-103

A6

ES-302

B7

ES-901

C1

ES-901

C3

ES-104

LOCK CHAMBER

WATER DEPTH ~22 FEET

REPLACED.)

OF CONDUIT TO BE

DISPLAYS THE LENGTH

(THIS PICTURE

REPLACED

CONDUITS TO BE

INCOMPATIBLE

EXTEND TO NEW ATS

FOR NEW GENERATOR,

CONTROL CONDUITS

EXISTING POWER AND

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:02:02 PM 8/27/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-104.dgn

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

O J E

C T I

D

F

IL

E N

A M

E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

K P

C

E

S -1

.d g n

A N

S

IC

A G

O

IL

L

IN

O

IS

SHEET KEYNOTES

A1

SCALE: 3/32" = 1' 0 8' 32'16'

ELECTRICAL SITE PLAN

W P -2

-C -0

X

X

W P -2

-B -0

M A

T C

H L

IN

E T

O E -1

O

F

F A

Y E L

E F F

L E

R P

E

E L E

C T

R

IC

A L S

IT

E P

L A

N

-6

G B

J E

R E

M

IA

H H

A L E

Y P

O W

E R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

ALIGNMENT.

COORDINATE WITH COR AND FACILITY MANAGER ON THE MOUNT

1. ROUTE CONDUIT AND MOUNT ON EXISTING RACE WAY RACK.

GENERAL NOTES

B R

IA

N P

O R

T E

R P .E

ES-104

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

A5

SCALE: NTSE-104

G8

A3

SCALE: NTSX-###

X# OUTSIDE CONDUIT ENTRANCE INTO LOCKHOUSECONDUITS TO BE REPLACED

N O

T E C

H A

N G

E S

/2

/2

THE MCC-P2 LOCATION IN THE LOCKHOUSE BUILDING.

THE CONTRACTOR SHALL INSTALL A NEW 250A BREAKER INSIDE OF 6.

TO FIT THE 2.5" CONDUIT.

THE CONTRACTOR SHALL FIELD ADJUST THE A-HOUSE PENETRATION 5.

REMOVE THE EXISTING BREAKER IN THE SWITCHBOARD.

AND CONDUIT AND ROUTE TO MCC. THE CONTRACTOR SHALL

THE CONTRACTOR SHALL DISCONNECT THE EXISTING CONDUCTOR 4.

IN THE LOCKHOUSE MCC.

THE EXISTING SWITCHBOARD AND RECONNECT IT TO A NEW CKT BRK

BUBBLER COMPRESSOR FEEDER FROM THE EXISTING BREAKER IN

CONTRACTOR SHALL DISCONNECT THE EXISTING SOUTHEAST 3.

THE GRATING INTO THE LOCKHOUSE.

ROUTE FROM THE ATS TO THE LAKESIDE PIER WALL UNDERNEATH

WHICH IS LOCATED INSIDE OF THE LOCKHOUSE.THE CONDUIT WILL

XHHW WIRE FROM THE ATS TO THE MAIN CKT BKR IN THE MCC

THE CONTRACTOR SHALL INSTALL NEW PVC COATED RMC AND NEW 1.

A5

ES-103

PIER WALL

EXISTING 2" CONDUIT FOR NEW GENERATOR SIGNAL

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-301.dgn

1:14:09 PM 8/26/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

E N

A M

C

E

S -3

.d g n

A N

S I

D

W P -2

-B -0

O J E

C T I

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

E L E

C T

R

IC

A L R

E V

IS

IO

N S

/2

F A

Y E L

E F F

L E

R P

E

J E

R E

M

IA

H H

A L E

Y

-6

G B

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A4

PIER WALL SECTION

SCALE: 3" = 1' 6"0 3" 1'

P

IE

R W

A L L S

E C

T

IO

N B

R

IA

N P

O R

T E

R P .E

NOTES

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

ES-301

N

O T

E C

H A

N G

E S

/2

/2

CABLES TO THE NEW 1600A ATS.

GENERATOR. THE CONTRACTOR SHALL THEN ROUTE AND CONNECT THOSE

CONDUIT AND SIGNAL VIA AN EXISTING 2" CONDUIT TO A NEW 300KW STAND-BY

CONTRACTOR SHALL CONNECT GENERATOR POWER VIA AN EXISTING 4" 1.

UNISTRUT

LOT LOW VOLTAGE

2" CONDUIT; 480V PARKING

INNERDUCT & PULLROPE

3" CONDUIT-24 STRAND WITH

COMED 12kV

2, 5" CONDUIT; HIGH VOLTAGE

EXISTING 4" CONDUIT FOR NEW GENERATOR POWER

2" CONDUIT 480V HEAT TRACE

2" CONDUIT 12 STRAND FIBER TO H-FRAME

COMPRESSOR""

CKT. BKR. AND NAMEPLATE STYLES, INSCRIBED WITH "SOUTHEAST BUBBLER

BKR INCLUDING NEW MCC BUCKET, DOOR WITH EXTERNAL OPERATOR FOR THE

"CONTRACTOR SHALL FURNISH AND INSTALL A NEW,250A,480VAC, 3 PHASE CKT.

CONTRACTOR TO REPLACE BOTH CONDUITS AND CABLES END TO END.

REFER TO SHEET ES-104

SWITCHBOARD AND REMOVED.

DISCONNECTED FROM

CONDUCTOR SHALL BE

COMPRESSOR CONDUIT AND

SOUTHEAST BUBBLER

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-302.dgn

11:56:38 AM 8/26/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript

E N

A M

C

E

S -3

.d g n

A N

S I

D

W P -2

-B -0

O J E

C T I

IC

A G

O

IL

L

IN

O

IS

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

E L E

C T

R

IC

A L R

E V

IS

IO

N S

/2

F A

Y E L

E F F

L E

R P

E

J E

R E

M

IA

H H

A L E

Y

-6

G B

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

A1

B R

IA

N P

O R

T E

R P .E

SCALE: N.T.S.

A6

SCALE: N.T.S.

E1

SCALE: N.T.S.

BUBBLER CONDUITS

SOUTHWEST BUBBLER COMPRESSOR CONDUIT

LOCKHOUSE MCC-P2

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

ES-302

EXISTING SWITCHBOARD

E X

IS

T

IN

G C

O N

D

IT

IO

N S

SEPARATING CONDUITS

/2

/2

N O

T E A

D D

E D T

IT

L E C

H A

N G

E

SE BUBBLER CONDUCTOR TO BE RAN TO A BREAKER IN THE SPARE MCC.

EVALUATE TO DETERMINE HOW MUCH FEEDER TO LEAVE IN ORDER FOR THE

WHEN BEGINNING THE WORK ON THE SE BUBBLER THE CONTRACTOR SHALL 1.

GENERAL NOTES

#2 GROUND, 4"C

3 #2/0, #2/0 NEUTRAL

IN 2•"C

4/0, 1 #4/0 GROUND, 4" RGS CONDUIT

4 SETS, 3 #600KCMIL, 1 #700KCMIL NEUTRAL,

SUPPRESSOR

SURGE

VOLTAGE

TRANSIENT

NEUTRAL

700KCMIL

BUBBLER MANUFACTURER

STEEL ENCLOSURE BY

IN NEMA 4X STAINLESS

BUBBLER CONTROLLER

200A DISCONNECT SWITCH

NEMA 4X STAINLESS STEEL

IN 2•"C

4/0, NORTH WALL OF THE LOCK, ONE SPARE

2 - 5" RGS CONDUITS FROM THE NORTH PIER TO

3 #250KCMIL, #2/0 GROUND, 2"C

EXISTING 4" RGS CONDUITS

EXISTING 1 #2/0 GROUND,

EXISTING 1 #2/0 NEUTRAL,

EXISTING 4 SETS, 4 #400KCMIL,

EXISTING MCC-P2

ARE NOT SHOWN ON THIS DIAGRAM.

ADDITIONAL MCC LOADS

THE SWITCHBOARD TO THE PLC CABINET

THIS FEEDER WILL BE REPLACED FROM

COMPRESSOR IS REROUTED TO BE FED FROM MCC-P2.

250A 3P CB WILL BECOME SPARE AFTER FEEDER TO SE BUBBLER

SHORT TIME, INSTANTANEOUS AND GROUND FAULT)"

NEW BREAKER "ELECTRONIC TRIP, LSIG TYPE (LONG TIME,

4 POLE ATS

NEW

NEW CABLES

3 #250KCMIL, #2/0 NEW GROUND, 2"C

AND RECONNECTED UNSPLICED TO NEW CB IN MCC-P2

THIS FEEDER WILL BE REMOVED FROM SWITCHBOARD

HOUSE MCC

AND LOCK CONTROL

CABLES BETWEEN ATS

NEW CONDUIT AND

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

T

NW CONTROL HOUSE

CABINET BEHIND THE

SLUICE GATE METER

TO EXISTING COMED

M

G

R

MONITOR

POWER LOGIC

TVSS

G

N

N E

L

C211 C211A

C311A

G

GFI TYPE

1600A/3P

SPARE

SPARE

SPACE

SPACE

SPACE

SW BUBBLER

SE BUBBLER

250A/3P

800A/3P

200A/3P

100A/3P

375kVA pf.8 (300kw)

STEEL SWITCHBOARD

NEMA 4X STAINLESS

LOOP

GROUND

EXISTING

TO

LOOP

GROUND

EXISTING

TO

V /2

V -P

H

W

A

K A

IC

NEW GENERATOR LOCATION

SEE ES-101 FOR

NEW GENERATOR

SERVICE

COMED

12.47KV

TRANSFORMER

COMED

SPARE

1600A

250A/3P

800A/3P

MAIN MCC

IA

N P

O R

T E

R P .E

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

IA

N P

O R

T E

R P .E

P -2

-B -0

IA

N P

O R

T E

R P .E

12:16:10 PM 8/26/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-601.dgn

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

-6

G B

E

S -6

.d g n

GENERAL NOTES

B3

SCALE: NTS

P R

O J E

C T P

A R

T

IA

L O

N E L

IN

E D

IA

G R

A M

A N

S I

D

P R

O J E

C T P

A R

T

IA

L O

N E L

IN

E D

IA

G R

A M

A N

S I

D

P R

O J E

C T P

A R

T

IA

L O

N E L

IN

E D

IA

G R

A M

CABLE/CONDUIT ROUTING.

SEE DRAWING E-101 FOR STANDBY GENERATOR LOCATION AND 2.

CONTRACTOR SHALL PULL IN AND CONNECT ALL GENERATOR WIRING.1.

A U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

F A

Y E L

E F F

L E

R P

E

K P

C

F A

Y E L

E F F

L E

R P

E

K P

C

F A

Y E L

E F F

L E

R P

E

K P

C

ES-601

NEW PARTIAL ONE LINE DIAGRAM

/2

/2

O

N E L

IN

E D

IA

G R

A M C

H A

N G

E S

LB CONNECTOR

NEW UNISTRUT AND NEW 2 1/2'' CONDUIT

NEW LB CONNECTOR

WILL ENTER THE PLC CABINET THROUGH NEW PLC PENETRATION

A NEW CEILING AND NEW WALL PENETRATION. THE CONDUIT

THE CONTRACTOR WILL INSTALL A NEW 2 1/2'' CONDUIT VIA

UNISTRUT TO THE A-HOUSE

CONDUCTORS ACROSS NEW

ROUTE NEW 2 1/2" CONDUIT AND

EDGE

WELD SHOP ROOF

CONDUIT AROUND

BEND NEW 2 1/2"

THE WELD SHOP

UNISTRUT AND TRANSITION TO

BEND NEW 2 1/2" CONDUIT TO

SHOWN IN DETAIL

THROUGH THE WALL AS

ROUTE 2.5'' BUBBLER CONDUIT

USE AN LB CONNECTOR TO

WELD SHOP

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

P -2

-B -0

12:54:04 PM 8/26/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-901.dgn

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

-6

G B

E

S -9

.d g n

GENERAL NOTES

A N

S I

D A

N S I

D

C1

SCALE: N/A

B7

SCALE: N/A

PIER WALL TO A-HOUSE TRANSITION

A-HOUSE ROOF TO INSIDE OF A-HOUSE TRANSITION

P

IC

T U

R E

S

K P

C

J E

R E

M

IA

H H

A L E

Y

P

IC

T U

R E

S

K P

C

J E

R E

M

IA

H H

A L E

Y

P

IC

T U

R E

S

K P

C

J E

R E

M

IA

H H

A L E

Y

R O

U T

IN

G P

L A

N R

O U

T

IN

G P

L A

N R

O U

T

IN

G P

L A

N B

R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

A U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

F A

Y E L

E F F

L E

R P

E F

A Y

E L

E F F

L E

R P

E F

A Y

E L

E F F

L E

R P

E

ES-901

N O

T E C

H A

N G

E S

/2

/2

EXISTING GROUND LOOP.

CONTRACTOR SHALL ADD AIR TERMINALS ON UNISTRUT AND CONNECT TO 4.

BUBBLER CONDUCTOR WITH THE EXISTING SW BUBBLER CONDUCTOR.

CABLE TROUGH. THE CONTRACTOR WILL THEN SPLICE THE NEW SW

PENETRATION INTO THE A-HOUSE WALL AND ROUTE INTO THE EXISTING

TO THE A-HOUSE ROOF DOWN TO A NEW LV CONNECTOR AND NEW WALL

THEN ROUTE FROM THE WELD SHOP ROOF TO A NEW UNISTRUT AND ROUTE

A NEW 2 1/2'' CONDUIT AND ROUTE TO WELD SHOP ROOF. THE CONDUIT WILL

OUT OF MANHOLE 4 AND CONNECT THE EXISTING SW BUBBLER CONDUIT TO

3. THE CONTRACTOR SHALL REROUTE THE EXISTING SW BUBBLER CONDUIT

PHOTOS.

SEE SHEET ES-103 FOR LOCATION OF AREAS REPRESENTED BY THE 2.

ALL ROUTING LOCATIONS MUST BE COORDINATED WITH THE COR. 1.

EXISTING PLC CABINET VIA EXISTING CONDUIT

TROUGH VIA LB CONNECTOR AND TRANSITION INTO

CONDUITS WILL ENTER INTO THE CONDUIT

CABINET

TRANSITION TO PLC

FEEDER TROUGH

NEW SW BUBBLER

EXISTING CONDUIT FOR

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

O J E

C T I

D

F

IL

E N

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

P -2

-B -0

1:08:46 PM 8/26/2021

...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-902.dgn

IC

A G

O

IL

L

IN

O

IS

P O

W E

R D

IS

T R

IB

U T

IO

N U

P G

R A

D E

C H

IC

A G

O H

A R

B O

R L

O C

K

W P -2

-C -0

X

X

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

-6

G B

E

S -9

.d g n

GENERAL NOTES

A N

S I

D A

N S I

D

B4

SCALE: N/A

P

IC

T U

R E

S

K P

C

J E

R E

M

IA

H H

A L E

Y

P

IC

T U

R E

S

K P

C

J E

R E

M

IA

H H

A L E

Y

P

IC

T U

R E

S

K P

C

J E

R E

M

IA

H H

A L E

Y

R O

U T

IN

G P

L A

N R

O U

T

IN

G P

L A

N R

O U

T

IN

G P

L A

N B

R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

B R

IA

N P

O R

T E

R P .E

A-HOUSE ROOF TO NORTH WALL ELECTRICAL TROUGH

A U

G U

S T

CERTIFIED FINAL DOCUMENTS - RTA

A U

G U

S T

F A

Y E L

E F F

L E

R P

E F

A Y

E L

E F F

L E

R P

E F

A Y

E L

E F F

L E

R P

E

ES-902

/2

/2

N

O T

E C

H A

N G

BLOCKS TO COMPLETE THE SPLICE.

THE CONTRACTOR SHALL UTILIZE NEW INSULATED POWER DISTRIBUTION 4.

CABLE, INSIDE OF THE TROUGH IN THE A-HOUSE.

THE CONTRACTOR SHALL SPLICE THE SW BUBBLER CABLE TO THE EXISTING 3.

PHOTOS.

SEE SHEET ES-103 FOR LOCATION OF AREAS REPRESENTED BY THE 2.

ALL ROUTING LOCATIONS MUST BE COORDINATED WITH THE COR. 1.

114419_ES-001
114419_ES-002
114419_ES-101
114419_ES-102
114419_ES-103
114419_ES-104
114419_ES-301
114419_ES-302
114419_ES-601
114419_ES-901
114419_ES-902

File details come from the government source that posted it. Updated .