Chicago Lock Power Distribution Upgrade FY21 Plans .pdf
PDF 18 MB Posted
- Attached to
- W912P621B0015 CHICAGO HARBOR LOCK POWER DISTRIBUTION UPGRADE, CHICAGO HARBOR, CHICAGO, IL
- Solicitation number
- W912P621B0015
About this file
This federal contract opportunity solicitation seeks bids for the Chicago Harbor Lock Power Distribution Upgrade project. The project scope includes removing an existing 300 KVA generator and replacing it with a new standby generator along with associated new conductors and conduits. Incompatible conduits will also be replaced and all associated conductors. The work will take place at the Chicago Harbor Lock in Chicago, Illinois. Competition is restricted to small businesses with a size standard of $39.5 million or less. The NAICS code is 237130. The estimated construction costs range from $250,000 to $500,000. Applicable wage rates are determined by General Decision Number IL20210009 dated July 2, 2021. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Chicago.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
PROJECT AREA
ACCESS ROUTE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P
R O J E
C T I
D
F
IL
E N
A M
E
F
IL
E N
A M
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
CHICAGO DISTRICT
2:36:11 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_G-001.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A N
S I
D
G-001
K P
C
G-001
K P
C
ALL DRAWINGS IN THIS SET.
INDICATE OFFICIAL RECOMMENDATION OF
REQUIRED BY ER 1110-1-8152. SIGNATURES
THE SCOPE OF THEIR EMPLOYMENT AS
ON THESE PROJECT DOCUMENTS WITHIN
TION DESIGNATIONS OF INDIVIDUALS APPEAR
INITIALS OR SIGNATURES AND REGISTRA-
CHICAGO DISTRICT CORPS OF ENGINEERS. THE
THIS PROJECT WAS DESIGNED BY THE
REVIEWED BY:
DRAWINGS CONTAINED IN THE SHEET INDEX.
RECOMMENDATION AND APPROVAL FOR ALL
SIGNATURE AFFIXED BELOW INDICATE OFFICIAL
APPROVED BY:
APPROVAL RECOMMENDED BY:
DATE
JOHN GROBOSKI
DATE DATE
CHIEF, DESIGN SECTION
JOHN GROBOSKI, P.E.
N/A
ATR TEAM LEADER
N/A, P.E.
N/A
PROJECT MANAGER
N/A
W P -2
-C -0
X
X
W912P6-21-C-00XX
C H
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
W P -2
-B -0
X
X
J U
L Y
CHICAGO, ILLINOIS
POWER DISTRIBUTION UPGRADE
CHICAGO HARBOR LOCK
W912P6-21-B-00XX
JULY 2021
G -0
.d g n
-6
G B
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
Y
E L
E F F
L E
R P
E F
A Y
E L
E F F
L E
R
O
V E
R S
H E
E T S
C O
V E
R S
H E
E T S
NN NN
LOCATION MAP VICINITY MAP
(N.T.S.) (N.T.S.)
SHEET INDEX
SHEET SHEET TITLE
NUMBER REFERENCE
1. G-001 LOCATION, VICINITY MAP AND SHEET INDEX
2. G-002 LEGEND, ABBREVIATIONS AND SYMBOLS
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
ES-102
E-301
ES-104
ED-101
ED-102
CS-001
G-003 LEGEND AND SYMBOLS
ELECTRICAL SITE PLAN 2 OF 4
ES-103 ELECTRICAL SITE PLAN 3 OF 4
ELECTRICAL SITE PLAN 4 OF 4
DUCT BANK SECTIONS
OVERALL SITE PLAN
ELECTRICAL DEMOLITION PLAN 1 OF 3
ELECTRICAL DEMOLITION PLAN 2 OF 3
E-601 PROJECT PARTIAL ONE LINE DIAGRAM
ES-101 ELECTRICAL SITE PLAN 1 OF 4
STRUCTURAL CONCRETE PAD DETAILSSS-501
ED-103 ELECTRICAL DEMOLITION PLAN 3 OF 3
14.
15.
16.
CS-002 OVERALL SITE PLAN - WORK LIMITS AND STAGING
E-901
E-902
ROUTING PLAN PICTURES 1
ROUTING PLAN PICTURES 2
17.
18.
19.
of Engineers
US Army Corps
ES-001 GENERAL NOTES
T
IM
M
O Y
A T
IM
M
O Y
A
L A
U R
A V
A N
D E
N B
E R
G L
A U
R A V
A N
D E
N B
E R
G
V-101 SURVEY CONTROL AND BENCHMARKS
E-302 EXISTING CONDITIONS
20.
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:36:29 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_G-002.dgn
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S I
D
G-002
G-002
K P
C
A N
S I
D
G-002
K P
C C
H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
ABBREVIATIONS
COURSE(S)CRS
CROSS GRAINCRG
CORROSIVE RESISTANT STEELCRES
CIRCUMFERENCECRCMF
CARPETCPT
COMPRESSIBLECPRS
COVERCOV
CORRIDORCORR
CONTRACTORCONTR
CONTINUE CONT
CONSTRUCTIONCONSTR
CONNECTCONN
CONCRETECONC
COMPARTMENTCOMPT
COMBUSTIONCOMB
COMMONCOM
COLUMNCOL
CARBON DIOXIDECO2
CLEANOUTCO
COUNTERCNTR
CORNERCNR
CONDUCTIVE NEOPRENE LATEXCNL
CONDUITCND
CONCRETE MASONRY UNITCMU
COMPOSITECMPST
CORRUGATED METAL PIPECMP
CENTIMETER(S)cm
CLEAR WIRED GLASSCLWG
CLEAR(ANCE)CLR
CLOSURECLOS
CLOSETCLO
CONTRACT LIMIT LINECLL
CLEAR GLASSCLGL
CEILING HEIGHTCLG HT
CEILINGCLG
CENTER LINECL
CIRCUIT BREAKERCKT BRKR
CIRCUITCKT
CONSTRUCTION JOINTCJ
CONTROL JOINTCJ
CIRCULARCIRC
CAST-IN-PLACECIP
CURB INLETCI
CAST IRONCI
CHROME PLATEDCHR PL
CHECKCHK
CHIMNEYCHIM
CHAMFERCHFR
CHALKBOARDCH BD
CORNER GUARDCG
CUBIC FEET PER MINUTECFM
COUNTERFLASHINGCFLG
CONDUCTIVE FLOORINGCFI
CERAMICCER
CEMENT PLASTERCEM PLAS
CEMENTCEM
COVER ELEVATIONCE
CLOSED CIRCUIT TELEVISIONCCTV
CUBICLE CURTAIN TRACKCCT
CATCH BASINCB
CAPACITYCAP
CABINETCAB
BOTH WAYSBW
BUILT-UP ROOFINGBUR
BETWEENBTWN
BTU PER HOURBtuH
BRITISH THERMAL UNITBtu
BASEMENTBSMT
BOTH SIDESBS
BRONZEBRZ
BRACKETBRKT
BRICKBRK
BEARING PLATEBRG PL
BEARINGBRG
BRIDGINGBRDG
BRACINGBRCG
BACK PLASTER(ED)BP
BOTTOMBOT
BOTTOM OFBO
BENCHMARKBM
BELOWBLW
BUILDINGBLDG
BUILDING LINEBL
BED JOINTBJT
BITUMINOUSBITUM
BEVELBEV
BRICK EXPANSION JOINTBEJ
BOUNDARYBDRY
BOARDBD
BOOKCASEBC
BULLETIN BOARDBB
ACOUSTICAL WALL TREATMENTAWT
AMERICAN WIRE GAUGEAWG
AVERAGEAVG
AUTOMATICAUTO
ACOUSTICAL TILE CEILINGATC
ASPHALTASPH
ABOVE SUSPENDED CEILINGASC
ASBESTOSASB
AMERICAN REFRIGERATION INSTITUTEARI
ARCHITECTARCH
APPROXIMATEAPPROX
APPROVEDAPPD
AMERICAN NATIONAL STANDARDS INSTITUTEANSI
ANODIZEANOD
AMPEREAMP
AMBIENTAMB
ALUMINUMALUM
ALTERNATEALT
ACTIVE LEAFA.L.
AMERICAN INSTITUTE OF STEEL CONSTRUCTIONAISC
AMPERE INTERRUPTING CAPACITYAIC
AREA INLETAI
AIR HANDLING UNITAHU
ANCHOR AHR
AGGREGATEAGGR
ABOVE FINISHED FLOORAFF
AUTOMATIC DOOR OPERATORADO
ADJACENT, ADJOINING, ADJUSTABLEADJ
ADHESIVEADH
ADDENDUMADDM
ACOUSTICAL CEILING TILEACT
ACOUSTICACST
ALUMINUM CABLE STEEL REINFORCEDACSR
ACCESS PANELACS PNL
ACCESS DOORACS DR
ACRYLIC PLASTICACR
AMERICAN CONCRETE INSTITUTEACI
ACCESSIBLEACC
ALTERNATING CURRENTAC
ABOVEABV
ANCHOR BOLTAB
AIR CONDITIONING UNITA/C UNIT
AIR CONDITIONINGA/C
ANGLEL
FRAMINGFRMG
FORGEDFRG
FRAMEFR
FIRE RESISTANT FR
FEET PER MINUTEFPM
FIREPROOFFP
FIRE PARTITIONFP
FACE OF STUDFOS
FACE OF MASONRYFOM
FACE OF FINISHFOF
FACE OF CONCRETEFOC
FENCEFN
FLUORESCENTFLUOR
FLOOR PLATEFLR PL
FLOORINGFLG
FLEXIBLEFLEX
FLOORFLR
FLASHINGFLASH
FLUSH JOINTFJT
FIXTUREFIXT
FINISH FLOORFIN FLR
FINISHFIN
FIGUREFIG
FLAT HEAD WOOD SCREWFHWS
FIRE HOSE STATIONFHS
FIRE HOSE RACKFHR
FLAT HEAD MACHINE SCREWFHMS
FIRE HOSE CABINETFHC
FLAT HEADFH
FIRE HYDRANTFH
FIBERGLASSFGL
FACTORY FINISHFF
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHER BRACKETFEB
FIRE EXTINGUISHERFE
FOUNDATIONFDTN
FIRE DAMPERFDMPR
FLOOR DRAINFD
FAN COIL UNITFCU
FLOOR CLEANOUTFCO
FLOOR CONSTRUCTION JOINTFCJ
FACINGFCG
FACE BRICKFC BRK
FOOT CANDLEFC
FIRE BRICKF BRK
FRESH AIR INTAKEFAI
FIRE APPARATUS CLOSETFAC
FRESH AIRFA
FIRE ALARMFA
FAHRENHEITF
EXTERIOREXT
EXPANSION BOLTEXP BT
EXPOSEDEXP
EXPANSIONEXP
EXISTINGEXST
EXHAUST AIREXH A
EXHAUSTEXH
EXCAVATEEXC
ENTERING WATER TEMPERATUREEWT
ELECTRIC WATER COOLEREWC
ESTIMATE(D)EST
ESCALATORESCAL
EQUIPMENTEQUIP
EQUALEQ
EPOXY COATINGEPY
EXPLOSION PROOFEPRF
ELECTRICAL PANELBOARDEP
ENTRANCE, ENTERINGENTR
ENCLOSE(URE)ENCL
EMERGENCYEMER
ESTIMATED MAXIMUM DEMANDEMD
EXPANDED METAL EM
ELECTRICELEC
ELEVATION - GRADE OR BUILDINGEL
EXPANSION JOINTEJ
EACH FACEEF
ENTERING AIR TEMPERATUREEAT
EACHEA
EASTE
DIRECT EXPANSIONDX
DUMBWAITERDWTR
DRAWERDWR
DOWELSDWLS
DRAWINGDWG
DOVETAIL DVTL
DRAIN TILEDT
DOWNSPOUTDS
DOUBLE STRENGTH (GLASS)DS
DOOR CLOSERDR CL
DRAINBOARDDRB
DRAINDR
DOORDR
DOWNDN
DEMOUNTABLEDMT
DAMPERDMPR
DAMPPROOFINGDMPF
DEAD LOADDL
DIVISIONDIV
DISTRIBUTION PANELDISTR PNL
DISPENSERDISP
DISCONNECTDISC
DIMENSIONDIM
DIAGONALDIAG
DIAMETERDIA
DUCT HEATERDH
DOUBLE HUNGDH
DRINKING FOUNTAINDF
DETAILDET
DEPARTMENTDEPT
DEPRESSIONDEPR
DEMOLITIONDEMO
DEGREEDEG
DUMMY CONTROL JOINTDCJT
DOWELED CONTROL JOINTDCJ
DOUBLE ACTING DOORDBL ACT DR
DOUBLEDBL
DRY BULBDB
DATUMDAT
PENNY (AS IN NAIL - 10D)d
CYLINDERCYL
COLD WATERCW
CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)CVH
CEILING VENTCV
CUBIC YARDSCU YD
CABINET UNIT HEATERCUH
CUBIC FEETCU FT
COPPERCu
CONDENSING UNITCU
CENTERCTR
CENTER TO CENTERC TO C
CURRENT TRANSFORMERCT
CERAMIC TILECT
CASEMENTCSMT
COUNTERSUNKCSK
CAST STONECS
LIGHTINGLTG
LIGHTWEIGHTLT WT
LIGHTLT
LAWN SPRINKLERLS
LIVING ROOMLR
LOW POINTLPT
LIGHTPROOF LOUVERLPL
LIGHTPROOF DOORLPD
LIGHTPROOFLP
LONGITUDINALLONG
LINTELLNTL
LIMESTONELMST
LUMENLM
LEAD-LINED DOORLLD
LIVE LOADLL
LOCKERLKR
LINEARLIN
LEFT HAND(ED)LH
LENGTHLG
LOADINGLDG
LOADLD
LIGHT CONTROLLC
LUMBERLBR
LABELLBL
POUNDLB
LAG BOLTLB
LAVATORYLAV
LAUNDRYLAU
LEAVING AIR TEMPERATURELAT
LAMINATELAM
LADDERLAD
LABORATORYLAB
KEYWAYKWY
KILOWATTkW
KILOVOLT AMPERES REACTIVEkVAR
KILOVOLT AMPERESkVA
KILOVOLTSkV
KICKPLATEKPL
KNOCKOUT PANELKOP
KITCHENKIT
KILOPOUND (1000 POUNDS)KIP
JOINTJT
JOISTJST
JUNCTIONJCT
JUNCTION BOXJ-BOX
JANITOR’S CLOSETJAN CLO
INSIDE PIPE SIZEI.P.S.
IRON PIPE SIZEIPS
IRON PIPEIP
INVERTINV
INTERMEDIATEINTM
INTERIORINT
INSULATIONINSUL
INSULATING FILLINSF
INCLUDEDINCL
INCINERATORINCIN
INCHIN
INTERLOCKILK
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICAIESNA
INSIDE DIAMETERID
INTERCOMIC
HERTZHz
HYDRAULICHYDR
HEATING, VENTILATING AND AIR CONDITIONINGHVAC
HEATERHTR
HEATINGHTG
HEIGHTHT
HOUSEKEEPINGHSKPG
HIGH-STRENGTH GYPSUM PLASTERHSGYP
HIGH STRENGTHHS
HOURHR
HIGH POINTHPT
HORSEPOWERHP
HIGH PRESSUREHP
HORIZONTALHORIZ
HANDRAILHNDRL
HOLLOW METALHM
HOOK(S)HK
HANDHOLEHH
HEXAGONHEX
HIGH EARLY-STRENGTH CEMENTHES
HARDWOODHDWD
HARDWAREHDW
HEADERHDR
HEAD JOINTHD JT
HARDBOARDHDBD
HEAVY DUTYHD
HEADHD
HANDICAPPEDHCP
HALON CONTAINMENT DAMPERHCD
HOLLOW COREHC
HOSE BIBBHB
GYPSUM PLASTERGYP PLAS
GYPSUM BOARDGYP BD
GYPSUMGYP
GLAZED WALL TILEGWT
GROUTGT
GLAZED STRUCTURAL UNITSGSU
GLAZED STRUCTURAL TILEGST
GRATINGGRTG
GRADE LINEGR LN
GRANITEGRAN
GYPSUM TILEGPT
GALLONS PER MINUTEGPM
GOVERNMENTGOVT
GROUNDG
GLAZED CONCRETE MASONRY UNITSGLZ CMU
GLAZINGGLZ
GLASS FIBERGLF
GLASS BLOCKGL BLK
GLASSGL
GASKET(ED)GKT
GALVANIZED IRON PIPEGIP
GALVANIZED IRONGI
GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLEDGFE/CI
GOVERNMENT-FURNISHED EQUIPMENTGFE
GROUND FAULT CIRCUIT INTERRUPTERGFCI
GROUND FACEGF
GENERALGEN
GENERAL CONTRACTORGC
GRAB BARGB
GALVANIZED STEELGALV STL
GALVANIZEDGALV
GALLON(S)GAL
GAGEGA
NATURAL GASG
FABRIC WALL COVERINGFWC
FIRE WATERFW
FUTUREFUT
FURRINGFURG
FOOTINGFTG
FEETFT
FASTEN(ER)FSTNR
FULL SIZEFS
FIRE-RETARDANTFRT
PRESTRESSED CONCRETEPS CONC
PRESSED STEELP.S.
PIPE SPACEPS
PRESSURE-REGULATING VALVEPRV
PROJECTPROJ
PARKINGPRKG
PREFORMEDPREFMD
PREFINISHEDPREFIN
PREFABRICATE(D)PREFAB
PAIRPR
PARTS PER MILLIONPPM
POLISHED PLATE GLASSPPGL
PORTABLEPORT
PORCELAINPORC
POLISHEDPOL
PAINT(ED)PT
PANELPNL
PLYWOODPLYWD
PLATE GLASSPL GL
PILINGPLG
POUNDS PER LINEAR FOOTPLF
PLUMBINGPLBG
PLATFORMPLAT
PLASTERPLAS
PLASTIC LAMINATEPLAM
PROPERTY LINEPL
PLATEPL
POST INDICATING VALVEPIV
PREFAB ISOLATION POWER UNITPIPU
POINT OF INTERSECTIONPI
PHARMACYPHAR
PHASEPH
PERIMETERPERIM
PERFORATE(D)PERF
PEDESTALPED
PAVEMENT DRAINPD
CEMENT PLASTER (PORTLAND)PCP
POUNDS PER CUBIC FOOTPCF
PRECAST CONCRETEPCC
PIECEPC
PUSH BUTTON STATIONPBS
PARTICLE BOARDPBD
PANIC BARPB
PARALLELPAR
PUBLIC ADDRESSPA
POLEP
OBSCURE WIRED GLASSOWGL
OUTSIDE SCREW AND YOKEOS & Y
OPERATIONSOPS
OPAQUEOPQ
OPPOSITEOPP
OPENINGOPNG
OPPOSITE HANDOPH
OVALHEAD WOOD SCREWOHWS
OVALHEAD MACHINE SCREWOHMS
OVERHEADOH
OBSCURE GLASSOGL
OFFICEOFC
OUTSIDE DIAMETEROD
ON CENTER EACH WAYOCEW
ON CENTEROC
OBSERVATION WINDOWOBW
OBSCUREOBSC
OUTSIDE AIROA
NOT TO SCALENTS
NOT REQUIREDN’’REQD
NOISE REDUCTION COEFFICIENTNRC
NOISE REDUCTIONNR
NOMINALNOM
NUMBERNO
NORMALLY OPENNO
NONMETALLICNM
NEOPRENE LATEXN.L.
NAILABLENL
NOT IN CONTRACTNIC
NICKELNi
NATIONAL FIRE PROTECTION ASSOCIATIONNFPA
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNEMA
NATIONAL ELECTRICAL CODENEC
NORMALLY CLOSEDNC
NATURALNAT
NORTHN
MULLIONMULL
MOVABLEMVBL
METALMTL
METAL FURRINGMTFR
MOUNTEDMTD
MOUNTMT
METAL THRESHOLDMT
MACHINE SCREWSMS
METAL ROOF DECKINGMRD
MARBLE BASEMRB
MOP RECEPTORMR
MOVABLE PARTITIONMP
MOTORMOT
MODIFIEDMOD.
MODULARMOD
MASONRY OPENINGMO
MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)MNIC
MILLIMETER(S)mm
MILLWORKMLWK
MOULDINGMLDG
MONOLITHICML
METAL LATHML
MISCELLANEOUSMISC
MIRRORMIRR
MINIMUMMIN
MALLEABLE IRONMI
MANHOLEMH
MATTE-GLAZED TILEMGT
MOTOR GENERATORMG
MANUFACTURERMFR
MANUFACTURINGMFG
METAL FLOOR DECKINGMFD
METAL EDGE STRIPMES
MEMBRANEMEMB
MEDIUMMED
MECHANICAL ROOMMECH RM
MECHANICALMECH
METAL DIVIDER STRIPMDS
METAL-CASED OPENINGMCO
MASONRY CONTROL JOINTMCJ
MEDICINE CABINETMC
MEMBERMBR
MACHINE BOLTSMB
MAXIMUMMAX
MATERIAL(S)MATL
MASONRYMAS
MACHINEMACH
MATCHED AND BEADEDM&B
METER(S)m
LEAVING WATER TEMPERATURELWT
LIGHTWEIGHT CONCRETELWC
LOUVERLVR
LIGHTNINGLTNG
THICK(NESS)THK
TRUSS HEADTH
TOGGLETGL
TONGUE AND GROOVET&G
TERMINALTERM
TERRAZZOTER
TEMPORARYTEMP
TEMPERATURETEMP
TELEPHONETEL
TERRA COTTATC
TOWEL BARTB
TANGENTTAN
TREADT
SYSTEMSYS
SYNTHETICSYNTH
SYMMETRICALSYMM
SWITCHBOARDSWBD
SWITCHSW
SHEET VINYL SV
SUSPENDEDSUSP
SUBFLOORSUB FL
STAIRWAYSTWY
STRUCTURALSTRUCT
STRINGERSTR
STATIC PRESSUREST PR
STORAGESTOR
STEELSTL
SEATINGSTG
STANDARDSTD
STATIONSTA
STAINLESS STEELSST
STANDING SEAM (ROOF)SS
SERVICE SINKSS
SHELF AND RODS&R
SQUARE HEADSQHD
SQUARESQ
SPEAKERSPKR
SPACE HEATERSPH
SPECIAL FINISHSP FIN
SOUNDPROOFSPF
SPECIFICATIONSPEC
SOUNDPROOF DOORSPD
SPECIALSPCL
SPACERSPC
SHUT OFF VALVESOV
SHEET METAL SCREWSSMS
SHEET METALSM
SLEEVESLV
SEALANTSLNT
SKYLIGHTSKLT
STEEL JOIST INSTITUTESJI
SIMILARSIM
SHELVINGSHV
SHEATHINGSHTHG
SHEETSHT
SHOULDERSHLDR
SHEET GLASSSG
STRUCTURAL FACING UNITSFU
STRUCTURAL FACING TILE UNITSFTU
SAFETY GLASSSFGL
SEQUENCESEQ
SECTIONSECT
STEEL DOOR INSTITUTESDI
STORM DRAINSD
STRUCTURAL CLAY TILESCT
SCREENSCRN
SCHEDULESCHED
SOLID CORESC
SECURITY BARSS.B.
SPLASH BLOCKSB
SUPPLY AIRSA
SOUTHS
RAINWATER CONDUCTORRWC
RIVETRVT
REVERSERVS
RUBBER TILE FLOORRTF
RAISED PATTERN RUBBER TILERPRT
REVOLUTIONS PER MINUTERPM
RETRACTABLE PARTITIONRP
RIGHT OF WAYROW
ROUGH OPENINGRO
ROUNDRND
ROOMRM
RAILINGRLG
RACKRK
ROOF HATCHRH
RIGHT HANDRH
RELATIVE HUMIDITYRH
ROOFINGRFG
REVISIONREV
RETURNRET
RESILIENTRESIL
REQUIREDREQD
REMOVE(ABLE)REM
REINFORCEREINF
REGLETREG
REGISTERREG
REFRIGERATIONREFR
REFLECTREFL
REFERENCEREF
RECTIFIERRECT
RECREATION ROOMREC ROOM
RECEPTACLERECPT
RIGID INSULATIONRDG INS
ROOF DRAINRD
RECEIVERRCVR
REINFORCED CONCRETE PIPERCP
REMOTE CONTROLRC
RUBBERRBR
RUBBLE STONERBL
RUBBER BASE, RESILIENT BASERB
RETURN AIR REGISTERRAR
RETURN AIR GRILLERA GR
RABBETEDRAB
RETURN AIRRA
RISERR
RANGER
RADIUSR
QUANTITYQTY
QUARTER ROUND1/4 RND
QUARTERQTR
QUARTQT.
QUARRY TILEQT
PASS WINDOWPW
PAVINGPVG
POLYVINYL CHLORIDEPVC
PAVEDPV
PAPER TOWEL RECEPTACLEPTR
PARTITIONPTN
PAPER TOWEL DISPENSERPTD
POST-TENSIONED CONCRETEPT CONC
POINTPT.
PNEUMATIC TUBEPT
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
YARD DRAINYD
YARDYD
TRANSFORMERXFMR
WELDED WIRE REINFORCEMENTWWR
WELDED WIRE MESHWWM
WELDED WIRE FABRICWWF
WALL TO WALLW/W
WIDTHWTH
WEIGHTWT
WAINSCOTWSCT
WASTE STACKW.S.
WATERSTOPWS
WARDROBEWRB
WASTE RECEPTACLEWR
WORKING POINTWP
WEATHERPROOFWP
WATERPROOF(ING)WP
WITHOUTW/O
WIRE MESHWM
WORK SHOPWKSH
WROUGHT IRONWI
WATT-HOUR METERWHM
WHEEL BUMPERWHB
WATER HEATERWH
WALL HUNGWH
WIRED GLASSWGL
WIDE FLANGEWF
WINDOWWDW
WASTE DISPOSERWDSP
WOOD DOORWD
WOODWD
WOOD-CASED OPENINGWCO
WHEELCHAIRW/C
WATER CLOSETWC
WOOD BLOCKINGWBL
WET BULBWB
WITHW/
WESTW
VINYL WALL COVERINGVWC
VENT THRU ROOFVTR
VOLTAGE TRANSFORMERV.T.
VENT STACKVS
VERMICULITEVRM
VAPOR RETARDERVR
VOLUMEVOL
VENEERVNR
V-JOINT(ED)VJ
VINYL HOMOGENEOUSVH
VERTICAL GRAINVG
VINYL FABRICVF
VESTIBULEVEST
VERTICALVERT
VENTILATOR(TION)VENT
VAULT DOORVD
VITRIFIED CLAY TILEVCT
VINYL COMPOSITION TILEVCT
VINYL BASEVB
VARNISHVAR
VOLTV
UNIT VENTILATORUV
UTILITYUTIL
URINALUR
UNINTERRUPTABLE POWER SUPPLYUPS
UNFINISHEDUNFIN
UNEXCAVATEDUNEX
UNDERWRITERS LABORATORIESUL
UNIT HEATERUH
UNDERGROUNDUGND
UNIT COOLERUC
TYPICALTYP
TELEVISIONTV
THERMOSTATTSTAT
TRANSVERSETRANS
TRANSOMTRANS
TOILET PARTITIONTPTN
TOILET PAPER DISPENSERTPD
TOP OF WALLTOW
TOP OF STEELTOS
TOP OF SLABTOS
TOPOGRAPHYTOPO
TOLERANCETOL
TOP OFTO
TACKSTRIPTKS
TACKBOARDTK BD
THRESHOLDTHRES
A B
B R
E V
IA
T
IO
N S
A B
B R
E V
IA
T
IO
N S
W P -2
-C -0
X
X
F A
Y E L
E F F
L E
R
J U
L Y
F A
Y E L
E F F
L E
R
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
W P -2
-B -0
X
X
J U
L Y
F A
Y E L
E F F
L E
R
B
B R
E V
IA
T
IO
N S
G -0
.d g n
-6
G B
L A
U R
A V
A N
D E
N B
E R
G L
A U
R A V
A N
D E
N B
E R
G L
A U
R A V
A N
D E
N B
E R
G
T
IM
M
O Y
A T
IM
M
O Y
A T
IM
M
O Y
DIRECTION OF CUT
DETAIL IS SHOWN
SHEET WHERE
SECTION IS SHOWN
SHEET WHERE
OF DETAIL
GRID LETTER/NUMBER
SECTION
GRID LETTER/NUMBER OF
GRID LETTER/NUMBER
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
2:36:39 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_G-003.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
G-003G-003
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
G-003
LEGEND
STORM MANHOLE
WATER MANHOLE
FENCE
STANDARD ABBREVIATIONS
MONITORING WELL
WATER VALVE VAULT
FIRE HYDRANT
CATCH BASIN
WATER LEVEL
ELECTRIC HANDHOLE
GUY WIRE
WORK POINTWP
WORK LIMITWL
WELL POINTSWLP
VERTICALV
VERIFY IN FIELDVIF
TYPICALTYP.
STEEL SHEET PILESSP
REINFORCED CONCRETE PIPERCP
PIPE SLOPES
OCEAN SURVEYS, INC.OSI
NOT TO SCALENTS
NORTH AMERICAN VERTICAL DATUMNAVD
NATURAL WATER LINENWL
NATIONAL GEODETIC VERTICAL DATUMNGVD
MONITORING WELLMW
MINIMUMMIN
MANHOLEMH
LOCAL CONTROL PANELLCP
ILLINOIS DEPARTMENT OF TRANSPORTATIONIDOT
HORIZONTALH
HIGH WATER ELEVATIONHWL
GRATED MANHOLEG.M.H.
GRATE DRAING.D.
GRADE AT FOUNDATIONGF
FIRE HYDRANTFH
FINISH FLOORFF
EXTRACTION WELLEN
EXPANSION JOINTEJ
ELEVATIONELEV
ELECTRICAL MAN HOLEEMH
ELECTRICAL HAND HOLEEHH
DUCTILE IRON PIPED.I.P.
DIGITAL TERRAIN MODELDTM
DIAMETER AT BREAST HEIGHTDBH
DIAMETERDIA.
CORRUGATED METAL PIPECMP
CORPS OF ENGINEERSCOE
CONTRACTING OFFICER'S REPRESENTATIVECOR
CONSTRUCTION JOINTCJ
CENTERLINECL
CATCH BASINCB
ARMY CORPS OF ENGINEERSACOE
TREE
TELEPHONE LINE
LINE STYLES
SYMBOLS
WATER DOMESTIC MAIN
STORM DRAIN
-10 DESIGN CONTOUR
EXISTING CONTOUR-11
ELECTRICAL MANHOLE UTILITY POLE
CATCH BASIN ROUND
DETAIL INDICATOR
X# SCALE:
DRAWING AREA TITLE
TRIANGULATION POINT
SECTION INICATOR
W.L. AT '( )
ELECTRICAL PRIMARY
ELECTRICAL SECONDARY
DRAWING AREA TITLE INDICATOR
GAS LINE
CONDUITS
GENERAL NOTES
SANITARY FORCE MAIN
WATER MAIN
TELECOMFIBER OPTIC
LIGHT FIXTURE
WATER (PUBLIC MAIN)
RIPRAP GRAVEL PATH
EXISTING EASEMENT
CONSTRUCTION WORK LIMITS
F A
Y E L
E F F
L E
R P
E
L E
G E
N D
S A
N D S
Y M
B O
L S
K P
C
A N
S I
D
F A
Y E L
E F F
L E
R P
E
L E
G E
N D
S A
N D S
Y M
B O
L S
K P
C
W P -2
-C -0
X
X
A N
S I
D
F A
Y E L
E F F
L E
R P
E
L E
G E
N D
S A
N D S
Y M
B O
L S
K P
C
J U
L Y
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
W P -2
-B -0
X
X
J U
L Y
-6
G B
G -0
.d g n
CONDITIONS AT THE COMPLETION OF WORK.
12. ALL STAGING, STORAGE AND TEMPORARY EASEMENT AREAS SHALL BE RESTORED TO PRE-CONSTRUCTION GRADE AND
11. NO BURNING OR INCINERATION OF RUBBISH WILL BE PERMITTED ON THE SITE
10. ALL WORK SHALL BE PERFORMED IN ACCORDACE WITH EM 385-1-1, DATED 30 NOVEMBER 2014.
BE REPLACED IN KIND AT NO COST TO THE GOVERNMENT.
FACILITY WHICH IS REMOVED TO ACCOMMODATE CONSTRUCTION ACTIVITIY OR DAMAGED DURING CONSTRUCTION ACTIVITIY SHALL
SHALL BE REPLACED TO THE SATISFACTION OF THE OWNER AND AT NO COST TO THE GOVERNMENT. ANY PAVEMENT, UTILITY, OR OTHER
9. EXISTING STRUCTURES, SIGNAGE, AND OTHER FACILITIES TO REMAIN SHALL BE PROTECTED FROM DAMAGE AND IF DAMAGED, WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL LAWS AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. THE CONTRANCTOR SHALL BE RESPONSIBLE FOR DISPOSING OF EXCAVATED MATERIALS AND CONSTRUCTION DEBRIS OFF-SITE IN STRICT ACCORDANCE
DURING CONSTRUCTION.
7. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT OF ANY SUBSURFACE UTILITY OR OTHER PIPE NOT SHOWN ON THE DRAWINGS THAT IS ENCOUNTERED
REPLACEMENT COSTS OF UTILITIES DAMAGED DURING CONSTRUCTION WHETHER ABOVE OR BELOW GRADE AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORT AND PROTECTION OF EXISTING UTILITIES AND STRUCTURES, AS WELL AS REPAIR AND/OR
ON THAT ACCOUNT SHOULD THERE BE OTHER THAN SHOWN.
LINES SHOWN ON THESE PLANS ARE NOT WARRENTED TO BE EXACT, NOR IS IT WARRENTED THAT ALL ARE SHOWN. THE CONTRACTOR SHALL HAVE NO CLAIM
THE LOCATION, SIZE, AND MATERIAL OF EXISTING PIPES, DUCTS, CONDUITS AND OTHER UNDERGROUND STRUCTURES AND THE LOCATION OF PROPERTY
TO PROCEED VIA THE FOLLOWING INFORMATION
LOCATIONS AT LEAST TWO (2) BUSINESS DAYS, BUT NOT MORE THAN FOURTEEN (14) BUSINESS DAYS PRIOR TO CONSTRUCTION AND AFTER NOTICE
5. THE CONTRACTOR SHALL CONSULT WITH ALL UTILITY SYSTEM OWNERS ON SITE. CONTRACTOR SHALL VERIFY PIPELINE
4. HORIZONTAL DATUM AND DISTANCES ARE REFERENCED TO TEXAS STATE PLANE, NAD83, ILLINOIS STATE PLANE EAST, U.S. SURVEY FEET.
3. ELEVATIONS ARE REFERENCED TO NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) USING GEOID12B, U.S. SURVEY FEET.
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER’S AUTHORIZED REPRESENTATIVE OF ANY SIGNIFICANT DISCREPANCIES.
2. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRCTOR SHALL FIELD VERIFY ALL DIMENSIONS, LOCATIONS AND ELEVATIONS.
PERMITS SHALL BE OBTAINED AS REQUIRED PRIOR TO COMMENCING WITH CONSTRUCTION.
1. THE CONTRACTOR SHALL FOLLOW ALL GOVERNING REGULATIONS AND SHALL OBTAIN ALL NECESSARY PUBLIC AGENCY PERMITS.
L A
U R
A V
A N
D E
N B
E R
G
T
IM
M
O Y
A T
IM
M
O Y
A
L A
U R
A V
A N
D E
N B
E R
G
T
IM
M
O Y
A
L A
U R
A V
A N
D E
N B
E R
G
X-###
X#
X-###
X#
MW
H
W CB
D
W
CB
LOCK PARKING LOT
CHICAGO HARBOR
GATE
WEST SECTOR
CONTROL HOUSE
CHICAGO LOCK
GATE
EAST SECTOR
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
2:36:48 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_V-001.dgn
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
NAVD88
IL EAST NAD83 STATEPLANE COORDINATES
BRASS DISK
BRASS DISK
HORIZONTAL & VERTICAL CONTROL POINTS
POINT
NORTHING (Y) EASTING (X)
DESCRIPTION
ELEV.
C-7 1,903,091.14 1,181,013.77
MSD-2 1,903,071.19 1,180,873.46
GENERAL NOTES
N
NAVY PIER
ILLINOIS STREET
L A
K E S
H O
R E D
R
IV
E
C-7
100 0 100 200
SCALE IN FEET
GRAND AVE.
MSD-2
5. CONVERSION FROM NAVD88 - 579.18 = CCD
TO NGS PIDS ME3251 (A.K.A. C-7), ME3260 (A.K.A. MSD-2).
4. ALL HORIZONTAL AND VERTICAL CONTROL POINTS ARE REFERENCED
VERTICAL DATUM OF 1988 (NAVD88) U.S. FEET.
3. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE NORTH AMERICAN
OF 1983 (NAD83) U.S. FEET.
PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM
2. ALL COORDINATES SHOWN ARE REFERENCED TO THE ILLINOIS STATE
TIME OF BIDDING, AND INCLUDE COST ACCORDINGLY IN THE BID.
NECESSARY ACTIONS TO ASSESS THE EXISTING CONDITIONS AT THE
DIFFER FROM THOSE SHOWN. THE CONTRACTOR SHALL TAKE ALL
TIME. EXISTING CONDITIONS DURING CONSTRUCTION MAY VARY AND
CHICAGO DISTRICT AND REPRESENTS CONDITIONS EXISTING AT THAT
2015 SURVEY PERFORMED BY US ARMY CORPS OF ENGINEERS,
1. THE CONTROL POINTS SHOWN ON THIS SHEET ARE FROM AN JUNE
588.024
582.576
CHI-LOCK-8
1,181,818.99 586.100 BRASS DISKCHI-LOCK-8 1,902,805.29
W P -2
-C -0
X
X
J U
L Y
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
C H
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
W P -2
-B -0
X
X
J U
L Y
-6
G B
V -0
.d g n
A N
S I
D A
N S I
D
S U
R V
E Y C
O N
T R
O L A
N D B
E N
C H
M A
R K
S
V-001
S U
R V
E Y C
O N
T R
O L A
N D B
E N
C H
M A
R K
S
V-001
S U
R V
E Y C
O N
T R
O L A
N D B
E N
C H
M A
R K
S
V-001
J O
H N E
N N
IS
K E
N N
E T
H C
L A
IR
S C
O T
T M
A R
S H
A L L
J O
H N E
N N
IS
J O
H N E
N N
IS
K E
N N
E T
H C
L A
IR
J O
H N E
N N
IS
S C
O T
T M
A R
S H
A L L
J O
H N E
N N
IS
K E
N N
E T
H C
L A
IR
J O
H N E
N N
IS
S C
O T
T M
A R
S H
A L L
RIVER WALL
LIGHT POLE
CONDUCTORS
CONDUCTORS AND CONTROL
NEW GENERATOR POWER
EXISTING 1-4", 1-2" RIGID CONDUIT FOR
NEW CONCRETE PAD
NEW GENERATOR SET W/
NEW FUEL STORAGE TANK
TO BE REMOVED
EXISTING GENERATOR
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
CHICAGO RIVER
LAKE MICHIGAN
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_CS-001.dgn
2:37:13 PM 7/7/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
GENERAL NOTES
A1
SITE PLAN
S I
D
W P -2
-B -0
O J E
C T I
C S -0
.d g n
IC
A G
O
IL
L
IN
O
IS
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
CS-001
K P
C
-6
G B
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
O V
E R
A L L S
IT
E P
L A
N
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
J U
L Y
SCALE: N.T.S.
T
IM
M
O Y
A
L A
U R
A V
A N
D E
N B
E R
G
R A
N A M
IS
H
R A
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
LAKE MICHIGAN
CHICAGO RIVER
N STREETER DR
LAKEFRONT TRAIL
P A
R K D
R
P A
R K D
R
E GRAND AVE
CHICAGO MARINE
SAFTEY STATION
LAKE MICHIGAN
NAVY PIER
CHICAGO HARBOR LOCK CHAMBER
E ILLINOIS ST
Y=1902890.47
X=1181771.57
GATE ACCESS
ACCESS ROUTE TO STAGING AREA
PARKING LOT
CHICAGO LOCK
STAGING AREA/
WORK LIMITS
TO CHICAGO LOCK CHAMBER
LAND BASE ACCESS ROUTE
GRAVEL ROAD
NORTH PIER
SLUICE GATES
SL01 SL02
SL03
SL04
WL02
WL03
WL01
WL04
WL05
WL06
C-7
MSD-2
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
2:37:22 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_CS-002.dgn
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
A1
SCALE: 1" = 100'
NORTH
PLAN
100' 200'0
SITE ACCESS, STAGING & MOORING AREAS
GENERAL NOTES
ILLINOIS STATE PLANE EAST NAD83
WORK LIMITS
CHICAGO LOCK CHAMBER
WL06
WL05
WL04
WL03
WL02
WL01
POINT
J U
L Y
J U
L Y
W P -2
-B -0
X
X
COORDINATES
ILLINOIS STATE PLANE EAST NAD83
STAGING LIMITS
CHICAGO LOCK CHAMBER
SL04
SL03
SL02
SL01
POINT
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
-6
G B
C S -0
.d g n
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
W O
R K L
IM
IT
S A
N D A
C C
E S
S W
O R
K L
IM
IT
S A
N D A
C C
E S
S W
O R
K L
IM
IT
S A
N D A
C C
E S
S
CS-002CS-002CS-002
S
IT
E P
L A
N
K P
C
A N
S I
D
S
IT
E P
L A
N
K P
C
A N
S I
D
S
IT
E P
L A
N
K P
C
1,903,137.6675
1,903,135.1311
1,902,763.1152
1,902,778.9424
1,902,863.7910
1,902,852.3148
NORTHING
1,182,341.3610
1,182,341.9458
1,181,843.9686
1,181,842.3634
1,181,726.2686
1,181,734.4028
EASTING
1,903,122.5999
1,903,122.5999
1,903,186.4819
1,903,186.4819
NORTHING
1,181,176.2398
1,181,319.1556
1,181,319.1556
1,181,176.2398
EASTING
RIVERSIDE SHEET PILE WALL.
BE APPLIED WITHIN 50 FEET OF THE NORTH PIER TUNNEL EXISTING
H20 (16 KIP WHEEL LOAD / 32 KIP AXLE LOAD). ADDITIONALLY, NO LOADS MAY
WORK LIMITS, HOWEVER THE NORTH PIER GRAVEL ROAD WEIGHT LIMIT IS
THE CONTRACTOR IS ALLOWED LAND BASE ACCESS WITHIN & OUT OF THE 2.
SHARING THE STAGING SPACE IN THE PARKING LOT.
PARKING LOT. THERE MAY BE OTHER CONTRACTORS IN THE VICINITY
HOWEVER, THE CONTRACTOR DOES NOT HAVE RIGHTS TO THE ENTIRE
MAY BE USED BY THE CONTRACTOR TO PLACE EQUIPMENT, MATERIALS, ETC.
THE EXTENTS OF THE PARKING LOT, CALLED OUT AS THE STAGING AREA 1.
L A
U R
A V
A N
D E
N B
E R
G
T
IM
M
O Y
A T
IM
M
O Y
A
L A
U R
A V
A N
D E
N B
E R
G
T
IM
M
O Y
A
L A
U R
A V
A N
D E
N B
E R
G
R A
N A M
IS
H
R A P
E R
A N
A M
IS
H
R A P
E R
A N
A M
IS
H
R A
1 2
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:51:20 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-101.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
E
D -1
.d g n
E
D -1
.d g n
A N
S
IC
A G
O
IL
L
IN
O
IS
SHEET KEYNOTES
0 8' 32'16'A1
ELECTRICAL SITE PLAN - DEMOLITION
SCALE: 3/32"=1'-0"
ED-101ED-101
NORTH
PLAN
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
O
F
O
F
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
C H
IC
A G
O H
A R
B O
R L
O C
K
E L E
C T
R
IC
A L D
E M
O L
IT
IO
N P
L A
N E
L E
C T
R
IC
A L D
E M
O L
IT
IO
N P
L A
N
J U
L Y
J E
R E
M
IA
H H
A L E
Y J E
R E
M
IA
H H
A L E
Y
F A
Y E L
E F F
L E
R P
E -6
G B
W P -2
-C -0
X
X
W P -2
-B -0
X
X
MATCHLINE TO ED-101
M A
T C
H L
IN
E T
O E
D -1
B R
IA
N P
O R
T E
R P .E
CONDUITS. REMOVE THE 4" MISALIGNED CONDUITS FROM END TO END.
REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 2.
AND CABLES.
DISCONNECT AND REMOVE EXISTING GENERATOR ASSOCIATED CONDUITS 1.
C3
ES-104
PULLBOX
THE TWO, 4" MISALIGNED CONDUITS FROM END TO END.
REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" CONDUITS. REMOVE
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:52:18 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-102.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
E
D -1
.d g n
A N
S
IC
A G
O
IL
L
IN
O
IS
A1 0 8' 32'16'
SHEET KEYNOTES
ED-102ELECTRICAL SITE PLAN - DEMOLTION
SCALE: 3/32"=1'-0"
M A
T C
H L
IN
E T
O E
D -1
NORTH
PLAN
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
O
F
O
F
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
C H
IC
A G
O H
A R
B O
R L
O C
K
E L E
C T
R
IC
A L D
E M
O L
IT
IO
N P
L A
N
J E
R E
M
IA
H H
A L E
Y
F A
Y E L
E F F
L E
R P
E
W P -2
-C -0
X
X
W P -2
-B -0
X
X
J U
L Y
-6
G B
M A
T C
H L
IN
E T
O E
D -1
B R
IA
N P
O R
T E
R P .E
CONDUITS. REMOVE THE 4" MISALIGNED CONDUITS FROM END TO END.
REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 2.
CONDUITS AND CABLES.
DISCONNECT AND REMOVE EXISTING GENERATOR AND ASSOCIATED 1.
ES-302
A1
LAKE MICHIGAN
WATER DEPTH ~20 FEET
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:53:19 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ED-103.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
E
D -1
.d g n
A N
S
IC
A G
O
IL
L
IN
O
IS
A1 0 8' 32'16'
SHEET KEYNOTES
ED-103ELECTRICAL SITE PLAN - DEMOLTION
SCALE: 3/32"=1'-0"
NORTH
PLAN
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
O
F
O
F
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
C H
IC
A G
O H
A R
B O
R L
O C
K
E L E
C T
R
IC
A L D
E M
O L
IT
IO
N P
L A
N F
L
J E
R E
M
IA
H H
A L E
Y
F A
Y E L
E F F
L E
R P
E
W P -2
-C -0
X
X
W P -2
-B -0
X
X
J U
L Y
-6
G B
M A
T C
H L
IN
E T
O E
D -1
CONDUITS. REMOVE THE 4" MISALIGNED ONDUITS FROM END TO END.
REMOVE FEEDER TO THE LOCK CONTROL BUILDING FROM TWO, 4" 1
C5
ES-104
C1
ES-104
MCC-P2
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W P -2
-B -0
2:38:34 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_E-001.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E-001
J U
L Y
E-001
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K J
U L
Y
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
-6
G B
E-001
E -0
.d g n
ADVANCE.
THE ENERGIZED WORK REQUEST MUST BE PREPARED IN D.
PROTECTIVE EQUIPMENT.
EQUIPMENT AND ENSURE PROPER USE OF PERSONAL
MUST APPROVE ANY PLAN TO WORK ON ENERGIZED
A QUALIFIED SUPERVISOR MUST BE CONSULTED AND C.
USE TWO -PERSON TEAMS TO PERFORM WORK.B.
WORK IN ADVANCE.
CONTRACTING OFFICER. THE CO MUST APPROVE ENERGIZED
SUBMIT A REQUEST FOR LIVE WORK THROUGH THE A.
COMPLETED THE CONTRACTOR SHALL:
LIVE PARTS EXPOSED. IN THE EVENT THAT LIVE WORK MUST BE
WORK AREA SHALL BE PLACED IN A SAFE CONDITION WITH NO
DE-ENERGIZED PRIOR TO ENERGIZING THE EQUIPMENT, THE
ALL WORK SHALL BE COMPLETED WHILE THE FEEDERS ARE 5.
EQUIPMENT (PPE) REQUIRED TO PERFORM WORK.
CONTRACTOR SHALL FURNISH ALL PERSONAL PROTECTIVE 4.
COMPLYING WITH THE ENERGIZED WORK PERMIT.
SAFE WORKING POSITIONS, HANDLING TOOLS SAFELY, AND
CHECKING THEM CONSTANTLY TO MAKE SURE THEY ARE IN
SUPERVISOR MUST CLOSELY SUPERVISE THE WORKERS,
WHILE THE JOB IS IN PROGRESS, AN ON -SITE C.
WRITTEN SAFE CLEARANCE FORM.
OF THIS PARAGRAPH, COR APPROVAL IS GRANTED THROUGH A
ABOVE SHALL BE FOLLOWED; HOWEVER, FOR THE PURPOSES
PERFORMING "ENERGIZED WORK" AND ALL THE PROCEDURES
PURPOSE OF ISOLATING CIRCUITS IS CONSIDERED
OPERATING CIRCUIT BREAKERS/DISCONNECTS) FOR THE
OFF/ON A SWITCH, OPENING AND CLOSING SWITCHES, OR
DE-ENERGIZING/RE-ENERGIZING METHODS (I.E., TURNING
CONVENTIONAL CIRCUIT B.
ENSURE SAFETY.
SUPERVISION, TRAINING, AND PLANNING ARE PARAMOUNT TO
EQUIPMENT AND APPROPRIATE SUPERVISION. PROPER
PLACE SPECIAL EMPHASIS ON PERSONAL PROTECTIVE A.
WITHOUT MEETING THE FOLLOWING REQUIREMENTS:
STARTING. ENERGIZED WORK SHALL NOT BE ALLOWED
REVIEWED WITH ALL PERSONNEL IMMEDIATELY BEFORE
WORK PROCEDURES LISTED IN AFI 32-1064 ARE FOLLOWED AND
EXTREME CAUTION AND ONLY WHEN THE BASIC ENERGIZED
ABSOLUTELY NECESSARY, IT SHOULD BE ACCOMPLISHED WITH
ENERGIZED CIRCUITS: WHEN ENERGIZED WORK IS DEEMED 3.
PARAGRAPH 11.A.02.C. REFERENCE NFPA70E.
CONTAIN INFORMATION REQUIRED BY USACE EM 385-1-1
VIA THE CONTRACTING OFFICER FOR ACCEPTANCE AND SHALL
WORK REQUEST SHALL BE SUBMITTED TO THE GOVERNMENT
WORKED ON IN AN ENERGIZED CONDITION, AN ENERGIZED
EXIST. IF IT IS DETERMINED THAT EQUIPMENT MUST BE
CIRCUITS UNLESS PROOF IS PROVIDED THAT NO OTHER MEANS
NO WORK SHALL BE PERFORMED ON ENERGIZED ELECTRICAL 2.
BE COMPLIED WITH BY THE CONTRACTOR.
WITH EM 385-1-1 AND THE LATEST EDITION OF NFPA 70E SHALL
LOCAL ''LOCKOUT/TAG OUT' PROCEDURES IN ACCORDANCE 1.
COST TO THE GOVERNMENT.
COMPLETION OF THE PROJECT AT NO ADDITIONAL
EQUIPMENT TO ITS ORIGINAL CONDITION AT THE
SHALL BE RESPONSIBLE FOR RETURNING THE
THE CONTRACTING OFFICER. THE CONTRACTOR
THE EQUIPMENT'S OPERABILITY IN THE PRESENCE OF
SHALL DEMONSTRATE AND DOCUMENT IN A REPORT
DESIGN. PRIOR TO REMOVAL, THE CONTRACTOR
STORED, AND RE- INSTALLED AS DESCRIBED IN THE
NOTED IN THE DESIGN SHALL BE REMOVED, SAFELY
EXISTING EQUIPMENT THAT IS TO BE RE-USED AS 25.
REPLACED AT THE CONTRACTOR'S EXPENSE.
DOCUMENTS SHALL BE COMPLETELY REMOVED AND
ANY ITEMS INSTALLED INCORRECTLY PER CONTRACT 24.
MEETINGS FOR THE DURATION OF THE PROJECT.
CONTRACTOR SHALL ATTEND ALL CONSTRUCTION 23.
CONTRACT.
(PLANS), SPECIFICATIONS, AND TERMS OF THE
THE WORK IN ACCORDANCE WITH THE DRAWINGS
TESTING AND INCIDENTALS REQUIRED TO COMPLETE
EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES,
FURNISH ALL LABOR, SUPERVISION, MATERIALS,
FURTHER INTENDED THAT THE CONTRACTOR SHALL
DESCRIBED, UNLESS OTHERWISE NOTED. IT IS
COMPLETION IN EVERY DETAIL OF THE WORK
EQUIPMENT FOR THE CONSTRUCTION AND
THE CONTRACTOR SHALL FURNISH AND INSTALL ALL 22.
CUTTING AND PATCHING FOR THEIR WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 21.
PRIOR TO INITIATING THE WORK.
CONTRACTING OFFICER FOR REVIEW AND APPROVAL
METHODS SHALL BE SUBMITTED TO THE
SATISFACTION OF THE GOVERNMENT. ALL REPAIR
IMMEDIATELY REPAIRED WITHIN 24 HOURS TO THE
GOVERNMENT. ALL DAMAGED SYSTEMS SHALL BE
REMAIN SHALL BE AT NO ADDITIONAL COST TO THE
ANY DAMAGED EXISTING SYSTEMS/UTILITIES TO
BE PROTECTED FROM DAMAGE. REPLACEMENT OF
ALL EXISTING SYSTEMS/UTILITIES TO REMAIN SHALL 20.
OTHER GROUPS.
INSURE THAT THE WORK DOES NOT INTERFERE WITH
OTHER DISCIPLINES BEFORE BEGINNING WORK TO
THIS CONTRACT. COORDINATE THE WORK WITH ALL
PROPER SUPPORT OF EQUIPMENT FURNISHED UNDER
STRUCTURAL SUPPORTS, AND ACCESSORIES FOR
MOUNTED. PROVIDE ALL BOLTS, INSERTS, BRACKETS,
RELATED ITEMS ARE TO BE SUPPORTED OR
DETERMINE HOW EQUIPMENT, ACCESSORIES, AND
DRAWINGS, SHOP DRAWINGS, AND CATALOG DATA TO
INSTALLED UNDER THIS CONTRACT. STUDY ALL
PROPERLY SUPPORT ALL WORK AND EQUIPMENT 19.
POINT CONCERNED.
PRIOR TO THE PROGRESS OF THE WORK BEYOND THE
DISCREPANCY OR POINTS OF CONFLICT IN WRITING
CONTRACTING OFFICER WILL CLARIFY SUCH
NOTIFY THE CONTRACTING OFFICER IN WRITING .THE
DRAWINGS OR THE SPECIFICATIONS, IMMEDIATELY
DISCREPANCY OR POINTS OF CONFLICT IN THE
WITH ANY WORK. UPON DISCOVERY OF ANY
AND EXISTING CONDITIONS PRIOR TO PROCEEDING
CONTRACTOR WILL FIELD VERIFY ALL DIMENSIONS 18.
UTILITIES.
INTERFERENCE WITH OTHER EQUIPMENT AND
ADJUST EQUIPMENT AND FIXTURES TO AVOID 17.
ARRANGEMENT BEFORE INSTALLING THE EQUIPMENT.
APPROVAL WITH A PROPOSED REVISED
DRAWING TO THE CONTRACTING OFFICER FOR
NOT FIT AS SHOWN ON THE DRAWINGS, PROVIDE A
SHOWN ON THE DRAWINGS. WHERE EQUIPMENT WILL
EQUIPMENT FURNISHED WILL FIT INTO THE SPACE AS
MEASUREMENTS TO INSURE THAT ALL ITEMS OF
BEFORE INSTALLING EQUIPMENT, MAKE FIELD 16.
THE GOVERNMENT, PRIOR TO STARTING WORK.
SERVICE SHALL BE COORDINATED AND APPROVED BY
INTERRUPTION OF AN EXISTING SYSTEM OR UTILITY
LOCATION OF ALL EXISTING UTILITIES. ANY
WORK. THE CONTRACTOR SHALL STAKE/MARK THE
WORK WITH THE GOVERNMENT PRIOR TO STARTING
CONTRACTORS RESPONSIBILITY TO COORDINATE ALL
FOR EXACT LOCATIONS. IT SHALL BE THE
PLANS ARE APPROXIMATE AND SHALL NOT BE SCALED
THE EXISTING UTILITY LOCATIONS SHOWN ON THE 15.
NOTED.
THE PROJECT BE REMOVED UNLESS OTHERWISE
ARE NO LONGER REQUIRED AS A RESULT OF
WIRING MATERIALS, AND SYSTEMS, ETC., WHICH
THAT ALL EQUIPMENT, DEVICES, FIXTURES,
THE INTENT OF THE DEMOLITION DRAWINGS
BUILT' DRAWINGS OF THE AREAS AFFECTED. IT IS
EXISTING CONDITIONS AND ON EXISTING ''AS-
BASED ON FIELD OBSERVATION OF THE ACTUAL
CONDITIONS AND DEMOLITION DRAWINGS ARE
ALL WORK SHOWN ON THE EXISTING 14.
AND ACCESSORIES AS MAY BE REQUIRED.
CONDITIONS AND PROVIDE SUCH EQUIPMENT
ARRANGE THE WORK TO MEET THESE
INVESTIGATED. THE CONTRACTOR SHALL
STRUCTURAL AND FINISH CONDITIONS
SHALL BE CHECKED AT THE SITE AND ALL
AND LOCATION OF EQUIPMENT. ALL DIMENSIONS
AS POSSIBLE IN THE GENERAL ARRANGEMENT
SHOULD HOWEVER BE FOLLOWED AS CLOSELY
REQUIRED FOR THE COMPLETE SYSTEM. THEY
DRAWINGS DO NOT SHOW ALL DETAILS
CONDITIONS PRIOR TO STARTING WORK. THESE
CONTRACTOR SHALL VERIFY EXISTING 13.
ENVIRONMENTAL CONDITIONS.
PROPERTIES AGAINST FIRE, THEFT, AND
RESPONSIBILITY FOR PROTECTION OF
THE JOB SITE. OWNER ASSUME NO
THE SAFEKEEPING OF HIS OWN PROPERTY ON
THE CONTRACTOR WILL BE RESPONSIBLE FOR 12.
SPRING THROUGH EARLY SUMMER.
THE PUMPING SEASON WHICH OCCURS FROM
ACCESS TO SHUT DOWN EQUIPMENT DURING
CONTRACTOR SHOULD PLAN FOR LIMITED
AND FOR HOW LONG A PERIOD OF TIME. THE
WHEN THE PROPOSED SHUTDOWN WILL OCCUR,
INDICATING WHICH AREAS WILL BE AFFECTED,
NOTICE MUST BE GIVEN TO THE OWNER
OR DISCONNECTION, SUFFICIENT ADVANCED
ARE AFFECTED BY ANY SHUTDOWN, REMOVAL
IF ANY AREAS NOT WITHIN THE SCOPE OF WORK
REMAIN IN OPERATION WILL NOT BE AFFECTED.
AND/OR ENGINEER. CONFIRM THAT AREAS TO
WITHOUT PRIOR REVIEW WITH THE OWNER
REMOVED, DISCONNECTED, OR SHUT DOWN
NO WIRING, EQUIPMENT, ETC. WILL BE 11.
WIRE.
DEDICATED NEUTRALS AND SEPARATE GROUND
ALL NEW CIRCUITS WILL BE PROVIDED WITH 10.
WILL BE BASED ON CHAPTER 9 OF THE NEC.
UNLESS OTHERWISE INDICATED, CONDUIT SIZES 9.
UNLESS OTHERWISE NOTED. SEE SPECS.
ALL CONDUCTORS WILL BE COPPER THHN/THWN, 8.
ELECTRICAL CODE.
CURRENT EDITION OF NFPA 70 - NATIONAL
ALL WIRING METHODS WILL COMPLY WITH THE 7.
BEEN AFFECTED.
BY THE CONTRACTOR WHERE FINISHES HAVE
ALL PATCHING AND FINISHING SHALL BE DONE
ALL ELECTRICAL EQUIPMENT AND MATERIALS.
NECESSARY FOR THE PROPER INSTALLATION OF
THE CONTRACTOR WILL DO ALL WORK 6.
BE USED.
WHERE CONDUIT WILL BE EXPOSED, RGS WILL
WIRING WILL BE RUN IN EMT CONDUIT. IN AREAS
BRANCH, CONTROL, AND COMMUNICATIONS
UNLESS OTHERWISE INDICATED FEEDERS, 5.
TYPE 1 (INDOOR), NEMA TYPE 3R (OUTDOOR).
ENCLOSURES FOR EQUIPMENT WILL BE NEMA
UNLESS OTHERWISE INDICATED, ALL 4.
WORK.
SURVEY THE SPACE BEFORE PERFORMING THE
REQUIRING THE CONTRACTOR TO INSPECT AND
AND/OR HIDDEN, THAT MAY EXIST; THUS
INTERFERENCES AND CONDITIONS, VISIBLE
PLANS AND DETAILS DO NOT SHOW ALL 3.
AND LOCAL GOVERNING AUTHORITIES.
WORKMEN IN ACCORDANCE WITH THE STATE
ALL WORK WILL BE DONE WITH LICENSED 2.
ACCORDANCE WITH THEIR LISTING.
LABELED AND LISTED AND PROVIDED IN
ALL EQUIPMENT AND MATERIAL WILL BE 1.
F A
Y E L
E F F
L E
R P
E
G E
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
K P
C
J E
R E
M
IA
H H
A L E
Y
A N
S I
D
F A
Y E L
E F F
L E
R P
E
G E
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
K P
C
J E
R E
M
IA
H H
A L E
Y
A N
S I
D
F A
Y E L
E F F
L E
R P
E
G E
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
K P
C
J E
R E
M
IA
H H
A L E
Y
GENERAL SITE NOTES ELECTRICAL SAFETY NOTES
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
UTILITY.
AND COORDINATE FINAL RESPONSIBILITIES WITH
SEE "DIVISION OF RESPONSIBILITY" MATRIX BELOW 29.
EQUIVALENT TO THE ORIGINAL.
THE GROUNDING SYSTEM WITH MATERIALS
WITH THE PROJECT, THE CONTRACTOR SHALL REPAIR
SYSTEM IS COMPROMISED BY THE WORK ASSOCIATED
IN ANY LOCATIONS THAT THE EXISTING GROUNDING 28.
SITE.
SHALL BE DISPOSED OF BY THE CONTRACTOR OFF
EXISTING EQUIPMENT SLATED TO BE REPLACED 27.
AND MATERIALS PROVIDED TO THE OWNER.
ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT
THE CONTRACTOR SHALL TURN OVER TO THE OWNER 26.
NEW GENERATOR
LOCATION OF
SEE DETAIL E6
2" CONDUIT FOR GENERATOR SIGNAL
4" CONDUIT FOR GENERATOR POWER
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:38:52 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-101.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
E
S -1
.d g n
A N
S
IC
A G
O
IL
L
IN
O
IS
W P -2
-C -0
X
X
W P -2
-B -0
X
X
O
F
F A
Y E L
E F F
L E
R P
E
E L E
C T
R
IC
A L S
IT
E P
L A
N
-6
G B
J E
R E
M
IA
H H
A L E
Y
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K J
U L
Y
A1
SCALE: 1/8" = 1' 0 8'4' 16'
ELECTRICAL SITE PLAN
E6
SCALE: NTS
SEE SS-501 FOR DETAILS.
CONTRACTOR SHALL FURNISH A CONCRETE PAD FOR TEH 300KVA GENSET. 3.
CONTRACTOR TO FIELD VERFIY ALL COMPONENTS OF THE SITE DETAILS.2.
CONNECT THOSE CABLES TO THE EXISTING ATS.
GENERATOR. THE CONTRACTOR SHALL THEN CONNECT ROUTE AND
CONDUCTORS LOCATED IN 2" CONDUIT TO NEW 300KVA STAND-BY
CONTRACTOR SHALL CONNECT GENERATOR POWER 4" AND SIGNAL 1.
GENERAL NOTES
B R
IA
N P
O R
T E
R P .E
MATCHLINE TO ES-102
ES-101
EXISTING GENERATOR CONDUITS
T T
B2 E-301
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:39:10 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-102.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
E
S -1
.d g n
A N
S
IC
A G
O
IL
L
IN
O
IS
W P -2
-C -0
X
X
W P -2
-B -0
X
X
O
F
F A
Y E L
E F F
L E
R P
E
E L E
C T
R
IC
A L S
IT
E P
L A
N
-6
G B
J E
R E
M
IA
H H
A L E
Y
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K J
U L
Y
A1
SCALE: 1/8" = 1' 0 8'4' 16'
ELECTRICAL SITE PLAN
B R
IA
N P
O R
T E
R P .E
MATCHLINE TO ES-103
MATCHLINE TO ES-101
ES-102
B2 E-301
WELD SHOP
2" CONDUIT TO COMPLETE ROUTING TO ROOF
ROOF UTILIZING AND NEW LB CONNECTOR AND ADDED NEW
2" CONDUIT FROM OUT OF MANHOLE 4 TO WELDHOUSE
CONTRACTOR SHALL FIELD VERIFY AND RE-ROUTE EXISTING
EXISTING MANHOLE
A-HOUSE
WELD SHOP
500MCIL, COPPER FEEDERS
THE LOCK CONTROL BUILDING PARALLEL
MANUFACTURER. PULL IN NEW FEEDER TO
RECOMMENDED BY THE CONDUIT
CONDUITS WITH EXPANSION FITINGS AS
END. INSTALL NEW 4", PVC COATED STEEL
THE 4" MISALIGNED CONDUITS FROM END TO
BUILDING FROM TWO, 4" CONDUITS. REMOVE
REMOVE FEEDER TO THE LOCK CONTROL
TO BE REMOVED
EXISTING GENERATOR
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:39:27 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-103.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
E
S -1
.d g n
A N
S
IC
A G
O
IL
L
IN
O
IS
SHEET KEYNOTES
A1
SCALE: 3/32" = 1' 0 8' 32'16'
ELECTRICAL SITE PLAN
W P -2
-C -0
X
X
W P -2
-B -0
X
X
MATCH LINE TO ES-102
M A
T C
H L
IN
E T
O E
S -1
O
F
F A
Y E L
E F F
L E
R P
E
E L E
C T
R
IC
A L S
IT
E P
L A
N
-6
G B
J E
R E
M
IA
H H
A L E
Y
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K J
U L
Y
C6
SCALE: NTSES-103
G3
PLC CABINET. ALL ROUTING SHALL BE COORDINATED WITH COR.
ROUTE INSIDE OF THE WELD SHOP AND ROUTE INTO THE EXISTING
ROOF THE CONDUIT WILL ROUTE TO A NEW LV CONNECTOR AND
OUT OF MANHOLE 4 TO WELD SHOP ROOF. FROM THE WELD SHOP
CONTRACTOR SHALL REROUTE EXISTING CONDUIT AND CONDUCTOR 1.
B R
IA
N P
O R
T E
R P .E
ES-103
WEST GATE BUBBLER CONDUIT ROUTING
C6
ES103
A6
ES-302
LOCK CHAMBER
WATER DEPTH ~22 FEET
CONDUITS TO BE REPLACED
ENTRANCE OF BUBBLER CONDUIT
JUNCTION BOX TO BE UTILIZED FOR
REPLACED.)
CONDUIT TO BE
THE LENGTH OF
(THIS PICTURE DISPLAYS
CATWALK
CONDUITS RUN UNDER
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:39:45 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_ES-104.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
K P
C
E
S -1
.d g n
A N
S
IC
A G
O
IL
L
IN
O
IS
SHEET KEYNOTES
A1
SCALE: 3/32" = 1' 0 8' 32'16'
ELECTRICAL SITE PLAN
W P -2
-C -0
X
X
W P -2
-B -0
X
X
M A
T C
H L
IN
E T
O E -1
O
F
F A
Y E L
E F F
L E
R P
E
E L E
C T
R
IC
A L S
IT
E P
L A
N
-6
G B
J E
R E
M
IA
H H
A L E
Y
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K J
U L
Y
C1
C5
ALIGNMENT.
COORDINATE WITH COR AND FACILITY MANAGER ON THE MOUNT
1. ROUTE CONDUIT AND MOUNT ON EXISTING RACE WAY RACK.
GENERAL NOTES
B R
IA
N P
O R
T E
R P .E
ES-104
CONDUIT ENTRANCES INTO LOCKHOUSE CONDUITS UNDER CATWALK OUTSIDE CONDUIT ENTRANCE INTO LOCKHOUSE
SOUTHEAST BUBBLER CONDUIT TO THE NEW 250A BREAKER.
THE MCC-P2 LOCATED IN THE LOCKHOUSE BUILDING AND ROUTE THE
THE CONTRACTOR SHALL INSTALL A NEW 250A BREAKER INSIDE OF 6.
THE 2.5" CONDUIT.
THE CONTRACTOR SHALL FIELD ADJUST THE PENETRATION TO FIT 5.
LOCATED BELOW THE COMMUNICATION CABINET.
VIA AN EXISTING PENETRATION INSIDE OF THE JUNCTION BOX
LB CONNECTOR AND THEN TRANSITION INSIDE OF THE LOCKHOUSE
CONDUIT DOWN THE EXISTING PATH ON THE PIER WALL INTO A NEW
THE CONTRACTOR SHALL ROUTE THE 2.5" SOUTHEAST BUBBLER 4.
SWITCHBOARD.
BUBBLER FEEDER FROM THE EXISTING BREAKER IN THE EXISTING
CONTRACTOR SHALL DISCONNECT THE EXISTING SOUTHEAST 3.
LOCKHOUSE. AS DISPLAYED IN THE FOLLOWING DETAILS TBD.
LAKESIDE PIER WALL UNDERNEATH THE CATWALK INTO THE
THE CONDUIT WILL ROUTE FROM THE TRANSFORMER TO THE 2.
MCC WHICH IS LOCATED INSIDE OF THE LOCKHOUSE.
AND NEW XLP WIRE FROM THE COMED TRANSFORMER 480V, TO THE
THE CONTRACTOR SHALL INSTALL NEW PVC COATED RMC CONDUIT 1.
C3 E-104
C5 E-103
C1
PIER WALL
EXISTING 2" CONDUIT FOR GENERATOR SIGNAL
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_E-301.dgn
2:39:56 PM 7/7/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
C
E -3
.d g n
A N
S I
D
W P -2
-B -0
O J E
C T I
IC
A G
O
IL
L
IN
O
IS
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
E L E
C T
R
IC
A L R
E V
IS
IO
N S
/2
F A
Y E L
E F F
L E
R P
E
J E
R E
M
IA
H H
A L E
Y
-6
G B
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
J U
L Y
E-301
A4
PIER WALL SECTION
SCALE: 3" = 1' 6"0 3" 1'
P
IE
R W
A L L S
E C
T
IO
N B
R
IA
N P
O R
T E
R P .E
NOTES
CABLES TO THE EXISTING 800A ATS.
THE CONTRACTOR SHALL THEN CONNECT ROUTE AND CONNECT THOSE
CONDUCTORS LOCATED IN 2" CONDUIT TO NEW 300KVA STAND-BY GENERATOR.
CONTRACTOR SHALL CONNECT GENERATOR POWER 4" AND SIGNAL 1.
UNISTRUT
3" CONDUIT; HEAT TRACE
3" CONDUIT; TELECOM
GENERATOR SIG
3" CONDUIT; PARKING LOT
LOT LOW VOLTAGE
3" CONDUIT; 480V PARKING
INNERDUCT & PULLROPE
3" CONDUIT-24 STRAND WITH
COMED 12kV
2, 5" CONDUIT; HIGH VOLTAGE
EXISTING 4" CONDUIT FOR GENERATOR POWER
SOUTHEAST GATE BUBBLER CONDUIT
CONTRACTOR TO REPLACE BOTH CONDUITS END TO END
CONTRACTOR SHALL INSTALL NEW 250 AMP BREAKER
A6
SCALE: N.T.S.
E1
SCALE: N.T.S.
BUBBLER CONDUITS
LOCKHOUSE MCC-P2
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_E-302.dgn
2:40:03 PM 7/7/2021 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
C
E -3
.d g n
A N
S I
D
W P -2
-B -0
O J E
C T I
IC
A G
O
IL
L
IN
O
IS
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
E L E
C T
R
IC
A L R
E V
IS
IO
N S
/2
F A
Y E L
E F F
L E
R P
E
J E
R E
M
IA
H H
A L E
Y
-6
G B
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K
PRELIMINARY 90% SUBMITTAL INITIAL BCOES/ATR
J U
L Y
E-302
A1
B R
IA
N P
O R
T E
R P .E
E X
IS
T
IN
G C
O N
D
IT
IO
N S
INCOMPATIBLE/SEPERATING CONDUITS
SCALE: N.T.S.
WEST GATE BUBBLER CONDUIT
#2 GROUND, 4"C
3 #2/0, #2/0 NEUTRAL
CONTRACTOR
AND INSTALL BY
CABINET, PROVIDE
APPROVED METER
NEMA 3R COMED
IN 2•"C
4/0, 1 #4/0 GROUND, 4" RGS CONDUIT
4 SETS, 3 #600KCMIL, 1 #700KCMIL NEUTRAL,
SUPPRESSOR
SURGE
VOLTAGE
TRANSIENT
EXISTING CONDUIT AND CABLES
4" RGS CONDUITS
1 #2/0 GROUND,
1 #2/0 NEUTRAL,
2 SETS, 3 #500KCMIL,
4 POLE ATS
EXISTING
EXISTING CONDUIT AND CABLES
NEUTRAL
700KCMIL
BUBBLER MANUFACTURER
STEEL ENCLOSURE BY
IN NEMA 4X STAINLESS
BUBBLER CONTROLLER
200A DISCONNECT SWITCH
NEMA 4X STAINLESS STEEL
IN 2•"C
4/0, 3 #250KCMIL, #2/0 GROUND, 2"C
NORTH WALL OF THE LOCK, ONE SPARE
2 - 5" RGS CONDUITS FROM THE NORTH PIER TO
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
T
NW CONTROL HOUSE
CABINET BEHIND THE
SLUICE GATE METER
TO EXISTING COMED
M
G
R
MONITOR
POWER LOGIC
TVSS
G
N
N E
L
C311
C211 C211A
C311A
G
800A
GFI TYPE
1600A/3P
SPARE
SPARE
SPACE
SPACE
SPACE
SW BUBBLER
SE BUBBLER
250A/3P
250A/3P
800A/3P
200A/3P
100A/3P
150KW
#2/0 NEUTRAL, #2/0 GROUND
EXISTING CABLE WITH 3 #2/0,
CONTRACTOR SHALL REPLACE
STEEL SWITCHBOARD
NEMA 4X STAINLESS
LOOP
GROUND
EXISTING
TO
SEE SHEET XXX
TO MCC-P2
LOOP
GROUND
EXISTING
TO
V /2
V -P
H
W
A
K A
IC
NEW GENSET AND LOCATION
REMOVED. SEE CS-001 FOR
EXIST. GENERATOR TO BE
SERVICE
COMED
12.47KV
TRANSFORMER
COMED
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
P -2
-B -0
2:40:16 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_E-601.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E-601
J U
L Y
E-601
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K J
U L
Y
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
-6
G B
E-601
E -6
.d g n
GENERAL NOTES
SHEET KEYNOTES
B3
SCALE: NTS
PROJECT PARTIAL ONE LINE DIAGRAM
P R
O J E
C T P
A R
T
IA
L O
N E L
IN
E D
IA
G R
A M
A N
S I
D
P R
O J E
C T P
A R
T
IA
L O
N E L
IN
E D
IA
G R
A M
A N
S I
D
P R
O J E
C T P
A R
T
IA
L O
N E L
IN
E D
IA
G R
A M
CONDUITS TO SWITCHBOARD.
OF (3) 500 KCMIL. 1 - #2/0 NEUTRAL, 1 - #2/0 GROUND ON 2 NEW 4" RGS
INSTALL NEW LUGS ON LOAD SIDE OF ATS, TO ACCOMODATE 2 NEW SETS 3.
FEEDERS WITH NEUTRAL AND GROUND CONDUCTORS.
ADD LUGS, IF REQUIRED, TO ACCOMMODATE THE NEW PARALLEL 2.
CONDUITS, SAWCUT AND TRENCH FOR CONDUIT INSTALLATION.
2 SETS OF 3-500KCMIL, 1#2/0 NEUTRAL AND 1#2/0 GND. IN 2 NEW, 4" RGS 1.
CABLE/CONDUIT ROUTING.
SEE DRAWING E-101 FOR STANDBY GENERATOR LOCATION AND 3.
CONTRACTOR SHALL PULL IN AND CONNECT ALL GENERATOR WIRING.2.
SEE SHEET R-101 FOR EXISTING POWER DISTRIBUTION ONE LINE DIAGRAM. 1.
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
UNISTRUT TO THE A-HOUSE
CONDUCTORS ACROSS NEW
ROUTE NEW 1" CONDUIT AND
ROOF EDGE
AROUND WELD SHOP
BEND NEW 1" CONDUIT
THE WELD SHOP
UNISTRUT AND TRANSITION TO
BEND NEW 1" CONDUIT TO
THROUGH THE WALL
ROUTE BUBBLER 1" CONDUITS
USE AN LB CONNECTOR AND
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
P -2
-B -0
2:40:25 PM 7/7/2021
...\Power Distribution Upgrade FY21 -114419-6073GB\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_E-901.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E-901
J U
L Y
E-901
IC
A G
O
IL
L
IN
O
IS
P O
W E
R D
IS
T R
IB
U T
IO
N U
P G
R A
D E
C H
IC
A G
O H
A R
B O
R L
O C
K J
U L
Y
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
-6
G B
E-901
E -9
.d g n
GENERAL NOTES
A N
S I
D A
N S I
D
C1
SCALE: N/A
B7
SCALE: N/A
PIER WALL TO A-HOUSE TRANSITION
A-HOUSE ROOF TO INSIDE OF A-HOUSE TRANSITION
P
IC
T U
R E
S
K P
C
J E
R E
M
IA
H H
A L E
Y
P
IC
T U
R E
S
K P
C
J E
R E
M
IA
H H
A L E
Y
P
IC
T U
R E
S
K P
C
J E
R E
M
IA
H H
A L E
Y
R O
U T
IN
G P
L A
N R
O U
T
IN
G P
L A
N R
O U
T
IN
G P
L A
N B
R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
B R
IA
N P
O R
T E
R P .E
PHOTOS.
SEE SHEET ES-103 FOR LOCATION OF AREAS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .