Amendment 0002 W912P522B0009 JPP SEWER REHAB 06.23.2022.pdf

PDF 371 KB Posted

Attached to
JPP Seven Points Campground Sewer Rehab Project
Solicitation number
W912P522B0009
Issued by

About this file

This document is an amendment to a solicitation for construction services. The solicitation is for the JPP Seven Points Campground Sewer Rehab Project issued by the U.S. Army Corps of Engineers Nashville District. The scope of work includes clearing, excavation, installation of force mains and sewer lines, construction of a wet well and pump vault, pump installation, backfilling, seeding and any incidental work. The contractor must complete construction by March 31, 2023. The amendment provides responses to bidder questions, replaces and adds technical specifications and contract drawings, and extends the response due date from June 24 to July 7, 2022. The total estimated value of construction is between $500,000 to $1,000,000. The NAICS code is 237110 and it is set aside 100% for small businesses with a size standard of $39.5 million.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD13471401

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project Title: JPP Seven Point Sew er Rehab PURPOSE: The purpose of this amendment is to:

1. Provide Government's response to the Contractor's questions from ProjNet.

2. Provide revised changes to TECHNICAL SPECIFICATIONS and CONTRACT DRAWINGS as a result of Bidder inquiry responses.

3. Extend the Bid due date from Friday, 24 June 2022 to Thursday, 07 July 2022 at 1:00 pm Central Time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P522B0009

X 9B. DATED (SEE ITEM 11)

24-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2022

CODE

CELRN-RC-N CONTRACTING BRANCH

110 9TH AVE SOUTH, A405

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P522B0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

BID INQUIRY Q&A

Attachment – Four (4) pages

SUMMARY OF CHANGES

I. CHANGES TO TECHNICAL SPECIFICATIONS

A. Section 01 20 00 PRICE AND PAYMENT PROCEDURES. Remove Section 01 20 00 in its entirety and replace with revised Section 01 20 00.

B. Section 01 32 01 PROJECT SCHEDULE. Remove Section 01 32 01 in its entirety and replace with revised Section 01 32 01.00 10 PROJECT SCHEDULE.

C. Section 01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM).

Remove Section 01 45 00.15 in its entirety and replace with revised Section 01 45 00.15.

D. Section 02 41 00 DEMOLITION. Add section 02 41 00 in its entirely to the specifications package.

E. Section 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL. Remove Section 26 05 00 in its entirety and replace with revised Section 26 05 00.

F. Section 31 00 00 EARTHWORK. Remove Section 31 00 00 in its entirety and replace with revised Section 31 00 00.

G. Section 33 30 00 SANITARY SEWERAGE. Remove Section 33 30 00 in its entirety and replace with revised Section 33 30 00.

H. Section 33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS. Remove Section 33 32 16 in its entirety and replace with revised Section 33 32 16.

I. Section 01 95 00 FORMS AND ATTACHMENTS Attachment 05 Submittal Register. Removed

Attachment 05 Submittal Register in its entirety and replace with revised Attachment 05 Submittal Register.

II. CHANGES TO CONTRACT DRAWINGS

A. The following CONTRACT DRAWINGS have been revised and replaced:

Drawing No. Description

Q5-SPS-C-104 PLAN AND PROFILE 4

Q5-SPS-E-601 PUMP CONTROL SCHEMATIC AND CABINET DETAILS

W912P522B0009

B. The following CONTRACT DRAWING has been added to the package:

C. The following REFERENCE DRAWING / FOR INFORMATION ONLY DRAWING has been added to the package:

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 24-Jun-2022 01:00 PM to 07-Jul-2022 01:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001 for Solicitation W912P522B0009 is to extend the ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled on 13 June 2022 prior to the closing date stated in the solicitation. The Government responses will be entered into the ProjNet system after 17 June 2022 prior to the closing date stated in the solicitation.

Amendment 00002

1. Provide Government's response to the Contractor's questions from ProjNet.

2. Provide revised changes to TECHNICAL SPECIFICATIONS and CONTRACT DRAWINGS as a result of Bidder inquiry responses.

3. Extend the Bid due date from Friday, 24 June 2022 to Thursday, 07 July 2022 at 1:00 pm Central Time.

(End of Summary of Changes)