W912P521B0015_Submittal Register-AMEND0001.pdf
PDF 61 KB Posted
- Attached to
- Obey River Sewer Line Replacement Federal contract opportunity
- Solicitation number
- W912P521B0015
About this file
This submittal register and solicitation provide details for the Obey River Sewer Line Replacement project. The project scope involves replacing an existing sewer line near the Obey River Campground, including trench excavation, installing PVC and HDPE piping and components, connecting to the existing network, constructing a dosing tank, pump vault and leach fields. Responses are due September 2, 2021 and will be publicly opened via video conference. Questions are due by August 20. The pre-bid site visit will take place on August 12 and registration is required in advance. The U.S. Army Corps of Engineers Nashville District is the contracting agency. Specifications and drawings are available on SAM.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P521B0015_TSpecs-AMEND0001.pdf | ||
| W912P521B0015_TPlans-AMEND0001.pdf | ||
| W912P521B0015 0001_ Obey Campground Sewer Line v3.pdf | ||
| W912P521B0015_Reference Files.pdf | ||
| Site Visit Attendee List - Obey - 12 Aug 21.pdf | ||
| Obey River Bid Schedule.pdf | ||
| W922P521B0015 Solicitation for Obey Campground Sewer Line.pdf | ||
| W912P521B0015 Tplans RTA.pdf.pdf | ||
| TN Davis-Bacon Act WD_TN20210059.pdf | ||
| Site Visit Request Form.pdf | ||
| W912P521B0015 TSpecs RTA.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
OBEY RIVER SEWERLINE
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
1.8 GPedestrian and Traffic Control
Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.3.2 GStandard Lift Plan
1.7.3.3 GCritical Lift Plan
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
33 30 00 SD-01 Preconstruction Submittals
1.7 GStorm Water Pollution Prevention
Plan
1.7Construction Permits
SD-02 Shop Drawings
1.5.2 GShop Drawings
2.10.1 GPrecast concrete manhole
1.9 G ECE-Piping Crossing Roads
2.6 G ECE-Valve Box
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
33 30 00 2.9Hydrosplitter
SD-03 Product Data
2.1 G ECE-Pipeline Materials
2.4 G ECD-Flow Meter
2.5 G ECD-Valves
1.10 G ECE-Cleanouts
2.1.2 G ECE-High Density Polyethylene Pipe
2.3.1 G ECE-Access Hatch Cover
G ECE-Protective Bollards
2.1.1 G ECE-PVC Plastic Gravity Sewer Piping
2.8 G ECE-Leaching Chambers
2.8 G ECE-Leaching Chambers
2.10.6 GTracer Wire
2.3 GDosing Chamber
2.1.3 G ECD-Flexible Flanged Coupling
2.10.7 GWarning Tape
2.9Hydrosplitter
SD-06 Test Reports
2.11Test Reports
2.11 G ECE-Watertightness Test Procedures
2.11 G ECE-Watertightness Test Reports
SD-07 Certificates
2.7.2Portland Cement
1.5.1 GInstaller Qualifications
SD-11 Closeout Submittals
1.11 GTDEC's Final Inspection Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
33 32 16 SD-02 Shop Drawings
2.1Fabrication Drawings
2.1Erection/Installation Drawings
SD-03 Product Data
2.4 GPump Performance Curve
2.4 GPump Motor
2.5 GPump Control System
2.7.3 GFlexible Flanged Coupling
2.7 GStation Piping
2.8 GValves
3.3.1 GSpare Parts Data
2.6.2Access Hatch Covers
2.2 G ECD-Submersible Effluent Pumps
2.3 G ECD-Submersible Grinder Pumps
SD-05 Design Data
2.2 G ECD-Submersible Effluent Pumps
2.3 G ECD-Submersible Grinder Pumps
SD-06 Test Reports
3.2.1 GPump Test
SD-08 Manufacturer’s Instructions
2.1 GManhole Chamber
2.6.2Access Hatch Covers
2.5 GPump Control System
2.4 GPump Motor
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
33 32 16 3.3.1Operation And Maintenance
Manuals
3.3.1Posted Instructions
SD-11 Closeout Submittals
1.5 GWarranty
3.3.1 GSpecial Tools
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .