W912P521B0015_Submittal Register-AMEND0001.pdf

PDF 61 KB Posted

Attached to
Obey River Sewer Line Replacement Federal contract opportunity
Solicitation number
W912P521B0015
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

This submittal register and solicitation provide details for the Obey River Sewer Line Replacement project. The project scope involves replacing an existing sewer line near the Obey River Campground, including trench excavation, installing PVC and HDPE piping and components, connecting to the existing network, constructing a dosing tank, pump vault and leach fields. Responses are due September 2, 2021 and will be publicly opened via video conference. Questions are due by August 20. The pre-bid site visit will take place on August 12 and registration is required in advance. The U.S. Army Corps of Engineers Nashville District is the contracting agency. Specifications and drawings are available on SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Obey River Sewer Line Replacement, newest first.
File Type Posted
W912P521B0015_TSpecs-AMEND0001.pdf PDF
W912P521B0015_TPlans-AMEND0001.pdf PDF
W912P521B0015 0001_ Obey Campground Sewer Line v3.pdf PDF
W912P521B0015_Reference Files.pdf PDF
Site Visit Attendee List - Obey - 12 Aug 21.pdf PDF
Obey River Bid Schedule.pdf PDF
W922P521B0015 Solicitation for Obey Campground Sewer Line.pdf PDF
W912P521B0015 Tplans RTA.pdf.pdf PDF
TN Davis-Bacon Act WD_TN20210059.pdf PDF
Site Visit Request Form.pdf PDF
W912P521B0015 TSpecs RTA.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

OBEY RIVER SEWERLINE

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

1.8 GPedestrian and Traffic Control

Plan

SD-06 Test Reports

1.4Monthly Exposure Reports

1.13Notifications and Reports

1.13.2 GAccident Reports

1.13.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.3.2 GStandard Lift Plan

1.7.3.3 GCritical Lift Plan

1.9Activity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4Certificate of Compliance

33 30 00 SD-01 Preconstruction Submittals

1.7 GStorm Water Pollution Prevention

Plan

1.7Construction Permits

SD-02 Shop Drawings

1.5.2 GShop Drawings

2.10.1 GPrecast concrete manhole

1.9 G ECE-Piping Crossing Roads

2.6 G ECE-Valve Box

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

33 30 00 2.9Hydrosplitter

SD-03 Product Data

2.1 G ECE-Pipeline Materials

2.4 G ECD-Flow Meter

2.5 G ECD-Valves

1.10 G ECE-Cleanouts

2.1.2 G ECE-High Density Polyethylene Pipe

2.3.1 G ECE-Access Hatch Cover

G ECE-Protective Bollards

2.1.1 G ECE-PVC Plastic Gravity Sewer Piping

2.8 G ECE-Leaching Chambers

2.8 G ECE-Leaching Chambers

2.10.6 GTracer Wire

2.3 GDosing Chamber

2.1.3 G ECD-Flexible Flanged Coupling

2.10.7 GWarning Tape

2.9Hydrosplitter

SD-06 Test Reports

2.11Test Reports

2.11 G ECE-Watertightness Test Procedures

2.11 G ECE-Watertightness Test Reports

SD-07 Certificates

2.7.2Portland Cement

1.5.1 GInstaller Qualifications

SD-11 Closeout Submittals

1.11 GTDEC's Final Inspection Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

33 32 16 SD-02 Shop Drawings

2.1Fabrication Drawings

2.1Erection/Installation Drawings

SD-03 Product Data

2.4 GPump Performance Curve

2.4 GPump Motor

2.5 GPump Control System

2.7.3 GFlexible Flanged Coupling

2.7 GStation Piping

2.8 GValves

3.3.1 GSpare Parts Data

2.6.2Access Hatch Covers

2.2 G ECD-Submersible Effluent Pumps

2.3 G ECD-Submersible Grinder Pumps

SD-05 Design Data

2.2 G ECD-Submersible Effluent Pumps

2.3 G ECD-Submersible Grinder Pumps

SD-06 Test Reports

3.2.1 GPump Test

SD-08 Manufacturer’s Instructions

2.1 GManhole Chamber

2.6.2Access Hatch Covers

2.5 GPump Control System

2.4 GPump Motor

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

33 32 16 3.3.1Operation And Maintenance

Manuals

3.3.1Posted Instructions

SD-11 Closeout Submittals

1.5 GWarranty

3.3.1 GSpecial Tools

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .