Obey River Bid Schedule.pdf
PDF 67 KB Posted
- Attached to
- Obey River Sewer Line Replacement Federal contract opportunity
- Solicitation number
- W912P521B0015
About this file
This document provides details for the Obey River Sewer Line Replacement federal contract opportunity. The scope of work involves construction of a new sewer line network at the Obey River Campground in Dale Hollow Lake, Tennessee, including selective clearing, removal and installation of gravity and pressure sewer lines, construction of a dosing tank and pump vault, installation of pumps and controls, construction of leach fields, backfilling, seeding, and other related work. A pre-bid site visit is scheduled for August 12, 2021, with questions due by August 20, 2021 and bids to be opened on September 2, 2021. Bidders are required to submit bids electronically through the SAFE system to the Army Corps of Engineers, Engineering District Nashville.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P521B0015_TPlans-AMEND0001.pdf | ||
| W912P521B0015 0001_ Obey Campground Sewer Line v3.pdf | ||
| W912P521B0015_Reference Files.pdf | ||
| Site Visit Attendee List - Obey - 12 Aug 21.pdf | ||
| W912P521B0015_Submittal Register-AMEND0001.pdf | ||
| W912P521B0015_TSpecs-AMEND0001.pdf | ||
| W922P521B0015 Solicitation for Obey Campground Sewer Line.pdf | ||
| W912P521B0015 Tplans RTA.pdf.pdf | ||
| TN Davis-Bacon Act WD_TN20210059.pdf | ||
| Site Visit Request Form.pdf | ||
| W912P521B0015 TSpecs RTA.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912P5-##-X-#### Amendment No. ####
OBEY RIVER CAMPGROUND SEWER LINE
Dale Hollow Lake
Byrdstown, TN
BID SCHEDULE
ITEM
NO. DESCRIPTION
SPEC.
SECTION
EST.
QTY. UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
BASE
0001 Mobilization and Demobilization 1 JOB -$ -$
0002 Installation of New Pressure Sewer Line 464 LF -$ -$
0003 Installation of New Gravity Sewer Line 835 LF -$ -$
0004 Leach Field System 1 JOB -$ -$
0005 Selective Clearing 1.7 AC -$ -$
0006 Pumps and Pump Controls 1 JOB -$ -$
0007 Dosing Tank (7,000 gal) 1 JOB -$ -$
0008 Installation of New Electrical Line 210 LF -$ -$
0009 Installation of Curtain Drain 791 LF -$ -$
0010 Seeding 1 JOB -$ -$
-$ TOTAL ESTIMATED AMOUNT
Prepared: 12/9/2017 Page 1 of 1 IGE BID SCHEDULE