M-401.pdf
PDF 204 KB Posted
- Attached to
- Center Hill Medium Voltage Cable Replacement Federal contract opportunity
- Solicitation number
- W912P521B0007
About this file
This document contains a federal contract opportunity solicitation and related details. The U.S. Army Corps of Engineers, Nashville District, is soliciting firms for a fixed price construction contract to remove and replace existing medium-voltage cables and associated equipment at the Center Hill Power Plant in Lancaster, Tennessee. The scope of work includes disassembling and removing existing medium voltage cables and terminations; procuring and installing new 15kV MV-105 cables and Class 1A terminations; providing temporary feeders; developing asbestos abatement and environmental mitigation plans; and performing special factory and field tests. A site visit was tentatively scheduled for April 13, 2021, with details to be provided upon solicitation package posting. Questions must be submitted in writing by the specified deadline to the named Contract Specialist.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P521B0007 Bid Abstract page 2.pdf | ||
| W912P521B0007 Bid Abstract page 1.pdf | ||
| Center Hill Reference Photos - Amendment 002.pdf | ||
| E-502.pdf | ||
| W912P521B00070002 Amendment 2.pdf | ||
| W912P521B0007 TSpecs Amendment 0002.pdf | ||
| E-602.pdf | ||
| W912P521B00070001 Amendment 1.pdf | ||
| W912P521B0007 Site Visit SignIn.pdf | ||
| W912P521B0007 final.pdf | ||
| W912P521B0007 RTA TSpecs.pdf | ||
| W912P521B0007 RTA TPlans.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
S I Z
E
S U
B M
IT
T
E D
B Y
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
SHEET ID
M E
D
IU
M V
O L
T A
G E
C A
B L
E R
E P
L A
C E
M E
N T
C A
N E
Y F
O R
K R
IV
E
R
C E
N T
E R
H
IL
L D
A M
X X
X X
X X
-X X
-X -X
X X
N A
S H
V
IL
L E
D
IS
T R
IC
T
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
XXXXXXXX
XXXXXXXX
XXXXXXXX
W X
X X
X X
-X X
-X -X
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E
C
D
E
F
G
H
J
K
1312111098765432
®of Engineers
US Army Corps
F il e N a m e
P lo t D a te
P lo t T im e
T im e
D a te
F il e
B
REFERENCE DRAWINGS:
Q-4/764A1 RAW WATER DISTRIBUTION SYSTEM
FLAT FIN SURFACES, THERMAL COUNTER FLOW, REMOVABLE HEADER
MANUAL ISOLATION VALVES, CAPPED DRAIN PORTS, ALUMINUM
WATER COIL SCHEDULE
DOOR
(35,000 CFM)
POWER CABLE TUNNEL
EXISTING DUCT TO
SEE NOTE 4
NEW SUPPLY LINE EXISTING DRAIN LINE
PENETRATIONS
AND DRAIN LINE
EXISTING 2" SUPPLY
EXISTING TEE
EL. 497
EL. 510
EL. 515
EXISTING 3" RAW WATER SUPPLY PIPE
DRAIN PLUG
FOR CLARITY
COWLING REMOVED
4' - 9"
NEW WATER COIL, WC-1
PENETRATIONS
SEE NOTE 7
SHUT OFF VALVE
EL. 515
/2
7' - 6"
RAW WATER LINE
MARK TYPE QTY.
1WC-1
700,000
(BTU/H)
MIN COOLING
MOUNTING TYPE
FRAME
ACCESSORIES
COOLING COIL
WATER SUPPLIED
AIR TEMP.
ENTERING
AIR TEMP.
LEAVING
WATER TEMP.
SUPPLY
WATER TEMP.
LEAVING
35,000
(CFM)
AIR FLOW
A
WATER COIL INSTALLATION DETAILS
SCALE: N.T.S.
N.T.S.
STAIRS NOT SHOWN FOR CLARITY
SEE SPEC 23 82 19.00 40 SEC 2.2.4 & 3.1.3
NEW FLOOR MOUNTED SUPPORTS MUST BE PROVIDED.
INFORMATION ON THE POWER CABLE TUNNEL.
9. SEE REFERENCE DWG Q-4/766.1 AND Q-4/768.2 FOR ADDITIONAL
EXISTING RAW WATER LINE.
8. SEE REFERENCE DWG Q-4/764A.1 FOR ADDITIONAL INFORMATION ON
7. EXISTING SHUTOFF VALVE TO REMAIN.
MODIFIED OR REPLACED AS NECESSARY TO FIT WC-1.
6. THE EXISTING DUCT COWLING IN POWER CABLE TUNNEL TO BE
REINSTALLED WITH MODIFICATIONS AS NECESSARY.
NEW COOLING COIL & ASSOCIATED ITEMS. COUPLING TO BE
M.I. SCREWED FITTINGS.
STANDARD GALVANIZED STEEL PIPE WITH STANDARD GALVANIZED
POWER CABLE TUNNEL FOR WC-1.
DRAINING AND MAINTENANCE. MODIFY COWLING AS REQUIRED.
2. WATER COIL, WC-1, TO BE INSTALLED TO FACILITATE
1. BOLD / RED ITEMS INDICATE EQUIPMENT TO BE INSTALLED
GENERAL NOTES:
S
M
IL
E S
P
.E
IN
S
T A
L L
H V
A C
R E
F U
R B
IS
H
M E
N T
D E
T A
IL
S
M-401
M G
U N
D R
U M
C S
T O
K M
M -4
.d g n
D B
E N
JA
M
IN
A R
C H
E
S H
V
IL
L E
T
E N
N E
S S
(GPM)
WATER FLOWRATE
60 GPM
FROM TERMINATION TO WATER COIL.
NEW PIPING WILL NEED TO BE ROUTED
THROUGH WALL AND IS CAPPED OFF.
EXISTING DRAIN LINE PENETRATES
M-401
File details come from the government source that posted it. Updated .