E-502.pdf

PDF 11 MB Posted

Attached to
Center Hill Medium Voltage Cable Replacement Federal contract opportunity
Solicitation number
W912P521B0007
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

This document outlines a federal contract opportunity issued by the U.S. Army Corps of Engineers Engineering District Nashville. The solicitation seeks a firm fixed price construction contract to remove and replace existing medium-voltage cables and associated equipment for four generating units at the Center Hill Power Plant in Lancaster, Tennessee. The work includes modifying, installing, terminating, and testing medium-voltage bus work and cables; disassembling and removing existing cables and terminations; procuring and installing new 15kV MV-105 cables and Class 3 terminations; procuring and installing temporary feeders and supporting systems; developing asbestos abatement and environmental mitigation plans; and performing factory and field testing of new cable systems. A site visit is tentatively scheduled for April 13, 2021, with submission of a site visit request form encouraged. Questions must be submitted in writing to the specified Contract Specialist by the stated deadlines.

View the file

Other files for this federal contract opportunity

Other files attached to Center Hill Medium Voltage Cable Replacement, newest first.
File Type Posted
W912P521B0007 Bid Abstract page 1.pdf PDF
W912P521B0007 Bid Abstract page 2.pdf PDF
Center Hill Reference Photos - Amendment 002.pdf PDF
M-401.pdf PDF
W912P521B00070002 Amendment 2.pdf PDF
W912P521B0007 TSpecs Amendment 0002.pdf PDF
E-602.pdf PDF
W912P521B00070001 Amendment 1.pdf PDF
W912P521B0007 Site Visit SignIn.pdf PDF
W912P521B0007 RTA TPlans.pdf PDF
W912P521B0007 final.pdf PDF
W912P521B0007 RTA TSpecs.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

S I Z

E

S U

B M

IT

T

E D

B Y

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

SHEET ID

M E

D

IU

M V

O L

T A

G E

C A

B L

E R

E P

L A

C E

M E

N T

C A

N E

Y F

O R

K R

IV

E

R

C E

N T

E R

H

IL

L D

A M

X X

X X

X X

-X X

-X -X

X X

N A

S H

V

IL

L E

D

IS

T R

IC

T

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

XXXXXXXX

XXXXXXXX

XXXXXXXX

W X

X X

X X

-X X

-X -X

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E

C

D

E

F

G

H

J

K

1312111098765432

®of Engineers

US Army Corps

F il e N a m e

P lo t D a te

P lo t T im e

T im e

D a te

F il e

B

A

MID - SPAN

S A

G

NOTE: ONLY ONE CABLE SHOWN FOR BREVITY.

S A

G

MID - SPAN

63 5

SECTION: TYPICAL SAG SECTION

3/8"=1'-0"SCALE:

SHEET KEYNOTES

PULLING DEVICE(S). NEVER USE A SADDLE CLEAT TO TERMINATE TENSION.

USE ANCHOR TO TERMINATE TENSION PRIOR TO RELEASING ANY CABLE 7.

SET THIS SAG SIXTH ACCORDING TO TABLES ON THIS SHEET.6.

TIGHTEN THIS CLEAT FIFTH.5.

SET THIS SAG FOURTH ACCORDING TO TABLES ON THIS SHEET.4.

TIGHTEN THIS CLEAT THIRD AFTER SETTING SAG FROM KEYNOTE 2.3.

ACCORDING TO TABLES ON THIS SHEET.

WHEN TENSION TERMINATION CLEAT IS SET, SET THIS SAG SECOND 2.

PULLING DEVICE(S). NEVER USE A SADDLE CLEAT TO TERMINATE TENSION.

USE ANCHOR TO TERMINATE TENSION PRIOR TO RELEASING ANY CABLE 1.

FROM SUPPORT 39 (ANCHOR) TO SUPPORT 27 (ANCHOR)).

FOR CIRCUIT 4A AND 4B, PINS MAY BE REMOVED AFTER THE SAG IS SET

PROPERLY FOR AN ENTIRE ANCHOR TO ANCHOR SECTION (FOR EXAMPLE,

DO NOT REMOVE LEVELING PIN UNTIL SAG IS SET AND CLEATS ARE TORQUED 8.

SETTING SAG.

DOCUMENTATION OF HOW SECOND CABLE PULL WILL NOT INTERFERE WITH

ENSURE PROPER SAG AND INTERFERENCE IS MINIMIZED, OR PROVIDE

SET SAG OF ENTIRE CABLE RUN BEFORE PULLING SECOND CABLE TO 6.

SET SAG AND TIGHTEN CLEATS IN ORDER AS SHOWN IN KEYNOTES.5.

MEASURE SAG.

APPROPRIATE TABLE TO SET THE SAG OF THE CABLE. SEE ABOVE DETAIL TO

USING THE TEMPERATURE OF THE CABLE AND SPAN LENGTH, USE THE 4.

MEASUREMENT DEVICE.

OR CONTRACTOR SHALL PROVIDE DOCUMENATION OF EMI RESILIENCE OF

DETERMINE TEMPERATURE SAG. CABLE SHALL BE OFF AND DE-ENERGIZED,

TEMPERATURE OF TUNNEL. CABLE TEMPERATURE SHALL BE USED TO

TEMPERATURE IMMEDIATELY PRIOR TO SETTING SAG. DO NOT USE AMBIENT

USING A CALIBRATED TEMPERATURE SENSING "GUN", TAKE THE CABLE 3.

MOVEMENT IS NOTABLE.

SIDES OF STRAP WITH DISTINCT PAINT MARKING TO ENSURE CABLE

DO NOT USE SADDLE STYLE CLEAT TO HOLD CABLE IN TENSION. MARK BOTH 2.

AND CE406 FOR TERMINATION DETAILS.

NOT CUT OR TERMINATE CABLE UNTIL ALL SAGS ARE SET. SEE SHEETS CE405

OTHER END OF THE TUNNEL. DO NOT "SKIP" SECTIONS AND RETURN. DO

TRANSFORMER END OF THE TUNNEL. WORK FROM THAT POINT TO THE

CLEAT (ANCHOR) NEAREST THE TERMINATION POINT AT THE GENERATOR OR

BEGIN AT ONE END OF TUNNEL. START FROM THE FIRST TENSION HOLDING 1.

DETERMINED AND INSTALLED CORRECTLY.

THE FOLLOWING PROCEDURE SHALL BE USED TO ENSURE CABLE SAG IS

CABLE SAG SETTING METHOD

DETAIL: SAG SECTION

6"=1'-0"SCALE:

MAXIMUM SAG (7.25").

CALCULATIONS, OR REVISED TABLES WHICH DO NOT EXCEED DISPLAYED

BASED ON THESE CONDITIONS AND SUBMIT THIS DRAWING TOGETHER WITH

DISTANCES. CONTRACTOR TO PROVIDE ACTUAL DISTANCES AND TENSIONS

EXPECTED TO CHANGE BASED ON TUNNEL CONSTRAINTS AND SUPPORT

SAG TABLES HAVE BEEN ISSUED AS A GENERAL EXAMPLE. TABLES ARE 8.

SPANS REMAIN THE SAME.

LOOKUP TABLES FOR SLOPE SECTIONS. ALL OTHER NOTES FOR LEVEL

BE MEASURED PERPINDICULAR TO THE STRINGLINE PATH. USE SLOPE

STRAPS. MID SPAN TO BE THE HALF WAY POINT OF THIS DISTANCE. SAG TO

FOR SLOPE SPANS: MEASURE POINT TO POINT DISTANCE BETWEEN CLEAT 7.

FROM STRING LINE AND MID-SPAN LOCATION.

USACE WILL USE DIGITAL INTERNAL CALIPER TO VERIFY SAG MEASUREMENT 6.

SAG TOLERANCING TO BE WITHIN +/- 1/16".5.

ACCEPTANCE.

USACE WILL VERIFY MID-SPAN LOCATION AND DEPTH OF SAG PRIOR TO 4.

QA/QC VERIFICATION.

ADD DISTINCT PAINT MARKING TO MID SPAN MEASUREMENT POINT FOR 3.

SHOWN ON THIS SHEET.

MID-SPAN TO BE FOUND WITHIN 1/2" WHEN CABLE SAG IS WITHIN RANGE AS 2.

CLOSEST TO THE SAG.

CABLE, IMMEDIATELY ADJACENT TO THE LAST SADDLE STRAP ON THE SIDE

WHEN MEASURING SAG FROM AN ANCHOR, MEASURE FROM THE TOP OF THE 2.

THE TOP OF THE CABLE IN THE MID-SPAN, AS SHOWN ABOVE.

CABLE ON THE SADDLES, IMMEDIATELY ADJACENT TO THE SADDLE STRAP TO

WHEN MEASURING SAG ON A SADDLE, MEASURE FROM THE TOP OF THE 1.

GENERAL NOTES

S

M

IL

E S

P

.E

IN

S

T A

L L

D E

T A

IL

S

S U

S P

E N

D E

D C

A B

L E

S U

P P

O R

T S

E-502

M G

U N

D R

U M

B S

C H

O F

IE

L

D

E -5

.d g n

E R

O G

E R

S

A R

C H

N A

S H

V

IL

L E

T

E N

N E

S S

File details come from the government source that posted it. Updated .