This is a notice for a solicitation for an Excitation Rehabilitation Single Award Task Order Contract (SATOC) for Nashville District Power Plants. The scope of work requires replacing existing excitation systems with new, fully static, digital excitation systems at up to eight hydropower generation plants along the Cumberland River. This will be a full and open competitive acquisition for a firm-fixed-price SATOC not to exceed $30 million, with a minimum guarantee of $25,000. The contract term is four years base plus three two-year options, for a potential total of ten years. The prototype project involves replacing excitation equipment at the Cordell Hull Power Plant in Carthage, Tennessee, estimated between $1-5 million. The NAICS code is 237130 and size standard is $39.5 million. There is no set-aside designated. The Army Corps of Engineers is the contracting agency.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD92311091
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PURPOSE: The purpose of this amendment is to:
1. Publish the second and final set of questions and answ ers (Q&A).
2. Amend technical specif ication sections 01 33 00 Submittal Procedures and 01 78 00 Closeout Submittals as separate attachments to this amendment.
3. Revise Description of Prototype Task Order Price Schedule CLIN 0014.
4. Update Telecommunications and Video Surveillance Services or Equipment provision 52.204-24 and clause 52.204-25.
5. Revise 52.252-3 Alterations in Solicitation
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P519R0001
X 9B. DATED (SEE ITEM 11)
09-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2020
CODE
CELRN-RC-N CONTRACTING BRANCH
110 9TH AVE SOUTH, A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P519R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006 Q&A
83. Reference “1.4 GOVERNMENT EQUIPMENT INTERFACE, 1.4.4 Potential and Current Transformers “… One current transformer (CT) for each generator is available for the voltage regulators of the new excitation system …” Proper operation of the PSS requires a minimum of two CTs. Three CTs, one per each phase, is the recommended arrangement. See – from the PLANS document sent with the Solicitation – pages E611, E612 and E613. For the CTs that the Corps have already shown as planned for use with the AVR, seen in the coordinates G/F by 3/4 on the drawing, there are three CTs that route to the SEL-751A relay and only one that runs to the “DIGITAL EXCITER.” The other two run elsewhere. Would the government permit the secondary leads of these other CTs could be run to the new exciter as well.”
Answer: The referenced CTs are not permitted for use for the excitation system at this time. Offerors that require more than one (1) CT for implementation of a PSS should include consideration of the effort and cost for adding additional CT(s) as necessary for their system in their proposal.
84. Reference “2.4 POWER POTENTIAL TRANSFORMERS, 2.4.4 Enclosure “… The cubicles shall be of the totally enclosed, freestanding, dead-front type built on a suitable framework of structural steel or by an equivalent approved method. … For a PPT enclosure that is not, in the strictest sense, dead-front type, the protection from incidental contact with live conductors is formed with cabinet openings that are not casually opened, which can offer isolation from the conductors. Would the government review what is desired by “dead-front type” and allow touch safe construction appropriate for powerhouse environment?”
Answer: The described approach of closed cabinet openings offering isolation from conductors and touch safe construction are in line with Government expectations for “dead-front type” enclosure construction.
The NEC definition of “dead front” which is stated as “Without live parts exposed to a person on the operating side of the equipment” is the intent.
85. Reference “2.5 EXCITATION SYSTEM REQUIREMENTS, 2.5.1 General, 2.5.1.6 Electronic Equipment Components, All electronic equipment, such as amplifiers and logic circuits, shall be of solid state design using industrial or military grade discrete transistors or integrated circuits bearing JEDEC Solid State Technology Association registered device numbers, where possible. Non-JEDEC parts shall be identified and approved by the Government. The Bidder asks if the Corps will accept other means of identifying circuit boards – without requiring JEDEC labeling on individual solid state devices.”
Answer: As described in the referenced paragraph of the specifications, labeling and bearing registered device numbers “where possible” is required. Other means of identification are allowable where this may not be practically achieved.
86. Reference “2.5.7.6 Painting, “… Exterior surfaces shall then be primed, filled where necessary, and given not less than two coats of finish matching the color of the existing excitation cabinets. …” The factory can match color, if the customer is able to identify the color to match in a manner that is meaningful to paint suppliers. Can the government furnish a paint chip or a paint number?”
Answer: The existing paint color “Do It Best Alkyd Industrial Enamel”” and a paint sample can be provided after contract award upon request.
87. Question, 20 Jul (Basler): “2.5.10 Field Discharge, Surge Suppression, and Surge Withstand “… a path for the field current and to dissipate the stored energy in the field. The circuitry shall incorporate bi-directional thyristors with a field discharge varistor, or similar approved circuitry. …”Bidder asks for approval for thyristors and field discharge resistors to dissipate the stored energy in the field.”
Answer: The described approach would seem likely to be “similar circuitry” which would be considered for approval. Drawings and details of the proposed system would be provided as part of Submittals for Government approval after contract award.
88. Reference “2.6 EXCITATION SYSTEM CONTROLS, 2.6.12 Power System Stabilizer (PSS) 2.6.12.3 Input Signals “… The power signal shall be derived from an instantaneous watt transducer or equivalent digital algorithm, using three phase voltage and single phase current input signals …” Proper operation of the PSS requires a minimum of two CTs, as mentioned in 1.4.4 above. Three CTs, one per each phase, is the recommended arrangement.”
Answer: Reference Amendment 0006. See the Government’s response to Question 83.
89. Reference “2.7 EXCITER COMMUNICATION, 2.7.3 Human-Machine Interface (HMI) “… Provide the following minimum display parameters … (h) Limiter and protective device setpoints …” Given the CYBERSECURITY REQUIREMENTS, described in SECTION 01 35 70, Paragraph 1.3.9 as “configured using a role-based scheme so that normal operations occur using an Operator level account with minimum privileges required to operate the system. The Contractor shall document the minimum privileges required for the Operator level account. Administration-level (privileged access) accounts shall be required to perform any configuration changes on the system,” the use of the operator’s interface panel, to access limiters setpoints and protective setpoints, contradicts the protections intended. Making changes to limiters and protective functions is not among operations required to operate the system – and accommodating access via the HMI defeats the role-based scheme configured to protect the system from tampering. Changing Auto and Manual operation setpoints is common and those setpoints can be displayed. Limiter and protection setpoints may be accessed via PC with the appropriate level of access. However, limiter and protection setpoint adjustments in the HMI seem to be in conflict with Cybersecurity concerns in Section 01 35 70. The bidder asks the Corps to revise the requirement – to remove the access to the SETPOINTS of the limiters and protections in the digital excitation controller from the HMI panel requirements. The access to these parameters would be more securely accessed via equipment with privileged access and with consideration of the appropriate role in configuring the controller.”
Answer: The referenced paragraphs do not go into specific details regarding the level of access permissions or privileges required for accessing and editing various parameters. Such specifics will be addressed post award through coordination between the contractor and the Government, and subject to Government approval during factory testing and commissioning as well as in submittals such as the “Comprehensive Account List (Encrypted)” submittal item. Manufacturer philosophy and approach towards display and modification of these setpoints and parameters will be compared against specification requirements, and discrepancies will be reviewed and discussed for consideration.
90. Reference “2.7.3 Human-Machine Interface (HMI), “… Provide the following minimum display parameters …(i) PSS status and setpoint, including active / inactive setpoints …” PSS function blocks do not have a setpoint.
PSS status can be displayed such as Enabled/Disabled, Active/Non-Active, or PSS output. The meaning of “setpoint” for the PSS is unknown.”
Answer: PSS indication desired includes PSS Status (as Enabled/Disabled, Active/Inactive, as described in the question) and an indication of the setpoints for power output levels at which the PSS becomes active/inactive. The second are the desired "setpoints" to be displayed for the PSS. Again, manufacturer typical practice may be considered and the final approach utilized will be addressed post award.
91. Reference “Page 5 of 76. CLIN 0014 is listed here as ‘Refurbish exciter collector ring assembly’ whereas under section 01 22 00, item it is listed as ‘Performance and payment bonds’. Please clarify.”
Answer: Reference Amendment 006. CLIN 0014 was revised to be consistent with the specifications.
92. Reference “Page 53 of 76. FAR 52.211-10. It is noted that the project completion is 540 calendar days after notice to proceed. Are there any outage duration limitations, number of units in outage or restrictions when the outages can be scheduled etc? Please advise.”
Answer: Reference Amendment 0005. See the Government’s response to Question 41.
93. Reference “Is a Primavera schedule required for the proposal or can it be MS project?”
Answer: Reference Amendment 0005. See the Government’s response to Question 9.
94. Reference “Section 48 19 26, Item 2.10: Please provide qty, brand and model number of existing brushes and brush holders. Also can you provide mechanical drawing of collector ring that shows mounting of the brush holders.”
Answer: Reference Amendment 0005. See the Government’s response to Question 27. The brush holders are GE part # 4979813-3 and the brushes are Carbon Products Operations (now Morgan A&T) part #2444711.
95. “Solicitation, Page 18, Volume I – Factor I, 4.1 Past Performance - Submission Requirements. All current evaluation factors under Factor I are installation related. This will ensure good quality and performance of the removal and installation work. However, there is not a single performance evaluation factor related to the Excitation System equipment itself. Hence, an installation contractor that qualifies under the current evaluation factors, could use an excitation system that the government has no previous experience with. The government technical specification for the Excitation System is different compared to other utility customers and there is a great deal more documentation requirements related to the Excitation System. Using an Excitation System manufacturer that has no previous experience with USACE projects, would increase the risk of unsuccessful performance for the project. It is suggested that a past performance factor for the Excitation System equipment is added to both guarantee that the proposed system has a past performance with USACE with a similar scope and that the past performance feedback on such projects are evaluated. Alternatively, a modification can be done of the last paragraph under 4.2 Evaluation Criteria: “Additionally, projects that are “similar in scope” and “similar in magnitude” and demonstrate experience with one or both of the following may will receive additional consideration: • Designing, manufacturing and installing a fully static, digital excitation for a USACE project; and/or • Developing and implementing an asbestos abatement plans associated with power plant excitation system removal and abatement of asbestos in accordance with approved plans and local, state, and federal regulations.” We believe that this modification will ensure that the government receives qualified proposals for both the on-site labor and the supplied excitation equipment.”
Answer: These suggestions are noted. The Government is comfortable with the evaluation factors as they stand, however, and will not be changing them.
96. “Solicitation, Page 407, Section 48 19 26, Paragraph 2.11 Please provide part number information on the existing brushes and holders. Also, please provide estimated number of brushes/holders for the uprated generator.”
Answer: Reference Amendment 0006. See the Government’s response to Question 94.
97. “Solicitation, Page 415, Section 48 19 26, Paragraph 3.3.3.4 Would it be possible to provide a photo of the exciter/PPT location showing the intended footprint in order to see how much of the architectural floor finish that needs to be restored after the existing equipment have been removed. Does the plant have matching tiles for use by the contractor or is aware of it the tiles are readily available?”
Answer: Reference Amendment 0005. See the Government’s Response to Question 28.
98. “Solicitation, Page 425 Section 48 70 01, Paragraph 1.4.3 Please confirm if MOD-027-1 (Governor testing) should be part of this excitation contract.”
Answer: Reference Amendment 0005. See the Government’s response to Question 29.
99. “Contract Drawings, Page 31, E-101, Non-seg DC bus routing, Can more dimensions be provided for E-101 to indicate the estimated length of the DC bus duct on top of the generator floor plates as well as the bus extending from the top of the generator to the new exciter location. Also, a side view of the bus duct run from the generator to the Excitation System with dimensions would be preferable. Could a picture also be provided showing the existing Excitation System, Amplidyne, Rheostat and Actuator cabinet etc.”
Answer: Reference Amendment 0005. See the Government’s response to Question 30.
100. “Contract Drawings, Page 33, E-401, Unit Control Board, Please indicate the intended location for the remote HMI panel and if there is sufficient space for mounting an Ethernet switch and 24Vdc power supply in the back of the cabinet.”
Answer: Reference Amendment 0005. See the Government’s response to Question 31.
101. Reference “01 35 70, 1.3.1 “The Contractor shall provide timely patches for vulnerabilities … for all IT HW and SW provided by the Contractor within 30 days of notification.” Please confirm understanding that patching running systems is not included in the scope of work of this contract. In case of any vulnerability alert or notification after conclusion of the commissioning test: 1. Contractor will timely provide the necessary tested Patches for vulnerabilities for the provided excitation system. 2. Government will decide the real need of the system Patching
3. Government will be responsible to install or contract the installation service for the Patches.”
Answer: Prior to commissioning and acceptance by the Government, the contractor is responsible for providing timely patches for vulnerabilities. The Government is not responsible to install the patch if the system has not been turned over to the Government.
102. Reference “01 35 70, 1.3.1 Please confirm if application of whitelisting technologies for the maintenance notebook will be accepted as an alternative.”
Answer: Whitelisting is not an accepted alternative. The contract must patch the maintenance notebook if there are known patches. If a patch is known to have a negative impact to the system, then it does not have to be installed but it must be documented. Reference Specification Section 01 35 70 paragraph 1.3.1.
103. Reference “01 35 70, 1.3.12 Please confirm if this requirement is also applicable to the maintenance notebook.”
Answer: The requirement is applicable to any notebook or computer that will be used for system start-up or testing.
104. Reference “01 35 70, 1.3.12 Please confirm if Microsoft Defender is also a DoD antivirus approved software.”
Answer: Confirmed. Microsoft Defender is a DoD antivirus approved software.
105. “According to the ‘Buy American Requirement’ notice and by request of inapplicability determination, how much of the content of the construction materials should originate in the United States to avoid disqualification? (if applicable).”
Answer: Reference Amendment 0005. See the Government’s response to Question 54.
106. “What is the expected installation date / overall term of the prototype project?”
Answer: Reference Amendment 0005. See the Government’s response to Question 74.
107. “What are the expected progress payment schedules?”
Answer: Please reference FAR 52.232-5 Payments under Fixed-Price Construction Contracts, which is incorporated in the Solicitation.
108. “Would we have to provide personnel to operate the crane on site?”
Answer: Reference Amendment 0005. See the Government’s response to Question 42.
109. “Would we have to provide our own scaffolding to access 13.8kV tap points and to install additional cable trays? Or would it be supported by the plant personnel?”
Answer: Contractor is responsible for providing scaffolding.
110. “Would we have to provide forklift operators to assist in the removal of old equipment and the installation of new equipment?”
Answer: Contractor is responsible for providing a forklift operator.
111. “What safety training is required to work on site and other activities?”
Answer: Reference Specification Section 01 35 26, GOVERNMENTAL SAFETY REQUIREMENTS.
EM385-1-1 will be enforced. Additionally, there is site specific Lock out/Tag out training facilitated by the Cordell Hull project staff that all contractor personnel must complete.
112. “Do all team members need to be OSHA certified to work on site and other activities for this project?”
Answer: No. However, the SSHO and Alternate SSHO must meet requirements of Specification Section
01 35 26, GOVERNMENTAL SAFETY REQUIREMENTS.
113. “About how much concrete work would be required?”
Answer: The anticipated concrete work includes the concrete penetrations to supply AC to the PPT, as well as demo of existing housekeeping pads for Amplidyne. However, the Contractors shall use the provided drawings and reference drawings to determine all inclusive concrete requirements. Refer to specification section 03 60 00 for additional information.
114. “Note: the drawing looks like there are 3 output dents at the AVR, What are the dimensions of the exit dents at the AVR?”
Answer: Assuming that “output dents” and “dimensions of exit dents” refer to the penetrations below the existing exciter cabinets, those dimensions can be found in the password protected pdf of the PowerPoint slides from the virtual site visit that were sent via email to all registered and approved attendees of the virtual site visit.
115. “Could you please provide the image (photos) and specifications of the generator and exciter nameplates?”
Answer: Reference Amendment 0005. See the Government’s response to Question 72.
116. “Is it possible to obtain the characteristic curves of the generator?”
Answer: Reference Amendment 0006. See document “COR U2 Characteristic Curves” published with the Amendment.
117. “What is the full load excitation current (IE)?”
Answer: Reference Amendment 0005 for the relevant name plates. Reference Amendment 0006 for generator information, including characteristic curves. The exciter sizing must meet requirements as laid out in Specification Section 48 19 26.
118. “What is the FSNL excitation current at no-load (IE)?”
Answer: Reference the Government’s response to Question 116.
119. “Will the parts attached to the rotor be removed or reused (retained)?”
Answer: The parts attached to the rotor will be retained, as shown in contract drawing ED-101.
120. “What are the dimensions of the existing slip rings?”
Answer: The dimensions of the existing slip rings are 2” high and approximately 40” in diameter.
121. “How many excitation brushes should be removed (if applicable)?”
Answer: Reference Specification Section 48 19 26 Paragraph 3.3.6. All excitation brushes should be removed and replaced under this contract.
122. “Is it necessary to replace the existing high voltage wiring? And/or wiring from PT and CT?”
Answer: All the wiring that is required to be replaced is designated in the contract drawings ED600 through E-801.
123. “What type/model of synchronization device is currently in operation?”
Answer: Manual synchronization.
124. “Is it required (or optional) to upgrade the existing synchronization device as part of this proposal?”
Answer: No, upgrading the existing synchronization is outside the scope of the contract.
125. “Are the existing cables from the existing AVR to the synchronization device in good condition?”
Answer: Reference the Government’s response to Question No. 122.
126. “What are the specifications of the battery charger source?”
Answer: The 125 VDC battery chargers are (2) 100 amp chargers. They are fed from 3 phase 480 AC.
Normal station DC load is around 65 amps.
127. “Please confirm that the battery charger source voltage is 125VDC?”
Answer: It is unclear what is meant by “battery charger source voltage”. However, the Government can confirm the control power is 125 VDC. Refer to reference drawings for more information.
128. “Is there a 24VDC power supply?”
Answer: No.
129. “Are there other sources that come from batteries?”
Answer: Normal station DC loads are fed from the battery. Preferred AC inverter is fed from the battery.
Normal DC load is around 65 amps.
130. “Can you please provide generator protection settings? a. Device used for generator protection (is it SEL300G?) b. Is an 86 Lockout Relay being used to send trip signal to Field Breaker? c. 40 – Loss of Protection d.
27 – Undervoltage e. 59 – Overvoltage f. 24 – V/Hz g. 81 – Under/Over Frequency”
Answer: SEL300G is used for generator protection. Generator protection settings can be provided after award.
131. “Has any SERC/NERC testing been performed?”
Answer: The Government has not done any testing to date. As equipment is replaced, testing will be required per Specification Section 48 70 01.
132. “Do you have the reports (if applicable)? a. PRC 19, PRC 25 b. MOD 25, MOD 26”
Answer: There are no reports.
133. “Can you please confirm the PT & CT inputs? a. One 3-phase PT voltage input to AVR b. One 1-phase CT current input to AVR”
Answer: Confirm. Those are generator quantities.
134. “Is 37MVA (from drawing) or 46.4MVAR (from spec) required to activate the PSS?”
Answer: The intent of this question is unclear. The PSS would be enabled at a MW loading far lower than either of these referenced values. Tuning and equipment settings will be determined in greater detail after
135. “What is the magnitude of the MW oscillation ranges (rough zones) where there is substantial hydrodynamic instability due to water vortices or turbulent flow?”
Answer: The hydraulic rough zones for the units are around 18 MW to 26 MW. This information should be confirmed during commissioning by the Contractor for their intended purpose.
136. “At what load is the nominal operating output power (typical in MW and MVAR)?”
Answer: Reference Specification Section 48 19 26 Paragraph 1.1.2. Nominal operating output power can be found in.
137. “What is the typical operating voltage of the generator?”
Answer: Nominal (nameplate) voltage for generator is 13.8 KV. The typical voltage is 13.2 KV.
138. “Is the generator operating voltage mostly constant at 13.8kV? Or does it has significant voltage fluctuation?”
Answer: See the Government’s Response to Question 137.
139. “What is the proposed location to place the Excitation Transformer (PPT)?”
Answer: Proposed location for the Excitation Transformer can be found in the contract drawing E-201.
140. Would the PPT be installed on the same deck and adjacent to the AVR cabinets? Or will it be placed underneath or above ground near the 13.8kV bus?”
Answer: Proposed location can be found on the contract drawing E-201. It is on the same deck and adjacent to the AVR cabinets.
141. “Are the instrument boards the only required/ source allowable source for the control room to view the AVR status? HTS can provide an additional touchscreen linked to the AVR that can provide the following: • Excitation ON/OFF • Voltage Raise/Lower Commands (for AVR & Manual Sync) • Excitation Local/Remote Indications • PSS Status • Limiter Control / Activation & Deactivation (o V/Hz Limiter o PQ, Under Excitation Limiter o FCL, Field Current Limiter o Minimum Field Current Limiter o Stator Current Limiter) • Additional Protection Functions (3rd tier of protection in case limiters and 300G fails to operate) (o Overvoltage Protection o Field Overcurrent Protection o Loss of Voltage Balance Protection) • Ability to view more specific AVR alarms in addition to what is provided to HMI alarm/event lists”
Answer: Reference contract drawings, especially ED401 and E-401, for details on instrument boards and indication. A remote HMI is also required which is connected to each AVR as described in Section 48 19 26, paragraph 2.7.7
142. “Which switching functions the current AVR has available? - HTS recommends having accessible by a Touchscreen to switch between: a. AVR Voltage Regulation (Auto Mode) b. VAR, Q Regulation c. Power Factor, Cos Phi Regulation d. Field Current Regulation (Manual Mode)”
Answer: The current AVR has AVR Voltage Regulation (Auto Mode) and Field Current Regulation (Manual Mode). The new ones also need to have AVR Voltage Regulation (Auto Mode) and Field Current Regulation (Manual Mode). VAR, Q Regulation and Power Factor, COS Phi Regulation must not be in place.
143. “Would it be attractive to have a physical excitation dashboard (for manual operation and non-electronic visual display)?”
Answer: The contract drawings and specification lay out required features. Any additional or differing features must be approved by the Government.
144. “Would a multi-function AVR touch screen be preferred in the control room?”
Answer: The contract drawings and specification lay out required features. A remote HMI is required which is connected to each AVR as described in Section 48 19 26, paragraph 2.7.7
145. “For man-machine interaction, would it be necessary to transfer AVR signals to integrate into the DCS Human Machine Interface (HMI) stations, or rather have a dedicated HMI monitor?”
Answer: The contract drawings and specification lay out required features. The meaning of this question is unclear. Specifics on implementation can be discussed and submitted for approval by the Government after
146. “What type/model of Distributed Control System (DCS) is being used?”
Answer: The current excitation system does not use SCADA or DCS.
147. “What type/model of DCS Human Machine Interface (HMI) is being used?”
Answer: The current excitation system does not use SCADA or DCS HMI.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 28-Sep-2020 10:00 AM to 02-Sep-2020 10:00 AM.
The following have been modified:
PROTOTYPE PRICE SCHEDULE
PRICE SCHEDULE
PROTOTYPE TASK ORDER
EXCITATION SYSTEM UPGRADE
CORDELL HULL POWER PLANT
Table
CLIN Description Unit Quantity Unit Price Amount
0001 Design, manufacture, 3 EA $_________ $__________ test and deliver excitation systems and appurtenances
(SECTION 48 19 26.00 26)
0002 Disassemble and remove 3 EA $_________ $__________ existing excitation systems
(SECTION 48 19 26.00 26)
0003 Install, test, and commission 3 EA $_________ $__________ excitation systems and appurtenances; modify existing powerhouse control panels; and deliver and install external wiring, cabling, conduits, and bus
(SECTION 48 19 26.00 26)
0004 Mobilize and demobilize 1 Job xxxxx $__________ for installation work
(SECTION 48 19 26.00 26)
0005 Perform special factory tests 1 Job xxxxx $__________
(SECTION 48 19 26.00 26)
0006 Special tools and spare parts 1 Job xxxxx $__________ (Section 48 19 26.00 26)
0007 Concrete removal and repair 3 EA $_________ $__________
(SECTION 03 60 00.01 26)
0008 Training 1 Job xxxxx $__________
(SECTION 48 19 26.00 26)
0009 Asbestos Abatement Work (Section 02 82 14)
0009A Asbestos Bulk Sampling of 1 Job $_________ $__________ Materials
0009B Disposal of Non-Friable 200 LBS $_________ $__________ Asbestos-Containing Materials
0009C Disposal of Friable 200 LBS $_________ $__________ Asbestos-Containing Materials
0009D Services of a Certified 120 MH $_________ $__________ Asbestos Abatement Worker
0009E Services of a Certified 60 MH $_________ $__________ Asbestos Abatement Supervisor
0009F Services of a Certified 60 MH $_________ $__________ Air Monitoring Personnel
0010 Model validation testing 1 Job xxxxx $__________ and reports (Section 48 70 01.00 26)
0011 Convert applicable reference 50 EA $_________ $__________ drawings into CADD format (Section 01 78 00)
0012 Furnish and install new 3 EA $_________ $__________ brushes and holders (Section 48 19 26.00 26)
0013 Inspect and test existing 3 EA $_________ $__________ collector ring assembly (Section 48 19 26.00 26)
OPTION
0014 Performance and Payment Bonds 1 JOB $_________ $__________
TOTAL $_______________
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001:
This solicitation is amended to change the Virtual Site Visit Date to 16 June 2020 at 10:00 am central time.
SECTION 00 21 00 INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS Paragraph 1.9 Pre-Proposal Site Visit has been revised.
FAR 52.236-27 ALT I, SITE VISIT (CONSTRUCTION) is updated.
Amendment 0002:
This solicitation is amended to change the Virtual Site Visit Date to 1 July 2020 at 10:00 am central time and the deadline for questions to 8 July 2020 at 1:00 pm central time.
The following paragraphs in SECTION 00 21 00 INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS have been revised to reflect the date changes: 1.9 Pre-Proposal Site Visit and 1.11 Point of Contact for Communication/Questions
FAR 52.236-27 ALT I, SITE VISIT (CONSTRUCTION) is updated.
Amendment 0003:
This solicitation is being amended to remove the requirement under Instructions to Offerors, paragraph 1.10, Requirements to Attend the Site Visit , "Only two persons from each business entity will be permitted to attend."
There is no limitation to the number of registered persons to attend the virtual site visit.
Amendment 0004:
This solicitation is being amended to extend the due dates for Questions until 1:00 pm Central Time on Friday, 24 Jul 2020 and Proposals until 10:00 am Central Time on Wednesday, 2 September 2020. SECTION 00 21 00 INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS, Paragraphs 1.11 Point of Contact for Communication/Questions and 6.0 Where to Submit & Submittal Deadline have been revised.
Amendment 0005:
PURPOSE: The purpose of this amendment is to:
1. Publish the first set of questions and answers (Q&A). The final set of Q&A will be published in a forthcoming amendment.
2. Provide the virtual site visit attendee list and amended technical specifications as separate attachments to this amendment.
3. Revise the terms (paragraph b) of FAR 52.246-21, Warranty of Construction, and Section 00 21 00 of the solicitation.
4. Incorporate Government Furnished Property clauses: FAR 52.245-1, FAR 52.245-9, DFARS 252.211-7007, DFARS 252.245-7001, DFARS 252.245-7002 (DEV), DFARS 252.245-7003, DFARS 252.245-7004.
Amendment 0006:
PURPOSE: The purpose of this amendment is to:
1. Publish the second and final set of questions and answers (Q&A).
2. Amend technical specification sections 01 33 00 Submittal Procedures and 01 78 00 Closeout Submittals as separate attachments to this amendment.
3. Revise Description of Prototype Task Order Price Schedule CLIN 0014.
4. Update Telecommunications and Video Surveillance Services or Equipment provision 52.204-24 and clause 52.204-25.
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been added by full text:
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES
OR EQUIPMENT (AUG 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it “does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument” in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
(d) Representations. The Offeror represents that—
(1) It [] will, [] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds “will” in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that—
It [] does, [] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds “does” in paragraph (d)(2) of this section.
(e) Disclosures. (1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded “will” in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded “does” in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by reference:
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
(End of Summary of Changes)
1-lul I - I 0 - •/ �"
- �--1 :J '
__ rel Ct: -c_J a::--; I
• + • --+ I 2.tXJd ... . I
��: �::_J :i:��-�;
/&ro:
/200i
Solicitation # W912P519R0001
US Army Corps Of Engineers Nashville District
Excitation Replacement
Cordell Hull Power Plant Smith County, Tennessee
Technical Specifications- Amendment 006
August 2020
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
Excitation Replacement Cordell Hull W912P519R0001_AMD 006 Smith County, TN
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 78 00 CLOSEOUT SUBMITTALS
PROJECT TABLE OF CONTENTS Page 1
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
SECTION TABLE OF CONTENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 SUBMITTALS
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Designer of Record Approved (DA)
1.4.2 Government Approved (G)
1.4.3 For Information Only
1.5 PREPARATION
1.5.1 Transmittal Form
1.5.2 Source Drawings for Shop Drawings
1.5.2.1 Terms and Conditions
1.5.3 Electronic File Format
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of Samples SD-04 Samples
1.7 INFORMATION ONLY SUBMITTALS
1.8 SUBMITTAL REGISTER
1.8.1 Use of Submittal Register
1.8.2 Contractor Use of Submittal Register
1.8.3 Approving Authority Use of Submittal Register
1.8.4 Copies Delivered to the Government
1.9 VARIATIONS
1.9.1 Considering Variations
1.9.2 Proposing Variations
1.9.3 Warranting that Variations are Compatible
1.9.4 Review Schedule Extension
1.10 SCHEDULING
1.11 GOVERNMENT APPROVING AUTHORITY
1.11.1 Review Notations
1.12 DISAPPROVED SUBMITTALS
1.13 APPROVED SUBMITTALS
1.14 APPROVED SAMPLES
1.15 WITHHOLDING OF PAYMENT
1.16 STAMPS
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
SECTION 01 33 00 Page 1
Appendix A - Submittal Register
Appendix B ENG Form 4025-R
-- End of Section Table of Contents --
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
1.1 SUMMARY
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby.
Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.
A submittal register showing items of equipment and materials for when submittals are required by the specifications is provided as "Appendix A - Submittal Register".
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates of insurance
SECTION 01 33 00 Page 3
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction progress schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices or Earned Value Report
Health and safety plan
Work plan
Quality Control(QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a Canmaterial, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared
SECTION 01 33 00 Page 4 for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (SDS) concerning impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase
SECTION 01 33 00 Page 5 of construction on a multi-phase contract.
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .