Cordell Hull Excitation AMD-005 Reference Drawings.pdf
PDF 2 MB Posted
- Attached to
- Excitation Rehabilitation Single Award Task Order Contract (SATOC) for Nashville District Power Plants
- Solicitation number
- W912P519R0001
About this file
This document outlines a solicitation for a Single Award Task Order Contract (SATOC) to improve excitation equipment at hydropower generation plants. The Nashville District US Army Corps of Engineers seeks to replace excitation systems at up to eight plants along the Cumberland River with new digital systems through a firm-fixed price construction contract not to exceed $30 million. The prototype project involves replacing equipment at the Cordell Hull Power Plant for $1-5 million. Offerors must furnish supervision, engineering, labor, materials and equipment to design, manufacture, test, deliver and install three new excitation systems and remove three existing systems at Cordell Hull. The scope also includes associated wire, cable, conduits and commissioning. A virtual site visit will be held on June 16, 2020 to review the prototype project. The contract period is four base years with three two-year options and NAICS code 237130 applies with a $39.5 million size standard. The solicitation is open to all and there is no set-aside designated.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
q16-79^110.2
| q16-79^128 |
| q16-79^129.1 |
File details come from the government source that posted it. Updated .