W912P519R0001.pdf
PDF 1 MB Posted
- Attached to
- Excitation Rehabilitation Single Award Task Order Contract (SATOC) for Nashville District Power Plants
- Solicitation number
- W912P519R0001
About this file
This is a solicitation for a single award task order construction contract to replace excitation equipment at up to eight hydropower generation plants along the Cumberland River. The Nashville District US Army Corps of Engineers will award an indefinite delivery indefinite quantity firm-fixed-price construction contract with a value not to exceed $30 million over ten years. The minimum guarantee is $25,000 for the base period. The contract will include a base period of four years and three two-year option periods. The solicitation is full and open and subject to a 10% price evaluation preference for HUBZone small businesses. The prototype project involves replacing excitation equipment at the Cordell Hull Power Plant in Carthage, Tennessee by August 14, 2020. The estimated value is between $1 million and $5 million. Offerors must have experience with excitation system removal and installation, control system work, and medium voltage cable projects. The submission includes requirements for past performance, technical design, safety, and small business participation information.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD92311091
PROJECT TITLE: Excitation Equipment Replacement Single Aw ard Task Order Contract (SATOC) for Nashville District Pow er Plants
NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM CODE (NAICS): 237130, Pow er and Communication Line and Related Structures Construction
SMALL BUSINESS ADMINISTRATIION SIZE STANDARD FOR 237130: $39.5 M.
TYPE OF COMPETITION: This is a Full and Open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.
ESTIMATED MAGNITUDE OF PROTOTYPE PROJECT: Betw een $1,000,000 and $5,000,000.
Proposals received by email or facsimile w ill not be considered.
NOTE: Complete information in Block 11 w ill be provided on a Task Order basis.
ROBERT B HOLDSWORTH
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-Jun-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________14 Aug 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
615-736-7124FAX:TEL: 615-736-7917 TEL: FAX:
W912P519R0001 76
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912P519R0001
Section 00 10 00 - Solicitation
BASIC CONTRACT SCOPE OF WORK
This is an Indefinite Delivery Indefinite Quantity (IDIQ), Single Award Task Order Contract (SATOC) for the removal of the existing excitation equipment and replacement of Solid State Excitation equipment/systems in support of the U.S. Army Corps of Engineers, Nashville District (LRN) hydropower mission.
The SATOC will be utilized by LRN for demolition, fabrication or installation of low-, medium- or high-voltage electrical controls and equipment in hydropower generating facilities throughout the Cumberland River System in Tennessee and Kentucky. The equipment may consist of electrical controls, digital turbine governors, medium-voltage cables, breakers, exciters, transformers and similar equipment used in the production and distribution of power generated at Cumberland River facilities. The potential exists for the contractor to encounter asbestos or lead-based paint in connection with the work, and remediation of affected components will be required as part of the scope of work. This description is not intended to be all encompassing and is subject to change.
The basic contract will be awarded and administered (e.g. issuing modifications, etc.) by the Nashville Contracting Division, 110 Ninth Avenue South, Nashville, TN 37203-3817. Basic contract data for the IDIQ-SATOC contract is as follows:
The Government intends to award one (1) IDIQ-SATOC contract.
This procurement is Full & Open.
Period of contract shall not exceed four (4) year base period and three (3) two (2) year option periods for a total of ten (10) years.
The minimum guaranteed contract amount is $25,000 for the base period. There is no guaranteed minimum for the option periods.
The total combined contract capacity under this SATOC contract is $30,000,000 over the ten (10) year period.
A bid guarantee is only required for the Prototype Project in accordance with FAR 52.228-1. Payment and performance bonds shall be submitted for each individual task order within ten (10) calendar days following task order award.
Liquidated damages amounts will be provided in this solicitation for the Prototype Project and with each individual task order.
Wage Determinations will be provided in this solicitation for the Prototype Project and with each individual task order
Task Order: Evaluation Criteria and Award:
The Prototype Project will be awarded as a task order against the SATOC. Award of that task order is anticipated within 60 days of the SATOC award. See Section 00 21 00 for additional information on the Prototype Project.
Future Projects: Future requirements will be procured by issuance of firm fixed-price task orders against the SATOC. Each task order will be initiated by the issuance of a Request for Proposal (RFP) to the SATOC-holder and will include, among other information: the statement of work, opportunity for a site visit, technical plans and specifications, period of performance, liquidated damages, and wage determinations.
PROTOTYPE PRICE SCHEDULE
PRICE SCHEDULE
PROTOTYPE TASK ORDER
EXCITATION SYSTEM UPGRADE
CORDELL HULL POWER PLANT
Table
CLIN Description Unit Quantity Unit Price Amount
0001 Design, manufacture, 3 EA $_________ $__________ test and deliver excitation systems and appurtenances
(SECTION 48 19 26.00 26)
0002 Disassemble and remove 3 EA $_________ $__________ existing excitation systems
(SECTION 48 19 26.00 26)
0003 Install, test, and commission 3 EA $_________ $__________ excitation systems and appurtenances; modify existing powerhouse control panels; and deliver and install external wiring, cabling, conduits, and bus
(SECTION 48 19 26.00 26)
0004 Mobilize and demobilize 1 Job xxxxx $__________ for installation work
(SECTION 48 19 26.00 26)
0005 Perform special factory tests 1 Job xxxxx $__________
(SECTION 48 19 26.00 26)
0006 Special tools and spare parts 1 Job xxxxx $__________ (Section 48 19 26.00 26)
0007 Concrete removal and repair 3 EA $_________ $__________
(SECTION 03 60 00.01 26)
0008 Training 1 Job xxxxx $__________
(SECTION 48 19 26.00 26)
0009 Asbestos Abatement Work (Section 02 82 14)
0009A Asbestos Bulk Sampling of 1 Job $_________ $__________ Materials
0009B Disposal of Non-Friable 200 LBS $_________ $__________ Asbestos-Containing Materials
0009C Disposal of Friable 200 LBS $_________ $__________ Asbestos-Containing Materials
0009D Services of a Certified 120 MH $_________ $__________ Asbestos Abatement Worker
0009E Services of a Certified 60 MH $_________ $__________ Asbestos Abatement Supervisor
0009F Services of a Certified 60 MH $_________ $__________ Air Monitoring Personnel
0010 Model validation testing 1 Job xxxxx $__________ and reports (Section 48 70 01.00 26)
0011 Convert applicable reference 50 EA $_________ $__________ drawings into CADD format (Section 01 78 00)
0012 Furnish and install new 3 EA $_________ $__________ brushes and holders (Section 48 19 26.00 26)
0013 Inspect and test existing 3 EA $_________ $__________ collector ring assembly (Section 48 19 26.00 26)
OPTION
0014 Refurbish existing collector 3 EA $_________ $__________ ring assembly
(SECTION 48 19 26.00 26)
TOTAL $_______________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 30,000,000 Job Excitation Systems and Appurtenances
FFP
EXCITATION EQUIPMENT REPLACEMENT CONSTRUCTION SATOC FOR
NASHVILLE DISTRICT POWER PLANTS IN ACCORDANCE WITH EACH
INDIVIDUAL TASK ORDER'S SPECIFICATIONS AND PLANS TO BE
ISSUED UNDER THIS CONTRACT. SATOC SHALL NOT EXCEED
$30,000,000.00 FOR THE LIFE OF THE CONTRACT. GUARANTEED
MINIMUM IS $25,000.00.
FOR INFORMATIONAL PURPOSES; DO NOT INCLUDE PROPOSED
PRICING ON THIS LINE ITEM (CLIN).
FOB: Destination
MILSTRIP: W38XDD92311091
PURCHASE REQUEST NUMBER: W38XDD92311091
PSC CD: Z2MD
NET AMT
1001 Job OPTION Option 1
FFP
EXCITATION EQUIPMENT REPLACEMENT CONSTRUCTION SATOC FOR
NASHVILLE DISTRICT POWER PLANTS IN ACCORDANCE WITH EACH
INDIVIDUAL TASK ORDER'S SPECIFICATIONS AND PLANS TO BE
ISSUED UNDER THIS CONTRACT. SATOC SHALL NOT EXCEED
$30,000,000.00 FOR THE LIFE OF THE CONTRACT.
FOR INFORMATIONAL PURPOSES; DO NOT INCLUDE PROPOSED
PRICING ON THIS LINE ITEM (CLIN).
FOB: Destination
MILSTRIP: W38XDD92311091
2001 Job OPTION Option 2
FFP
EXCITATION EQUIPMENT REPLACEMENT CONSTRUCTION SATOC FOR
NASHVILLE DISTRICT POWER PLANTS IN ACCORDANCE WITH EACH
INDIVIDUAL TASK ORDER'S SPECIFICATIONS AND PLANS TO BE
ISSUED UNDER THIS CONTRACT. SATOC SHALL NOT EXCEED
$30,000,000.00 FOR THE LIFE OF THE CONTRACT.
FOR INFORMATIONAL PURPOSES; DO NOT INCLUDE PROPOSED
PRICING ON THIS LINE ITEM (CLIN).
FOB: Destination
3001 Job OPTION Option 3
FFP
EXCITATION EQUIPMENT REPLACEMENT CONSTRUCTION SATOC FOR
NASHVILLE DISTRICT POWER PLANTS IN ACCORDANCE WITH EACH
INDIVIDUAL TASK ORDER'S SPECIFICATIONS AND PLANS TO BE
ISSUED UNDER THIS CONTRACT. SATOC SHALL NOT EXCEED
$30,000,000.00 FOR THE LIFE OF THE CONTRACT.
FOR INFORMATIONAL PURPOSES; DO NOT INCLUDE PROPOSED
PRICING ON THIS LINE ITEM (CLIN).
FOB: Destination
Section 00 21 00 - Instructions
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
1.0 GENERAL REQUIREMENTS
1.1 Intent
The intent of this solicitation is to issue a SATOC for the removal of the existing excitation equipment and replacement with a new, fully static, digital excitation system at up to eight (8) of the U.S. Army Corps of Engineers (USACE), Nashville District’s (LRN) hydropower generation plants on the Cumberland River. If all options are exercised, the requirement will cover a 10-year period (a base of four (4) years and three (3) 2-year options) or when the overall contract capacity has been met, whichever comes first. One (1) Indefinite Delivery Indefinite Quantity (IDIQ) construction contract will be awarded.
1.2 Project Description
The SATOC can be utilized by LRN for the demolition, design, fabrication, supply and/or installation of new exciters in hydropower generating facilities throughout the Cumberland River System in Tennessee and Kentucky.
The potential exists for the contractor to encounter asbestos or lead-based paint in connection with the work, and remediation of affected components will be required as part of the scope of work. This description is not intended to be all encompassing and is subject to change. The prototype project, Cordell Hull Power Plant Excitation System Upgrade is located in Carthage, Tennessee. This project involves the removal of the current shaft-mounted exciters and installation of floor-mounted digital, solid state exciters in accordance with the plans and specifications.
1.3 Disclosure of Magnitude of Construction Project
The estimated magnitude of this requirement is between $25,000,000 and $100,000,000. The minimum guarantees contract amount is $25,000.
The estimated magnitude of the prototype project is between $1,000,000 and $5,000,000.
1.4 Basis of Selection of Award
The basis of award is the Best Value Tradeoff Process. The Contracting Officer will award one (1) construction SATOC to the responsible Offeror whom the Source Selection Authority (SSA)/Contracting Officer determines conforms to the solicitation, is fair and reasonable and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
The prototype project is anticipated to be first task order and will be used for the purpose of evaluating each Offeror’s price.
1.5 Type of Contract
The Government intends to award one (1) firm-fixed price construction SATOC.
1.6 Who May Submit
This procurement is unrestricted to obtain full and open competition. Proposals from firms organized as joint ventures (JV) that have associated specifically for this project must include a copy of the legal joint venture agreement in the proposal submission.
1.7 North American Industry Classification System (NAICS) Code and Small Business Size Standard
The NAICS code for this project is 237130 (Power and Communication Line and Related Structures Construction) with a size standard of $39,500,000.
1.8 AVAILABILITY OF PLANS (DRAWINGS), TECHNICAL SPECIFICATIONS AND ADDITIONAL
DOCUMENTS
Specifications and Drawings will be provided as separate files and will be available in www.beta.SAM.gov due to the size and pages associated with each. See the complete drawings and specifications package located at the following website: www.fbo.gov.
The Specifications and Drawings are part of the contract and shall be considered in that respect (see DFARS 252.236-7001, Contract Drawings and Specifications).
1.9 Pre-Proposal Site Visit
An organized site visit has been scheduled to occur during the solicitation period. Offerors should inspect the job site prior to submitting a proposal. Offerors should take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof.
Failure to do so will not relieve Offerors from the responsibility for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents, and any amendments to the solicitation as may be issued.
Please refer to the Federal Acquisition Regulations (FAR) 52.236-27 Alt 1, Site Visit (Construction)
Visit (Construction), incorporated by full text in this solicitation, for information pertaining to the scheduled site visit.
Due to the social distancing guidelines provided by the Centers for Disease Control and Prevention (CDC) because of COVID-19, this site visit will be a video conference presentation that shall be held on at 10:00AM Central Time on 15 June 2020. Recorded and/or livestream videos will be accessible. Contract Specialist Rob Holdsworth (Robert.B.Holdsworth@usace.army.mil) will provide information to registered Offerors regarding how to access the system and associated teleconference at least one (1) business day prior (reference paragraph 1.10 Requirements to Attend the Site Visit).
This will be the only site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.
1.10 Requirements to Attend the Site Visit
Only registered persons will be permitted to attend the site visit. In addition to the below information, please also provide the name of your firm, firm’s CAGE and/or Unique Entity Identifier (formerly known as DUNS), and name and position title of primary point-of-contact and their telephone number and email address. Only two persons from each business entity will be permitted to attend.
U.S. Citizens: To register, U.S. citizens interested in attending the site visit must submit a Nashville District (LRN) Security Access Form to the Point of Contract (POC), Contract Specialist Robert (Rob) Holdsworth, by email to Robert.B.Holdsworth@usace.army.mil no later than three (3) business days prior to the site visit. If submitting the form in less than three days, the person may not receive approval for participation. Notification of approval or denial will be provided prior to the date of the site visit. The form is available as a pdf attachment on www.fbo.gov with this solicitation and is titled as Pre-Proposal Site Visit Form.
Foreign Nationals (FNs): FNs wishing to attend the site visit shall submit a completed LRN FN Security Form and legible color copies of two of the following documents: Passport (unexpired or expired), Certificate of U.S.
Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N 550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I-688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS- Form I571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN POC. These documents must be submitted two (2) weeks prior to the site visit. Exceptions will be considered on a case by case basis but will be limited. The form is available at:
http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx
1.11 Point of Contact for Communication/Questions:
Any communications regarding this procurement must be made in writing to the Nashville Contracting Branch, Attn: Contract Specialist Robert (Rob) Holdsworth at email Rob.B.Holdsworth@usace.army.mil. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, and telephone number to include area code.
Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be scheduled.
QUESTIONS: Questions regarding the solicitation must be submitted to Robert (Rob) Holdsworth via email at Robert.B.Holdsworth@usace.army.mil no later than 1:00 PM Central Time, June 24, 2020 (subject to change IAW with the release of the solicitation).
1.12 Amendments Prior to Date Submission for Request for Proposals (RFP). The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of Request for Proposals (RFP). Such revisions and amendments, if any will be announced by an amendment or amendments to this RFP. If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of RFPs may be postponed by such number of days as in the opinion of the issuing Contracting Officer will enable Offerors to revise their offer. In such cases, the amendment will include an announcement of the new date for receipt of offer.
1.13 Notice to Offeror: Use of Class I Ozone-Depleting Substances
a. In accordance with Section 326 of P.L. 102-484, the Government is prohibited from awarding any contract which includes a specification or standard that requires the use of a Class I ozone-depleting substance (ODS) identified in Section 601(a) of the Clean Air Act, (42 U.S.C 767a(a)), or that can be met only through the use of such a substance unless such use has been approved, on an individual basis, by a senior acquisitions official who determines that there is no suitable substitute available.
b. To comply with this statute, the Government has conducted a best effort screening of the specifications and standards associated with this acquisition to determine whether they contain any ODS requirements. This requirement has no relationship to ODSs.
c. If the Offeror possesses any special knowledge about any other ODSs required directly or indirectly at any level of contract performance, the U.S. Army would appreciate if such information were surfaced to the Contracting Officer for appropriate action. To preclude delay to the procurement, the Offeror should provide any information as soon as possible after release of this Request for Proposal (RFP) and prior to the submission of proposals to the extent practicable. It should be understood that there is no obligation on the Offeror to comply with the request and that no compensation can be provided for doing so.
2.0 BONDS AND INSURANCE
2.1 BID GUARANTEE. All Offerors shall furnish an electronic copy bid guarantee with their proposal submission.
In accordance with FAR 52.228-1, Bid Guarantee, the bidder (or Offeror for this solicitation) shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond (use Standard Form 24) supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3,000,000.00. If using a Bid Bond, it must be submitted on SF 24. The SF 24 can be found at the GSA Forms Library at https://www.gsa.gov/forms. Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates, without regard to the order in which they are affixed.
2.2 INSURANCE. Contractor shall carry Liability and Insurance. See FAR 52.228-5, Insurance – Liability to Third Persons.
2.3 The successful Offeror will, within the time established in the proposal, furnish performance and payment bonds in the amounts indicated in the RFP or the specifications.
a. PERFORMANCE BONDS (Standard Form (SF) 25). Pursuant to FAR 52.228-15, Performance and Payment
Bonds—Construction (Deviation 2020-O0016), the penal amount of the performance bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received on a SF 25 within ten (10) calendar days after receipt of contract award. The SF 25 can be found at the GSA Forms Library at https://www.gsa.gov/forms.
b. PAYMENT BONDS (SF 25A). Pursuant to FAR 52.228-15, Performance and Payment Bonds—
Construction (Deviation 2020-O0016), the penal amount of the payment bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received on a SF 25A within ten (10) calendar days after receipt of contract award. The SF 25A can be found at the GSA Forms Library at https://www.gsa.gov/forms.
3.0 SYSTEM FOR AWARD MANAGEMENT (SAM)
In accordance with FAR 52.204-7, System for Award Management, registration is required in the System for Award Management (SAM) database located at www.sam.gov. More specifically, "An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation." (See FAR 52.204-7(b)(1)).
For SAM Customer Service, contact:
Federal Service Desk URL: www.fsd.gov Hours: 8am - 8pm (Eastern Time) U.S. Calls: 866-606-8220 International Calls: 334-206-7828
DSN: 866-606-8220
IMPORTANT NOTICE: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 calendar days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS).
The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
4.0 SMALL BUSINESS PARTICIPATION PLAN (SBPP)
All Offerors (both large and small businesses) are required to complete a Small Business Participation Plan (SBPP) in accordance with Defense Federal Acquisition Supplement (DFARS) 215.304. Reference section 00 21 00 of this solicitation for additional submission requirements.
5.0 SUBCONTRACTING PLAN
The successful Offeror (if a large business) shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR 52.219-9 Alt II (Deviation 2018-O0018) and DFARS 252.219-7003. The Subcontracting Plan is not a requirement for evaluation in source selection but shall be provided upon request before contract award (if the successful Offeror is a large business). The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).
6.0 WHERE TO SUBMIT & SUBMITTAL DEADLINE
Offerors shall submit their proposals no later than the time and date specified in Block 13 of SF 1442 of this solicitation as follows:
The Offeror’s proposal shall be submitted electronically, as described below. The RFP will provide proposal submission instructions and receipt date for proposal submittal. The Offeror’s proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.
NOTE: The only authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR
MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall submit their proposals using the following link:
https://safe.apps.mil/
Please send proposals using the link above to Contract Specialist Rob Holdsworth at Robert.B.Holdsworth@usace.army.mil AND to Contracting Officer Stacy Wiggins at Stacy.S.Wiggins@usace.army.mil
INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site.
Submission shall be in Adobe PDF format. You are limited to twenty-five (25) maximum files per upload (total size cannot exceed 8GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
REQUEST FOR UPLOAD CODE: Offerors must email Contract Specialist Rob Holdsworth at Robert.B.Holdsworth@usace.army.mil AND Contracting Officer Stacy Wiggins at Stacy.S.Wiggins@usace.army.mil no later than five (5) business days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email or request a code five (5) business days before proposal submission date may not be able to receive a request code in time to upload their submission. THIS MUST BE DONE FOR THIS PROCUREMENT.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter
Privacy Act Data (Personal Identification Information (PII)) in the File Description. Submission shall be in Adobe PDF format.
INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:
1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email addresses for all recipients. For this solicitation, the recipients are the Contract Specialist, Rob Holdsworth at Robert.B.Holdsworth@usace.army.mil and the Contracting Officer Stacy Wiggins at Stacy.S.Wiggins@usace.army.mil. The e-mail address of the Government Employee who initiated the request code will be automatically entered. The Offeror must enter the email address for both the Contracting Officer and Contract Specialist. The Offeror can enter an additional email address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the Government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. An Offeror can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.
NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS: For the purpose of establishing whether a proposal submission is considered timely, the Government will consider the date and time the submission is completely uploaded into the SAFE website. For proposals larger than the 8GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
SECTION 00 21 00
PROCEDURES FOR SUBMITTAL OF OFFERS
AND
PROPOSAL EVALUATION APPROACH
1. Submittal of Offers
1.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein.
However, in order to be effectively and equitably be evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's past performance, technical design, safety and small business participation plan necessary for successful completion of the project. The requirements stated in this RFP are minimums.
1.2 Offerors shall submit their proposals to the Government no later than the time and date specified in Block 13 of Standard Form 1442 of this solicitation. Detailed submission instructions are listed above in section Instruction, Conditions, & Notices to Offerors, paragraph 6.0, Where to Submit & Submittal Deadline.
1.3 Offerors are required to submit a proposal made up of Past Performance, Technical Design, Safety, Small Business Participation Plan, and Price, and Pro Forma. All proposal materials shall be submitted via the SAFE website with a bookmarked table of contents and/or a standard electronic Tab Index. The sections should parallel the submission requirements identified below. Volume I shall be submitted in Portable Document Format (PDF) and shall be either tabbed or bookmarked to reflect the division of Factors in accordance with paragraph 3, Proposal Information and Related Evaluation Factors. Volume II shall be submitted as a separate PDF file and shall also be tabbed or bookmarked in accordance with paragraph 3.
*NOTE: Provide the complete Volume I proposal submittal including text, renderings, drawings, photographs, etc.
on SAFE site. Provide the complete Volume II proposal submittal on SAFE site with the final price breakout schedule electronically.
2. Proposal Evaluation Process
2.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of USACE, will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals will be reviewed and rated without knowledge of the price offered. The number and identities of Offerors are not revealed to anyone who is not involved in the evaluation and award process or to other Offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is the Best Value Tradeoff Process.
2.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility determination, technical evaluation, price evaluation, and cost/technical trade-off analysis.
2.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications (if applicable) are complete and that both a technical and price proposals were received.
2.2.2 Technical Evaluation: The SSEB will evaluate and rate the proposals against the RFP requirements. Some factors will be rated using an adjectival-based system. Others will be rated on an “acceptable/unacceptable” basis.
Past Performance will be rated based on recency/relevancy and confidence.
2.2.3 Price Evaluation: The SSEB, Cost Engineering, and Contracting Officer/Source Selection Authority (SSA) will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.
2.2.4 Cost/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The SSA will then consider all factors to select the proposal offering the best value to the Government.
3. Proposal Information and Related Evaluation Factors.
3.1 Proposals will be evaluated in accordance with the factors listed in relative order of importance.
Note: To be eligible for award, Factor I, Past Performance, must be rated at least “Satisfactory Confidence,” and Factors II - IV, must be rated at least “Acceptable.”
All non-priced factors, when combined, are approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with Offerors, except Clarifications (as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best technical and price terms.
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
3.2 Volume I – Past Performance Proposal
Volume I – Factor I – Past Performance
3.3 Volume I – Technical Proposal
Volume I – Factor II – Technical Design
Volume I – Factor III – Safety
3.4 Volume I – Small Business Participation Proposal
Volume I – Factor IV – Small Business Participation Plan
3.5 Volume II - Price and Pro Forma Information
Section A Proposal Data Sheet Not Rated
Section B SF1442 and Acknowledged Amendments (if any) Not Rated
Section C Section B, Price Proposal Not Rated
Section D Joint Venture Agreement, if applicable Not Rated
Section E Proof of Financial Capability Not Rated
3.6 Ratings
Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.
Past Performance Confidence Relevancy Ratings Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Past Performance Confidence Assessments
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the
Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Technical Design Proposal Ratings
Adjectival Rating Definition Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Safety and Small Business Participation Plan Ratings
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
3.7 Definitions
1. Adverse Past Performance. Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “CPARS” or “FAPIIS.”
2. Clarification. Limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
3. Communications. Exchanges, between the Government and Offerors, after receipt of proposals, leading to establishment of the competitive range.
4. Competitive Range. See FAR 15.306(c)
5. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See
FAR 15.001.
6. Discussions. Negotiations conducted in a competitive acquisition. Discussions take place after establishment of the competitive range.
7. Evaluation Notice (EN). A written notification to the Offeror for purposes of clarifications, communications, or in support of discussions.
8. Performance Confidence Assessment. An evaluation of the likelihood (or Government’s confidence) that the Offeror will successfully perform the solicitation’s requirements; the evaluation is based upon past performance information.
9. Recency. As it pertains to Past Performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.
10. Relevancy. As it pertains to Past Performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
11. Risk. As it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost of degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.
12. Significant Strength. An aspect of an Offerors’ proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
13. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
14. Strength. An aspect of an Offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
15. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the Offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).
16. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
4.0 Volume I – Factor I – Performance Confidence
4.1 Submission Requirements:
Provide descriptions of three (3) but not more than five (5) projects of the Offeror’s past or current construction projects complete or substantially completed (75% or more) within the last six (6) years (from issuance of the solicitation) for projects which are similar in scope and magnitude, as further defined below. Projects shall be summarized in tabular form using the table format given at the end of this section. Detailed project information shall be provided using the Project Detail Sheet format described at the end of this section.
Similar in scope: Each of the projects presented as “similar in scope” must document/identify experience with every task within Category I. Each of the Category II tasks must be evidenced in one (1) or more of the projects presented as “similar in scope”.
Category I:
a. Disassembly and removal of floor mounted analog and/or digital type excitation systems.
b. Installation of new floor-mounted static, digital excitation systems.
c. Commissioned or arranged for the commissioning of new floor-mounted digital solid state exciter systems.
d. Installation and/or modification of exciter-related control systems in control rooms and/or machinery areas to include items such as digital/analog controls, meters and/or human/machine interface systems.
Category II
a. Disassembly and removal of components inside rotating exciter housings.
b. Manufacture or modification and installation of custom electrical control panels.
c. Modification and/or installation, termination and testing of medium-voltage cable systems.
Offerors shall clearly describe experience in each area identified in the above tasks for each of the project descriptions submitted. For a project where no experience was gained on a specific task in Category I or Category II, so state.
Similar in Magnitude: Projects presented as “similar in magnitude” are defined as construction contracts greater than $750,000 in value self-performed as a prime contractor or self-performed as a subcontractor. At least one (1) presented project must be valued greater than $2,000,000 to be considered for evaluation. All other presented projects must be similar in magnitude (i.e. greater in value than $750,000) to be considered for evaluation.
Format for Project Details are included for you at the end of this section. Use as many forms as necessary to meet the criteria. If you elect not to use the formats, all information identified on the formats is still required for evaluation of this item.
Provide two (2) references (Owner’s representative and a Project Manager, Resident Engineer, Project Engineer or equivalent) for all of the projects identified in paragraph 5.1. The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor I Performance Confidence. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Robert (Rob) Holdsworth, via email at Robert.B.Holdsworth@usace.army.mil prior to the proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. If the PPQ is for an ongoing (incomplete) project, the PPQ must show that it was completed after the solicitation issue date. Submission of a PPQ does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Also include performance recognition documents received within the last six (6) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442.
This is the start of the file's text. The full file is on GovTribe.