Sol W912P5-17-R-0002 Amendment 0001
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING DIVISION (RK)
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
W38XDD70275804
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project: Wolf Creek Station Service Upgrade The purpose of amendment 0001:
1. Change proposal due date from 27 Nov 2017 to 6 Dec 2017 w ith the time remaining the same as 1:00 PM Central Time;
2. Update specif ications (01 22 00 to add spare parts language, see paragraph 1.2 SPARE PARTS);
3. Remove line item 0019-Asbestos Abatement from Price Schedule;
4. Update specif ications to change "as-needed" to "options";
5. To answ er questions during question period, and provide photos taken during site visit w alk thru;
6. FAR 52.252-3 is updated
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Nov-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-17-R-0002
X 9B. DATED (SEE ITEM 11)
13-Oct-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Nov-2017
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P5-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0001 TECHNICAL CHANGES
IFB No. W912P5-17-R-0002 Amendment No. 0001
Station Service Upgrade Wolf Creek Powerhouse
Russell County, Kentucky
CHANGES TO TECHNICAL SPECIFICATIONS
Section 01 11 10 SUMMARY OF WORK
Remove Section 01 11 10 in its entirety (4 pages), and replace with revised Section 01 11 10 (5 pages).
Section 01 22 00 PRICE AND PAYMENT PROCEDURES
Remove Section 01 22 00 in its entirety (8 pages), and replace with revised Section 01
22 00 (7 pages).
Section 01 95 00 FORMS AND ATTACHMENTS
Remove Section 01 95 00 in its entirety (2 pages), and replace with revised Section 01 95 00 (2 pages).
Remove the Submittal Register in its entirety (18 pages) from the back of Section 01 95
00, and replace with revised Submittal Register (17 pages).
Add Asbestos Survey (8 pages) to the back of Section 01 95 00.
Section 02 82 13 ASBESTOS ABATEMENT
Remove Section 02 82 13 in its entirety (14 pages) without replacement.
Section 26 00 00.00 26 GENERAL ELECTRICAL WORK AND EQUIPMENT
Remove Section 26 00 00.00 26 in its entirety (26 pages), and replace with revised Section 26 00 00.00 26 (26 pages).
Section 26 08 01.00 26 SYSTEMS TESTING AND COMMISSIONING
Remove Section 26 08 01.00 26 page 2, and replace with revised Section 26 08 01.00 26 page 2.
Section 26 12 16.10 26 DRY-TYPE TRANSFORMERS
Remove Section 26 12 16.10 26 page 3, and replace with revised Section 26 12 16.10
26 page 3.
Section 26 13 13.00 26 METAL CLAD SWITCHGEAR
Remove Section 26 13 13.00 26 pages 4 and 15, and replace with revised Section 26 13 13.00 26 pages 4 and 15.
Section 26 24 19.00 26 SYSTEMS TESTING AND COMMISSIONING
Remove Section 26 24 19.00 26 page 3, and replace with revised Section 26 24 19.00
26 page 3.
--- END OF AMENDMENT NO. 0001 TECHNICAL CHANGES---
SITE VISIT Q&A
Questions and Answers W912P5-17-R-0002 Wolf Creek Station Service Upgrade
Question1: 2.7.2 – Request approval to providing Type K thermocouple instead of RTDs to measure temperature as they provide the same functionality as RTDs. (See Section 26 12 16.10 26 Dry Type Transformer)
Answer 1: Propose as specified in section 2.7.2 of 26 12 16.10 26 technical specifications.
Question 2: 3.1.2.a – Insulation power factor test is a liquid filled test only. As this is dry type transformer, please confirm test is not required. (See Section 26 12 16.10 26 Dry Type Transformer)
Answer 2: Insulation Power Factor tests are acceptable for dry type transformers over 50Kva. The transformers supplied under this contract are 2000Kva transformers. Therefore, the Insulation Power Factor test shall be required.
Question 3: 2.2.9.4 – Please confirm fluidized bed epoxy powder coat insulation and PVC boots in lieu of neoprene are acceptable as long as they meet the performance requirements as specified in this clause.
Answer 3: See amended technical specification 2.2.9.4 Insulation to add the language “or equal”.
Question 4: 2.2.10.4 and .5 – Protective metal enclosure and metal conduit for LV wiring are not required per the standards referenced in this section. Can Government advise basis of design for this requirement/or allow exception as long as manufacturer meets the standards.
Answer 4: The basis of the design is to provide shielding for the control wiring. Propose as specified.
Question 5: 2.3.1 – Please advise what is meant by “interchangeable with Eaton”. It is understanding that all breakers in the existing metal clad equipment, including the two Eaton breakers, are being removed and replaced by the new switchgear. To what extent is it required for breakers to be “interchangeable”/what does the Government mean by “interchangeable”? (See Section 26 13 13.10 26 – Metal Clad Switchgear)
Answer 5: This section is referring to the 15KV breakers associated with the station service transformer install, not the 480v breakers. We currently have three phase disconnects being replaced with 15KV breakers. “Interchangeable” means the existing six 15KV Eaton breakers should be usable within the new switchgear provided for the station service transformers.
Question 6: 2.2.8.1.c: Is a pad lockable transparent Breaker cover over each breaker acceptable in lieu of metal plate?
Answer 6: Yes, as long as the transparent plate is bolted down with security screws, be pad lockable, and as durable as a metal plate is acceptable.
Question 7: 2.2.10: SEL does not recommend using fiber optic sensing in LV Switchgear due to false tripping conditions. We recommend to configure SEL 751 relays and optical arc flash detection point sensors in the main breaker compartment of the LV switchgear. Contractor will then coordinate the installation of the relays with the Zone Selective Interlocking Protection System of Mains and Feeders in the switchgear. This approach will provide complete and fast load-side clearing of arcing faults in the switchgear without the risk of nuisance tripping. Please confirm this is acceptable approach.
Answer 7: Not an acceptable approach for the Government. Propose as specified.
Question 8: 2.2.11.e Metal Conduits are not required per ANSI/IEEE standards for LV SWITCHGEAR and will therefore add significant cost to provide. What is basis of this design requirement? Will Government accept alternate as long as meets standards as required in this section?
Answer 8: The basis of this design requirement is to provide shielding. Yes, Government will accept an alternate if it meets specifications.
Question 9: 2.2.12.a Is AMP approved equal to Burndy?
Answer 9: As long as individual component specifications are equal.
Question 10: 2.7.2- Our Standard VTs have accuracy/Burden and Thermal Rating values of 0.6w, 1.2x, 150va Thermal which meets IEEE C57.13. Is this acceptable? If not, can Government advise basis manufacturer(s) used as basis of design to help us source and provide in compliance? (See Section 26 23 10.10 26 – 480 Volt Switchgear)
Answer 10: Not acceptable by Government. Propose as specified.
Question 11: 2.1.4 Standard is manual shutters. Advise if this paragraph is indicating automatic shutters.
Answer 11: This is indicating shutters that mechanically close when breaker is being withdrawn.
Question 12: 2.1.14 Elapsed Time Meters – The specs ask to provide “as per the existing MCC’s”. Can Government provide information of make and model number of existing units?
Answer 12: The unwatering sump pump elapsed time meters: Redington model 720-6300, 85-500vac.
Question 13: Can Government confirm if any locations of MCCs have space constraints? (See Section 26 24 19.00 26 – Motor Control Centers)
Answer 13: There are locations that have height, width and depth constraints. These dimensions can be found in the reference drawings.
Question 14: The specs call for replacing feeders from SS switchgear to the U and V panels with options if the conductors are not able to be removed from the existing conduits. The contract drawings indicate the replacement of all the feeders leaving the SS switchgear. Do all feeders need to be replaced and if so what are the options for the remaining feeders if they cannot be removed from the existing conduits?
Some of these are 1200 feet long and are not in easily accessible areas."
Answer 14: Feeders shall be replaced in accordance with the plans and specifications. Wolf Creek Power Plant staff has assessed the condition and accessibility of the longer feeders, such as those in the power house pylon, and believe such instances will provide for feasible replacement. In the event the Contractor encounters feeders which they believe cannot be feasibly replaced, the Contractor shall notify the Contracting Officer, after which a decision will be made in accordance with the requirements of the contract technical documents and clauses.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 27-Nov-2017 01:00 PM to 06-Dec-2017 01:00 PM.
The Issued By organization has changed from
US ARMY CORPS OF ENGINEERS-NASHVILLE
CELRN-EC-C,
110 NINTH AVE. SOUTH
NASHVILLE TN 37203
to
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37203
The following have been modified:
PRICE SCHEDULE
W912P5-17-R-0017
Wolf Creek Station Service Upgrade
Russell County, Kentucky
PRICING SCHEDULE
ITEM
NO.
DESCRIPTION EST.
QTY.
UNIT UNIT
PRICE
ESTIMATED
AMOUNT
BASE
0001 Mobilization and Demobilization 1 Job $ $
0002 Replace Existing 480V Station Service Switchgear (SS) 1 Job $ $
0003 Remove Existing Station Service 1500kVA Transformer 1 Job $ $
0004 Furnish, Install, and Test Two 2000kVA Transformers 2 EA $ $
0005 Replace Existing 15kV Motorized Disconnect Switches With New 15kV Switchgear and Vacuum Breakers
1 Job $ $
0006 Replace Existing Station Service U-Boards And V-Boards 11 EA $ $
0007 Replace All Cables and Conductors Originating From 480V Station Service Switchgear (SS)
1 Job $ $
0008 Reuse All Cables and Conductors Originating From U- Boards And V-Boards
1 Job $ $
0009 Install Local-Remote Control Panel 1 Job $ $
0010 Install Ladder Type Cable Tray For Local-Remote Control Panel
1 Job $ $
0011 Remove Existing Station Service Transformer Electromechanical Relays
1 Job $ $
0012 Install Two New Differential Digital Relays 2 EA $ $
0013 Remove Existing 2000A-480V Station Service Supply Bus 1 Job $ $
0014 Install Two New 2500A-480V Station Service Supply Buses
2 EA $ $
0015 Remove 15kV Station Service Supply Buses 2 EA $ $
0016 Install New 15kV Station Service Supply Buses 2 EA $ $
0017 Furnish Operations and Maintenance Manuals and As- Constructed Drawings
1 Job $ $
0018 Furnish Training For Government Personnel 1 Job $ $
TOTAL BASE AMOUNT $
OPTIONS
0020 Option 1: Install Cable Tray and Route Feeders for U1 and U2
1 Job $ $
0021 Option 2: Install Cable Tray and Route Feeders for U3, U4, and U7
1 Job $ $
0022 Option 3: Install Cable Tray and Route Feeders for U5 & U6
1 Job $ $
0023 Option 4: Install Cable Tray and Route Feeders for U8 1 Job $ $
0024 Option 5: Install Cable Tray and Route Feeders for U9 1 Job $ $
0025 Option 6: Install Cable Tray and Route Feeders for V1 1 Job $ $
0026 Option 7: Install Cable Tray and Route Feeders for V2 1 Job $ $
0027 Option 8: Install Temporary Access Platform 1 Job $ $
TOTAL OPTIONS AMOUNT $
GRAND TOTAL $
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Project: Wolf Creek Station Service Upgrade Amendment 0001 The purpose of amendment 0001:
1. Change proposal due date from 27 Nov 2017 to 6 Dec 2017 with the time remaining the same as 1:00 PM Central Time;
2. Update specifications (01 22 00 to add spare parts language, see paragraph 1.2 SPARE PARTS);
3. Remove line item 0019-Asbestos Abatement from Price Schedule;
4. Update specifications to change "as-needed" to "options";
5. To answer questions during question period, and provide photos taken during site visit walk thru;
6. FAR 52.252-3 is updated.
(End of Summary of Changes)
| IFB No. W912P5-17-R-0002 |
| Amendment No. 0001 |
| Station Service Upgrade |
| Russell County, Kentucky |
| CHANGES TO TECHNICAL SPECIFICATIONS |
| Section 01 11 10 SUMMARY OF WORK |
| Remove Section 01 11 10 in its entirety (4 pages), and replace with revised Section 01 11 10 (5 pages). |
| Section 01 22 00 PRICE AND PAYMENT PROCEDURES |
| Remove Section 01 22 00 in its entirety (8 pages), and replace with revised Section 01 22 00 (7 pages). |
| Section 01 95 00 FORMS AND ATTACHMENTS |
| Remove Section 01 95 00 in its entirety (2 pages), and replace with revised Section 01 95 00 (2 pages). |
| Remove the Submittal Register in its entirety (18 pages) from the back of Section 01 95 00, and replace with revised Submittal Register (17 pages). |
| Add Asbestos Survey (8 pages) to the back of Section 01 95 00. |
| Section 02 82 13 ASBESTOS ABATEMENT |
| Remove Section 02 82 13 in its entirety (14 pages) without replacement. |
| Section 26 00 00.00 26 GENERAL ELECTRICAL WORK AND EQUIPMENT |
| Remove Section 26 00 00.00 26 in its entirety (26 pages), and replace with revised Section 26 00 00.00 26 (26 pages). |
| Section 26 08 01.00 26 SYSTEMS TESTING AND COMMISSIONING |
| Remove Section 26 08 01.00 26 page 2, and replace with revised Section 26 08 01.00 26 page 2. |
| Section 26 12 16.10 26 DRY-TYPE TRANSFORMERS |
| Remove Section 26 12 16.10 26 page 3, and replace with revised Section 26 12 16.10 26 page 3. |
| Section 26 13 13.00 26 METAL CLAD SWITCHGEAR |
| Remove Section 26 13 13.00 26 pages 4 and 15, and replace with revised Section 26 13 13.00 26 pages 4 and 15. |
| Section 26 24 19.00 26 SYSTEMS TESTING AND COMMISSIONING |
| Remove Section 26 24 19.00 26 page 3, and replace with revised Section 26 24 19.00 26 page 3. |