W912P5-17-R-0002_TSpecsAm2page.pdf
PDF 13 KB Posted
- Attached to
- Wolf Creek Station Service Upgrade
- Solicitation number
- W912P5-17-R-0002
About this file
Technical Specifications_Amendment 0002
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
St at i on Ser vi ce Upgr ade Wol f Cr eek Power house W912P5- 17- R- 0002 Amendment 0002 Russel l Count y, Kent ucky
01 12 16. 00 26
WORK SEQUENCE
PART 1 GENERAL
The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
1. 2 COORDINATION
The const r uct i on sequence i s cr i t i cal i n mai nt ai ni ng oper abi l i t y of t he Wol f Cr eek St at i on Ser vi ce el ect r i cal di st r i but i on and cont r ol syst ems dur i ng t he r equi r ed upgr ades and r epl acement of equi pment . Ther ef or e, t he Cont r act or shal l not begi n physi cal wor k at t he pr oj ect s i t e, except f or const r uct i on of t he t empor ar y access pl at f or m, unt i l al l r epl acement equi pment has been del i ver ed t o t he pr oj ect s i t e and appr oved f or use by t he Cont r act i ng Of f i cer . Equi pment and syst ems out ages shal l be kept t o a mi ni mum and shal l be coor di nat ed wi t h t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) pr i or t o cut over f r om exi st i ng equi pment / syst ems t o new equi pment / syst ems. Tempor ar y out ages wi l l be r equi r ed as l oads ar e t r ansf er r ed f r om exi st i ng equi pment t o new equi pment . Pr oper sequenci ng of t he wor k shal l be r equi r ed t o mi ni mi ze t he dur at i on of t hese out ages.
I n addi t i on, speci f i c cr i t i cal l oads i dent i f i ed i n t he TECHNI CAL SPECI FI CATI ONS must be suppor t ed by t empor ar y power sour ces f ur ni shed by t he Cont r act or 24 hour s a day 7 days a week dur i ng t he ef f ect ed wor k. The Cont r act or ' s wor k shal l be schedul ed so t hat al l uni t s can oper at e at f ul l capaci t y, wi t h no i nt er r upt i ons, bet ween 1 June and 31 August .
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Equi pment Repl acement and Cut over Pl an; G, HDC
SD- 03 Pr oduct Dat a
Tempor ar y Power Cabl es; I , HDC
SECTI ON 01 12 16. 00 26 Page 2
File details come from the government source that posted it.