W912P5-17-R-0002_Reference_Drawings.pdf

PDF 22 MB Posted

Attached to
Wolf Creek Station Service Upgrade
Solicitation number
W912P5-17-R-0002
Issued by

About this file

Contract Reference Drawings

View the file

Other files

File Type Posted
W912P5-17-R-0002Am2-TechChanges.pdf PDF
W912P5-17-R-0002_TSpecsAm2page.pdf PDF
Sol_W912P5-17-R-0002_WOL_Station_Svcs_Amend_02.pdf PDF
20171024_104457.jpg JPG image
Q&A_-_Wolf_Creek_Station_Services_Responses_112017-Final.pdf PDF
20171024_104834.jpg JPG image
20171024_113310.jpg JPG image
20171024_110548.jpg JPG image
20171024_104658.jpg JPG image
20171024_105420.jpg JPG image
20171024_105605.jpg JPG image
20171024_112227.jpg JPG image
20171024_104217.jpg JPG image
20171024_104152.jpg JPG image
W912P5-17-R-0002_TSpecsAm1pages17-Nov-2017.pdf PDF
20171024_105446.jpg JPG image
20171024_105615.jpg JPG image
20171024_105428.jpg JPG image
20171024_104703.jpg JPG image
Sol_W912P5-17-R-0002_WOL_Station_Svcs_Amend_01.pdf PDF
20171024_104207.jpg JPG image
20171024_112707.jpg JPG image
20171024_104842.jpg JPG image
20171024_111739.jpg JPG image
20171024_112654.jpg JPG image
20171024_110121.jpg JPG image
20171024_105506.jpg JPG image
20171024_104858.jpg JPG image
W912P5-17-R-0002Am1-TechChanges17-Nov-2017.pdf PDF
20171024_105458.jpg JPG image
20171024_110432.jpg JPG image
20171024_111511.jpg JPG image
Site_Visit_Request_Form.pdf PDF
Foreign_National_Security_Site_Visit_Form.pdf PDF
W912P5-17-R-0002_TSpecs.pdf PDF
W912P5-17-R-0002.pdf PDF
W912P5-17-R-0002_Contract_Drawings.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

NO. 6

NO. 3

NO. 1

NO. 4

NO. 8 NO. 8 NO. 8

111 112

A

12"0 5' 10' 15'

1'-10…"

17'-7" 3'-0"

11" 3'-6" 11'-3" 3'-2" 3'-0" 14'-7" 7'-0"

1'

1'

1'

2'-6"

1'

2'-8"

1'-5"

1'-7"

1'

1'-7" 1'-5"

21'-8" 22'-0" 23'-9" 4'-0" 27'-0" 27'-0" 4'-0" 27'-0" 27'-0" 4'-0" 27'-0" 27'-0" 4'-0"

1'-0"

1†"

2'-10"

1'

13'-6ƒ" 1'-4•" 8'-9ƒ"

OPNG.

2'-0"

6"

12'-3"9'-6"

1'

1'-0"

1'-4•"

1'-0"

0ƒ"

8" 7'-7•" 8" 9'-6ƒ" 8"

1'-3"

5'-10†"

3'-10…" 12'-5…" 8'-9†" 15'-8†" 5'-6…"

1' ƒ

12'-0•" 3'-9"

6'-1†

1'-3"

4' -1 0…

3' -9 ƒ

2'-6"

8"

2'-9" 24'-3" 2'-0" 2'-0" 27'-0" 27'-0" 2'-0" 2'-0" 27'-0" 9'-0‚" 17'-11ƒ" 2'-0"

5'-10†" 5'-10†"

15'-6" 12'-5…"

1†"

8'-9†" 15'-8†" 5'-6…" 15'-6" 12'-5…"

1†"

8'-9†" 15'-8†" 5'-6…" 13'-7†"

15'-1…" 3'-0"

1'-0"

9"

1'

439'-5" TO

ƒ

0ƒ"

8" 7'-7•" 8"

20'-0" I.D. (TYP.)

58'-0" (TYP.)

1'

3' -3

2'-4"

1'

1'

SEPARATION JOINT

NOT IN THIS CONTRACT

STORAGE BINS

DRAIN

OVEN

DRYING

OIL PUMP

FIRE DAMPER

16"x24" GRILLE &

PURIFIER

DRAIN

STORE ROOM

S T

O R

A G

E

T A

N K

L U

B R

IC

A T

IN

O

IL

S T

O R

A

N K

L U

B R

IC

A T

IL

PURIFIER

DRAIN

PUMPS

SEE Q2/729-H

FIRE DAMPER

16x32" GRILLE &

R

U P

R

D N

DRAIN

SEPTIC TANK EJECTOR

SEWAGE

16"x24" GRILLE

STRAINER

8" TWIN

ELEV.

NOT IN POWERHOUSE CONTRACT

FACE OF DAM STEP

DRAIN

DRAIN

WATER TREATMENT PLANT

DRAIN DRAIN

U-7

SEPARATION JOINT

DRAINDRAIN

DRAIN

FACE OF DAM

U P

C O

N T

R A

C T

IO

N

J

O

IN

T

U-3SUMP

AND

PUMP

TRENCH

TANK

PRESSURE

METAL FRAME AND COVER

U P

UP DOWN UP

U P

EL. 567.0

D N

GRATING

TRENCH

TRENCH

D N

UNIT NO. 2 UNIT NO. 3

U-2SUMP

AND

PUMP

TANK

PRESSURE

TRENCH

TURBINE ROOM EL. 567.0

CEMENT MORTAR FIN. FLOOR

U-1

SUMP

AND

PUMP

TANK

PRESSURE

U P

DOWNUP

UNIT NO. 1

MANUFACTURER

TURBINE

METAL STAIRS BY

RAMP

N O

N S

L

IP

S

R F

A C

E

R A

M P

H

V E

E L .0

S T

A T

IO

R V

IC

B

Y

C E

M E

M

R T

F

O

IS

H

F

IL

L

DRAIN

S W

IT

C H

B O

A R

D DOWN

T A

N K

SD

R A

IN

R E T

A

IN

W

L L

N

O

W E

R H

O U

C

N T

R A

C T

A C

F

E

E

D

C

D

B

C O

N T

R A

C T

IO

N

J

O

IN

T

7 8 8•

C

1 17

9 10•105 6 6•

SEE DWG. Q2/717-A AND Q2/717-B.

FOR DETAILS OF MONOLITH #54

NOTE:

B

4•4

LADDER

DRAFT TUBE GATE

DRAFT TUBE

LADDER TO

A

A

B

C

D

D

E

F

E

S T

O R

A G

E

D R

A

IN

F

IR

M P

E R

"x

G R

IL

IL

D R

A

IN

T R

A N

S

IL

GRILLE

8"x16"

Co2 STORAGE

16 R

DN.

PIPE

UP 26 R

VALVES

GENERATOR

GRATING

5 R

UP

C O

N T

R A

C T

IO

N

J

O

IN

T

C O

N T

R A

C T

IO

N

J

O

IN

T

GRATINGGOVERNOR

GRATING

COVER

PUMPS

D N

METAL FRAME AND COVER

TRENCH

C O

N T

R A

C T

IO

N

J

O

IN

T

DRAFT TUBE

ACCESS TO

LADDER

GRATING

C O

N T

R A

C T

IO

N

J

O

IN

T

B

GENERAL NOTES

FOR SECTION "A-A" & "B-B" SEE DRAWING Q2/736.

FOR SECTION "C-C" SEE DWG. Q2/735.

FOR SECTION "D-D" SEE DWG. Q2/737.

FOR SECTION "E-E" SEE DWG. Q2/738.

FOR STAIRS NO. 3 SEE DWG. Q2/729-E.

FOR PIPE TRENCH DETAILS SEE DWG. Q2/750-G.

FOR STAIRS NO. 6 SEE DWG. Q2/729-B.

FOR STAIRS NO. 8 SEE DWG. Q2/730-B.

FOR TYPICAL WALL SECTIONS SEE DWG. Q2/733-B.

FOR CIRCULAR STAIRS SEE DWG. Q2/729-B.

FOR STAIRS NO. 1 & NO. 4 ON DWG. Q2/729-D.

FOR AREAS MARKED "NOT IN POWERHOUSE CONTRACT" SEE DWG. Q2/717.

12345

B

C

D

A

B

C

D

A

Drawn By:

Date:

Drawing

Number

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

NASHVILLE, TENNESSEE

Checked By:

US Army Corps of Engineers Nashville District

Record Drawing as constructed dated

Approved By:

REV. DESCRIPTION DATE CHECKED

REVISIONS

BY

ATLANTA, GA

CADD CONSULTANT

CARPENTER DUNLAP ASSOCIATES, INC.

Scale:

Sheet

CUMBERLAND RIVER WATERSHED

WOLF CREEK RESERVOIR PROJECT

CUMBERLAND RIVER, KENTUCKY

POWERHOUSE

„" = 1'-0" of

ZGA1:[110,20]Q2E729.DGN

TURBINE ROOM FLOOR PLAN - EL. 567.0

F.M.G.

A.R.K.

W. M. HALL

T. M. CONE

MADICY WILDING

CHAS. T. MAIN, INC.

HEAD ENGINEER

COL., C.O.E. DIST. ENG.

Q-2/729.5

FLOOR PLAN - ELEVATION 567.0

UNITS NO. 1-2-3

Scale: „" = 1'-0-"

1 12-27-48 H.G.W. T.H.P.STORE RM., DOOR 102 & WALL BETWEEN 3B & 4B REV.

2 7-17-50 C.W.B.

3 7-28-50 T.H.P.

4 T.H.P.

5 11-29-50 T.H.P.

CHANGE COL. LOCATION BETWEEN 2 & 3 LINES ON D

CORRECT COLUMN LOCATION D-LINE 2 TO 3

RELOCATE S.S. GEN. BUS DUCT OPENING

REVISE WALL AT S.S. GEN. BUS DUCT OPENING

9-7-50

NO. 9

NO. 8

NO. 8

NO. 8NO. 8

NO. 4

NO. 8

12"0 5' 10' 15' ƒ

8" 7'-7•"

8"

3'-1"

3'-9"

27'-0"2'-0"

27'-0" 2'-0"

9'-0" 11'-9"

27'-0"

58'-0" (TYP.)

20'-0" I.D. (TYP.)

27'-0"27'-0" 2'-0" 2'-0" 27'-0"

1'

1' ƒ

1'-8"

2'-0"

17'-4…" 3'-9"3' -9

1'-3"

6'-1†

3' -3 5' -4

1†"

1'-10…" 12'-5…" 8'-9†" 15'-8†"

4'-0" 27'-0" 27'-0" 4'-0"

15'-0" 3'-9"

1'

3'-0" 3'-0"

3'-0"

3'-0"

1'

15'-0" 3'-9"

27'-0" 27'-0" 4'-0"

1'

439'-5" TO

27'-0" 27'-0"

4'-0" 27'-0" 27'-0" 24'-0"

5'-10†" 5

5'-6…"

5'-6…" 15'-6"

1†"

5'-10†"

12'-5…" 8'-9†" 15'-8†"

5'-6…" 15'-6" 12'-5…" 8'-9†"

1†"

5'-10†"

15'-8†" 5'-6…" 11'-7†"

21'-3"

17'-6"3'-9"

U-7

DRAIN

SEPARATION JOINT

U P

DRAIN

TRENCH

TANK

PRESSURE

SUMP

AND

PUMP

FIN. FL. EL. 567.0

U-3

C O

N T

R A

C T

IO

N

J

O

IN

T

NOT IN POWERHOUSE CONTRACT

FACE OF DAM

DRAIN

113 CFM COMPRESSOR

330 CFM COMPRESSOR

34 CF RECEIVER

96 CF RECEIVER

275 CF RECEIVER DRAIN

SEPARATION JOINT

10.8 CFM COMPRESSOR

DRAIN

DRAIN

7'-9•"

CEILING

CONTRACT

NOT IN POWER HOUSE

E L .0

F

IN

F L

P

SEPARATION JOINT

7'-11"

CEILING

DN. 42 R

NO. 10

TANK

PRESSURE

SUMP

AND

PUMP

U-6

TURBINE ROOM EL. 567.0

(CEMENT MORTAR FINISH)

TRENCH

TANK

PRESSURE

METAL FRAME AND COVER

SUMP

AND

PUMP

U-5

UNIT NO. 6

TANK

PRESSURE

AND SUMP

OIL PUMP

GOVERNOR

U-4

U P

UP

U P

DN.

MANUFACTURER

TURBINE

METAL STAIRS BY

UP DN.

GRATING

D N

METAL FRAME AND COVER

TRENCH

UP

U P

DN. UP

U P

EL. 567.0

FIN. FL.

B O

A R

D

S W

D N

15 R

DN.

NO. 11

G

E

D

AND COVER

METAL FRAME

SUMP PUMPS

F

IN

F L

E L .0

D N

STAIRS

METAL CIRCULAR

C O

N T

R A

C T

IO

N

J

O

IN

T

TRENCH

TRENCH

GRATING

G

D N

GRATING

D N

DN.

14 R

DN.

EL. 553.0

LANDING

15 R

UPNO. 11

14 R

UP

EL. 544.33

G

PLATFORM

G

EL. 553.67

FIN. FL.

C O

N T

R A

C T

IO

N

J

O

IN

T

D N

F

C O

N T

R A

C T

IO

N

J

O

IN

T

D

F

PLANS OF PUMP SUMP

8 8• 9

10•10

A

11 12 12• 13

1 17

1615 17

A

B

C

D

F

E

17161514 14•11 12 12• 1310•1098 8•

F

D

E

B

C

UNIT NO. 3 UNIT NO. 4 UNIT NO. 5

C O

N T

R A

C T

IO

N

J

O

IN

T

E

14 14•

AT ELEVATION 544.33

B B

AT ELEVATION 553.67

GENERAL NOTES

FOR SECTION "D-D" SEE DRAWING Q2/737-A.

FOR SECTION "E-E" SEE DRAWING Q2/738-A.

FOR SECTION "F-F" AND "G-G" SEE DRAWING Q2/735-A.

FOR CIRCULAR STAIRS SEE DWG. Q2/729-B.

FOR STAIRS NO. 9-10-11 SEE DWG. Q2/729-F.

FOR TRENCHES SEE DWGS. Q2/750-A AND Q2/750-G.

FOR AREAS MARKED "NOT IN POWERHOUSE CONTRACT"

SEE DWG. Q2/717.

12345

B

C

D

A

B

C

D

A

Drawn By:

Date:

Drawing

Number

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

NASHVILLE, TENNESSEE

Checked By:

US Army Corps of Engineers Nashville District

Record Drawing as constructed dated

Approved By:

REV. DESCRIPTION DATE APPROVED

REVISIONS

BY

CARPENTER DUNLAP ASSOCIATES, INC.

CADD CONSULTANT

ATLANTA, GA

Scale:

Sheet

CUMBERLAND RIVER WATERSHED

WOLF CREEK RESERVOIR PROJECT

CUMBERLAND RIVER, KENTUCKY

POWERHOUSE

„" = 1'-0" of

Q-2/729A

TURBINE ROOM FLOOR PLAN - ELEVATION 567.0

F.M.G.-A.R.K.

J.R.B.

W. M. HALL

T. M. CONE

MADICEY WILDING

CHAS. T. MAIN, INC.

HEAD ENGINEER

COL., C.O.E. DIST. ENG.

ZGA1:[110,20]Q2X729A.DGN

FLOOR PLAN - ELEVATION 567.0

UNITS. NO. 4-5-6

Scale: „" = 1'-0"

T-3

12"0 5' 10' 15'

Scale: „" = 1'-0"F

GENERATOR ROOM FLOOR PLAN - EL. 580.0

D

E

F

E

D

8'-6"

6"

11'-2•" 6'-6"

10'-7" 7'-9"

2'-2"

1'-4"

8" 7'-9" 8"

6'-9‚"

1"

1'

2'-0"

2'-0"

3'-6"

3"

1'-4"

16'-2"

1'-2"

3'-0"

24'-0"27'-0"27'-0"4'-0"27'-0"27'-0"4'-0"27'-0"27'-0"4'-0"

439'-5" TO

1'

1"

2'-0"

2'-0"

3'-0"

8"

2'-0"

2'-0"

1'

ARCHITECTURAL TRIM SCHEDULE

GENERATOR ROOM

FIBRE BOARD ABOVE EL. 624.23 - CEILING SIMILAR

CONCRETE WALLS ABOVE TO EL. 624.23

PAVER TILE FLOOR AND BASE - GLAZED UNIT DADO-

STAIR NO. 9

CONCRETE STAIRS & SOFFITS - CEMENT PLASTER WALLS.

L E G E N D

INDICATES TERRA COTTA TILE

INDICATES BRICK

INDICATES CONCRETE IN POWER HOUSE CONTRACT

INDICATES CONCRETE NOT IN POWER HOUSE CONTRACT

INDICATES GLAZED TILE

GENERAL NOTES

FOR SECTION "D-D" SEE DRAWING Q2/737-A.

FOR SECTION "E-E" SEE DRAWING Q2/738-A.

FOR STAIR NO. 9 SEE DRAWING Q2/729-F.

FOR TUNNEL LAYOUT SEE DRAWING Q2/760 & Q2/760-A.

DRAWING Q2/717.

FOR AREAS MARKED NOT IN POWERHOUSE CONTRACT SEE

FOR SECTION "F-F" SEE DRAWING Q2/735-A.

G4

RELAY CABINET

DRAIN

UP

DRAIN

CYLINDER RACKS

Co2 SYSTEM

ROUTING VALVES

Co2 SYSTEM

SWITCHGEAR "F4""A4"

ACTUATOR

N

N

GLAZED TILE DADO

"A5"

ACTUATOR

SWITCHGEAR "F5"

DRAIN

G5

BUS DUCT OPENING

CYLINDER RACKS

Co2 SYSTEM

SWITCHGEAR "F6"

G6

NO. 9

UP

N

P

"A6"

ACTUATOR

N

N

DRAIN

DRAIN

P A

R A

P E

T

S P

R

Y

W

L L

S L

O P

E

SPILLWAY

FACE OF

DRAIN

DRAIN

DRAIN

GANTRY CRANE RAILS

CRANE STOP

DRAIN

DRAIN

GLAZED TILE DADO

DRAIN

WATERTIGHT HATCH COVER

PERFORATED GATE SLOT COVER & STEEL FRAME

C O

N T

R A

C T

IO

N

J

O

IN

T

PAVER TILE

DRAIN

GANTRY CRANE DECK

EL. 580.0

GENERATOR ROOM

UNIT NO. 5UNIT NO. 4 UNIT NO. 6

D E

C K

EL. 580.0

SWITCHGEAR ROOM

CABLE TUNNEL

A

B

C

D

E

F

10•10 11 12 12• 13 17161514 14•

1 17

313 315

304 305

311 309

303302

12"0 5' 10' 15'

1'

1'

12'-2" 4'-0"

1'-2" 1'-2"

3'-0"

7'-2" 1'-8"

2‚"

1'-4"

1"

1'-8"

1'-4"

3'-0" 8'-2•" 11'-9•"

1'

1'

1' 1"

1"

1'

7'-7"

1'-5"

6" 3'-0" ƒ

6'-0"

1' 1"1'

3'-0"

9"

14'-0"

7'-8"

7'-7"

9"

2'-0"2'-0"

4'-0"23'-9"

9'-4"18'-10"9'-4"7'-8"

21'-8" 22'-0" 27'-0" 27'-0" 4'-0"

2'-0"2'-0"

439'-5" TO

27'-0" 27'-0" 4'-0"

2'-0"2'-0"

27'-0" 27'-0" 4'-0"

2'-0"2'-0"

1"

58'-0" (TYP.)23'-1…"

1"

6" 5'-2" 6"

9'-6"

9'-6"

8" 7'-9" 8" 8" 8'-5" 6"

1"

8" 7'-9" 8" 21'-8"

6" 8'-1" 6"

1'

7'-3" 3'-4" 1'-10" 3'-0" 2'-8"

6" 18'-1"

THIS CONTRACT

SHELVING NOT IN

SHELVING

STEEL

U N

IT

IR

N D

COMPRESSOR

3" H.D.A.

ORNED-E SK 2/85

D DC

STATION SERVICE SWITCHGEAR "SS"

NO. 2

LTG. TRANSF.

NO. 1

LTG. TRANSF.

LTG. SWGR. "LS"

VENTILATING SWGR. "V1"

P

N

ROOM

DARK

SINK

INSTRUMENT ROOM

NO. 4

ROOM

FAN

S L

O P

E

EL. 594.0

SLOPE

DN.

E L .0

D N

.ORNED-E SK 2/85

& SHELF

HOOK STRIP

TOIL.

KITCHEN

CORRIDOR

RECORDS

JAN.

D .F

NO. 1

ELEV.

N

P

S W

IT

C H

B O

A R

D

"C

S

SWITCHBOARD "MS"

CONTROL ROOM

BENCHBOARD "MB"

NOTE:

LIGHTING MAY BE EXTENDED FOR ADDITIONAL PANELS

CEILING FURRING TO BE ARRANGED SO THAT SWITCHBOARD

S W

IT

C H

B O

A R

D

"A

S

TABLE

REFERENCE

DESK

OPERATOR'S

PLASTER SOFFIT ABOVE

PLATE GLASS PARTITION

PAVER TILE FLOOR

R A

IL

IN

G

R E

M O

V A

B L

E

SECTIONS

REMOVABLE SLAB

SOLE PL

DISMANTLING PLATFORM

EL. 595.0

RUNGS

LADDER

SHAFT

RAILING

CONCRETE

L UNITC

EL. 580.0

GENERATOR ROOM

EL. 595.0

SWITCHGEAR ROOM

L

N T

R A

C T

IO

N

J

O

IN

T

L

N T

R A

C T

IO

N

J

O

IN

T

G E

N E

R A

T

O M

UNIT NO. 1

L

N T

R A

C T

IO

N

J

O

IN

T

D.F.

BRONZE GATE

EL. 595.0

PAVER TILE FLOOR

DRAINS

U P

NO. 2

WATERTIGHT HATCH COVER

GATE SLOT COVER RETAINING WALL

NO. 3

DN. 24 R

UP 26 R

UNIT NO. 2 UNIT NO. 3

D

B

A

B

L E G E N D

INDICATES TERRA COTTA TILE

INDICATES CONCRETE WORK IN THIS CONTRACT

INDICATES BRICK

INDICATES GLAZED TILE

GENERAL NOTES

10•108 8• 97

1 17

6 6•54•4321

A

B

C

D

E

F

E

CA

C

D

E

DISMANTLING FLOOR PLAN - EL. 595.0

12345

B

C

D

A

B

C

D

A

Drawn By:

Date:

Drawing

Number

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

NASHVILLE, TENNESSEE

Checked By:

US Army Corps of Engineers Nashville District

Record Drawing as constructed dated

Approved By:

REV. DESCRIPTION DATE CHECKED

REVISIONS

BY

ATLANTA, GA

CADD CONSULTANT

CARPENTER DUNLAP ASSOCIATES, INC.

Scale:

Sheet

CUMBERLAND RIVER WATERSHED

WOLF CREEK RESERVOIR PROJECT

CUMBERLAND RIVER, KENTUCKY

POWERHOUSE

„" = 1'-0" of

ZGA1:[110,20]Q2D731.DGN

W. M. HALL

T. L. CONE

Scale: „" = 1'-0"

J.R.B.

A.R.K.

CHAS. T. MAIN, INC.

HEAD ENGINEER

H. V. CONAN

COL., C.O.E. DIST. ENG.

Q-2/731.4

1 WALL BETWEEN COLS. 3B & 4B REVISED 12-27-49 H.G.W. T.H.P.

2 7-17-50 C.W.B.

3 7-17-51 J.C.D.

CHANGED LOCATION OF SOLE PLATE

ADDED DARK ROOM; KITCHEN FLOOR REV.

REVISED AS CONSTRUCTED 7-8-91 W.L.

E.B.

FLOOR PLAN - ELEVATION 595.0

UNITS NO. 1-2-3

TOILET & JANITORS CLOSET

DISMANTLING PLATFORM

CONTROL ROOM

RECORD ROOM, CORRIDOR

CONTROL ROOM PARTITION - FIBRE BOARD CEILING.

PAVER TILE FLOOR - CONCRETE WALLS & CEMENT PLASTER ABOVE

WALLS & CEILING

RUBBER TILE FLOOR & ASPHALT COVE BASE - GYPSUM PLASTER

JANITOR'S CLOSET - GLAZED UNIT WALLS & BASE - GYPSUM PLASTER CEILINGS.

CERAMIC TILE FLOOR IN TOILET, CEMENT MORTAR FLOOR FINISH IN

ONLY - CEMENT PLASTER & CONCRETE WALLS - CONCRETE CEILING.

CEMENT MORTAR FLOOR FINISH - CEMENT BASE AT PLASTER WALLS

SWITCHGEAR ROOM

DARK ROOM

INSTRUMENT ROOM

STAIRS NO. 1 & 4

KITCHEN

PLATE GLASS WALLS - ACOUSTICAL TILE CEILING

RUBBER TILE FLOOR & ASPHALT COVE BASE - GYPSUM PLASTER &

STAIRS NO. 2 & 3

BRICK & CONCRETE WALLS - CONCRETE CEILING

CEMENT MORTAR FLOOR FINISH - SMOOTH FACE T.C.

BRICK & CONCRETE WALLS - CONCRETE CEILING

CEMENT MORTAR FLOOR FINISH - SMOOTH FACE T.C.,

CONCRETE STAIRS & SOFFITS - CEMENT PLASTER WALLS

AT PLASTER WALLS ONLY - CONCRETE CEILINGS.

CONCRETE & CEMENT PLASTER WALLS - CEMENT BASE

CONCRETE STAIRS & SOFFITS - PAVER TILE FLOOR -

GYPSUM PLASTER WALLS & CEILING

CERAMIC TILE FLOOR - RD. TOP TILE COVE BASE

ARCHITECTURAL TRIM SCHEDULE

FOR SECTIONS "A-A" & "B-B" SEE DRAWING Q2/736.

FOR SECTION "C-C" SEE DRAWING Q2/735.

FOR SECTION "D-D" SEE DRAWING Q2/737.

FOR SECTION "E-E" SEE DRAWING Q2/738.

FOR STAIRS NO. 1 & NO. 4 SEE DRAWING Q2/729-D.

FOR STAIRS NO. 2 & NO. 3 SEE DRAWING Q2/729-E.

FOR PLATE GLASS PARTITION SEE DRAWING Q2/731-E.

FOR KITCHEN & TOILET ROOM LAYOUT SEE DRAWING Q2/732-E.

FOR REMOVABLE SLAB DETAILS, SEE DRAWING Q2/731-F.

FOR ENTRANCE AT DOORS 301-302-303 SEE DRAWING Q2/731-B.

FOR REMOVABLE RAILING DETAILS, SEE DRAWING Q2/731-D.

FOR TYPICAL WALL SECTIONS SEE DRAWING Q2/733-B.

315313

12"0 5' 10' 15'

6" 8'-1" 6"

8" 7'-9" 8" 21'-8" 6" 26'-9"

1"

6"8'-8"2'-8"3'-0"1'-10"3'-4"7'-3"

3'-6"

6" 53'-1ƒ" 8" 7'-9" 8" 5'-1‚"

3'-0"

1"

1'

1"

" 11

1' 1"

1'

1'-4"

2'-2"

2'-0" 2'-6"

8" CONCRETE WALL

UP TO BOTTOM OF BEAM

1'-8"

1'-4"

8'-6"

"2

1" MIN.

4'-0" 27'-0" 27'-0" 4'-0" 27'-0" 27'-0" 4'-0" 27'-0" 27'-0" 24'-0"

439'-5" TO

ARCHITECTURAL TRIM SCHEDULE

SWITCHGEAR ROOM

CEMENT PLASTER & CONCRETE WALLS - CONCRETE CEILING.

CEMENT MORTAR FLOOR FINISH - CEMENT BASE AT PLASTER WALLS ONLY-

FAN ROOMS

CONCRETE CEILING.

CEMENT MORTAR FLOOR FINISH - SMOOTH FACE T.C. AND CONCRETE WALLS -

STAIR NO. 9

CEMENT PLASTER CEILING

CONCRETE STAIRS AND SOFFIT - CEMENT PLASTER WALLS

GENERAL NOTES

FOR SECTION "D-D" SEE DRAWING Q2/737-A.

FOR SECTION "E-E" SEE DRAWING Q2/738-A.

FOR SECTION F-F SEE DRAWING Q2/735-A.

FOR STAIR NO. 9 SEE DRAWING Q2/729-F.

DISMANTLING FLOOR PLAN - EL. 595.0

EL. 580.0

GENERATOR ROOM

UNIT NO. 5

EL. 580.0

GENERATOR ROOM

RAILING

CONCRETE

VENTILATING SWGR. V2

SWITCHGEAR ROOM

EL. 595.0

SERVICE BUS

SWITCHES "T3"

STA. SERVICE SELECTOR

GRILLE

18"x36"

EL. 595.0

GRILLE

18"x36"

X X

16 R

DN.

SLOPE

E L .0

O V

A

IR

S

C O

N C

P L

A S

C E

IL

IN

G

N

FAN ROOM

GRILLE

18"x18"

IRON LADDER

RAILING

CONCRETE

CRANE CAB ABOVE

OUTLINE OF

EL. 607.0

BALCONY

FLOOR OF

TO CRANE CAB

STUB LADDER

L

N T

R A

C T

IO

N

J

O

IN

T

SWITCHES "T2"

STA. SERVICE SELECTOR

RAILING

CONCRETE

FIN. FL.EL. 595.0

GRILLE

20"x36"

P2

N

NO. 4

ROOM

DARK

SINK

INSTRUMENT ROOM

X X

F

14•

6" T.C. TILE

FIN. FL. EL. 595.0

PLASTER

CEMENT BASE

SLAB EL. 594.33

TOP OF ROUGH

SWITCHGEAR ROOM STORAGE OR FAN ROOM

D D

L UNITSC

GRILLE

20"x36"

F A

N

14 ROOM

FAN

FAN #13

F

EE

DN. 15. R

S L

O P

EF

10•10 11 13 1412 12• 15 16 17

A

B

C

D

E

F

L

N T

R A

C T

IO

N

J

O

IN

T

L

N T

R A

C T

IO

N

J

O

IN

T

E L .0

SLOPE

E L .0

UNIT NO. 6UNIT NO. 4

NO. 9

ƒ" R

12345

C

D

C

D

REV. DESCRIPTION DATE APPROVED

REVISIONS

BY

1 ADDED DARK ROOM AT 9 & F LINE 7-17-51 J.C.P.

A

A

Drawn By:

Date:

Drawing

Number

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

NASHVILLE, TENNESSEE

Checked By:

US Army Corps of Engineers Nashville District

Record Drawing as constructed dated

Approved By:

ATLANTA, GA

CADD CONSULTANT

CARPENTER DUNLAP ASSOCIATES, INC.

Scale:

Sheet

CUMBERLAND RIVER WATERSHED

WOLF CREEK RESERVOIR PROJECT

CUMBERLAND RIVER, KENTUCKY

POWERHOUSE

„" = 1'-0" of 139

W.M. HALL

T.M. CONE

H.V. CONAN

F.M.G. - A.R.K.

J.R.B.

CHAS. T. MAIN, INC.

HEAD ENGINEER

COL., C.O.E. DIST. ENG.

Q-2/731A.1

ZGA1:[110,20]Q2A731A.DGN

Scale: „" = 1'-0"

FLOOR PLAN ELEVATION 595.0

UNITS NO. 4-5-6

L E G E N D

INDICATES TERRA COTTA TILE

INDICATES BRICK

INDICATES CONCRETE IN POWER HOUSE CONTRACT

1 17

E

SCALE: 1•" = 1'-0"

BB

SECTION X-X

CROSS SECTION A-A

CROSS SECTION B-B

43'-4" 24'-0" 22'-0" 24'-0" 23'-7"

22'-0" 24'-0" 23'-7" ƒ

1' ƒ

2'-4" 2'-4"32'-8" 32'-8"

R A

D

IU

S

39'-9" 78'-6" 20'-0"

39'-3" 39'-3"

4'-3" 2'-8 •"

4'-3"

59'-3"

2'-8 •"

EL.506.0

STATION DRAINAGE PIPES.

TOP OF PARAPET EL. 660.87

TOP OF PARAPET EL.638.83

DUCT

TOP OF ROOF

SLAB EL.637.5

DUCT

PLASTER

MARBLE

GRILL

MARBLE

MARBLE

ACOUSTICAL TILE CEILING

GLASS

PLASTER

FIN FLOOR EL.611.0

GRILL

TOP OF PARAPET EL.629.33

TOP OF ROOF SLAB EL.638.0

DRAIN

EARTH

FILL

DRAIN

6"0 POROUS

CON DRAIN

EL.605.0

EL.605.0

POWER

CABLE

TUNNEL

UNITS NO.

4,5,&6

POWER

CABLE

TUNNEL

UNIT NO.

1,2,&3

EL. 583.62

6"I.D. HALF ROUND POROUS

CONC. DRAIN-SEE Q 2/7J8G

EL.537.5

NOT IN

POWER HOUSE

CONTRACT

INSIDE

CONTROL

CABLE

TUNNEL

TERRA

COTTA

CONCRETE BLOCK

DUCT

BRICK

DUCTS

ACOUSTICAL TILE CEILING

PLASTER

LINOLEUM BASE

FIN. FLOOR EL.595.0

PLASTER ABOVE

PARTITION.

METAL AND GLASS

PARTITION

TOP OF CRANE RAIL EL.629.0

CRANE RAIL

CRAIN GRIDER

EL.624.23

OPEN

GLAZED TILE DADO

FIN. FLOOR EL.580.0

STORAGE BIN

NOT IN THIS CONTRACT

EL.550.0

CONCRETE

PIPE RAILING

CONC.

CONC.

BLOCK

CONC.

EL.563.0

TERRA COTTA

CONCRETE

TOP OF CRANE

REMOVABLE PIPE RAILINGS

RAIL EL.587.62

EYE BOLTS

OPEN

EL.550.0

FINISH FLOOR EL.564.0

REMOVABLE RAILING

EL.544.33

VENTILATOR

4" FILL AT RIDGE OF ROD

FOR CATWALKS SEE DWG Q2/743 B & C

TOP OF ROOF SLAB EL.659.5 C L

FILTER BOARD CEILING

ON METAL LATH AND PLASTER

SCUTTLE

PIPE RAILING

LADDER

6" T.C.

12"x12"

GLASS

BLOCK

LIGHTS

DUCT

FIN. FLOOR EL.647.5

FIN FLOOR EL.627.75

GATE

SLOT

EL.594.96

CEILING IN TOILET

ROOMS ON THIS

FLOOR TO BE SAME

HEIGHT

NOT IN

POWER HOUSE

CONTRACT

EL.539.33

EL.537.83

GLAZED

TILE

427 405

209 207

VENTILATOR

C OF UNITSL

REMOVABLE RAILING

EL.595.0

FIN. FLOOR

REMOVABLE SLABS

FIN FLOOR EL.580.0

CONCRETE

TOP OF CRANE RAIL EL.587.62

LEDGE

GOVERNOR

OPENING TO

PIT LINER

FIN. FLOOR

EL.564.0

GENERATOR

FLOOR

STAND

DUCT

EL.567.0

OPEN

PENSTOCKCL

EL.553.33

EL.550.0

EL.544.5

EL.540.0

EL.550.0

BOTTOM OF DISCHARGE PIT EL.533.0

EL.541.0

EL.553.67

CONCRETE

EL.564.0

FIN FLOOR

CONCRETE

WATERTIGHT

DOOR

CONCRETE

EL.595.0

FIN FLOOR

CONCRETE

12"x12"

GLASS

BLOCK

GLASS

BLOCK

12"x12"

CONCRETE

AUTOMATIC SHUTTER

OPENING

TOP OF PARAPET EL.660.87

TOP OF ROOF SLAB EL.659.54

FIN. FLOOR EL.627.75

FIN. FLOOR EL.611.0

TOP OF PARAPET

WATER TIGHT HATCH COVER

GATE SLOT COVER

LADDER RUNGS

NOT IN

POWER HOUSE

CONTRACT

7T@9"1-0"

5'-3"

R

EL.532.5

6 •"

4'-0" RADIUS 4'-0" RADIUS

EL.642.00CL

1'-8"

1'-6 ‚" 1'-0"

Q

U

IS

E R

S

" FIN FL.EL.553.67

OPEN

EL.567.0

OPEN DUCT

RAMP

2"

EL.580.0

1'-8"

1'-7"

3'-0"

3'-8"

9"9"9"9"

C B A

F E D C B A

41 42 43 25

36 37 35

41 42 43 25

36 37 3524

42 43

41 42 43 25

36 37 35

42 43

36 3724

26 37 3433

44 3838 45

36 37 3432 33

100 101

38 45

36 37 2332 33

38 45

36 37 3432 33

38 45

36 3732 33

38 45

36 31 3432 33

38 45

36 37 2332 33

4 3

14 2

4 3

19 19

18 18

20 20 1414

28 22

5" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 5"

26'-6"

40 27

40 27

40 27

102 102

4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 4"

26'-4"

1 2

AM

LINE

AM

LINE

AM

LINE

VM

LINE

WM

LINE

VAR

LINE

ANNUNCIATOR L

AM

LINE

AM

LINE

AM

LINE

WM

LINE

WM

LINE

VAR

LINE

ANNUNCIATOR K

AM

LINE

AM

LINE

AM

LINE

WM

LINE

WM

LINE

VAR

LINE

ANNUNCIATOR J ANNUNCIATOR H

AM

TRANSF

VM

TRANSF

WM

TRANSF

AM

GEN

VM

GEN

WM

GEN

ANNUNCIATOR G

Am

GEN

VM

GEN

WM

GEN

RPM GATERPM GATE

AM

SPARE

OCB

AM

SPARE

OCB

AM

SPARE

OCB

WM

SPARE

OCB

VM

TRANSF

VAR

SPARE

OCB

AM

SPARE

OCB

AM

SPARE

OCB

AM

SPARE

OCB

VM

TRANSF

WM

SPARE

OCB

VM

SPARE

VAR

SPARE

OCB

AM

GEN

VM

VAR

GEN

AM VM

VAR

GEN

AM

GEN

VM

GEN

WM

GEN

AM

GEN

VM

GEN

WM

GEN

GATE

AM

VAR

GEN

AM

GEN

VM

GEN

WM

GEN

GATE

VAR

GEN

AM

GEN

VM

GEN

WM

GEN

RPM

GATE

AM

GEN

VAR

GEN

AM

GEN

VM

GEN

WM

GEN

FIELD

AM

GEN

VAR

GEN

FIELD

FIELD

AM

FIELD

LINE

GAR

RPM

1 2

1 2

3'-6

3'-2"

VM

RUN

SYN

FI

RUN

VM

INC

FI

INC

M

IN

. VOLTAGE

REGULATOR

DIRECT

ACTING

TYPE

464646464646

WHM

IN

TRANSF

WHM

GEN

POT

CUR.

POT

CUR.

POT

CUR.

POT

CUR.

POT

CUR.

POT

CUR.

POT

CUR.

POT

CUR.

WHM

IN

WHM

POT

CUR.

POT

CUR.

VOLTAGE

REGULATOR

WHM

IN

WHM

POT

CUR.

POT

CUR.

OUT OUT

VOLTAGE

REGULATOR

WHM

IN

WHM

POT

CUR.

POT

CUR.

OUT

VOLTAGE

REGULATOR

WHM

IN

WHM

POT

CUR.

POT

CUR.

OUT

VOLTAGE

REGULATOR

TYPE

WHM

IN

WHM

POT

CUR.

POT

CUR.

OUT

VOLTAGE

REGULATOR

RHEOSTATIC

ACTING

TYPE

WHM

IN

WHM

POT

CUR.

POT

CUR.

OUT

3148 47

3148 47

3148 47

EXPLANATION

1. OIL CIRCUIT BREAKER CONTROL SWITCH.

2. DISCONNECTING SWITCONTROL SWITCH

3. OIL CIRCUIT BREAKER SYNCHRONIZE SWITCH

4. DISCONNECTING SWITCH PERMISSIVE CONTROL SWITCH

5. GENERATOR NEUTRAL ACB CONTROL SWITCH

6. GENERATOR MAIN ACB CONTROL SWITCH.

7. GENERATOR MAIN ACB SYNCHRONIZING SWITCH

8. MAIN EXCITER FIELD ACB CONTROL SWITCH.

9. MAIN EXCITER FIELD RHEOSTAT CONTROL SWITCH.

10. VOLTAGE REGULATOR TRANSFER SWITCH

11. EMERGENCY SHUTDOWN PUSH BUTTERS

12. GOVERNOR GATE LIMIT CONTROL SWITCH

13. GOVERNOR SPEED LEVEL CONTROL SWITCH

14. VOLTMETER TRANSFER SWITCH.

15. AMMETER TRANSFER SWITCH.

17. TEST TELEPHONE JACK

18. 460 VOLT ACB CONTROL SWITCH.

19. 460 VOLT ACB SYNCHRONIZING SWITCH

20. 15KV MOTOR-OPERATED SELECTOR SWITCH CONTROL SWITCH

22. ILLUMINATED SYMBOL-STATION SERVICE GENERATOR

23. BUS DIFFERENTIAL RELAYS D-C PILOT LIGHT

24. SPARE RELAYS D-C PILOT LIGHT.

25. LINE METERS AND RELAYS BOTANICAL TRANSFER SWITCH.

26. CONTROL BY-PASS SWITCH (TO BY-PASS A AUX SWITCH RELAY ON LINE ACB)

27. NAMEPLATE-MAIN TRANSFORMER BANK (1, 2, 0, 3)

28. NAMEPLATE-STATION SERVICE TRANSFORMER

29. CARRIER CURRENT TRIP CUT-OUT SWITCH.

30. ILLUMINATED SYMBOL-LINE DESIGNATION.

31. CARRIER TEST. SWITCH, 4 POSITION MARKED (1) SEND, (2) RECEIVE.

(3) NORMAL AND (4) RESERVE SIGNAL.

32. FIELD TRIP D-C PILOT LIGHT.

33. GENERATOR RELAYS D-C PILOT LIGHT.

34. TRANSFORMER RELAYS D-C PILOT LIGHT

35. LINE RELAYS D-C PILOT LIGHT.

36. ANNUNCIATOR RESET RESET PUSH-BUTTON.

38. GENERATOR VOLTAGE ADJUSTING RHEOSTAT.

39. STATION SERVICE EXCITER FIELD RHEOSTAT.

40. TRANSFORMER BUS 1 AND 2 OCB INDICATING LIGHTS.

41. HIGH SPEED RECLOSING CUT-OUT SWITCH

42. UNDER VOLTAGE RELAY CUT-OUT SWITCH.

43. SYNCHRONISM CHEEK RELAY CUT-OUT SWITCH.

44. STATION VOLTAGE LEVEL POTENTIAL SELECTOR SWITCH WITH "OFF" POSITION.

45. STATION VOLTAGE LEVEL UNIT CUT-OFF SWITCH.

46. VOLTAGE REGULATOR INDICATING LIGHTS.

47 CARRIER CURRENT MILLIMETER

48. CARRIER CONTROL SWITCH 2 POSITION MARKED (1) CARRIER ON AND

(2) "CARRIER OFF"

49. BUS BACK-UP RELAYS D-C PILOT LIGHT.

100. STATION VOLTAGE LEVEL ADJUSTING RHEOSTAT.

101. CONTROL SWITCH IN VOLTAGE REG. C.T. CIRCUIT. (SEE DWG. Q-2/834B).

102. 15KV MOTOR OPERATED SELECTOR SWITCH. NAMEPLATE (T2, T3).

SINGLE POLE, 30A, 250V, TOGGLE SWITCH.

EL. 595.0

SUMMER SHADE 1

154KV LINE

PANEL 11

NORRIS 1

154 KV LINE & SPARE OCB

PANEL 10

SUMMER SHADE 2

154 KV LINE

PANEL 9

SPARE OCB

154 KV LINE (FUT)

PANEL 8

STATION SERVICE

GENERATOR & TRANSFORMER

PANEL 7

GENERATOR 1

PANEL 6

GENERATOR 2

PANEL 5

GENERATOR 3

PANEL 4

GENERATOR 4

PANEL 3

GENERATOR 5

PANEL 2

GENERATOR 6

PANEL 1

FRONT ELEVATION-INSTRUMENT PANELS

SWITCHBOARD-MM

SUMMER SHADE

PANEL 11

TRANSF BUS NORRIS

PANEL 10

TRANSF BUS SUMMER

SECT. BANK 2 SECT. SHADE 2

PANEL 9

BUS TRANSF FUTURE

SECT BANK 3 LINE

PANEL 8

STATION SERVICE

PANEL 7

GENERATOR 1

PANEL 6

GENERATOR 2

PANEL 5

GENERATOR 3

PANEL 4

GENERATOR 4

PANEL 3

GENERATOR 5

PANEL 2

GENERATOR 6

PANEL 1

BENCH PLAN

BUS. OCB

IND LIGHTS

BUS 2, OCB IND LIGHTS

TRANSF 3

154 KV BUS 2

APRON ELEVATION

BENCHBOARD-MB

GENERAL NOTES

1.

MANUFACTURER.

2.THIS IS A CONTRACT DRAWING USED FOR THE PROCUREMENT OF EQUIPMENT,

AND IS NOT TO BE USED FOR CONSTRUCTION FOR CONSTRUCTION PURPOSES

USE MANUFACTURER'S DRAWING'S.

3.MINOR MODIFICATIONS WILL BE PERMITTED IN APPARATUS ARRANGEMENT,

PANEL WIDTHS, AND OTHER DIMENSIONS IN ORDER TO SUIT THE MANU-

FACTURER'S STANDARDS, SUBJECT TO APPROVAL OF THE CONTRACTING OFFICER

4.

SYMBOLS:

DRILL AND PLUG

GREEN INDICATING SWITCHBOARD LIGHT

RED INDICATING SWITCHBOARD LIGHT

WHITE INDICATING SWITCHBOARD LIGHT

AMBER INDICATING SWITCHBOARD LIGHT

NAMEPLATE

TEST BLOCK

STAINLESS STEEL

WEARING STRIP

BENCH

EACH END OF

BENCHBOARD

APRON

HINGED PANEL

AT REAR OF

EACH SECTION

EL. 595.0'

END ELEVATION

DATE REC. APPR.

C U M B E R L A N D R I V E R W A T E R S H E D

W O L F C R E E K R E S E R V O I R P R O J E C T

C U M B E R L A N D R I V E R, K E N T U C K Y

P O W E R H O U S E

MAIN CONTROL SWITCHBOARD

IN SHEETS SHEET NO

12" 6" 0 1' 2'

SCALE: 1 INCH = 1 FOOT

U.S. ENGINEER OFFICE, NASHVILLE, TENN.,

APPROVAL RECOMMENDED:SUBMITTED APPROVED

PRINCIPAL ENGINEER HEAD ENGINEER COL . CORPS OF ENGINEERS

DISTRICT ENGINEER

SUPV. CHECKED TO ACCOMPANY SPECIFICATIONS

DRAWN TRACED DATED

ERS

C.R.C.

ERS

BENCHBOARD "MB" & INSTRUMENT PANELS "MM"

CHED.BYDESCRIPTION

REVISIONS

VOLTAGE

REGULATOR

154KV. BLS 1

RHEOSTATIC

TYPE

RHEOSTATIC

TYPE

RHEOSTATIC

TYPE

RHEOSTATIC

TYPE

RHEOSTATIC

WAR DEPARTMENT CORPS OF ENGINEERS, U.S. ARMY

SEP 2014 CONVERTED TO CAD MJC JHG

AM

GEN

VM

GATEGATE

AMAM

GEN

RPM

AMAMAM

GEN

RPM

21. ILLUMINATED SYMBOL-MAIN GENERATOR (1,2,3,4,5,6)

103. SHUTDOWN RELAY-HAND RESET

BANK 1 SECT 1

HINGED DOOR AT

Q-2/786.1

37. ANNUNCIATOR TEST PUSH-BUTTON

ANNUNCIATOR WINDOW CABINETS FURNISHED BY ANNUNCIATOR EQUIPMENT

BLUE INDICATING SWITCHBOARD LIGHT**

INSTALLATION OF THIS EQUIPMENT TO BE PAID FOR UNDER CONTRACT

ITEM

FURNISHED BY TURBINE-GOVERNOR CONTRACTOR. MOUNTING AND WIRING

FURNISHED BY GENERATOR CONTRACTOR. MOUNTING AND WIRENING BY

SWITCHGEAR CONTRACTOR.

BY SWITCHGEAR CONTRACTOR.

16. PUSHBUTTON FOR TELEMETERING AUXIARY, RESET

ANNUNCIATOR F ANNUNCIATOR E

FIELD

** POS

ANNUNCIATOR D ANNUNCIATOR C

POS

FIELD

FIELD

PILOT

EXC

** POS

ANNUNCIATOR B ANNUNCIATOR A

PILOT

EXCFIELD

POS**

FRONT ELEVATION

OPERATORS DESK

PLAN

OPERATOR'S DESK

SPACE FOR TELEPHONE

EQUIPMENT RECORDER

END ELEVATION

EI. 595.0

REFERENCE TABLE OR DESK,

FURNISHED BY GOVERNMENT

EXPLANATION:

TRANSFORMER DIFFERENTIAL RELAY-SINGLE PHASE, 2 ELEMENT

TRANSFORMER DIFFERENTIAL AUXILIARY RELAY-HAND RESET

GENERATOR OVERCURRENT RELAY-SINGLE PHASE

GENERATOR DIFFERENTIAL RELAY-SINGLE PHASE

GENERATOR DIFFERENTIAL BACK-UP RELAY

GENERATOR OVERCURRENT AUXILIARY RELAY-SELF RESET

GENERATOR DIFFERENTIAL AUXILIARY RELAY-SELF RESET

GENERATOR OVERVOLTAGE AUXILIARY RELAY-SELF RESET

SHUT DOWN RELAY-HAND RESET

TRANSFORMER DIFFERENTIAL BACK-UP OVERCURRENT RELAY

AUXILIARY RELAY FOR ITEM 81 HAND RESET

BUS DIFFERENTIAL RELAY-SINGLE PHASE (154KV BUSES)

TRANSFORMER OVERCURRENT RELAY-SINGLE PHASE

TRANSFORMER OVERCURRENT AUXILIARY RELAY-SELF RESET

GENERATOR UNDERVOLTAGE RELAY-SINGLE PHASE

GENERATOR UNDERVOLTAGE AUXILIARY RELAY- SELF RESET

BUS BACK UP DIFFERENTIAL GROUND RELAY

HIGH SPEED DIRECTIONAL GROUND RELAY

DIRECTIONAL GROUND RELAY, CURRENT POLARIZED

BUS DIFFERENTIAL AUXILIARY RELAY-HAND RESET

CARRIER CURRENT RECEIVER RELAY

HIGH SPEED ENCLOSING BLOCKING RELAY

TIMING RELAY

DIRECTIONAL GROUND RELAY, POTENTIAL POLARIZED, 1.5-6 AMP

WITH 10-40 AMP INSTANTANEOUS ELEMENT

TELEMETER AUXILIARY RELAY

UNDERCLOTHES RELAY. SEE NOTE 4

ENCLOSING RELAY, SINGLE SHOT, WESTINGHOUSE TYPE SGR-12. SEE NOTE 4

AUXILIARY RELAY FOR HIGH SPEED ENCLOSING SCHEME, 1 AMP

SERIES COIL.

AUXILIARY RELAY, 125V D-C COIL.

BUS BACK-UP, 3-ZONE 1, DISTANCE RELAY

SPARE OCB DISTANCE RELAY WESTINGHOUSE TYPE HZ

SPARE OCB DIRECTIONAL GROUND RELAY; SHORT LINE

SPARE OCB DIRECTIONAL GROUND RELAY, LONG LINE

SPARE OCB RELAYS SHORT-LONG LINE SELECTOR SWITCH

BUS BACK-UP TIMING AUXILIARY RELAY

LINE OCB "A" AUXILIARY SWITCH RELAY (MTD ON INSIDE PANEL)

AUXILIARY RELAY FOR TELEMETERING TEST ANN (MTD ON INSIDE PANEL)

TRANSMITTER-RECEIVER FILAMENT FAILURE ALARM RELAY.

GENERATOR ACB "B" AUXILIARY SWITCH RELAY. (MTD ON INSIDE PANEL)

AUXILIARY TRIPPING RELAY, 125V D-C COIL.

AUXILIARY ALARM RELAY, 125V D-C COIL. SEE NOTE 4

50.

51.

52.

53.

54.

55.

56.

57.

58.

59.

60.

61.

62.

63.

64.

65.

66.

67.

68.

69.

70.

71.

72.

73.

74.

75.

76.

77.

78.

79.

80.

81.

82.

83.

84.

85.

86.

87.

88.

89.

90.

91.

92.

93.

4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 2'-4" 4"

26'-4"

1 2

GENERATOR 6 &

BUS 2 DIFF & BACKUP

PANEL 1

GENERATOR 5 &

PANEL 2

END ELEVATION

6'-6"

TRANSF & SPARE OCB 964 154 KV LINE

GENERATOR 4 &

SPARE OCB 928

PANEL 3

GENERATOR 3 &

TRANSFORMER 2

PANEL 4

GENERATOR 2 &

PANEL 5

GENERATOR 1 &

TRANSFORMER 1

PANEL 6

STA SERV GEN &

PANEL 7 PANEL 8

SUMMER SHADE 2

154 KV LINE

PANEL 9

NORMS 1

154 KV LINE

PANEL 10

SUMMER SHADE 1

154 KV LINE

PANEL 11

EI.595.0

GENERAL NOTES:

THIS IS A CONTRACT DRAWING USED FOR THE PROCUREMENT OF

EQUIPMENT, AND IS NOT TO BE USED FOR CONSTRUCTION. FOR

CONSTRUCTION PURPOSES USE MANUFACTURER'S DRAWINGS

MINOR MODIFICATIONS WILL BE PERMITTED IN APPARATUS

ARRANGEMENT, PANEL WIDTHS, AND OTHER DIMENSIONS IN ORDER

TO SUIT THE MANUFACTURER'S STANDARDS SUBJECT TO APPROVAL

OF THE CONTRACTING OFFICER.

TWO RELAYS, ITEM 88 & 89 (TO BE MOUNTED ON SIDE SHEET,

PANELS 9, 10 & 11.)

FIVE RELAYS ITEM 76, 77, 78, 87 & 93 TO BE MOUNTED ON

SIDE SHEET, PANELS 3 & 7.

ONE RELAY ITEM 91 TO BE MOUNTED ON SIDE SHEET, PANELS

1, 3, & 5. (SEE DWG. Q-2/834B)

1.

2.

3.

4.

5.

GENERAL NOTES: (CONT'D.)

TO BE MOUNTED ON SIDE SHEET PANEL 7, FOR

STATION TRANSF. DIFFERENTIAL RELAYS.

6.

5'-6" 5'-6"±

WAR DEPARTMENT CORPS OF ENGINEERS, U.S. ARMY

DATE REC. APPR.

CUMBERLAND RIVER WATERSHED

WOLF CREEK RESERVOIR PROJECT

CUMBERLAND RIVER, KENTUCKY

POWERHOUSE

IN SHEETS SHEET NO. 4

SCALE: 1 INCH = 1 FOOT

U.S. ENGINEER OFFICE, NASHVILLE, TENN.,

APPROVAL RECOMMENDED:SUBMITTED: APPROVED:

HEAD ENGINEER COL ., CORPS OF ENGINEERS

DISTRICT ENGINEER

DRAWN

TO ACCOMPANY SPECIFICATIONS

DATED

RELAY PANELS MR & OPERATORS DESKS

CHKD.BYDESCRIPTION

REVISIONS

PRINCIPAL ENGINEER

TRACED

CHECKEDE R S

S.P.W.

SUPV.

MAIN CONTROL SWITCHBOARD

E R S

CARRIER RELAYS

3 4 4 1/221

F

E

11 10 9 8 7 6 5 4 3 2 1

11 10 9 8 7 6 5 4 3 2 1

OPER

DESK

REF

TABLE

7 8

1 8

29'-11

26'-4" 15'-1 3/4"

5'-6" 5'-6" 13'-9

5'-0" 4'-0 3/4"26'-8"5'-0"5'-11"

4'-0"

21'-9" 22'-0" 23'-9" 4'-0"

4'-0"

RELAY PANELS MR

BENCH BOARD MB

R E

C O

R D

E R S

W B

D C

S

D -C S

W E

D A

KEY PLAN-CONTROL ROOM

SCALE: 1/8" = 1'-0"

71'-5"

SEP 2014 CONVERTED TO CAD MJC JHG

Q-2/787.1

GENERATOR OVER VOLTAGE RELAY-SINGLE PHASE

TRANSFORMER 3

SYNCHRONISM CHECK RELAY. SEE NOTE 4

SYNCHRONOUS CHECK AUXILIARY RELAY. SEE NOTE 4

THREE AUX. CURRENT TRANSFORMERS, 5-10 AMP.,

NORRIS FUTURE

BUS 1 DIFF AND BACKUP

INSTRUMENT PANELS MM

REAR ELEVATION-RELAY PANELS

SWITCHBOARD-MR

TRANSF

DIFF

TRANSF

DIFF

TRANSF

DIFF

BUS 2

DIFF

BUS 2

DIFF

TRANSF

DIFF

TRANSF

DIFF

TRANSF

DIFF

BUS 1

DIFF

BUS 1

DIFF

TRANSF

DIFF

TRANSF

DIFF

TRANSF

DIFF

TRANSF

DIFF

TRANSF

DIFF

TRANSF

DIFF

68 68 68 68

BUS 2

DIFF

GEN

DIFF

GEN

OC

GEN

DIFF

GEN

OC

GEN

OC

GEN

DIFF

TRANSF

OC

TRANSF

OC

GEN

OV

GEN

DIFF

55 54

57 58 57 58

55 54

TRANSF

OC

59 51 56 56

TIMER

BUS 2

BECK-UP

55 54

57 58

59 59 51 59 70 59 51 56 56 56 93

56 56

GEN

OC

GEN

OC

GEN

OC

GEN

OC

GEN

OC

GEN

OC

6155 54 55 54

TRANSF

OC

TRANSF

OC

TRANSF

OC

TRSNSF

OC

TRANSF

OC

OV

AUX

DIR

GRD

BUS 2

BACK-UP

DIR

DIST

BUS 2

BACH-UP

DIR

GRD

BUS 1

BACK-UP

TRANSF

OC

TRANSF

OC

DIR

DIST

BUS 1

BACK-UP

DIR

GRD

SHORT

LINE

DIR

GRD

SHORT

LINE

TRANS

OC

DIR

DIST

GEN

UV

UV

AUX

DIR

DIST

TRANSF

AUX

DIR

DIST

DIR

GRD

REC

DIR

DIST

DIR

DIST

DIR

GRD

SHORT

LINE

DIR

GRD

LONG

LINE

TRANSF

OC

57 58 57 58

79 80 87 90 92 93 79 80 92 93 79 80 87 92 92 93

68 68

69 72 76 69 72 76

74 71 75 74 71 75

78737873

UV

AUX

DIR

DIST

DIR

DIST

DIR

DIST

DIR

GRD

TIMER

SGR 12

TIMER

BUS 1

DIR

DIST

51 85

BUS 1

DIFF

DWG Q-2/786

RELAY PANELS,

REAR

HINGED DOOR OF EACH

END OR BOARD

NOTE:

FOR INSTRUMENT

PANEL LAYOUT, SEE

INSTRUMENT

BACK UP

TELM

CARR

SYN

CHK

REL

BLOCK

RECL

PANELS FRONT

9'-0" 9'-0" 4'-0" 9'-0" 9'-0" 9'-0" 9'-0" 9'-0"

58'-0"

EL. 610.83

5'-012"

EL. 595.0

8'-0"

B E

A M

EL. 610.83

EL. 595.0

OPENING IN FLOOR

BOX CONTAINING 1 STA. SERVICE

SECTION B-B

K V M

A

IN

L

E A

D S

K

V M

A

IN

L

E A

D S

T2 T3

TO SWGR 64

TO MAIN POWER

TRANSF. BANK NO. 2

TO MAIN POWER

TRANSF. BANK NO. 3

* ELECTRICALLY INTERLOCKED 50 THAT NEITHER

CAN BE OPERATED UNLESS THE OTHER IS OPEN

TRANSFORMER

ONE LINE DIAGRAM

FRONT ELEVATION

GENERAL NOTES:

1.

B E

A M

3 PST 1200A 15 KV

GANG OPERATED

STA. SERVICE SWITCH

2'-3" 2'-3"

8'-0"

F

TRANSFORMER HIGH

7'-1" 11"

4" 1'-0" 1'-0"

OPENING IN FLOOR

EL. 595.0

2" FINISH

6" FILL

5 1/2" SLAB

SECTION A-A

TO G4

FOR CONTINUATION

THIS IS A CONTRACT DRAWING TO BE USED FOR THE

PROCUREMENT OF EQUIPMENT AND IS NOT TO BE USED

FOR CONSTRUCTION. FOR CONSTRUCTION PURPOSES USED

MANUFACTURER'S DRAWINGS.

MINOR MODIFICATIONS WILL BE PERMITTED APPARATUS

ARRANGEMENT, PANEL WIDTHS, AND OTHER DIMENSIONS

IN ORDER TO SUIT THE MANUFACTURER'S STANDARDS,

SUBJECT TO APPROVAL OF THE CONTRACTING OFFICER.

THESE DIMENSIONS WILL DEPEND ON THE DIMENSIONS OF

THE TRANSFORMER FURNISHED AND SHALL BE DETERMINED

FROM THE TRANSFORMER MANUFACTURER'S CERTIFIED

DRAWINGS BEFORE FABRICATION OF THE TIE

BUS.

SWITCHGEAR T2 AND T3 SHALL BOTH HAVE 8 POINT AUX.SWITCHES.

INSTALLATION OF THIS EQUIPMENT WILL BE PAID FOR

UNDER CONTRACT ITEM.

2.

3.

4.

5.

C-

TERMINAL BOARD, 4

POLE WITH SHORT

CIRCUITING STRIPS

CUMBERLAND RIVER WATERSHED

WOLF CREEK RESERVOIR PROJECT

CUMBERLAND RIVER, KENTUCKY

POWERHOUSE

15 KV STATION SERVICE SWITCHGEAR EQPT.

UNITS T2, T3 AND SS TRANSF.

SHEET NO. 8

SHEETSIN 12" 0 1'

SCALE: 1/2 INCH = 1 FOOT

U.S. ENGINEER OFFICE, NASHVILLE, TENN.,

SUBMITTED:

PRINCIPAL ENGINEER

APPROVAL RECOMMENDED:

HEAD ENGINEER

APPROVED:

COL., CORPS OF ENGINEERS

DISTRICT ENGINEER

SUPV.

DRAWN

CHECKED

TRACED

TO ACCOMPANY SPECIFICATIONS

DATED

5-4-50 S.B.F.

BY CHKD. REC. APPR.DATE DESCRIPTION

REALLOCATED SWITCHGEAR T2 & T3

REVISIONS

1'-8" 1'-8"

A

A

4'-1012" 7'-8"

5'-3" OPENING

5'-0"

7'-612"

9'-5"

1'-8" 1'-8"

5'-0"

5'-012" 4'-1012"

5'-3" OPENING

S E

E N

O T

E

STATION SERVICE

SELECTOR SWITCH

GEAR BOX

PROVIDE MEANS FOR

MANUAL OPERATION

MOTOR MECHANISM LIMIT OF BUS

DUCT CONTRACT

OPENING IN FLOOR

1500 KVA 3 STATION SERVICE

TRANSF. 13,200/480 VOLTS

SEE NOTE 3

1 2

DETAILS OF THESE CONNECTIONS TO BE

COORDINATED BETWEEN TRANSFORMER

AND BUS MANUFACTURERS

15 KV STATION SERVICE BUS

SWITCHGEAR T3

DOORS CLOSED

7'-8" TO LINE

480 VOLT BUS TO

SWITCHGEAR SS

SEE DWGS Q-2/793

& Q-2/797

B

B

SWITCHGEAR T2

DOORS OPEN

4 1/2" SLAB

EL. 610.83

12 1/2 13

2' 3' 4' 5'

S.B.F.

CORPS OF ENGINEERS, U. S. ARMYWAR DEPARTMENT

2"± 71

2"±

9'-0" TO 14 LINE

S

L A

B

SEE DWG. Q-6" FILL/799

17 KV 1200 A 1200 SERVICE TIE BAR

TO SWGR G5

FOR SECONDARY LEADS

1 1/4" CONDUIT TO CABLE TUNNEL

/2 S

L A

B

F

IL

L

F

IN

8± 8±

TO STA. SERVICE TRANSFORMER

13,200/480 VOLTS-1500 KVA

3-400/SY MOUNT IN

VOLTAGE COMPARTMENT

* STATION SERVICE SELECTOR SWITCH 15KV 1200A

SEP 2014 CONVERTED TO CAD MJC JHG

Q-2/790.2

V

CONT. CBS

20A,2P

2 4

300A

STATION SERVICE TRANSFORMER

STATION SERVICE GENERATOR

ANNUNCIATION COMPLETE SHUTDOWN

AUX. RELAY NO.1 TRIPS AND

LOCKS OUT:

O.C.B.'S 944 & 948

GENS 3 & 4 MAIN ACB'S 238&243

TRIPS:

STA. SERV. TRANSF. A.C.B. 073

ANNUNCIATOR

AUX. RELAY NO.2 TRIPS AND

LOCKS OUT:

O.C.B.'S 924 & 928

TRIPS:

STA. SERV. TRANSF. A.C.B. 073

ANNUNCIATOR

THRUST BEARING OIL COOLER -LOW WATER FLOW

ALL BEARINGS - HIGH TEMPERATURE

OIL RESERVOIRS -LOW OIL LEVEL

UNDERVOLTAGE RELAY OPERATION

OVERCURRENT RELAY OPERATION (STATION LOAD)

OVERCURRENT RELAY OPERATION (SYSTEM LOAD)

SHUTDOWN RELAY OPERATION

MANUAL EMERGENCY (7G11)

LOW GOVERNOR OIL PRESSURE (63QTS)

UNDER VOLTAGE (27G1X)

87T5X1 87T5X2

GENS 5 & 6 MAIN ACB'S 258 & 268

RELAY RACK

TO ANNUNCIATOR

C O

N T

R O

L T

R A

N S

F O

R M

E R

A N

D P

A N

E L

B O

A R

D

B U

L K

H E

A D H

O

IS

T F

E E

D E

R

N O .1

B R

E A

K E

R 'S A

IR

C

O M

P R

E S

S O

R

T U

N N

E L S

U P

P L

Y F

A N N

O .1

T U

N N

E L S

U P

P L

Y F

A N N

O .1

E X

H A

U S

T F

A N N

O .1

E X

H A

U S

T F

A N N

O .1

E X

H A

U S

T F

A N N

O .1

E X

H A

U S

T F

A N N

.9

X

H A

U S

T F

A N N

.7

H A

U S

T F

A N N

.6

H A

U S

T F

A N N

.5

H A

U S

T F

A N N

.8

H A

U S

T F

A N N

.4

H A

U S

T F

A N N

.3

H A

U S

T F

A N N

.2

H A

U S

T F

A N N

.1

H O

U S

T F

A N N

O .7 D

A M

P E

R

E X

H O

U S

T F

A N N

O .6 D

A M

P E

R

E X

H O

U S

T F

A N N

O .5 D

A M

P E

R

S U

P P

L Y F

A N N

O .8 I

N T

A K

E D

A M

P E

R

S U

P P

L Y F

A N N

O .4 I

N T

A K

E D

A M

P E

R

S U

P P

L Y F

A N N

O .3 I

N T

A K

E D

A M

P E

R

S U

P P

L Y F

A N N

O .2 I

N T

A K

E D

A M

P

P P

L Y F

A N N

O .1 I

N T

A K

E D

A M

P E

R

S U

P P

L Y F

A N N

O .4 R

E C

IR

C U

L A

T

IN

G D

A M

P E

R

S U

P P

L Y F

A N N

O .2 R

E C

IR

C U

L A

T

IN

G D

A M

P E

R

S P

A R

E C

O M

P A

R T

M E

N T

V

H

R

D A

M P

E R F

A N C

O N

T

S

IN

G L E U

N

IT

S P

A R

E C

O M

P A

R T

M E

N T

D

O U

B L E U

N

IT

G R

O U

P "D

"H

E A

T E

R S

G R

O U

P "E

"H

E A

T E

R S

G R

O U

P "B

"H

E A

T E

R S

G R

O U

P "A

"H

E A

T E

R S

G R

O U

P "C

"H

E A

T E

R S

S

IN

G L E U

N

IT

S P

A R

E C

O M

P A

R T

M E

N T

G E

N

A

IR

C

IR

C U

IT

RELAY RACK

TO ANNUNCIATOR

F A

N N

O .2

F A

N N

O .4

F A

N N

O .2

F A

N N

O .2

F A

N N

O .2

F A

N N

O .2

F A

N N

O .4

F A

N N

O .4

F A

N N

O .4

F A

N N

O .4

T O

V

T O

V

H

T O

V

H

"V1" 460V-XENTILATION BUS

FOR CONTINUATION SEE DWG. Q-21784

TO MAIN TRANSFORMER BANK 3

13.8 K.V. STA. SER.BUS

TO MAIN TRANSFORMER BANK 2

51G7-LONG TIME DELAY

5168-SHORT TIME DELAY

51G7X TRIPS ACB 078 (13)

& ANN

51G8X TRIPS ACB 073 (15)

& ANN

27G7X, 63Q75 (LOW GOV.

OIL PRESS), 7511 ACTUATE

86G7

86G7 TRIPS AND LOCKS OUT.

1.GEN. ACB 078 (13)

2.GOV. SHUTDOWN SOL.

3.ANN.

RELAY RACK

TO ANNUNCIATOR

GOVERNOR

FLYBALL MOTOR

ATTACH

INSTANT

AT RIGHT

SEE TABLE

1500 KVA-13,200-480V.

TRANSFORMER BANK

STATION SERVICE

"SS"'-460V MAIN STATION SERVICE

T O F

E E

D E

R B

K R S .S

B D

'SS"-460V MAIN STATION SERVICE BUS NO.1S

P

A R

E C

O M

P A

R T

M E

N T

S P

A R

E C

O M

P A

R T

M E

N T

S P

A R

E C

O M

P A

R T

M E

N T

R O

O M H

T R

S

O N S

W G

R F

T U

R B

IN

E O

IL

P

U M

P

G O

V

O

IL

P

U M

P

B

J A

C K

IN

G P

U M

P

G O

V

O

IL

P

U M

P

A

G E

N

H O

U S

IN

G H

E A

T E

R

T O F

E E

D E

R B

K R S .S B

D

"U1" 460V-UNIT BUS #1

"U2" 460V- UNIT BUS #2

(SAME AS "U1")

"U3" 460V- UNIT BUS #3

(SAME AS "U1")

"U4" 460V- UNIT BUS #4

(SAME AS "U1")

"U6" 460V-UNIT BUS #6

(SAME AS #UI#)

"U5" 460V- UNIT BUS #5

(SAME AS "U1")

"U7" 460V-PUMP AND COMPRESSOR BUS

V

IL

L A

G E P

U M

P N

O .1

B A

T T

C H

A G

R .M

-G S

E T N

O .1

R O

T A

R Y D

IS

P L

A C

E M

E N

T

C

H E

M

IC

A L

P U

M P

F E

E D P

U M

P S F

E E

D E

R /6

C O

N T

S

E T T

A N

K A

G

IT

A T

O R

V

IL

L A

G E P

U M

P N

O .2

N O .1 S

E W

A G

E P

U M

P

N O .2 S

E W

A G

E P

U M

P

N O .1 -1

C

F M A

IR

C

O M

P R

N O .2 -3

C

F M A

IR

C

O M

P R

N O .3 -1

.8

C F

M A

IR

C

O M

P R

N O .2 A

IR

C

O N

D

U N

IT

F

D R

N O .1 A

IR

C

O N

D

U N

IT

F

D R

E L E

V A

T O

R F

E E

D E

R

S P

A R

E B

R E

A K

E R

U N

IT

S P

A R

E C

O M

P A

R T

M E

N T

RELAY RACK

TO ANNUNCIATOR

G O

V

O

IL

P

U M

P

T U

R B

IN

E O

IL

P

U M

P

U

N

IT

S P

A R

E C

O M

P A

R T

M E

N T

R O

O M H

E A

T E

R S

S P

A R

E B

R E

A K

E R

S U

M P P

U M

P N

O .1

A

G A

N T

R Y C

R A

N E F

D R

C A

B L E P

IP

E L

IN

E S

Y S

T E

M

P U

M P

IN

G U

N

IT

O

IL

R

O O

M F

E E

D E

R

M A

C H

IN

E S

H O

P F

E E

D E

R

S P

A R

E B

R E

A K

E R

S U

M P P

U M

P N

.2

M P P

U M

P N

.3

M P P

U M

P N

O .1

B

B A

T T .C

H G .M

-G S

E T N

O .2

S .S

G E

N

H E

A T

E R

S

H U

N T T

R

IP

C O

N T

R O

L T

R A

N S

F O

R M

E R

A N

D P

A N

E L

B O

A R

D

T U

N N

E L S

U P

P L

Y F

A N N

O .2

E X

H A

U S

T F

A N N

O .1

E X

H A

U S

T F

A N N

O .2

E X

H A

U S

T F

A N N

O .2

E X

H A

U S

T F

A N N

O .2

E X

H A

U S

T F

A N N

O .2

E X

H A

U S

T F

A N N

O .2

E X

H O

U S

T F

A N N

O .2

D

A M

P E

R

S U

P P

L Y F

A N N

O .1

I

N T

A K

E D

A M

P E

R

S U

P P

L Y F

A N N

O .1

I

N T

A K

E D

A M

P E

R

S U

P P

L Y F

A N N

O .1

I

N T

A K

E D

A M

P E

R

G R

O U

P "E

"H

E A

T E

R S

G R

O U

P "D

"H

E A

T E

R S

G R

O U

P "C

"H

E A

T E

R S

G R

O U

P "B

"H

E A

T E

R S

G R

O U

P "A

"H

E A

T E

R S

S P

A R

E C

O M

P A

R T

M E

N T

S P

A R

E C

O M

P A

R T

M E

N T

S P

A R

E C

O M

P A

R T

M E

N T

G E

N

A .C .B

A

IR

C

O M

P R

E S

S O

R N

O .2

S U

P P

L Y F

A N

S

I

N T

A K

E D

A M

P E

R

V T -H

T R D

O M

P E

R F

A N C

O N

T

S U

P P

L Y F

A N N

O

S U

P P

L Y F

A N N

O

S U

P P

L Y F

A N N

O

S U

P P

L Y F

A N N

O

S U

P P

L Y F

A N N

O .8 I

N T

A K

E D

A M

P E

R

S U

P P

L Y F

A N N

O .1

R

E C

IR

C U

L A

T

IN

G D

A M

P E

R

C O

N T

R O

L T

U N

N E

L S

U P

P L

Y D

A M

P E

R T O

V

T R

O L L E

Y T

R A

V E

L

B R

ID

G E T

R A

V

X

IL

IA

R Y H

O

IS

T

M A

IN

H

O

IS

T

T R

O L L E

Y T

R A

V E

L

B R

ID

G E T

R A

V

X

IL

IA

R Y H

O

IS

T

M A

IN

H

O

IS

T

CRANE MANUFACTUER

EQUIPMENT FURNISHED BY

SWITCHGEAR SS

D-C DIST. PNLBD.

SWITCHYARD CONTROL

SWITCHBOARD AS

D-C DIST. PNLBD.

SWITCHYARD CONTROL

SWITCHBOARD AS

MAIN STATION SERVICE

POWERHOUSE CRANE

LIGHTING TRANSFORMER

5 KVA-1 -480 TO 120/240V.

F1-F2-F3

FIELD PANEL

F4-F5-F6

FIELD PANEL

SPARE BREAKER

SWITCHYARD (FUTURE)

SWITCHYARD

F7

FIELD PANEL

A S

V

B A

T T

E R

Y B

U S

BREAKER

SPARE

SPARE BREAKER

LC20 & LC19

LTG. CAB.

ANNUNCIATION

SYSTEM DC SUPPLY

METER TEST ROOM

L

IG

H T

IN

G C

A B L

C L

C

S P

A R

E B

R E

A K

E R

L C

L

C

L

IG

H T

IN

G C

A B

L

IG

T H

T

IN

G C

A B L

C L

C

S P

A R

E B

R E

A K

E R

S P

A R

E B

R E

A K

E R

RELAY RACK

TO ANNUNCIATOR

EMERGENCY HTY.L

IG

H T

IN

G C

A B L

C L

C

L

IG

H T

IN

G C

A B L

C

L

IG

H T

IN

G C

A B L

C

,1

L C 'S

EMERGENCY

,1

,1

L C 'S ,4

,8

L C 'S

L C 'S

L C 'S

L C 'S

S P

A R

E B

R E

A K

E R

L

IG

H T

IN

G C

A B L

C

S P

A R

E B

R E

A K

E R

L

IG

H T

IN

G C

A B .L

C

L

IG

H T

IN

G C

A B L

C L

C

L

IG

H T

IN

G C

A B L

C L

C

"V2" 460V-VENTILATION BUS

AT FAN NO.17

CONTROL CENTER "U7"

TO SEC.1 ACB NO.3

CONTROL CENTER "U8"

TO SEC.5 ACB NO.18

LIGHTING SWGR "LS"

120/208V-3 -4- WIRE LIGHTING BUS

3 VOLTMETER FUSES

RELAY RACK

TO ANNUNCIATOR

480-120/208V.

LIGHTING TRANSF. 3 200KVA

BATTERY 60 CELLS

S .S

B D

T O F

E E

D E

R B

K R

S .S

B D

T O F

E E

D E

R B

K R

460V-SUMP PUMP BUS

S P

A R

E C

O M

P A

T M

E N

T

C O

M P F

O R S

U M

P P

U M

P S

E L

S W

S

A N

D R

E L

A Y

S

S P

A R

E C

O M

P A

T M

E N

T

S

IN

G L E U

N

IT

M P P

U M

P N

O .5

S U

M P P

U M

P N

O .6

U N

IT

H

E A

T E

R

S

IN

G L E U

N

IT

A R

E C

O M

P A

T M

E N

T

S U

M P P

U M

P N

O .4

A

S P

A R

E B

R E

A K

E R

C R

A N

E F

E E

D E

R

P O

W E

R H

O U

S E

F D

R

N O .2

S W

IT

C H

B O

A R

D

V

IL

L A

G R F

D R

N O .2

D A

M F

E E

D E

R N

O .1

H E

A D

W A

T E

R F

D R

N O .2

S P

A R

E A

C B

D A

M F

E E

D E

R N

O .1

S W

IT

C H

Y A

R D F

D R

3 VOLTMETER FUSES

VS VS

M G

VM AM AM

M G

VM AM

VM

GR

TS

V

G

AS

VSA VSVSSSPL

ASAS

FB

AS AS

A

T

7 VSSVSVS

BUS NO.2

24 25 26 27

600A 300A

/0

350A

-4

M C

M

-4

M C

M

25 23

450A

450A

15A

25A

CONTROLS

CB'S

CONT.

20A, 2R

25A

25A

20A

20A

20A

20A

20A

20A

20A

20A

15A

35A

35A

25A

25A

10 9 8

90A

27 27

70A

18 18

70A

70A

18 18

70A

27 27

18 18

DISC. T3

SWGR. G5

SAT. C. T.'S

3-400-5Y

5-10Y

51TSX

ANNUNCIATOR

A.C.B. NO. 073 (15)

TRIPS

51TSX

87TSX SW DISC. T3

87T5X2

87TSX190G7

MM

10-5Y

MM

MM MM

MM

DISC.'T2

1-2000-5A

B6G7

2-2000-5A 3-2000-5-5Y

U8

A

MM

A

MM

GEN.

1500KVA

STATION

SERVICE

EX.

AM AM

SS

AR AR

A

REG

VOLT

R

MR

R

MR

AR

AR

MR

MR

T S

T S

AM AM

SS

W W

AR

AR

"A" SW DISC. T2

MR

R

1-480-120V

2-480-120V

43TS

MB

11 12 14 16 17 18 19 20

300A 500A 500A

500A 500A 300A 300A

VM VM

SS MM

21 22 23

800A 400A

SWGR. G4

51G7X

51G8XF7

MR MR MM MM

AM AR AR

51G7 51G8 27G7X

R R WH WH

MR

MB MB

MM

2-480-120V

SS

43TS

R

27G7

VM VM

CS

F7

VM

FC

R

6 7 8 9 10 11

90A 90A

40 2

15A 50A

275A

275A

3 4 5

15A 50A

275A

275A

275A

275A

275A

275A

275A

275A

275A

275A

500A19

16151413121110

150A 20A 125A 125A 50A 150A 500A

9876543

50A

20A 15A 15A20A

15A

70A

15 16 17 18 543

200A 100A 100A200A 50A 150A150A150A

VM29

AM27

800A

2 3 4 5 6 7 8 9 10

500A

500A 500A 800A 400A300A300A 500A 600A 500A

-5

M C

M

-5

M C

M

/0

-4

M C

M

/0

/0

/0

/0

/0

/0

-5

M C

M

-5

M C

M

-5

M C

M

N O .1

/0

/0

/0

H E

A D

G A

T E F

D R

N O .1

/0

D A

M F

E E

D E

R N

O .1

/0

-5

M C

M

/0

50A50A

24A 24B 24C

50A 50A50A

24D 24E 24F

50A

23 8 14

100A 50A 100A 100A

4-500MCM

3-800/5A

#1

21 20 19 18 17 16 14 13 12 10 9 8 7 6 5 4 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 18

15A

15A

20A

1 1

50A 125A

50A

50A

100A

60 15 15

125A

50A 15A 70A 100A

T

15A 50A

500A

500A

6KW

275A

275A

15A

CONTROLS 27

15A

25A

25A

35A

20A

20A

20A

20A

20A

25A

35A

25A

50A

50A

35A

35A

15 11

35A

"U8" 460V-STATION UNIT BUS

460 V. BUS

C

C

C

40 50 50

C C

50 50

C C

100A

100A

100A

100A

150A

150A

150A

150A125A

125A

100A

100A

125A

300A

225A

225A

225A

225A

100A

100A

100A

150A

150A

NO.1 CHARGER

NO.2 CHARGER

NONE

NONE

9 10 11 12 19 20 22 2118

100A 100A 100A 100A 150A 150A150A200A100A

VM28

AM

800A

3-800/5A

4-500MCM

#2

59 60 61 62 63 64 65

50A 50A 125A 125A50A 20A

"U9"

2 2 4

1715 15 60

400A

400A

SYMBOLS;

AIR CIRCUIT BREAKER-MANUALLY OPERATED

AIR CIRCUIT BREAKER-ELECTRICALLY OPERATED

AIR CIRCUIT BREAKER-DRAW OUT TYPE

DISCONNECT SWITCH

FUSE

MOTOR STARTER, NON-REVERSING LINESTART TYPE

NUMBER INDICATES NEMA STARTER SIZE

ELECTRIC HEATER,30KW

CRANE MOTOR CONTROLLER

TRANSFORMER

CURRENT TRANSFORMER

POTENTIAL TRANSFERMER

BATTERY

INSTANTANEOUS

TIME

FREQUENCY CONTROLLER

ACB TRIPPING MEANS

GROUND RESISTANCE METER

TEST TRANSFER SWITCH

GREEN IND. LT

120V CONTACTOR-NO. INDICATED NEMA SIZE

RED IND.LT

PUSH BUTTON-START

PUCH BUTTON-STOP

FOR METER SYMBOLS SEE DWG. Q-2/784

TS

GR

FC

C

MOTOR, 15 HORSEPOWER

1 2

2'-6" 2'-6" 2'-6" 2'-6" 1'-4" 3'-6" 3'-6" 3'-6" 1'-4" 2'-6" 2'-6" 2'-6" 2'-6"

33'-5" MAXIMUM

1'-9" 7'-0"

A

AUX. RELAY NO. 2 TRIPS AND LOCKS OUT:

O.C.B.'S 924 & 928

GENS. 5 & 6 MAIN A.C.B.'S

TRIPS:

1 2 3 4 5 6 7 8 9 10 11 12 14

500A

500A

500A

300A

300A

20 52

800A

400A

500A

600A

24 25

350A

300A

SINGLE LINE DIAGRAM

R A

V

STA. SERV. TRANSF. A.C.B.

ANNUNCIATOR

AUX. RELAY NO. 1 TRIPS AND LOCKS OUT:

O.C.B.'S 944 & 948

GENS. 3 & 4 MAIN A.C.B.'S

TRIPS:

STA. SERV. TRANSF. A.C.B.

ANNUNCIATOR

AR

R

Am

FC

AS

GOVERNOR

FLY-BALL MOTOR

FB

MR

ITEM

NO.

USE

VOLTAGE

RATING INT. CAP.

NEMA

FRAME

RATING

NO.

POLES

TRIP

RATING

TERMINAL

& CABLE

SIZE

MAN. OR

ELECT

OPERATED

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

75,000

75,000

75,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000

50,000 3

3 800

800 300

500 MAN.

6-#4/0

6-#4/0

3-#4/0

3-#4/0

6-500MCM

3-500MCM

3-500MCM

3-400MCM

3- #4/0

3 #4/0

BUS

BUS

BUS

6- #4/0

6- #4/0

6- #4/0

3- #4/0

3- #4/0

6-500MCM

3-500MCM

3-500MCM

3-400MCM

3- #4/0

3-400MCM

3 #4/0

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

ELECT.

ELECT.

ELECT.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

MAN.

STATION SERVICE BUS GRD. RELAY WITH AMBER IND. LIGHT

AMMETER-TRANSFER SWITCH

VOLTMETER-TRANSFER SWITCH

AMMETER-STATION SERVICE TRANSFORMER (0-2000A)

VOLTMETER-STATION SERVICE TRANSFORMER (0-600V)

AMMETER-STATION SERVICE GENERATOR (0-2000A)

VOLTMETER-STATION SERVICE GENERATOR (0-600V)

BUS TRANSITION SPACE

SWITCHYARD FEEDER NO 2 A.C.B.

CRANE FEEDER A.C.B.

VILLAGE FEEDER NO.2 A.C.B.

SWITCHGEAR "U9" & "V2" FEEDER NO.2 A.C.B.

SWITCHGEAR "U8" FEEDER NO.2 A.C.B.

LIGHTING TRANSFORMER NO.2 A.C.B.

SWITCHGEAR "U7" & "V1" FEEDER NO.2 A.C.B.

DAM FEEDER NO.2 A.C.B.

HEADGATE FEEDER NO.2 A.C.B.

SWITCHGEAR "U3" & "U6" FEEDER NO.2 A.C.B.

SWITCHGEAR "U2" & "U5" FEEDER NO.2 A.C.B.

SWITCHGEAR "U1" & "U4" FEEDER NO.2 A.C.B.

STATION SERVICE TRANSFORMER A.C.B.

BUS TIE A.C.B.

STATION SERVICE GENERATOR A.C.B.

SPARE A.C.B.

VILLAGE FEEDER NO.1 A.C.B.

SWITCHGEAR "U9" & V2" FEEDER NO.1 A.C.B.

SWITCHGEAR "U8" FEEDER NO.1 A.C.B.

LIGHTING TRANSFORMER NO.1 A.C.B.

SWITCHGEAR "U7" & "V1" FEEDER NO.1 A.C.B.

DAM FEEDER NO.1 A.C.B.

HEADGATE FEEDER NO.1 A.C.B.

SWITCHGEAR "U3" & "U6" FEEDER NO.1 A.C.B.

SWITCHGEAR "U2" & "U5" FEEDER NO.1 A.C.B.

SWITCHGEAR "U1" & "U4" FEEDER NO.1 A.C.B.

LIST OF EQUIPMENT

CIRCUIT BREAKER

NO DATE R E V I S I O N S BY CHKD

C U M B E R L A N D R I V E R W A T E R S H E D

W O L F C R E E K R E S E R V O I R P R O J E C T

C U M B E R L A N D R I V E R, K E N T U C K Y

P O W E R H O U S E

MAIN STATION SERVICE SWITCHGEAR SS

IN SHEETS SHEET NO. 11

SCALE: 1 INCH = 1 FOOT

U. S. ENGINEER OFFICE, NASHVILLE, TENN.

APPROVAL RECOMMENDED.SUBMITTED. APPROVED.

PRINCIPAL ENGINEER HEAD ENGINEER COL . CORPS OF ENGINEERS

DISTRICT ENGINEER

SUPV. CHECKED TO ACCOMPANY SPECIFICATIONS

DRAWN TRACED DATED

STATION SERVICE

TRANSF BANK

1500 KVA 13,200-180V

F7

VOLT

REG

MM

MR

INSTANT

ATTACH

MR

LINES IS NOT PART OF THIS SWGR.

EQUIPMENT SHOWN IN DASHED

MR INDICATES SWITCHBOARD

ON WHICH INSTRUMENT IS LOCATED.

R A

V

MR

ANNUNCIATOR

A.C. B NO. 5

'A' SW DISC. T3

'A' SW. DISC. T2

5'-0" 5'-5

6'-0"

5" 8" 4"

8"

2"

EL 5950

CABLE PIT

1'-8 1/2"

2000 5-5 CT'S

SECTION A-A

y

SCALE: 1/2" = 1'-0"

EL. 595.0

V

480-120V PT'S

6-#4/0

WAR DEPARTMENT CORPS OF ENGINEERS, U.S. ARMY

12" 6" 0 1' 2'

SEE SPECS

LIMIT OF BUS DUCT DOOR O

-2

-5 -5

Y

MANUFACTURER'S

STANDARDS. VARIATIONS TO SUIT OTHER MANUFACTURER'S

1 SEP 2014 CONVERTED TO CAD MJC JHG

Q-2/793.1

SWITCHYARD.1 FEEDER NO.1 A.C.B.

1 4 7 10

2 5 8 11

3 6 9 12

PANEL NO. 1 PANEL NO. 2 PANEL NO. 3 PANEL NO. 4

33 34

29 30

13 14 15

33 34

31 32

16 19 22 25

17 20 23 26

18 21 24 27

PANEL NO. 9 PANEL NO. 10 PANEL NO. 11 PANEL NO. 12 PANEL NO. 13

5'-6"

SPACE FOR TELEPHONE. TO BE

FURNISHED AND MOUNTED

BY GOVERNMENT

STATION SERVICE GENERATOR

A.C.B. ELECTRICALLY OPERATED

BUS TIE A.C.B.

ELECTRICALLY OPERATED

STATION SERVICE TRANSFORMER

A.C.B. ELECTRICALLY OPERATED

PANEL NO. 5 PANEL NO. 6 PANEL NO. 7

FRONT ELEVATION

C STA. GEN.L

BUS DUCT.

SEE DWG

Q-2/797

Q-2/797

SEE DWG

BUS DUCT.

C STA. TRANSF.L

PANEL NO. 8

SAT. CT'S

3-400-5Y

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

H E

A D

G A

T E F

E E

D E

R N

O

D A

M F

E E

D E

R N

O

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

V

L

IG

H T

IN

G T

R A

N S

F

N O

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

V

V

IL

L A

G E F

E E

D E

R N

O

S W

IT

C H

Y A

R D F

E E

D E

R N

O

S P

A R

E A .C .B

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

H E

A D

G A

T E F

E E

D E

R N

O

D A

M F

E E

D E

R N

O

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

V

L

IG

H T

IN

G T

R A

N S

F

N O

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

U

S W

IT

C H

G E

A R

V

V

IL

L A

G E F

E E

D E

R N

O

S W

IT

C H

Y A

R D F

E E

D E

R N

O

P O

W E

R H

O U

S E

C R

A N

E F

E E

D E

R

NOTES: (CONT.)

THE CONTRACTING OFFICER HOWEVER, THE GENERAL ORDER AND

ARRANGEMENT OF EQUIPMENT AS SHOWN HERE SHALL BE

FOLLOWED AS NEARLY AS PRACTICABLE.

ALL BREAKERS SHALL BE PROVIDED WITH AUXILIARY SWITCHES

1.

2.

FOR SYMBOLS SEE DWG., Q-2/7923.

THIS IS A CONTRACT DRAWING TO BE USED FOR THE PRO-

CUREMENT OF EQUIPMENT AND IS NOT TO BE USED FOR

CONSTRUCTION. FOR CONSTRUCTION PURPOSES USE

4.

MANUFACTURER'S DRAWINGS.

5. INSTALLATION OF THIS EQUIPMENT WILL BE PAID FOR

UNDER CONTRACT ITEM

C-

AND 2 NORMALLY CLOSED .)

HAVING NOT LESS THAN 4 CONTACTS (2 NORMALLY OPEN

GENERAL NOTES:

1. THE DIMENSIONS AND GENERAL CONSTRUCTION SHOWN ON

THIS DRAWING ARE BASED ON ONE MANUFACTURER'S

STANDARD CONSTRUCTION WILL BE PERMITTED IN ACCORDANCE

WITH THE SPECIFICATIONS AND SUBJECT TO APPROVAL BY

FURNISHED BY GENERATOR MANUFACTURER. MOUNTING

AND WIRING BY SWITCHGEAR MANUFACTURER.

THESE BREAKER'S ELECTRICALLY INTERLOCKED TO

REQUIRE USE OF SYNCHRUSCOPE (SEE SCHEM. DIAGRAMS)

5-200 VA 480-120V POT. TRANSFS.(3 IN GEN. ACB COMPT. AND 2 IN TRANSF. ACB COMPT.

3-2000-5A CT'S (IN GENERATOR ACB COMPT.)

3-10-54 AUXILIARY CTS (IN TRANSTFS. A.C.B. COMPT.)

57&56 D-C PANELBOARDS CONTAINING 15-250V, 2P, 50A FRAME BREAKERS (NOS. 40-54 INCL.) & 3-250V, 2P, 100A

FRAME FEEDER BREAKERS 9NOS. 39,55,&56) FOR TRIP RATING AND USE SEE DWG. Q-2/833

3 2000-5-5ACT'S (IN TRANSF. A.C.B. COMPT.)

TRIP RATING

SEE DWG Q-2/797

ENCLOSED BUS.

600V, 2000A, 3 PHASE

TRIPS:

5-10Y

R

R

SS MM

Am Am

MM MM

AR

AR

AS AS W WH

2-480-120V

VS VS SS

MB

VM VM

SS MM

460 VOLT-3 -60 CYCLE BUS NO. 2

10-5Y

2-480-120V

*1-480-120V

2-2000-5A

*1-2000-5A

1500KVA

STATION

SERVICE

GEN

AMAM

MM SS

T R

IP

S A

C B N

O

L O

N G T

IM

E D

E L

A Y

T R

IP

S A

C B N

O S

H O

R T T

IM

E D

E L

A Y

MR MM MM

WWHR AS AS

RVS VS VSPL SS

CS

MB MB

MR

VMVM

MM SS

VM

F7

460 VOLT-3 -60 CYCLE BUS NO. 1

500A

/0

500A 500A 300A 300A

-5

M

C M

800A

-5

M

C M

400A 500A 600A 300A

/0

/0

-4

M

C M

-5

M

C M

500A

/0

-5

M

C M

-5

M

C M

-5

M

C M

-4

M

C M

/0

-4

M

C M

/0

A 7

8'-4"

1'-8" 1'-8" 1'-8" 1'-8" 1'-8"

5'-0"

1'-8" 1'-8" 1'-8" 5"

1'-8"

GENERAL NOTES:

LIST OF EQUIPMENT - CONTROL CENTERS UI - U6 INCL.

ITEM

NO

VOLTAGE

RATING INT CAP

NEMA

NO.

POLES

FRAME

RATING

HP

LOAD

& CABLE

TERMINAL

TRIP

RATING SIZE

NEMA COIL

VOLTAGE

CIRCUIT BREAKER MOTOR STARTER

USE

SIZE

BUS SUPPLY FDR. NO.1

SPARE COMPARTMENT

GEN. JACKING PUMP MOTOR FDR.

GEN. HSG. HEATER FDR.

GOV. OIL PUMP (#1A-6A) FDR.

TURBINE OIL PUMP MOTOR STARTER

ROOM HEATER (F1-F6) FEEDER

INDICATING LIGHTS FEEDER BREAKER ON SWGR. SS

AUXILIARY RELAY TO OPERATE ALARM ON LOSS OF BUS VOLTAGE

BUS SUPPLY FDR. NO.2

GOV. OIL PUMP (#1B-6B) FDR.

SPARE COMPARTMENT

SPARE COMPARTMENT

INDICATING LIGHTS FEEDER BREAKER ON SWGR. SS

25,000

25,000

15,000

15,000

15,000

15,000

15,000

15,000

3 600 275 - - #4/0

3 600 275 - - #4/0

3 100 15 -- #12

3 100 50 - - #8

3 100 90 - - #4

3 100 90 - - #4

600 100 15 1 440AC #12

600 100 50 - - #8

1 1/2

24 KW

1/2

30 KW

BUS SUPPLY FDR. NO.1

DAM WATER SUPPLY PUMP FDR.

BATT. CHGR. M-G SET NO.1 MOTOR

ROTARY DISPL. & CHEM. FEED PUMPS FDR.

FILTERED WATER PRESSURE PUMP FDR.

NO.1 - 113 CFM AIR COMP. STARTER

NO.1 AIR COND. UNIT FDR.

ELEVATOR FEEDER

BUS SUPPLY FDR. NO.2

NO.1 SEWAGE PUMP MOTOR STARTER

25,000

25,000

15,000

15,000

15,000

15,000

15,000

15,000

3 600 500 - - 500 MCM

3 600 500 - - 500 MCM

3 100 15 1 440AC #12

3 100 15 - - #12

3 100 25 1 440AC #12

3 100 15 1 440AC #12

3 100 70 3 440AC #6

3 225 150 - 440AC #1/0

7 1/2

SPARE BREAKER

SPARE COMPARTMENT

INDICATING LIGHTS - NO.6 FEEDER BREAKER ON SWGR.SS

AUXILIARY RELAY USED TO OPERATE ALARM ON LOSS OF BUS VOLTAGE

NO.2 SEWAGE PUMP MOTOR STARTER

NO.2 - 330 CFM AIR COMP. STARTER

NO.3 - 10.8 CFM AIR COMP. STARTER

NO.2 AIR COND. UNIT FDR.

INDICATING LIGHTS - NO.21 FEEDER BREAKER ON SWGR.SS

600 25,000

15,000

15,000

15,000

15,000

15,000

15,000

120AC

440AC

440AC

#10

#12

#12

#1/0

#1/0

#8

#1/0

LIST OF EQUIPMENT - CONTROL CENTERS UI - U7

CORPS OF ENGINEERS, U. S. ARMY

SEE ONE LINE DIAGRAM FOR BREAKER NUMBERS

* MOUNT CONTROL TRANSFORMER, 480-120VOLT, IN THIS COMPARTMENT

THE DIMENSIONS AND GENERAL CONSTRUCTION SHOWN ON THIS

DRAWING ARE BASED ON ONE MANUFACTURER'S STANDARDS

AND VARIATIONS TO SUIT OTHER MANUFACTURER'S STANDARD

CONSTRUCTION WILL BE PERMITTED IN ACCORDANCE WITH

THE SPECIFICATIONS AND SUBJECT TO APPROVAL OF THE

CONTRACTING OFFICER. HOWEVER THE GENERAL ORDER AND

ARRANGEMENT OF EQUIPMENT SHOWN HERE SHALL BE FOLLOWED

AS NEARLY AS PRACTICABLE.

CONTROL CENTERS UI, THROUGH U6 ARE IDENTICAL AND ONLY

ONE FRONT VIEW, SINGLE LINE DIAGRAM, AND LIST OF

EQUIPMENT ARE SHOWN. HOWEVER, SIX COMPLETE IDENTICAL

CONTROL CENTERS ARE TO BE FURNISHED.

SECTION A-A THRU CONTROL CENTER UI IS ALSO TYPICAL FOR

CONTROL CENTER U7 FOR GENERAL CONSTRUCTION AND

ARRANGEMENT OF INCOMING CABLES.

ALL MOTORS STARTERS SHALL BE NON-REVERSING LINESTART

TYPE AND SHALL HAVE 3 EXTRA AUXILIARY CONTACTS

FOR USE AS INTERLOCKS, ETC.

ITEMS NOS.1 AND 2. CONTROL CENTERS UI THROUGH U6, AND

U7 SHALL BE MECHANICALLY INTERLOCKED SO THAT BOTH

CANNOT BE CLOSED AT THE SAME TIME.

THIS IS A CONTRACT DRAWING TO BE USED FOR THE

PROCUREMENT OF EQUIPMENT AND IS NOT TO BE USED

FOR CONSTRUCTION. FOR CONSTRUCTION PURPOSES USE

MANUFACTURER'S DRAWINGS.

FOR SYMBOLS SEE DWG. Q-2/792

INSTALLATION OF THIS EQUIPMENT TO BE PAID FOR UNDER

CONTRACT ITEM 95

C-

1.

2.

3.

4.

5.

6.

7.

8.

VOID - SEE MFGR'S DWG.

275A 275A 15A 50A 90A 90A 15A 50A

1 2 3 4 5 6 7 8 9 10 11

460 VOLT 3 BUS

TRIP RATING

SIZE

CONTACTOR

SIZE (NEMA)

T O A

N N

U N

C

IA

T O

R

R E

L A

Y R

A C

K

/0

/0

1 1/2 24 40 1/2 30

S U

P P

L Y F

D R

N O .1

S U

P P

L Y F

D R

N O .2

S P

A R

E C

O M

P A

R T

M E

N T

J A

C K

IN

G P

U M

P

G E

N E

R A

T O

R H

O U

S

IN

G H

E A

T E

R

G O

V E

R N

O R O

IL

P

U M

P

A

S P

A R

E C

O M

P A

R T

M E

N T

T U

R B

IN

E O

IL

P

U M

P

R O

O M H

E A

T E

R S O

N S

W G

R .F

S P

A R

E C

O M

P A

R T

M E

N T

G O

V E

R N

O R O

IL

P

U M

P

B

T O A

N N

U N

C

IA

T O

R

R E

L A

Y R

A C

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

460 VOLT 3 BUS

500A 500A 50A 15A 15A 25A 15A 15A 70A 150A 20A 125A 125A 50A 150A TRIP RATING

CONTACTOR SIZE

(NEMA)

SIZE

SIZE

SIZE

SIZE

SIZE

SIZE

SIZE

SIZE

-5

M

C M

-5

M

C M

/0

/0

/0

SECTION 1

MASTER TERMINAL BOARDS

A

1 4 9

12 5 10

2 6

3 8

13 7 11

EL.567.0

A

SECTION 1

MASTER TERMINAL BOARD

1 4 9 11 14

17 5 12 15

2 6

18 7

3 8

EL.567.0

FRONT VIEW CONTROL CENTER U1

CONTROL CENTERS U2 - U6 SIMILAR

ONE LINE DIAGRAM -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .