W912P5-17-R-0002
US Army Corps Of Engineers Nashville District
STATION SERVICE UPGRADE
Wolf Creek Powerhouse Cumberland River Russell County, Kentucky
Technical Specifications
August 2017
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
St at i on Ser vi ce Upgr ade Wol f Cr eek Power house W912P5-17-R-0002 Russel l Count y, Kent ucky
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 GENERAL REQUI REMENTS
01 11 10 SUMMARY OF WORK
01 12 16. 00 26 WORK SEQUENCE
01 22 00 PRI CE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 35 50 PROJECT SI TE SECURI TY AND AT/ OPSEC PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00 QUALI TY CONTROL
01 45 00. 15 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ONS AND MAI NTENANCE DATA
01 95 00 FORMS AND ATTACHMENTS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 82 13 ASBESTOS ABATEMENT
02 82 33 REMOVAL/ CONTROL AND DI SPOSAL OF PAI NT WI TH LEAD
DI VI SI ON 03 - CONCRETE
03 60 00. 00 CONCRETE DEMOLI TI ON, REPAI R OF CONCRETE SURFACES, AND
EQUI PMENT FOUNDATI ONS
DI VI SI ON 05 - METALS
05 50 03. 00 26 METALWORK FABRI CATI ON, MACHI NE WORK, AND MI SCELLANEOUS
PROVISIONS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00. 00 26 SEI SMI C RESTRAI NT FOR MECHANI CAL AND ELECTRI CAL EQUI PMENT
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 26 GENERAL ELECTRI CAL WORK AND EQUI PMENT
26 05 19. 00 26 I NSULATED WI RE AND CABLE
26 05 26. 00 26 GROUNDING
26 05 36. 00 26 CABLE TRAY FOR ELECTRI CAL SYSTEMS
26 08 01. 00 26 SYSTEMS TESTI NG AND COMMI SSI ONI NG
26 12 16. 10 26 DRY- TYPE TRANSFORMERS
26 13 13. 00 26 METAL CLAD SWI TCHGEAR
26 23 10. 10 26 480 VOLT SWI TCHGEAR
26 23 15. 00 26 HI GH RESI STANCE GROUNDI NG ( HRG) SYSTEM - LOW VOLTAGE
(480V)
26 24 19. 00 26 MOTOR CONTROL CENTERS
26 25 00. 00 26 BUS STRUCTURES
DI VI SI ON 33 - UTI LI TI ES
33 72 33. 14 26 POWER SYSTEM RELAY PROTECTI ON AND METERI NG
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
PROJECT TABLE OF CONTENTS Page 1
40 95 13. 00 26 PROCESS CONTROL PANELS AND HARDWARE
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 00 00
GENERAL REQUI REMENTS
PART 1 GENERAL
1. 1 GENERAL
1. 2 TEMPORARY ACCESS
1. 3 REFERENCES
1. 4 SUBMI TTALS
1. 5 SI TE WORKI NG HOURS
1. 5. 1 Gover nment Pr oj ect Per sonnel Wor ki ng Hour s
1. 5. 2 Cont r act or ' s Wor ki ng Hour s
1. 6 OCCUPANCY OF PREMI SES
1. 7 PERMI TS AND LI CENSES
1. 8 PROJECT SI GNS
1. 8. 1 Gener al
1. 8. 2 Mat er i al s
1. 8. 3 Pai nt i ng
1. 8. 4 Er ect i on and Mai nt enance
1. 9 NON- COMPLI ANCE OF SAFETY AND SECURI TY REQUI REMENTS
1. 10 PROTECTI ON OF EXI STI NG WORK AND DAMAGE REPORTS
1. 11 CONTRACT EMPLOYEES
1. 12 CONTRACTOR' S STAGI NG AREA
1. 13 SAFE CLEARANCE PROCEDURES
1. 14 DAI LY CLEANUP AND DI SPOSAL
1. 15 STORAGE OF EQUI PMENT AND MATERI ALS
1. 16 WORK COORDI NATI ON
1. 17 EVALUATI ON OF CONTRACTOR PERFORMANCE
1. 18 COORDI NATI ON CONFERENCES
1. 19 PARTNERI NG
1. 20 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS
CONTRACTS
1. 21 MEASUREMENT AND PAYMENT
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES
3. 1. 1 Cont r act or Responsi bi l i t i es
3. 1. 2 I nt er r upt i ons of Ut i l i t i es
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 00 00 Page 1
SECTI ON 01 00 00
GENERAL REQUI REMENTS
PART 1 GENERAL
1. 1 GENERAL
Thi s sect i on compr i ses an expl anat i on of t he gener al cont r act r equi r ement s needed t o accompl i sh t he wor k. Thi s sect i on i s not i nt ended t o be al l encompassi ng i n t he descr i pt i ons. Al l wor k speci f i ed her ei n shal l be accompl i shed i n accor dance wi t h t he pr ocedur es pr escr i bed i n t he speci f i cat i ons and dr awi ngs. Any engi neer i ng desi gns r equi r ed by t hese speci f i cat i ons t hat r equi r e cer t i f i cat i on, or a st amp, f r om a Pr of essi onal Engi neer must be per f or med by a t hi r d par t y vendor .
1. 2 TEMPORARY ACCESS
The cur r ent spaci al const r ai nt s i n t he power house pr ohi bi t movement of equi pment s i mi l ar i n di mensi on t o t he new t r ansf or mer s ont o f l oor el evat i on 595. 00; t her ef or e, t he Cont r act or shal l pr ovi de t he means, met hods, and equi pment necessar y f or t r anspor t i ng t he new t r ansf or mer s ont o t he power house f l oor at el evat i on 595. 00 f eet . The Cont r act or may use t he power house cr ane i f necessar y. Pr i or t o use of t he cr ane, t he Cont r act or shal l pr ovi de pr oof of appl i cabl e cer t i f i cat i ons, t r ai ni ng, and exper i ence f or any empl oyee oper at i ng t he power house cr ane. The Cont r act or shal l desi gn, f abr i cat e, and ut i l i ze a new t empor ar y access t o f aci l i t at e t he i nst al l at i on of t he new el ect r i cal t r ansf or mer s t o be i nst al l ed on f l oor el evat i on 595. 00. Desi gn r evi ew and appr oval wi l l be per f or med by t he Cont r act i ng Of f i cer pr i or t o f abr i cat i on. The access equi pment wi l l r emai n t he pr oper t y of t he Gover nment at t he concl usi on of t hi s cont r act ; t her ef or e, t he equi pment shal l be of suf f i c i ent qual i t y and st r engt h t o al l ow f or cont i nual assembl y, di sassembl y and use i n t he year s t o come. The access desi gn shal l i ncl ude onl y bol t ed connect i ons t o al l ow i t t o be easi l y di sassembl ed, st or ed, and r eassembl ed f or r epeat ed usage;
t he assembl y and di sassembl y pr ocesses shal l not r equi r e any wel di ng or cut t i ng of member s. The access shal l be desi gned t o car r y t he wei ght of t he new el ect r i cal t r ansf or mer and any equi pment used t o move t he t r ansf or mer i nt o pl ace or a mi ni mum of 20, 000 pounds, whi chever i s gr eat er . The maxi mum desi gn l oads, pl us appr opr i at e l oad f act or s per i ndust r y st andar ds and appl i cabl e Cor ps of Engi neer s cr i t er i a, shal l be appl i ed as ver t i cal poi nt l oads at any l ocat i on on t he access' l oad car r y i ng sur f ace. The Nashvi l l e Di st r i ct wi l l pr ovi de r ef er ence dr awi ngs upon r equest of t he exi st i ng st r uct ur e so t he Cont r act or can pr oper l y account f or f l oor l oadi ng capaci t i es of t he exi st i ng st r uct ur e. The Cont r act or shal l ensur e al l access submi t t al s ar e cer t i f i ed by a qual i f i ed Ci v i l / St r uct ur al Engi neer t hat hol ds a cur r ent Pr of essi onal Engi neer l i censes and i ncl ude r ef er ences t o al l document s used, desi gn assumpt i ons, l oad cases, al l cal cul at i ons, f abr i cat i on dr awi ngs, er ect i on dr awi ngs, engi neer i ng consi der at i ons f or f i el d per sonnel , and any ot her document s deemed necessar y by t he Cont r act or ' s desi gner or Gover nment . The t empor ar y access desi gn shal l not compr omi se t he l oad car r y i ng capaci t i es of t he exi st i ng st r uct ur e f r om i t s cur r ent , as const r uct ed, condi t i on. I f necessar y, t he t empor ar y access suppor t s shal l be pr oper l y l ocat ed and at t ached t o t he exi st i ng st r uct ur e' s f l oor beam and col umn syst em t o pr ovi de pr oper l oad pat h f or al l desi gn l oads associ at ed wi t h t he pl at f or m
SECTI ON 01 00 00 Page 2 such t hat no exi st i ng member s i n t he power house st r uct ur e shal l be over st r essed. Any unappr oved i mpact s t o t he exi st i ng st r uct ur es shal l be r epai r ed by t he cont r act or i n accor dance wi t h USACE hi st or i c pr eser vat i on cr i t er i a. The desi gn shal l be f ul l y back checked and appr oved by t he Gover nment pr i or t o const r uct i on; however , t he Cont r act or shal l per f or m an i ndependent i nt er nal back check of t he desi gn pr i or t o submi ssi on t o t he Gover nment . The Cont r act or shal l submi t an el ect r oni c copy of al l i nt er nal r evi ew comment s and r esol ut i ons wi t h t he desi gn submi t t al . Al l t empor ar y access mat er i al s shal l be coat ed wi t h one coat of pr i mer and one coat of saf et y yel l ow pai nt . The maxi mum l oad f or t he access shal l be post ed on t he access. The Cont r act or shal l pr ovi de on- si t e assembl y/ di sassembl y t r ai ni ng f or t he t empor ar y access at t he concl usi on of t hi s cont r act . The t r ai ni ng shal l i ncl ude, at a mi ni mum, di sassembl y of t he t empor ar y access i n t he pr esence of t he Wol f Cr eek Power Pl ant st af f . The t r ai ni ng shal l al so i ncl ude an oper at i on and mai nt enance manual f or t he access. Af t er t he t empor ar y access i s no l onger needed f or wor k on t hi s cont r act , t he Cont r act or shal l move t he st r uct ur e t o a Gover nment speci f i ed on- si t e st or age l ocat i on, unl ess t he act i v i t y i s wai ved by t he Cont r act i ng Of f i cer .
1. 3 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 310- 1- 6a ( 2006) Si gn St andar ds Manual , VOL 1
EP 310- 1- 6b ( 2006) Si gn St andar ds Manual , VOL 2, Appendices
ER 385- 1- 31 ( 2009) The Cont r ol of Hazar dous Ener gy
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 05 Desi gn Dat a
Tempor ar y Access; G, EC- CD- CS
1. 5 SI TE WORKI NG HOURS
1. 5. 1 Gover nment Pr oj ect Per sonnel Wor ki ng Hour s
The schedul ed wor ki ng hour s of t he Pr oj ect st af f ar e Mondays t hr ough Thur sdays f r om 6: 00 a. m. unt i l 4: 30 p. m. CST. Fr i days, Sat ur days, Sundays, and Feder al Hol i days ar e non- wor k days. Al l Pr oj ect suppor t r equi r ed by t he Cont r act or shal l be schedul ed dur i ng t he Pr oj ect st af f wor ki ng hour s.
1. 5. 2 Cont r act or ' s Wor ki ng Hour s
The Cont r act or ' s nor mal wor ki ng hour s shal l be bet ween 6: 00 a. m. and 4: 30
p. m. CST, Monday t hr ough Thur sday. The schedul e of wor k hour s, shi f t s and days of t he week shal l be coor di nat ed wi t h t he Gover nment Qual i t y
SECTI ON 01 00 00 Page 3
Assur ance Repr esent at i ve ( GQAR) . Not i f i cat i on of any pr oposed changes of t he schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e shal l be coor di nat ed wi t h t he GQAR.
1. 6 OCCUPANCY OF PREMI SES
Wol f Cr eek Dam wi l l be oper at i ng dur i ng per f or mance of t he wor k under t hi s Contract.
Bef or e wor k i s st ar t ed and i n accor dance wi t h t he ar eas shown on t he cont r act dr awi ngs, t he Cont r act or shal l ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches and r oadways.
1. 7 PERMI TS AND LI CENSES
The Cont r act or shal l , at hi s/ her own expense, obt ai n any l i censes, per mi t s or bondi ng r equi r ed t o per f or m t he cont r act . The Cont r act or shal l compl y wi t h cur r ent f eder al , st at e, and l ocal l aws and r egul at i ons and shal l compl y wi t h any subsequent changes.
1. 8 PROJECT SI GNS
1. 8. 1 General
Fur ni sh and er ect , wi t hi n 15 days af t er i ssuance of t he Not i ce t o Pr oceed, a PROJECT I DENTI FI CATI ON SI GN and a SAFETY PERFORMANCE SI GN at t he l ocat i on di r ect ed by t he Cont r act i ng Of f i cer . Let t er s i gns on one si de onl y and conf or m t o EP 310- 1- 6a ( Sect i on 16) , EP 310- 1- 6b, and t o t he det ai l s and col or s shown on t he sket ches at t ached at t he end of Sect i on 01 95 00 FORMS AND ATTACHMENTS. Name t he pr oj ect as f ol l ows:
STATI ON SERVI CE UPGRADE
1. 8. 2 Materials
Const r uct t he s i gn wi t h a f ace sheet of 3/ 4 i nch ext er i or gr ade pl ywood mount ed on a subst ant i al f r amewor k of t r eat ed 4- i nch by 4- i nch mat er i al .
Scr ews shal l be commer ci al qual i t y and of s i zes shown.
1. 8. 3 Painting
Appl y one pr i me coat and t wo f i ni sh coat s of ext er i or oi l pai nt t o s i gns and post bef or e l et t er i ng. Appl y l et t er s and t r i m t o one si de onl y usi ng one coat of enamel of col or , st y l e, and si ze shown.
1. 8. 4 Er ect i on and Mai nt enance
Er ect s i gns at t he l ocat i ons desi gnat ed by t he Cont r act i ng Of f i cer . Si gns shal l be pl umb and backf i l l of post hol es shal l be wel l t amped t o pr oper l y suppor t t he s i gns t hr oughout t he l i f e of t he cont r act . Mai nt ai n s i gns i n good condi t i on unt i l compl et i on of t he cont r act . Remove si gns f r om t he si t e upon f i nal accept ance of t he cont r act wor k.
1. 9 NON- COMPLI ANCE OF SAFETY AND SECURI TY REQUI REMENTS
I f t he Cont r act or f ai l s or r ef uses t o pr ompt l y compl y wi t h t he saf et y and secur i t y r equi r ement s, t he COR may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of
SECTI ON 01 00 00 Page 4 t he t i me l ost due t o any such st oppage shal l be made subj ect t o c l ai m f or ext ensi on of t i me or f or excess cost s or damages t o t he Cont r act or . The Cont r act or wi l l not be pai d f or wor k not per f or med as a r esul t of t he st op or der . Wor k shal l not r esume unt i l t he Cont r act or pr ovi des evi dence t o t he COR t hat he/ she has compl i ed or wi l l compl y wi t h appr opr i at e saf et y and secur i t y r egul at i ons.
1. 10 PROTECTI ON OF EXI STI NG WORK AND DAMAGE REPORTS
I n al l i nst ances when Gover nment pr oper t y and/ or equi pment i s damaged by t he Cont r act or ' s empl oyees or any cont r act empl oyees, t he Cont r act or shal l i mmedi at el y suspend al l wor k, and not i f y t he COR. A f ul l wr i t t en r epor t of t he i nci dent i ncl udi ng t he ext ent of damage shal l be submi t t ed t o t he COR f or eval uat i on wi t hi n t wo wor kdays of occur r ence. The Cont r act or shal l wai t f or a Not i f i cat i on t o Pr oceed f r om t he COR bef or e r esumi ng any wor k act i v i t i es.
1. 11 CONTRACT EMPLOYEES
a. Cont r act or , subcont r act or s, and t hei r empl oyees shal l conduct t hemsel ves i n a pr oper manner at al l t i mes. No al cohol i c bever ages or cont r ol l ed subst ances shal l be consumed by t he Cont r act or , subcont r act or or hi s/ her empl oyees whi l e on dut y.
b. The Cont r act or expr essl y agr ees t o r emove f r om t he si t e any i ndi v i dual whose cont i nued empl oyment i s deemed by t he COR t o be cont r ar y t o t he publ i c i nt er est or i nconsi st ent wi t h t he best i nt er est of t he Government.
c. The COR may r equi r e t he Cont r act or t o i mmedi at el y r emove f r om t he wor k s i t e any empl oyee who i s i ncompet ent or who endanger s per sons or pr oper t y or whose physi cal or ment al condi t i on i s such t hat i t woul d i mpai r t he empl oyee' s abi l i t y t o sat i sf act or i l y per f or m t he wor k.
Not i f i cat i on t o t he Cont r act or shal l be pr ompt l y made i n wr i t i ng i f t i me and ci r cumst ances per mi t .
1. 12 CONTRACTOR' S STAGI NG AREA
The Cont r act or wi l l be assi gned an ar ea near t he j obsi t e f or use as a st agi ng and st or age ar ea. The ar ea i s shown i n t he cont r act dr awi ngs.
The bui l di ng of st r uct ur es, t he er ect i on of t ent s or ot her f or ms of pr ot ect i on wi l l be per mi t t ed onl y at such pl aces as t he Gover nment shal l appr ove, and t he sani t ar y condi t i ons of t he gr ounds i n or about such st r uct ur es shal l at al l t i mes be mai nt ai ned i n a sat i sf act or y manner .
Tempor ar y Cont r act or f aci l i t i es pr ovi ded dur i ng s i t e oper at i ons shal l be r emoved pr i or t o f i nal accept ance f r om t he Gover nment . As a mi ni mum t he ar ea shal l be l ef t l ooki ng " br oom cl ean" and at l east as c l ean as bef or e t he st r uct ur e pl acement .
1. 13 SAFE CLEARANCE PROCEDURES
Pr oj ect per sonnel use A Saf e Cl ear ance Syst em, as st at ed i n ER 385- 1- 31 and amended by t he Nashvi l l e Di st r i ct t o ensur e cont i nui t y of ser vi ce and saf et y t o per sonnel and equi pment . Any wor k per f or med whi ch r equi r es t aki ng t he Pr oj ect ' s oper at i ng equi pment out of ser vi ce wi l l be done onl y af t er a f or mal c l ear ance i s obt ai ned by t he Cont r act i ng Of f i cer wi t h 48- hour mi ni mum not i ce. Cont r act or per sonnel shal l not v i ol at e c l ear ance. Any vi ol at i on of Saf e Cl ear ance Pr ocedur es wi l l be gr ounds f or r emoval of t he of f ender ( s) . Up t o f i ve copi es of t he Nashvi l l e Di st r i ct
SECTI ON 01 00 00 Page 5
Saf e Cl ear ance Pr ocedur e wi l l be suppl i ed t o t he Cont r act or upon r equest .
1. 14 DAI LY CLEANUP AND DI SPOSAL
Wor k ar eas shal l be kept r easonabl y neat on a dai l y basi s. Debr i s r esul t i ng f r om t he wor k, such as empt y pai nt cans, packi ng cases, scr ap l umber , oi l and gr ease spi l l s , and ot her debr i s shal l be col l ect ed, r emoved, and di sposed of of f - s i t e at l east once per week. Gover nment t r ash cans, dump boxes and ot her cont ai ner s shal l not be used. Li qui d wast e shal l not be di sposed of i n exi st i ng dr ai ns.
1. 15 STORAGE OF EQUI PMENT AND MATERI ALS
St or age of equi pment and mat er i al s wi l l be per mi t t ed onl y i n desi gnat ed st agi ng ar eas.
1. 16 WORK COORDI NATI ON
The Gover nment wi l l l i mi t i nt er f er ence wi t h t he Cont r act or ' s wor k t o t he maxi mum r easonabl e ext ent and t he Gover nment and Cont r act or shal l coor di nat e as necessar y. Cont r act or shal l al so need t o coor di nat e hi s or her wor k wi t h ot her cont r act or s t o avoi d conf l i c t s and t o mai nt ai n equi pment access and ser vi ceabi l i t y .
1. 17 EVALUATI ON OF CONTRACTOR PERFORMANCE
The Cont r act or ' s per f or mance wi l l be eval uat ed i n accor dance wi t h FAR Par t
42. 15 i n t he ar eas of qual i t y, schedul e, cost cont r ol , management , ut i l i zat i on of smal l busi nesses, and r egul at or y compl i ance at mi ni mum.
The eval uat i on wi l l i ncl ude a wr i t t en nar r at i ve and r at i ng of ei t her except i onal , ver y good, sat i sf act or y, mar gi nal , or unsat i sf act or y f or each. The f or mat f or t he eval uat i on i s at t ached at t he end of Sect i on
01 95 00 FORMS AND ATTACHMENTS.
The Cont r act or ' s r evi ew of t he eval uat i on shal l be compl et ed el ect r oni cal l y at t he CPARS, http://www.cpars.gov . Thi s websi t e al so i ncl udes gui dance and t he user ' s manual .
Upon cont r act awar d, t he Cont r act or shal l pr ovi de t he Cont r act i ng Of f i cer wi t h t he name and e- mai l addr ess of t he Cont r act or ' s Repr esent at i ve t o be r egi st er ed i nt o t he syst em. Fol l owi ng i ni t i al compl et i on by t he Gover nment , t he Cont r act or wi l l have si xt y ( 60) cal endar days t o r evi ew, comment , and r et ur n t he eval uat i on.
1. 18 COORDI NATI ON CONFERENCES
Rout i ne coor di nat i on conf er ences wi l l be schedul ed by t he Cont r act i ng Of f i cer t hr oughout t he l i f e of t hi s pr oj ect . Coor di nat i on conf er ences wi l l be hel d t o di scuss cont r act admi ni st r at i on, Cont r act or qual i t y cont r ol , phasi ng, schedul i ng, and ot her aspect s r el at i ng t o t hi s const r uct i on. The Cor ps of Engi neer s and t he Cont r act or wi l l be r epr esent ed at each of t hese meet i ngs. Coor di nat i on conf er ences wi l l be schedul ed t o occur when not i f i ed by t he Cont r act i ng Of f i cer .
1. 19 PARTNERING
I n or der t o most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment ur ges t he cont r act or t o j oi n t he Gover nment i n est abl i shi ng a cohesi ve and pr of essi onal pr oj ect management t eam. Thr ough t hi s " par t ner i ng"
SECTI ON 01 00 00 Page 6 r el at i onshi p bot h ent i t i es woul d st r i ve t o dr aw on t he st r engt hs of each or gani zat i on f or t he ul t i mat e goal of assur i ng t hat t he pr oj ect ’ s i nt ended r esul t s ar e achi eved, wi t hi n budget and on schedul e. Thi s endeavor seeks an envi r onment t hat nur t ur es t eam bui l di ng, cooper at i on and t r ust bet ween t he Gover nment and t he Cont r act or . The par t ner i ng r el at i onshi p woul d be bi l at er al i n make- up, and par t i c i pat i on wi l l be t ot al l y vol unt ar y.
The f i r st st ep i n i ni t i at i ng t he concept woul d be a j oi nt pr oj ect management t eam " par t ner i ng" conf er ence at t ended by mul t i pl e of f i cer s f r om each or gani zat i on r epr esent i ng management and t he key j obsi t e st af f of each ent i t y. The i ni t i al conf er ence woul d be hel d wi t hi n t he f i r st t hi r t y ( 30) days f ol l owi ng cont r act awar d. The Resi dent Engi neer woul d chai r t he conf er ence, est abl i sh i t s agenda and di st r i but e mi nut es of t he meet i ng. A pr of essi onal f aci l i t at or accept abl e t o bot h par t i es woul d l ead t he par t i c i pant s of t he sessi on, t hr ough t he st eps of t eam bui l di ng and t he f or mat i on of a pr obl em sol v i ng mechani sm wi t hi n t he gr oup. The conf er ence dur at i on woul d be no mor e t han one day. Locat i on of t he conf er ence woul d be of f s i t e wi t hi n a 60 mi l e r adi us of t he j obsi t e at a f aci l i t y whi ch of f er s conf er ence r ooms and f ood ser vi ce. Al l cost s i n connect i on wi t h r ent ed f aci l i t i es and t he f aci l i t at or woul d be shar ed equal l y by t he Gover nment and t he Cont r act or . Each or gani zat i on woul d pay ot her cost s of i t s r espect i ve empl oyees at t endi ng t he conf er ence.
Addi t i onal par t ner i ng sessi ons woul d be hel d no l ess t han bi annual l y.
I mpl ement at i on of t he par t ner i ng concept and phi l osophy woul d be an on- goi ng pr ocess.
1. 20 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS
CONTRACTS
I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS
222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:
a. U. S. Depar t ment of Labor Vet er ans empl oyment : www.vets.gov/
b. Feder al vet er an empl oyment i nf or mat i on: www.fedshirevets.gov/index.aspx
c. Vet er ans’ Empl oyment and Tr ai ni ng Ser vi ce ( VETS) :
http://www.dol.gov/vets/
d. Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am: http://benefits.va.gov/vow/
e. U. S. Ar my War r i or Tr ansi t i on Command Empl oyment I ndex:
http://www.wct.army.mil/modules/employers/index.html f . Hi r i ng Our Her oes i ni t i at i ve:
www.uschamberfoundation.org/hiring-our-heroes
g. Gui de t o Hi r i ng Vet er ans:
www.whitehouse.gov/sites/default/files/docs/white_house_business_council_ -_guide_to_hiring_veterans_0.pdf
SECTI ON 01 00 00 Page 7
1. 21 MEASUREMENT AND PAYMENT
No separ at e payment wi l l be made f or t he wor k cover ed under t hi s sect i on, except as ot her wi se pr ovi ded. The cost s t her eof shal l be i ncl uded i n t he i t em t o whi ch t he wor k per t ai ns. Payment f or t he wor k r equi r ed under t hi s cont r act wi l l made as l i s t ed i n t he bi ddi ng schedul e and as descr i bed i n Sect i on 01 22 00 PRI CE AND PAYMENT PROCEDURES.
PART 2 PRODUCTS
NOT USED.
PART 3 EXECUTI ON
3. 1 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES
3. 1. 1 Cont r act or Responsi bi l i t i es
a. The Cont r act or shal l be r esponsi bl e f or t he avai l abi l i t y of ut i l i t i es f or use on t he pr oj ect . Raw wat er i s avai l abl e wi t h no char ge at t he s i t e. The cont r act or shal l suppl y any ot her ut i l i t i es needed at hi s cost . The Cont r act or shal l car ef ul l y conser ve any ut i l i t i es f ur ni shed wi t hout char ge.
b. The Cont r act or , at i t s expense and i n a wor kmanl i ke manner sat i sf act or y t o t he Cont r act i ng Of f i cer , shal l i nst al l and mai nt ai n al l necessar y t empor ar y connect i ons and di st r i but i on l i nes. Bef or e f i nal accept ance of t he wor k by t he Gover nment , t he Cont r act or shal l r emove al l t he t empor ar y connect i ons, di st r i but i on l i nes, and associ at ed par apher nal i a.
c. The Cont r act or i s r esponsi bl e f or pr ovi di ng dr i nki ng wat er f aci l i t i es f or al l per sonnel associ at ed wi t h t hi s cont r act .
3. 1. 2 I nt er r upt i ons of Ut i l i t i es
a. No ut i l i t y ser vi ces shal l be i nt er r upt ed by t he Cont r act or t o make connect i ons, t o r el ocat e, or f or any pur pose wi t hout appr oval of t he Cont r act i ng Of f i cer .
b. Request f or Per mi ssi on t o shut down ser vi ces shal l be submi t t ed i n wr i t i ng t o t he Cont r act i ng Of f i cer not l ess t han sevent een ( 17) days pr i or t o dat e of pr oposed i nt er r upt i on. The r equest shal l gi ve t he f ol l owi ng i nf or mat i on:
( 1) Nat ur e of Ut i l i t y ( Gas, L. P. or H. P. , Wat er , et c. ) ( 2) Si ze of l i ne and l ocat i on of shut of f .
( 3) Bui l di ngs and ser vi ces af f ect ed.
( 4) Hour s and dat e of shut of f .
( 5) Est i mat ed l engt h of t i me ser vi ces wi l l be i nt er r upt ed.
c. Ser vi ces shal l not be shut of f unt i l r ecei pt of appr oval of t he pr oposed hour s and dat e f r om t he Cont r act i ng Of f i cer .
d. Shut of f s whi ch wi l l cause i nt er r upt i on of Gover nment wor k oper at i ons as det er mi ned by t he Cont r act i ng Of f i cer shal l be accompl i shed dur i ng r egul ar non- wor k hour s or on non- wor k days of t he Usi ng Agency.
SECTI ON 01 00 00 Page 8
e. Oper at i on of val ves on wat er mai ns wi l l be by Gover nment per sonnel .
Wher e shut of f of wat er l i nes i nt er r upt s ser vi ce t o f i r e hydr ant s or f i r e spr i nkl er syst ems, t he Cont r act or shal l ar r ange hi s oper at i ons and have suf f i c i ent mat er i al and per sonnel avai l abl e t o compl et e t he wor k wi t hout undue del ay or t o r est or e ser vi ce wi t hout del ay i n event of emer gency.
- - End of Sect i on - -
SECTI ON 01 00 00 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 10
SUMMARY OF WORK
PART 1 GENERAL
1. 1 DESCRI PTI ON OF WORK
1. 1. 1 As Needed Condui t I t ems
1. 1. 2 As Needed Tempor ar y Access Pl at f or m
1. 1. 3 As Needed Labor
1. 2 CHANGES I N SPECI FI CATI ONS AND DRAWI NGS
1. 3 DEFI NI TI ONS
PART 2 - PRODUCTS - NOT USED
PART 3 - PRODUCTS - NOT USED
SECTI ON 01 11 10 Page 1
SECTI ON 01 11 10
SUMMARY OF WORK
PART 1 GENERAL
1. 1 DESCRI PTI ON OF WORK
Thi s sect i on cover s t he t echni cal speci f i cat i ons t o per f or m al l wor k r equi r ed t o upgr ade t he Wol f Cr eek Power house El ect r i cal Di st r i but i on Syst em. Thi s sect i on i s a gener al summar y of t he r equi r ed wor k and i s not al l - i ncl usi ve. The wor k descr i bed wi t hi n t hese speci f i cat i ons shal l i ncl ude, but not necessar i l y be l i mi t ed t o t he f ol l owi ng:
a. Repl ace mai n 480V st at i on ser vi ce swi t chgear ( SS) and i t s associ at ed br eaker s wi t h new doubl e ended gear and new br eaker s at t he same l ocat i on. Pr ovi de Ar c Fl ash Reduct i on Mai nt enance Syst em ( ARMS) f or SS suppl y br eaker s, t i e/ i sol at i on br eaker s and al l f eeder br eaker s. Pr ovi de I nf r a Red vi ewi ng wi ndows f or t he SS swi t chgear .
b. Repl ace mai n st at i on ser vi ce 1500kVA del t a- del t a t r ansf or mer wi t h t wo new 2000kVA del t a- del t a t r ansf or mer s wi t h sur ge pr ot ect i on. The new St at i on Ser vi ce Tr ansf or mer s ( SST1 and SST2) wi l l be l ocat ed symmet r i cal l y c l ose t o exi st i ng mot or oper at ed di sconnect swi t ches 247 & 257. The t r ansf or mer s wi l l have 7. 7% per cent age i mpedance i n or der t o r educe t he f aul t cur r ent i n t he st at i on ser vi ce di st r i but i on 480V system.
c. I nst al l new 15kV Swi t chgear and t hr ee br eaker s; one f eedi ng T1, one f eedi ng T2, and one t i e br eaker at t he mi dpoi nt of t he 13. 8kV bus. The exi st i ng 247 and 257 mot or oper at ed di sconnect swi t ches wi l l be removed.
d. Repl ace U- boar d and V- boar d mot or cont r ol cent er s; U1, U2, U3, U4, U5, U6, U7, U8, U9, V1, and V2 and t hei r associ at ed br eaker s and st ar t er s wi t h new U- boar ds and V- boar ds, new br eaker s and st ar t er s.
e. Pr ovi de t empor ar y power f or cr i t i cal l oads f ed by equi pment bei ng replaced.
f . Repl ace al l t he f eeder conduct or s power ed by t he mai n st at i on ser vi ce swi t chgear ( SS) and f eedi ng t he U- boar d and V- boar d mot or cont r ol cent er s. Keep t he exi st i ng cabl e nami ng convent i on. Al l cabl es and conduct or s wi l l be r emoved f r om t he exi st i ng condui t s i f possi bl e.
Demol i t i on of t hese f eeder s wi l l be per f or med i n accor dance wi t h SECTI ON 26 00 00. 00 26 par agr aph 3. 1. 2. I f t he cabl e i s successf ul l y r emoved f r om t he condui t , t he new conduct or wi l l be pul l ed back i n t he exi st i ng condui t pr ovi di ng t he condui t i s of adequat e s i ze based on condui t f i l l cal cul at i ons. I f t he cabl es and conduct or s ar e unabl e t o be r emoved, or t he condui t i s not adequat e s i ze, t he as needed i t ems wi l l be exer ci sed.
g. Reuse al l exi st i ng cabl es and conduct or s or i gi nat i ng f r om t he u- boar d and V- boar d mot or cont r ol cent er s; U1, U2, U3, U4, U5, U6, U7, U8, U9, V1, and V2. Keep t he exi st i ng cabl e nami ng convent i on.
SECTI ON 01 11 10 Page 2
h. Pr ovi de Local - Remot e cont r ol s f or SS swi t chgear suppl y br eaker s, t i e/ i sol at i on br eaker s and al l f eeder br eaker s. I nst al l l adder - t ype cabl e t r ay wi t h gr oundi ng bet ween Local - Remot e panel and SS swi t chgear .
i . Remove exi st i ng st at i on ser vi ce t r ansf or mer el ect r omechani cal r el ay and pr ovi de new di f f er ent i al di gi t al r el ay pr ot ect i on f or t he t wo new st at i on ser vi ce t r ansf or mer s.
j . Remove exi st i ng 2000A- 480V st at i on ser vi ce suppl y bus l ocat ed at El . 580 f r om t he st at i on ser vi ce t r ansf or mer t o t he SS swi t chgear .
Pr ovi de t wo new 2500A- 480V st at i on ser vi ce suppl y buses, on El . 595.
k. Remove exi st i ng 15kV segr egat ed bus f r om t he 15kV di sconnect swi t ches t o t he ol d st at i on ser vi ce t r ansf or mer . I nst al l new 15kV segr egat ed bus f r om t he new 15kV br eaker s t o t he t i e br eaker and t he new SST1 and SST2 t r ansf or mer s.
1. 1. 1 As Needed Condui t I t ems
The f ol l owi ng as needed i t ems ar e al l cabl e t r ay i nst al l at i ons i n r egar ds t o r emovi ng f eeder conduct or s l eavi ng f r om t he mai n st at i on ser vi ce swi t chgear ( SS) and f eedi ng t he U- boar d and V- boar d mot or cont r ol cent er s as ment i oned i n Par t 1. 1 ( f ) . These i t ems wi l l onl y be i mpl ement ed af t er al l ef f or t s have been exhaust ed t o r emove t he or i gi nal cabl es and conduct or s and have f ai l ed, or t he condui t i s not adequat e s i ze. As needed cabl e t r ay i nst al l at i ons have been det ai l ed i n t he dr awi ngs. The Cont r act or i s r esponsi bl e f or ver i f y i ng t he si ze of t he cabl e t r ay. I f t he desi gnat ed si ze i n t he dr awi ngs i s not adequat e, t he cont r act or may r equest addi t i onal f undi ng f or t he i ncr eased si ze r equi r ement . Desi gn t he new cabl e t r ays t o i ncl ude spar e capaci t y f or f ut ur e use. These appr oval s must be submi t t ed and appr oved, i n wr i t i ng, by t he Cont r act i ng Of f i cer :
a. I f embedded condui t f eedi ng U1 and U2 i s no l onger useabl e, i nst al l cabl e t r ay and r out e f eeder s accor di ngl y.
b. I f embedded condui t f eedi ng U3, U4, and U7 i s no l onger useabl e, i nst al l cabl e t r ay and r out e f eeder s accor di ngl y.
c. I f embedded condui t f eedi ng U5 and U6 i s no l onger useabl e, i nst al l cabl e t r ay and r out e f eeder s accor di ngl y.
d. I f embedded condui t f eedi ng U8 i s no l onger useabl e, i nst al l cabl e t r ay and r out e f eeder s accor di ngl y.
e. I f embedded condui t f eedi ng U9 i s no l onger useabl e, i nst al l cabl e t r ay and r out e f eeder s accor di ngl y.
f . I f embedded condui t f eedi ng V1 i s no l onger useabl e, i nst al l cabl e t r ay and r out e f eeder s accor di ngl y.
g. I f embedded condui t f eedi ng V2 i s no l onger useabl e, i nst al l cabl e t r ay and r out e f eeder s accor di ngl y.
1. 1. 2 As Needed Tempor ar y Access Pl at f or m
At t he Gover nment ' s di scr et i on, f abr i cat e, and i nst al l a new t empor ar y pl at f or m t o f aci l i t at e i nst al l at i on f or t he equi pment . Desi gn r evi ew and appr oval wi l l be per f or med by t he Cont r act i ng Of f i cer pr i or t o f abr i cat i on.
SECTI ON 01 11 10 Page 3
1. 1. 3 As Needed Labor
As needed l abor i t ems ar e st r i ct l y f or unexpect ed Gover nment di r ect ed t asks t hat ar r i se and need t o be addr essed t o compl et e t he cont r act ed wor k and wi l l onl y be execut ed on an as needed basi s. As needed l abor wi l l be:
Machi ni st hi r e, el ect r i c i an hi r e, wel der hi r e, and gener al l abor er hi r e.
To qual i f y as mi scel l aneous hi r e, t he di r ect ed wor k wi l l be addi t i onal t o t hat necessar y t o compl y wi t h speci f i cat i ons r equi r ement s.
1. 2 CHANGES I N SPECI FI CATI ONS AND DRAWI NGS
The Gover nment r eser ves t he r i ght t o r evi se or amend t he speci f i cat i ons and/ or dr awi ngs pr i or t o t he dat e set f or accept i ng pr oposal s. Copi es of such amendment s wi l l be f ur ni shed t o al l pr ospect i ve of f er or s. I f t he r evi s i ons and amendment s r equi r e mat er i al changes i n quant i t i es or pr oposed pr i ces, or bot h, t he dat e set f or accept i ng pr oposal s may be ext ended t o enabl e of f er or s t he oppor t uni t y t o r evi se t hei r pr oposal s.
The amendment wi l l i ncl ude an announcement of t he new pr oposal due dat e.
1. 3 DEFINITIONS
a. Wher ever i n t he speci f i cat i ons, or upon t he dr awi ngs, t he wor ds " di r ect ed" , " r equi r ed" , " or der ed" , " desi gnat ed" , " pr escr i bed" , or wor ds of l i ke i mpor t ar e used, i t shal l be under st ood t hat t he " di r ect i on" , " r equi r ement " , " or der " , " desi gnat i on" , or " pr escr i pt i on" of t he Cont r act i ng Of f i cer i s i nt ended, and si mi l ar l y t he wor ds " appr oved" , " accept abl e" , " sat i sf act or y" , or wor ds of l i ke i mpor t shal l mean " appr oved by" or " accept abl e t o" or " sat i sf act or y t o" t he Cont r act i ng Of f i cer unl ess ot her wi se expr essl y st at ed.
b. Wher e " as shown" , " as i ndi cat ed" , " as det ai l ed" , or wor ds of l i ke i mpor t ar e used, i t shal l be under st ood t hat t he r ef er ence i s made t o t he dr awi ngs accompanyi ng t hi s cont r act unl ess st at ed ot her wi se. The wor d " pr ovi ded" as used her ei n shal l be under st ood t o mean " pr ovi ded compl et e i n pl ace" , t hat i s , " f ur ni shed and i nst al l ed" . ( FAR
52. 236. 21( b) and ( c) ) .
c. Wher ever i n t hese speci f i cat i ons or upon t he dr awi ngs, t he wor ds " Cont r act i ng Of f i cer " ( CO) or " Cont r act i ng Of f i cer ' s Repr esent at i ve" ( COR) ar e used, i t shal l be under st ood t o al so mean " Gover nment " unl ess ot her wi se expr essl y st at ed.
d. Wher ever i n t hese speci f i cat i ons t he acr onym " GQAR" i s used, i t shal l be under st ood t o mean " Gover nment Qual i t y Assur ance Repr esent at i ve" , unl ess ot her wi se expr essl y st at ed.
e. Wher ever i n t hese speci f i cat i ons t he wor d " weekend( s) " i s used, i t shal l be under st ood t o mean " Sat ur day, Sunday, and Feder al Hol i days" , unl ess ot her wi se expr essl y st at ed.
f . Whenever i n t hese speci f i cat i ons t he wor d " Pr oj ect " i s used, i t shal l be under st ood t o mean Wol f Cr eek Power house.
PART 2 - PRODUCTS - NOT USED
PART 3 - PRODUCTS - NOT USED
SECTI ON 01 11 10 Page 4
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 12 16. 00 26
WORK SEQUENCE
PART 1 GENERAL
1. 1 REFERENCES
1. 2 COORDI NATI ON
1. 3 SUBMI TTALS
1. 4 EQUI PMENT REPLACEMENT AND CUTOVER PLAN
1. 5 SEQUENCE OF WORK
1. 5. 1 I nst al l Cabl e Tr ay and Condui t
1. 5. 2 I nst al l Local - Remot e Panel and Rout e Cabl es
1. 5. 3 Tempor ar y Power
1. 5. 4 U- boar d and V- boar d Out age Const r ai nt s
1. 5. 5 U- boar ds and V- boar ds
1. 5. 6 St at i on Ser vi ce Out age Const r ai nt s
1. 5. 7 480V St at i on Ser vi ce Swi t chgear ( SS)
1. 5. 8 St at i on Ser vi ce Tr ansf or mer
1. 5. 9 15kV St at i on Ser vi ce Met al - Cl ad Swi t chgear .
1. 5. 10 Cont r act or ' s Commi ssi oni ng and Test i ng
PART 2 PRODUCTS
2. 1 Tempor ar y Power Cabl es
PART 3 EXECUTI ON
3. 1 Tempor ar y Power Syst ems
SECTI ON 01 12 16. 00 26 Page 1
01 12 16. 00 26
WORK SEQUENCE
PART 1 GENERAL
The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
1. 2 COORDINATION
The const r uct i on sequence i s cr i t i cal i n mai nt ai ni ng oper abi l i t y of t he Wol f Cr eek St at i on Ser vi ce el ect r i cal di st r i but i on and cont r ol syst ems dur i ng t he r equi r ed upgr ades and r epl acement of equi pment . Ther ef or e, t he Cont r act or shal l not begi n physi cal wor k at t he pr oj ect s i t e, except f or const r uct i on of t he t empor ar y access pl at f or m, unt i l al l r epl acement equi pment has been del i ver ed t o t he pr oj ect s i t e and appr oved f or use by t he Cont r act i ng Of f i cer . Equi pment and syst ems out ages shal l be kept t o a mi ni mum and shal l be coor di nat ed wi t h t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) pr i or t o cut over f r om exi st i ng equi pment / syst ems t o new equi pment / syst ems. Tempor ar y out ages wi l l be r equi r ed as l oads ar e t r ansf er r ed f r om exi st i ng equi pment t o new equi pment . Pr oper sequenci ng of t he wor k shal l be r equi r ed t o mi ni mi ze t he dur at i on of t hese out ages.
I n addi t i on, speci f i c cr i t i cal l oads i dent i f i ed i n t he TECHNI CAL SPECI FI CATI ONS must be suppor t ed by t empor ar y power sour ces f ur ni shed by t he Cont r act or 24 hour s a day 7 days a week dur i ng t he ef f ect ed wor k. The Cont r act or ' s wor k shal l be schedul ed so t hat al l uni t s can oper at e at f ul l capaci t y, wi t h no i nt er r upt i ons, bet ween 1 May and 31 August .
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Equi pment Repl acement and Cut over Pl an; G, HDC
SD- 03 Pr oduct Dat a
Tempor ar y Power Cabl es; I , HDC
SECTI ON 01 12 16. 00 26 Page 2
1. 4 EQUI PMENT REPLACEMENT AND CUTOVER PLAN
The Cont r act or shal l not begi n physi cal wor k at t he pr oj ect s i t e unt i l al l r epl acement equi pment has been del i ver ed t o t he pr oj ect s i t e and appr oved f or use by t he Cont r act i ng Of f i cer . The Cont r act or shal l submi t at l east 90 days pr i or t o t he st ar t of equi pment i nst al l at i on t he pr oposed st ep- by- st ep r emoval and i nst al l at i on pr ocedur e and syst em cut over schedul e. The pl an shal l i ncl ude a det ai l ed sequent i al l i s t of act i v i t i es, dur at i on of each act i v i t y, dur at i on of al l out ages r equi r ed, and t empor ar y power pl an i f r equi r ed. The pl an shal l r ef l ect t he coor di nat i on wi t h t he Gover nment ' s saf e c l ear ance pr ocedur e ( LOCK- OUT/ TAG- OUT) f or de- ener gi z i ng equi pment . The pl an shal l be coor di nat ed wi t h t he over al l pr oj ect schedul e. No wor k wi l l be al l owed t o commence unt i l t he pl an i s appr oved. Any r evi s i ons t o t he appr oved pl an shal l be submi t t ed f or appr oval .
1. 5 SEQUENCE OF WORK
Thi s subpar t i s t he r ecommended sequence of wor k t o mi ni mi ze out ages and di sr upt i ons t o t he f aci l i t y oper at i ons dur i ng t he r equi r ed i nst al l at i ons.
Any r equi r ed schedul e or l ogi st i cal const r ai nt s and t empor ar y power r equi r ement s ar e not ed f or t he af f ect ed el ement s of wor k. The sequence of wor k r epr esent s t he maj or el ement s of wor k and i s not t o be const r ued as al l - i ncl usi ve. Al l anci l l ar y wor k r equi r ed f or a compl et e and f unct i onal i nst al l at i on as def i ned by t he cont r act document s and sequence of wor k shal l be t he r esponsi bi l i t y of t he Cont r act or and shal l be i ncor por at ed i nt o t he pr oposed " Equi pment Repl acement and Cut over Pl an. " The Cont r act or may pr opose changes t o t he sequence of wor k, f or appr oval , i f t he changes i mpr ove i nst al l at i on schedul es, r educe syst em or equi pment out ages, or r esul t i n i mpr oved f unct i onal r el i abi l i t y .
1. 5. 1 I nst al l Cabl e Tr ay and Condui t
I nst al l cabl e t r ay f or l ocal - r emot e PLC panel and al l condui t needed t o r out e al l conduct or s.
1. 5. 2 I nst al l Local - Remot e Panel and Rout e Cabl es
Not e: Al l shop t est i ng r equi r ement s f or t he Local - Remot e panel must be compl et ed pr i or t o i nst al l at i on.
1. 5. 3 Tempor ar y Power
Any wor k r equi r i ng a power out age must acqui r e pr i or aut hor i zat i on. Loads deemed cr i t i cal by t he pr oj ect wi l l r equi r e t empor ar y power dur i ng t he out age. The dur at i on of t i me ci r cui t s can be de- ener gi zed wi l l coor di nat ed by t he cont r act or and appr oved by t he pr oj ect .
Bef or e a swi t chboar d i s r epl aced, al l of i t s cr i t i cal l oads shal l be t empor ar i l y r econnect ed t o an ext er nal power sour ce. Tempor ar y power sour ces shal l be compr i sed of a Cont r act or - desi gned por t abl e swi t chboar d wi t h br eaker s f or each l oad, power ed by a por t abl e engi ne- gener at or or an appr opr i at el y s i zed avai l abl e spar e br eaker , t he oper at i on of whi ch shal l compl y wi t h EM 385- 1- 1. Tempor ar y sour ces, i ncl udi ng f uel , shal l be f ur ni shed by t he Cont r act or , and equi pment shal l r emai n t he pr oper t y of t he Cont r act or . The heat er c i r cui t s f or al l U boar ds must be pr ovi ded wi t h t empor ar y power f or moi st ur e cont r ol dur i ng mai n uni t shut downs.
SECTI ON 01 12 16. 00 26 Page 3
1. 5. 4 U- boar d and V- boar d Out age Const r ai nt s
The const r uct i on sequence wi l l be cr i t i cal i n mai nt ai ni ng avai l abi l i t y and oper abi l i t y of t he pl ant dur i ng t he change- out of t he equi pment . The Cont r act or shal l submi t f or appr oval a det ai l ed sequence of wor k pl an per SECTI ON 26 23 10. 10 26 and 26 13 13. 00 26, cover i ng al l wor k t o be done t o t he U- boar d and V- boar d mot or cont r ol cent er s. Mai n uni t out ages ar e l i mi t ed t o t he mont hs of Januar y t hr ough May and Sept ember t hr ough December . No out ages of t he mai n uni t s wi l l be per mi t t ed dur i ng t he mont hs of June t hr ough August . Two mai n s i st er uni t s can be per mi t t ed t o be out of ser vi ce at a t i me f or a amaxi mum of t wo- weeks. Tempor ar y out ages of i ndi v i dual c i r cui t s wi l l be r equi r ed as l oads ar e t r ansf er r ed f r om t he exi st i ng equi pment t o t he new equi pment . Out ages shal l be kept t o a mi ni mum and shal l be coor di nat ed wi t h t he Pr oj ect and COR pr i or t o submi t t al of t he Equi pment Removal , I nst al l at i on, and Test i ng Pl an and Schedul e. I t i s expect ed t hat t he Cont r act or wi l l make al l nesessar y pr epar at i ons and ar r angement s t o maxi mi ze t he pr e- out age wor k and mi ni mi ze t he out age wor k.
1. 5. 5 U- boar ds and V- boar ds
The sequence of wor k f or t he U- boar d and V- boar d r epl acement i s as f ol l ows:
a. Request / coor di nat e Uni t 1 out age.
b. Pr ovi de t empor ar y power f or cr i t i cal l oads f ed f r om U1 MCC.
c. Remove exi st i ng U1 MCC.
d. I nst al l new U1 MCC.
e. Commi ssi on and f i el d t est new U1 MCC.
Repeat st eps a- e f or U2, U3, U4, U5, U6, U7, U8, U9, V1, and V2.
1. 5. 6 St at i on Ser vi ce Out age Const r ai nt s
The 15kV swi t chgear , st at i on ser vi ce t r ansf or mer s, and t he 480V SS swi t chgear shal l be i nst al l ed i n 2 sect i ons, separ at ed at t he Ti e br eaker sect i ons. Each t r ansf or mer and swi t chgear hal f shal l be r emoved i n i t s ent i r et y, f oundat i on made r eady and t he new SS swi t chgear hal f shal l be compl et el y i nst al l ed and t est ed pr i or t o t he r emoval of t he second hal f .
Onl y one swi t chgear hal f wi l l be al l owed t o be out of ser vi ce at any one t i me f or t he r emoval of exi st i ng equi pment , i nst al l at i on, and t est i ng of t he new equi pment . Out ages ar e r est r i ct ed dur i ng t he mont hs of June - August.
1. 5. 7 480V St at i on Ser vi ce Swi t chgear ( SS)
The sequence of wor k f or t he SS swi t chgear r epl acement i s as f ol l ows:
a. Request / coor di nat e st at i on ser vi ce out age.
b. Pr ovi de t empor ar y power f or cr i t i cal l oads on f i r st hal f of SS switchgear.
c. Remove f i r st hal f of t he SS swi t chgear .
SECTI ON 01 12 16. 00 26 Page 4
d. I nst al l new f i r st hal f of SS swi t chgear .
e. Commi ssi on and f i el d t est f i r st hal f of SS swi t chgear .
f . Pr ovi de t empor ar y power f or cr i t i cal l oads on second hal f of SS switchgear.
g. Remove second hal f of t he SS swi t chgear .
h. I nst al l new second hal f of SS swi t chgear .
i . Commi ssi on and f i el d t est second hal f of SS swi t chgear .
1. 5. 8 St at i on Ser vi ce Tr ansf or mer
To r educe out age dur at i on, i nst al l and commi ssi on one of t he new st at i on ser vi ce t r ansf or mer s pr i or t o di sconnect i ng and r emovi ng t he ol d t r ansf or mer . The sequence of wor k f or t he SS t r ansf or mer s i s as f ol l ows:
a. I nst al l t he f i r st new st at i on ser vi ce t r ansf or mer .
b. Commi ssi on and f i el d t est t he f i r st new st at i on ser vi ce t r ansf or mer .
c. Request / coor di nat e st at i on ser vi ce out age.
d. Pr ovi de t empor ar y power f or cr i t i cal l oads.
e. Remove exi st i ng st at i on ser vi ce t r ansf or mer .
f . I nst al l t he second new st at i on ser vi ce t r ansf or mer .
g. Commi ssi on and f i el d t est t he second new st at i on ser vi ce transformer.
1. 5. 9 15kV St at i on Ser vi ce Met al - Cl ad Swi t chgear .
The sequence of wor k f or t he 15kV swi t chgear r epl acement i s as f ol l ows:
a. Request / coor di nat e st at i on ser vi ce out age.
b. Pr ovi de t empor ar y power f or cr i t i cal l oads on f i r st hal f of t he 15kV swi t chgear .
c. Remove f i r st hal f of t he 15kV swi t chgear .
d. I nst al l new f i r st hal f of 15kV swi t chgear .
e. Commi ssi on and f i el d t est f i r st hal f of 15kV swi t chgear .
f . Pr ovi de t empor ar y power f or cr i t i cal l oads on second hal f of t he 15kV swi t chgear .
g. Remove second hal f of t he 15kV swi t chgear .
h. I nst al l new second hal f of 15kV swi t chgear .
i . Commi ssi on and f i el d t est second hal f of t he 15kV swi t chgear .
SECTI ON 01 12 16. 00 26 Page 5
1. 5. 10 Cont r act or ' s Commi ssi oni ng and Test i ng
Per f or m speci f i c equi mpent commi ssi oni ng and t est i ng as r equi r ed by each spec sect i on. At a mi ni mum, t he f ol l owi ng t est i ng i s r equi r ed as par t of t he Cont r act or ' s commi ssi oni ng pr ocess:
a. I nsul at i on Resi st ance Test ( 100% of al l Conduct or s) .
b. Conduct or Cont i nui t y Test ( 100% of al l Conduct or s) .
c. Ci r cui t Funct i onal i t y Test .
PART 2 PRODUCTS
2. 1 Tempor ar y Power Cabl es
Tempor ar y power cabl es must compl y wi t h speci f i cat i on 26 05 19. 00 26 I nsul at ed Wi r e and Cabl e and shal l become t he pr oper t y of t he gover nment upon compl et i on of t he pr oj ect .