Amendment 0003 The purpose of this amendment is to 1. Post Set Two Q A 2. Update the technical specifications 3. Include Cofferdam Design Document Report 4. Revise Plans and include DGN version of those plans 5. Add an order of precedence 6. Update DFARS clause 252.236-7001 7. Update FAR clause 52.252-3 and 8. Include Highway Wage Determination.

View the file

Other files for this federal contract opportunity

Other files attached to Downstream Cofferdam construction at Kentucky Lock, newest first.
File Type Posted
Bid_Opening_sign-in_sheet.pdf PDF
Bid_Abstract-signed.pdf PDF
W912P5-16-B-0004-0006.pdf PDF
W912P5-16-B-0004_TSpecs-Am6pgs.pdf PDF
W912P5-16-B-0004_TSpecs-Am5pgs.pdf PDF
W912P5-16-B-0004-0005.pdf PDF
W912P5-16-B-0004-0004.pdf PDF
W912P5-16-B-0004_TSpecs-Am4pgs.pdf PDF
W912P5-16-B-0004_DGN_Files_Am4.7z 7Z file
W912P5-16-B-0004_Plans-Am4Shts.pdf PDF
W912P5-16-B-0004_Plans-Am3Shts.pdf PDF
W912P5-16-B-0004-DDR-Am3.pdf PDF
W912P5-16-B-0004_DGN_Files_Am3.7z 7Z file
W912P5-16-B-0004_TSpecs-Am3pgs.pdf PDF
W912P5-16-B-0004-0002.pdf PDF
W912P5-16-B-0004_TSpecs-Am2pgs.pdf PDF
W912P5-16-B-0004_Plans-Am2Shts.pdf PDF
W912P5-16-B-0004_AppA-Am2.pdf PDF
W912P5-16-B-0004_DGN_Files.7z 7Z file
Prebidconferenceattendancelist.pdf PDF
Prebidconferencepresentationslides.ppt PPT presentation
Prebidconferenceminutes.pdf PDF
W912P5-16-B-0004-0001.pdf PDF
W912P5-16-B-0004_TSpecs.pdf PDF
Foreign_National_Pre-Bid_Meeting_Request_Form.pdf PDF
W912P5-16-B-0004_Plans.pdf PDF
W912P5-16-B-0004.pdf PDF
Pre-Bid_Meeting_and_Site_Visit_Request_Form.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, ROOM A680

NASHVILLE TN 37202-1070

W38XDD60272136

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Post Set Tw o Q&A;

2. Update the technical specifications;

3. Include Cofferdam Design Document Report;

4. Revise Plans and include DGN version of those plans;

5. Add an order of precedence;

6. Update DFARS clause 252.236-7001;

7. Update FAR clause 52.252-3; and

8. Include "Highw ay" Wage Determination.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 36

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-B-0004

X 9B. DATED (SEE ITEM 11)

13-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jul-2016

CODE

CONTRACTING DIVISION (JD9)

JAMIE.DAVIES@USACE.ARMY.MIL

(615) 736-7921

(615) 736-7124

NASHVILLE TN 37202-1070

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912P5

FACILITY CODECODE

EMAIL:TEL:

W912P5-16-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMEND. 0003 TECHNICAL CHANGES

IFB No. W912P5-16-B-0004 Amendment No. 0003

Downstream Cofferdam Kentucky Lock

Livingston County, Kentucky

I. CHANGES TO TECHNICAL SPECIFICATIONS

A. Section 01 00 00 GENERAL REQUIREMENTS

1. Remove Section 01 00 00 pages 7 and 8, and replace with revised Section 01 00 00 pages 7 and 8.

B. Section 01 95 00 FORMS AND ATTACHMENTS

1. Remove Section 01 95 00 in its entirety (3 pages), and replace with revised Section

01 95 00 (3 pages).

2. Add KY Lock Upstream Monolith Mix Designs (2 pages) to the back of Section 01 95 00.

C. Section 31 23 06 BLASTING

1. Remove Section 31 23 06 pages 21 and 22, and replace with revised Section

31 23 06 pages 21 and 22.

II. CHANGES TO CONTRACT DRAWINGS

A. Replace the following drawings:

Drawing No. Description

510N102A CONSTRUCTION LIMITS PLAN

61N651-8 FOUNDATIONS – SPECIALTY WORK OVERALL PLAN

--- END OF AMENDMENT NO. 0003 TECHNICAL CHANGES---

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

Q&A SET TWO

Kentucky Lock Downstream Cofferdam Solicitation Number: W912P5-16-B-0004

Questions and Answers

48. Question: Are there to your knowledge any Engineering or Consulting firms or individuals that the bidder/constructor is precluded from working with on prebid designs, specifically the precast element design for the Cofferdam wall?

Answer: No.

49. Question: As this was designed or developed 10-12 years ago, please provide all available precast element drawings developed by Gerwick or ____ Construction.

Answer: The precast element drawings developed by Gerwick over 13 years ago have subsequently undergone significant revisions by the Corps of Engineers, including the deletion of all drawings related to a specific construction method. Therefore, such drawings have not been included in the Solicitation.

50. Question: Will the US Army Corp of Engineers allow foundation elements associated with temporary supports/bracing below the final excavated elevation of the cofferbox?

Answer: Yes, but their location must obtain approval of the Contracting Officer to ensure they do not conflict with future features in this area (eg., grouting and possible shear resistance elements).

51. Question: Will the US Army Corp of Engineers allow foundation elements associated with temporary supports/bracing below the final excavated elevations of future lock work locations?

52. Question: Where does the US Army Corp of Engineers allow the Contractor to unload dredge spoils and rock from the wet excavation considering Disposal Area D does not show any direct water access, reference sheet 510N102A?

Answer: The East Bank River Access Ramp as shown in sheet 510N102A will be available to the Contractor throughout the contract for this purpose. Sheet 510N102A is being revised in Amendment 0003 to include this ramp in the construction work limits for this contract.

53. Question: Sheet 510N102A shows the Construction Limits and Temporary Exploratory Work Area. Note 4 of 6 on the same sheet indicates that this area is to be utilized from NTP until March 2018 for the purpose of subsurface investigation. Would the US Army Corp of Engineers allow the Contractor to have construction vehicle/equipment access throughout this area during the entire performance period?

Answer: No. However, the Contractor will have use of this area after March 2018 until such time as the future contractor requires its use.

54. Question: If there are temporary supports/bracing utilized in the design and construction of the cofferbox, will these elements be allowed to remain embedded in the subsequent concrete placements?

55. Question: Section 3.7 of Section 31 23 06 states “no moving river traffic will be allowed within 1500 feet of the blast area.” Because the existing lock is within 1500’ of the blast area, will the time required to load and shoot each blast be counted as a lock closure period?

Answer: Yes.

56. Question: Will the Contractor be permitted to temporarily fill the area between the proposed cofferdam alignment and the east shore line?

Answer: It is expected that temporary fill in this area will be acceptable if it conforms with all environmental requirements. All fill below water may be required to be clean rock to minimize the development of plumes and a modification to the 401 Water Quality permit may be required through the Kentucky Division of Water. A large quantity of shot rock is located in Disposal Area D and will be available for the Contractor’s use.

57. Question: If the USACE does not receive sufficient funding authorization to award all

Options contained in the Bid Schedule by the 28 April, 2017 deadline, will the order of award be in numeric sequence or some other sequence?

Answer: The deadline for exercise of the options has been revised to May 31, 2017 in Amendment 0003. There is no particular order for the award of the options.

58. Question: Can the deadline for questions be extended for two weeks?

Answer: Amendment 0002 extended the question deadline to July 18, 2016. The deadline for the submission of Questions has passed and will not be further extended.

59. Question: Will the Contractor be required to provide Builder’s Risk insurance? If so, will any part of the existing facility be required to be covered by this insurance?

60. Question: What is the expected duration for monitoring both new and existing instrumentation?

Answer: New instrumentation is being removed from the contract with the exception of five alignment pins. Instrumentation monitoring shall cover the entire contract duration. These revisions have been incorporated in Amendment 0002.

61. Question: Existing Instrumentation references 8 Inclinometers. Currently Inclinometer 5 and

8 (IN-5/IN-8) are not automated like the others. What is reading frequency for these two manual Inclinometers? (I don’t believe IN-8 even exists any more).

Answer: Manual inclinometers IN-5 and IN-8 have been read by Government personnel during the ongoing work, and that will be the case during this contract as well. The Contractor will not be responsible for reading IN-5 and IN-8 unless specifically directed to do so by the COR.

62. Question: Alignment Pins (new and existing) and RBMDs (existing) are read manually. a.

Drawing Sheet 61N852-10 says new AP to be read daily. b. What is frequency for existing AP and RBMDs?

Answer: The contractor is responsible for reading all instrumentation onsite, both manual and automated. Specification section 13 50 00 has been updated to clarify reading requirements as part of Amendment 0002.

63. Question: Piezometers- Specification requires 7 multiple depth Piezometers and 3 single-total of 17 Piezometers in 10 holes. Piezometer sensing zone (typ) is shown on Drawing 61N852-11 for only CCP 30. What are depths for all new Piezometers?

Answer: New piezometers are being removed from the contract, no new piezometers shall be installed. This revision has been incorporated in Amendment 0002.

64. Question: Inclinometers- Specification Drawing requires 8 ‘inclinometers with multiple sensors’. How many is multiple? What depths?

Answer: New inclinometers are being removed from the contract, no new inclinometers shall be installed. This revision has been incorporated in Amendment 0002.

65. Question: Drawing – Drawing 61N852-10, Note 1 references to Drawing 61N852 – 12.

Download does not include this drawing. Could this have Piezometers and Inclinometer layouts?

Answer: Drawing 61N852-10 has been revised and Drawing 61N852-11 has been removed from folio. Drawing 61N852-12 is not part of the folio and reference to it has been removed from the drawings. These revisions have been incorporated as part of Amendment 0002.

66. Question: Is permanent AC power provided for new instrumentation? Cofferdam Cell 1?

Current Instrumentation is solar powered.

Answer: New instrumentation is being removed from the contract. No revisions to the electrical requirements of the contract have been made, AC power is still to be supplied by the Contractor for lighting.

67. Question: Specification section 3.13 Ownership. This is basically requiring the Contractor to decommission ALL instrumentation, get it re-calibrated and send back to the COE. Really?

Buying all new equipment may be cheaper.

Answer: The intent of this section is covering the manual reading equipment, i.e.

inclinometer probes, water level indicators, etc. This does not require the Contractor to pull every sensor on the project and have it recalibrated. This has been updated in 13 50 00 for clarification in Amendment 0002.

68. Question: At the pre-bid conference, we were told that unless the west boat basin was to be used by the contractor, that all mussel relocation work is covered by an existing Corps contract. But if the west boat basin was to be used, then mussel relocation from that area will be the contractors responsibility. If this is so, then we need to know a bit about the West Boat Basin. Such as: 1-Does the Corps have existing information about mussel presence/densities in the west boat basin? 2-If so can you forward a copy of that report to us? 3-Also how deep is the water in the basin?

Answer: A survey report of mussel density in the contract area, including the West Bank Boat Basin, was included in Amendment 0002. Approximate contours for the bottom of the boat basin and information on the remnant H-piles are included in For Information Only Sheet 23N217. Additional information and requirements for this boat basin are in Paragraph

1.5.1.1 of Section 01 00 00 of the Specifications.

69. Question: The design of any precast structure requires significant upfront preliminary engineering. Cost for the general contractor as well as potential subcontractors and designers is also quite significant. Will the Owner reconsider providing a stipend to contractors who turn in price? It has been difficult to find contractors to provide pricing due to the challenging nature of this project as well as its significant risk.

70. Question: May Bergman Associates Engineering participate as a design partner for the project?

Answer: Yes.

71. Question: Will the Owner allow any variance in the Drilling and Blasting specifications as it pertains to the loading of holes?

Answer: It is not clear what kind of variance is being requested. Variances will be evaluated by the COR and design team and are subject to approval of the Contracting Officer after award of the contract.

72. Question: Is there a list of alternative sections that are allowed for the job in regards to the sheet piling? We have sections that have properties as good or better than the ones listed below and we would like to offer these.

Answer: Alternate materials will be evaluated by the Contracting Officer upon the request of the Contractor after award of the contract. Any proposed changes in materials must be proposed as a credit change to the Government or as a Value Engineering Proposal and they must adhere to all the design and performance criteria considered for the original design. All bidders are encouraged to submit bids based on the materials specified in the Solicitation.

73. Question: Is there a process to get our alternatives approved before the bid / award date and what do we need to do to get our material substitutes approved?

Answer: No. Alternate materials will be evaluated by the Contracting Officer upon the request of the Contractor after award of the contract.

74. Question: Is the cargo preference act in place on this job?

Answer: The Cargo Preference Act has not been incorporated into this contract.

75. Question: Drawings for the alignment pins show three (3) on the cells to be placed and two

(2) more on the existing sheet pile wall by the existing tower. The payment item for Survey pins only has three (3) for quantity. Is it correct we need to plan to install and price five (5) total alignment pins?

Answer: Five alignment pins shall be installed. The original bid schedule was incorrect. The bid schedule was updated as part of Amendment 0002 to reflect the correct quantity of alignment pins.

76. Question: The piezometer payment quantity is 17 but the drawings and specs each show ten

(10). Is it correct to assume that there are only ten (10) we need to price?

Answer: New piezometers have been removed from the contract, no new piezometers shall be installed. This revision has been incorporated in Amendment 0002.

77. Question: The specs imply that the “X” shaped weepholes will also be burned into the Tied

Z pile wall on the inside portion of the cofferdam. This work is not shown on the plans. Are the weepholes required on the tied Z pile wall?

Answer: See note no. 9 on drawing 510N106 that states the weepholes shall be placed on the entire cofferdam. This includes the Z-pile wall.

78. Question: Please provide more information on the Helper Boat- What size (hp) is required?

How will payment be handled if utilized for a partial day?

Answer: Information on the required Helper Boat is provided in Paragraph 1.6.2 of Section 01 00 00 of the Specifications. This information includes the minimum required horsepower.

Based on the requirements for the Helper Boat, it is anticipated that it will be required to be on-station and available for its sole purpose 24 hours per day over extended periods of time.

Therefore, partial day requirements are not anticipated.

79. Question: Drawing 61N651-8 has cut sections that refer to drawings 61N651-12, 61N651-

13, 61N651-14, and 61N651-15 that do not exist in the drawing set. Will these drawings come out in a later addendum?

Answer. These drawings have been eliminated and the cut section references will be removed from this drawing in Amendment 0003.

80. Question: Given the amount of construction engineering work required for this proposal, could the bid period be extended by 3 weeks.

Answer: Amendment 0002 extended the bid opening date to August 16, 2016 at 1:00 pm CDT. No additional extension will be considered.

81. Question: Can the period for questions be extended for a similar duration?

Answer: Amendment 0002 extended the question deadline to July 18, 2016. The deadline for the submission of Questions has passed and will not be further extended.

82. Question: Because the different Means and Methods that contractors may select for the construction of the concrete cofferdam, there may be differing life cycle and maintenance costs associated with each contractor’s approach. How does the government intend to evaluate these differences in this Solicitation format?

Answer. A final design and configuration has been provided in this Solicitation using prescribed materials. Therefore, there should not be any differences in life cycle costs for the final product. Means and Methods are typically short duration construction activities that also should not have life cycle costs associated with them. Life cycle costs will not be evaluated in this Solicitation.

83. Question: Could the Corps please provide the original design memorandum for the project?

84. Question: Could the Corps please provide the previously completed design documents for the concrete cofferdam?

Answer: The latest Design Documentation Report is being included as part of Amendment 0003.

85. Question: One approach to the concrete cofferdam would include placing the precast box on drilled piers. This would leave the potential for parts of the concrete wall to be unsupported in the event of scour or washout. Will this be acceptable to the Corps, or will a retention system be required to ensure continuous support f of the wall perimeter?

Answer. Changes to the design will not be considered during this Solicitation period but will be considered and evaluated post-award through the Value Engineering process. Because the concrete cofferdam is expected to be a water barrier structure, any proposed alternate designs would obviously need to consider this basic function. Because the existing channel bottom is near top of rock in the foot print of this cofferdam, scour in itself is not expected to be a design concern.

86. Question: At the areas to receive wall armor, is there a minimum thickness required to provide support of the wall armor anchorage?

Answer: Wall armor strap anchors should extend beyond the first line of the wall face rebar reinforcement.

87. Question: Could the wall armor be cast in to the walls after placement of all other concrete?

Answer: The Government does not intend to direct the contractor's Means and Methods of construction, but casting the wall armor after placement of all other concrete could be problematic, especially below tailwater.

88. Question: If a contractor’s Means and Methods included an onsite batch plant, would the

Corps provide space onsite for this?

Answer. The Government anticipates there is adequate space within the Construction Limits for an onsite batch plant.

89. Question: Sheets 61N650-2 and 61N650-3, Note 1 states that “Contractor shall submit their concrete cofferdam construction proposal detailing locations of all reinforcement, cast-in-place concrete, precast concrete, and tremie concrete mix designs and plans.” When does this submission occur? With the Bid? Could the evaluation criteria for these plans be provided? If post bid, how does the Corps ensure that the pricing received on bid day is compliant and executable for the bid price?

Answer: This submission would be post-award of this contract. The evaluation criteria for the submittals is to ensure the construction plan meets all the requirements of the contract.

This includes but is not limited to safety, environmental, and quality control requirements.

The bid price should reflect all the requirements contained in the Solicitation.

90. Question: Where is the dental concrete line item anticipated to be installed?

Answer. Refer to Specification Section 31 60 00, Paragraph 1.2.3: "Dental concrete is defined as tremie concrete used to fill/backfill depressed areas in the rock surface and discontinuities in the rock surface and discontinuities in the rock mass as specified herein."

91. Question: Can we get a location map and GPS coordinates for each seismograph monitoring location?

Answer: The approximate location for the seismographs is provided in Paragraph 3.15 of Section 31 23 06. Their exact location will be determined in the field in concert with the COR after contract award; therefore, GPS coordinates cannot be provided at this time.

92. Question: Will electronic/digital detonators be allowed?

93. Question: Please consider revising the 4-hour lock closure time for blasting; revising specifications to allow loading holes, exclusive of final wiring of the shot, prior to closure;

and/or significantly increasing the time of performance for the project. It is simply not possible to safely load and detonate more than a few blast holes in the current 4-hour window. Given the maximum 3x3 drill pattern, production blasting, exclusive of the test blasting program, will require drilling in excess of 5,000 holes or approximately 24 blast holes per LF of the excavation area as measured along the construction baseline. Even assuming the project can be staffed with sufficient qualified personnel to load and shoot these 24 holes in the 4-hour window, it will require an estimated 167 work days (500 LF at 3 lf per day) to blast the approximately 500’ long excavation area. Additionally only blasting one row of holes at a time will seriously compromise blasting efficiency, require the use of more explosives than would otherwise be necessary, and dramatically increase the chance for poor breakage results. The required 167 work days performance period is the duration after completion of the test blast program, and likely represents more than one entire construction season given seasonal limitations. Effectively, no other work on the project can proceed until completion of the rock excavation.

As mentioned above, an alternative to increasing the daily closure time is allowing loading of the holes, exclusive of completion of the wiring process, prior to commencing a lock closure period. Loading could be accomplished safely while maintaining river traffic thereby allowing time to shoot several rows of holes per shot. This method would reduce both the total amount of explosives needed and the duration of the blasting operation.

Answer. The 4-hour restriction for lock closure during blasting is being removed from Paragraph 3.7 of Section 31 23 06 of the Specifications in Amendment 0003. It is the Government's intention to allow flexibility to the contractor in determining how to best utilize the limited lock closure time allowed in this contract. However, the Government did utilize 4 hours of lock closure per blast in determining this contract's period of performance and in determining the allowed maximum lock closure period. For the blasting activity, the Government assumed a specialized floating plant that would accommodate multiple drilling rigs operating simultaneously and designed to accommodate the 3x3 drilling pattern. It was assumed that multiple rows of holes would be loaded per blast using PVC pipe extending from the hole to above the waterline. This method has been utilized successfully for previous underwater blasting operations. However, it is not the Government's intent to direct Means and Methods for this activity and more efficient methods would be encouraged. Methods to minimize lock closure impacts may require more resources to be applied to this element of work than in more common underwater blasting sites. Because of OSHA requirements, it is not expected that loading holes while vessels are transiting the site will be feasible or allowed.

94. Question: Why is there not a complete set of "for construction" documents issued with the Solicitation?

Answer: The Plans and Specifications constitute a complete set of construction documents.

All features of work have complete dimensions and materials specified necessary for construction. In addition, all other requirements necessary to meet the Government's intent during construction have been incorporated into the Plans and Specifications. This includes, but is not limited to, safety aspects, environmental aspects, and limitations on the negative impacts to the operation of the existing Kentucky Lock. The Government has not prescribed the Means and Methods "for construction" techniques to afford the bidders latitude to select those Means and Methods best suited to their expertise and resources.

95. Question: Why were the design criteria necessary to engineer the concrete cofferdam sections excluded from the Solicitation?

Answer: From the Government’s perspective, the design criteria is not necessary to develop Means and Methods. However, upon request, the latest Design Documentation Report describing the design criteria and computations for the concrete cofferdam is being provided as part of Amendment 0003.

96. Question: Because of the unknown pre-award activity schedule, it is possible the contractor could miss an entire construction season during preconstruction activities and submittals.

Why don't the Solicitation documents contemplate an alternative completion date for the time spent in the pre-award phase?

Answer. All substantive submittals and Value Engineering Proposals will be developed post-award. The Government anticipated significant time and effort in the development and approval of submittals for the Means and Methods for the concrete cofferdam sections in the development of the Period of Performance. The submittal development and approval process is not on the critical path because the Government's schedule does not anticipate marine construction activities to commence until 1 May 2017 - to allow for the two month window of fish spawning restrictions. The first marine activity assumed would be demonstration of underwater blasting techniques.

97. Question: Why are there no documents detailing the bearing surface of the stay-in-place concrete forms?

Answer: The Government is not directing or advocating the use of stay-in-place forms - a Means and Methods for the concrete cofferdam sections. For example, a coffer box type method may be feasible that would not require stay-in-place forms. If stay-in-place forms are chosen by the Contractor, then there are a multitude of techniques that could be applied for use as bearing surfaces. Constraints that could affect those Means and Methods have been incorporated into the Solicitation such as the requirement not allowing permanent intrusions above elevation 288.0 in the navigation channel.

98. Question: Why don't the design documents provide design details on the acceptable means for the connection between precast concrete and cast-in-place concrete?

Answer: While precast stay-in-place forms are not being directed by the Government, criteria or constraints pertinent to this Means and Methods or others have been included in the Solicitation as deemed appropriate to facilitate the development of bids and work plans.

The connection between a possible precast form and the cast-in-place concrete falls in that category so details and criteria for this connection will be included in a future amendment.

99. Question: Why don't the design documents provide details or criteria on the joint treatment at the monolith construction joints?

Answer: Details on the joint treatment are provided in Drawing Numbers 61N650-4 and 61N650-6. Criteria for these joints, including tolerances, is included in Section 03 30 00 of the Specifications.

100. Question: There are no Marine work rates in the bid documents. What labor rates should be used?

Answer: As listed in the "Highway" Davis Bacon Wage Decision included in Amendment 0003 the following rates should be used: Group 1 Operator for "tow or pushboat" operator and Group 2 Laborer for "deckhand scow man".

101. Question: There is a contrast in wording in the specs;" minimize overbreak to the extent possible" vs the very restrictive horizontal and vertical tolerances on overbreak- which is controlling?

Answer: The more restrictive Vertical and Horizontal tolerances will govern.

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001: The purpose of this amendment is to:

1. Inform site visit registrants to send their registration to both Jamie Davies (Jamie.Davies@usace.army.mil) and Isaac Taylor (Isaac.J.Taylor@usace.army.mil) as Mrs. Davies will be unavailable June 24-July 4. Failure to do this could result in registrants not being able to attend the site visit.

2. Revise FAR Clause 52.211-10 to add a delayed notice to proceed

3. Update FAR Clause 52.252-3.

Amendment 0002: The purpose of this amendment is to:

1. Post Q&A Set One,

2. Extend Q&A deadline to July 15, 2016 and extend the bid opening due date to August 16, 2016 at 1:00 pm CDT.

No additional requests for extension will be considered.

3. Revise the Bid Schedule: quantity of CLINs 0008, 0041, 0044 and 0063 changed, new CLIN 0024 added, CLINs renumbered, and CLINs within option 6 removed;

4. Update Specifications (See list of changes to follow);

5. Replace Drawings 510N100 and 61N852-10, Remove Drawing 61N52-11, add DGN drawings;

6. Add Appendix A;

7. Instructions Paragraph 1.3 revised to change option exercise deadline; and

8. Update clauses 52.217-7, 52.252-3 and 252.236-7001.

Amendment 0003: The purpose of this amendment is to:

1. Post Set Two Q&A;

2. Update the technical specifications;

3. Include Cofferdam Design Document Report;

4. Revise Plans and include DGN version of those plans;

5. Add an order of precedence;

6. Update DFARS clause 252.236-7001;

7. Update FAR clause 52.252-3; and

8. Include "Highway" Wage Determination.

(End of provision)

SECTION 00700 - CONTRACT CLAUSES

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Technical Specifications: W912P5-16-B-0004 TSpecs.pdf W912P5-16-B-0004_TSpecs-Am2pgs.pdf W912P5-16-B-0004_TSpecs-Am3pgs.pdf

Drawings: W912P5-16-B-0004 Drawings.pdf

W912P5-16-B-0004_Plans-Am2shts.pdf W912P5-16-B-0004 DGN Files.7z W912P5-16-B-0004_Plans-Am3Shts.pdf W912P5-16-B-0004 DGN Files_Am3.7z

Appendix A: W912P5-16-B-0004_AppA-Am2.pdf

Reference:

KY DS Cofferdam Design Document Report: W912P5-16-B-0004-DDR-Am3.pdf

GENERAL

510N100 INDEX OF DRAWINGS, SHEET 1 OF 2

510N100A INDEX OF DRAWINGS, SHEET 2 OF 2

510N101 STANDARD ABBREVIATIONS, AND LEGENDS

SITE WORK

510N102 PROJECT LOCATION PLAN

510N102A CONSTRUCTION LIMITS PLAN

510N103 HORIZONTAL AND VERTICAL CONTROL SURVEY MONUMENTS & BASELINES

510N104 EXISTING SITE TOPOGRAPHY PLAN WITH CLEARING & GRUBBING

510N104A DISPOSAL AREA "D", PLAN

510N104B DISPOSAL AREA "D", SECTION

CELLULAR COFFERDAM

510N105 CELLULAR COFFERDAM, FINAL GRADING PLAN

510N106 CELLULAR COFFERDAM, PLAN AND GENERAL NOTES

510N107 CELLULAR COFFERDAM, TYPICAL SECTIONS

510N107A CELLULAR COFFERDAM, TYPICAL SECTIONS

518N200 CELLULAR COFFERDAM, PROFILES

518N201 CELLULAR COFFERDAM, SHEET PILE LAYOUT

518N202 CELLULAR COFFERDAM, SHEET PILE, DETAILS

518N203 CELLULAR COFFERDAM, TIE-IN TO EAST BANK, PLAN AND ELEVATIONS

518N204 CELLULAR COFFERDAM, TIE-IN TO EAST BANK, SECTIONS

518N205 CELLULAR COFFERDAM, TIE-IN TO EAST BANK, DETAILS

518N206 CELLULAR COFFERDAM, FLOODING FACILITY, PLAN AND ELEVATIONS & SECTIONS

518N207 CELLULAR COFFERDAM, FLOODING FACILITY, FLOOD GATE, ELEVATION AND SECTIONS 518N208 CELLULAR COFFERDAM, FLOODING FACILITY, FLOOD GATE, ELEVATIONS, SECTIONS &

DETAILS

518N209 CELLULAR COFFERDAM, FLOODING FACILITY, REINFORCING DETAILS

518N210 CELLULAR COFFERDAM, FLOODING FACILITY, BRIDGE, PLAN, SECTIONS AND DETAILS

518N211 CELLULAR COFFERDAM, FLOODING FACILITY, BRIDGE, SECTIONS AND DETAILS

518N212 CELLULAR COFFERDAM, FLOAT-IN CONNECTION, PLAN, SECTION AND DETAILS

GUARD CELLS

518N250 GUARD CELLS PLAN

518N251 GUARD CELL NO. 1 PLAN, ELEVATION AND SECTION

518N252 GUARD CELL NO. 2 PLAN, ELEVATION, SECTIONS AND DETAILS

CONCRETE COFFERDAM

61N650-1 CONCRETE COFFERDAM, GENERAL PLAN

61N650-2 CONCRETE COFFERDAM, TYPICAL SECTION A-A

61N650-3 CONCRETE COFFERDAM, TYPICAL SECTION B-B

61N650-3A CONCRETE COFFERDAM, GENERAL NOTES

61N650-4 CONCRETE COFFERDAM, GENERAL NOTES AND DETAILS, SHEET 1 OF 3

61N650-5 CONCRETE COFFERDAM, GENERAL NOTES AND DETAILS, SHEET 2 OF 3

61N650-6 CONCRETE COFFERDAM, GENERAL NOTES AND DETAILS, SHEET 3 OF 3

61N650-7 MONOLITHS M-22C THROUGH M-24C, CONCRETE COFFERDAM, PLAN, ELEVATION, & SECTIONS 61N650-8 MONOLITHS M-25C THROUGH M-26C, CONCRETE COFFERDAM, PLAN, ELEVATION, & SECTIONS 61N650-9 MONOLITHS M-27C & M-28C, CONCRETE COFFERDAM, PLAN, ELEVATION, & SECTIONS 61N650-10 MONOLITHS M-29C & M-30C, CONCRETE COFFERDAM, PLAN, ELEVATION, & SECTIONS

61N650-11 MONOLITH M-31C, CONCRETE COFFERDAM, PLAN, ELEVATION, & SECTIONS

61N650-12 CONCRETE COFFERDAM, VERTICAL JOINT

61N650-13 CONCRETE COFFERDAM, TEMPORARY COFFERDAM, ANCHORS AND DETAILS

61N650-14 CONCRETE COFFERDAM, TEMPORARY COFFERDAM, INFILL AND DETAILS

61N650-15 CONCRETE COFFERDAM, TIE-IN TO L-25, PLAN

61N650-16 CONCRETE COFFERDAM, TIE-IN TO L-25, ELEVATION

61N650-17 CONCRETE COFFERDAM, TIE-IN TO L-25, SECTIONS

61N650-18 CONCRETE COFFERDAM, TIE-IN TO L-25, CLOSURE PC PANEL REINF DETAILS

61N650-19 CONCRETE COFFERDAM, TIE-IN TO L-25, TRANSITION NOSE

61N650-20 CONCRETE COFFERDAM, MISCELLANEOUS METAL WALL ARMOR

61N650-21 CONCRETE COFFERDAM, MISCELLANEOUS METAL, CORNER PROTECTION

FOUNDATIONS

61N651-1 FOUNDATIONS, EXCAVATION/BLASTING, EXCAVATION SEQUENCE

61N651-2 FOUNDATIONS, GENERALIZED CONSTRUCTION SEQUENCE, SCHEMATIC SECTION

61N651-3 FOUNDATIONS, EXCAVATION/BLASTING, TOP OF ROCK

61N651-3A FOUNDATIONS, EXCAVATION/BLASTING, EXISTING GRADE

61N651-4 FOUNDATIONS, EXCAVATION/BLASTING, SECTIONS A-A, B-B AND C-C

61N651-5 FOUNDATIONS, EXCAVATION/BLASTING, SECTIONS D-D AND E-E

61N651-6 FOUNDATIONS, EXCAVATION/BLASTING, SECTION F-F

61N651-7 FOUNDATIONS, UNDERWATER, BLASTING & EXCAVATION, PLAN AND GUIDELINES

61N651-8 FOUNDATIONS, SPECIALTY WORK, OVERALL PLAN

61N651-9 FOUNDATIONS, DENTAL CONCRETE & CELL 1/1A FILL AREAS, ENLARGED PLANS

61N651-11 FOUNDATIONS, CELLULAR COFFERDAM, DRILLED PIPE PILES, ENLARGED PLAN & PILE

SCHEDULE

61N651-16 FOUNDATIONS, DRILLED PIPE PILES, PROFILES AND DETAILS

INSTRUMENTATION

61N852-10 INSTRUMENTATION, PLAN AT EL. 343.5

U/S SITE DEWATERING AND INSTRUMENTATION

61N852-13 U/S SITE DEWATERING AND INSTRUMENTATION, PLAN AND DETAILS

POWER AND LIGHTING

65N480 ELECTRICAL, LEGEND, GENERAL NOTES, ABBREVIATIONS AND LIGHTING SCHEDULE

65N481 ELECTRICAL, PLAN FOR POWER, INSTRUMENTATION AND LIGHTING

65N482 ELECTRICAL, MISCELLANEOUS ELECTRICAL DETAILS

65N483 ELECTRICAL, MISCELLANEOUS ELECTRICAL DETAILS

65N484 ELECTRICAL, GEN SET & AUTOMATIC TRANSFER, SWITCH LOCATION

65N780 ELECTRICAL, SINGLE LINE DIAGRAM AND PANELBOARD SCHEDULES

65N880 ELECTRICAL GROUNDING AND BONDING

GEOTECHNICAL BORINGS

822N3030 EXPLORATORY BORINGS, LOWER GUIDE WALL SECTION

822N3031 EXISTING BORING LOCATIONS, LOWER GUIDE WALL SECTION

822N3032 GEOTECHNICAL LEGEND

822N3033 BORING LOGS, SHEET 1 OF 27

822N3034 BORING LOGS, SHEET 2 OF 27

822N3035 BORING LOGS, SHEET 3 OF 27

822N3036 BORING LOGS, SHEET 4 OF 27

822N3037 BORING LOGS, SHEET 5 OF 27

822N3038 BORING LOGS, SHEET 6 OF 27

822N3039 BORING LOGS, SHEET 7 OF 27

822N3040 BORING LOGS, SHEET 8 OF 27

822N3041 BORING LOGS, SHEET 9 OF 27

822N3042 BORING LOGS, SHEET 10 OF 27

822N3043 BORING LOGS, SHEET 11 OF 27

822N3044 BORING LOGS, SHEET 12 OF 27

822N3045 BORING LOGS, SHEET 13 OF 27

822N3046 BORING LOGS, SHEET 14 OF 27

822N3047 BORING LOGS, SHEET 15 OF 27

822N3048 BORING LOGS, SHEET 16 OF 27

822N3049 BORING LOGS, SHEET 17 OF 27

822N3050 BORING LOGS, SHEET 18 OF 27

822N3051 BORING LOGS, SHEET 19 OF 27

822N3052 BORING LOGS, SHEET 20 OF 27

822N3053 BORING LOGS, SHEET 21 OF 27

822N3054 BORING LOGS, SHEET 22 OF 27

822N3055 BORING LOGS, SHEET 23 OF 27

822N3056 BORING LOGS, SHEET 24 OF 27

822N3057 BORING LOGS, SHEET 25 OF 27

822N3058 BORING LOGS, SHEET 26 OF 27

822N3059 BORING LOGS, SHEET 27 OF 27

RIVER CURRENT TRAINING DIKE

518N230 TRAINING DIKE, PLAN

518N231 TRAINING DIKE, SECTIONS

SHEET PILE REMOVAL

510N240 SHEET PILE REMOVAL, OVERALL PLAN

510N241 SHEET PILE REMOVAL, INVENTORY & PLAN VIEW

FOR INFORMATION ONLY

23N217 P&L RAILWAY OVER TENN. RIVER, WEST BANK BOAT BASIN, GENERAL PLAN

61N247-4 SURVEY CONTROL PLAN

61N218 LOCK PLAN SHEET 1, STA. 6+95.00A TO STA. 2+56.00B

61N219 LOCK PLAN SHEET 2, STA. 2+56.00B TO STA. 7+06.00B

61N220 LOCK PLAN SHEET 3, STA. 7+06.00B TO STA. 13+15.00B

61N221 LOCK ELEV. LAND WALL, STA. 2+05.00A TO STA. 10+45.00B

61N250 LOCK CONCRETE, ARMOR, CHECK POSTS, LADDERS, GAGES; DETAILS

61N251 LOCK CONCRETE, DERRICK BASE, JOINTS, PORTS, SLEEVES; DETAILS

61N345 LOCK LOWER GUIDE WALL, CONCRETE, BLOCKS L-21, & L-22

61N348 LOCK LOWER GUIDE WALL, CONCRETE, BLOCKS L-23, L-24, & L-25

61N454 LOCK LOWER GUARD WALL, CONCRETE, BLOCKS R-29 & R-30

505N100-8 APPROACH WALL, CONSTRUCTION GRADING PLAN

65W702 SWITCHBOARDS, 440V. A.C. SWITCHBOARD, FRONT VIEW & WIRING

65W805 CONDUIT & GROUNDING, PLAN & DETAILS, LOWER PORTION

SK-4-25-16 KENTUCKY LOCK, TAILWATER ELEVATION, INFORMATION SKETCH

TRANSMISSION LINE INFORMATION

LW-2171s1A KENTUCKY DAM - NASHVILLE TRANSMISSION LINE, STA. 0+00 TO STA. 18+91.81 LA LW-2284s1 KENTUCKY DAM - MURRAY TRANSMISSION LINE, STA. 0+00 TO STA. 3080+00 LW-2666s2 KENTUCKY DAM - PADUCAH-EARLINGTON TRANS. LINE, (S.LOOP), STA. 0+00 TO STA. 35+83.6 LW-2986s1AA KENTUCKY DAM - CALVERT TRANSMISSION LINE, STA. 0+00 TO STA. 17+26.9 LA LW-3068s1 KENTUCKY DAM - CADIZ TRANSMISSION LINE, STA. 0+00 TO STA. 70+00 LW-3395s1B KENTUCKY DAM - HOPKINSVILLE TRANSMISSION LINE, STA. 0+00 TO STA. 17+40.21 LB LW-5732s4A KENTUCKY DAM - CALVERT NO. 2 TRANSMISSION LINE, STA. 0+00 TO STA. 18+55.96

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

ORDER OF PRECEDENCE

ORDER OF PRECEDENCE

The prospective bidder’s bid is incorporated into the contract in full effect and in accordance with the established order of precedence.

(a) The contract includes the standard contract clauses, schedule and specifications current at the time of award. It also entails: (1) the solicitation in its entirety, including all drawings, cuts and illustrations, and any amendments during bid process, and (2) the successful Contractor’s accepted bid. The contract constitutes and defines the entire agreement between the Contractor and the Government. No documentation shall be omitted which in any way bears upon the terms of that agreement.

(b) In the event of conflict or inconsistency between any of the clauses of the various portions of this contract, precedence shall be given in the following order:

(1) Contract Clauses

(2) Schedule (Period of Performance and Price)

(3) Specifications

(4) Drawings (pdf version)

(5) Other documents, exhibits, and attachments to include design products, including but not limited to CAD drawing files, engineering studies and analyses, shop drawings, equipment installation drawings, etc.

(6) Contractor’s accepted bid.

WAGE DETERMINATION

General Decision Number: KY160140 05/13/2016 KY140

Superseded General Decision Number: KY20150140

State: Kentucky

Construction Type: Heavy

Counties: Breckinridge, Caldwell, Carlisle, Crittenden, Fulton, Grayson, Hickman, Hopkins, Livingston, Muhlenberg, Ohio and Todd Counties in Kentucky.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/29/2016 2 03/25/2016 3 05/13/2016

ENGI0181-009 07/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 29.95 14.40

GROUP 2.....................$ 27.26 14.40

GROUP 3.....................$ 27.68 14.40

GROUP 4.....................$ 26.96 14.40

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Backhoe/Excavator/Trackhoe; Bulldozer; Crane; Drill;

Grader/Blade; Loader; Mechanic; Scraper

GROUP 2 - Bobcat/Skid Steer/Skid Loader; Forklift; Tractor (50 H.P. or over)

GROUP 3 - Articulating Truck Operator

GROUP 4 - Oiler; Tractor (under 50 H.P.)

Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate.

Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall receive $1.00 above the Group 1 rate.

Employees assigned to work below ground level are to be paid 10% above basic wage rate. This does not apply to open cut work.

* IRON0782-010 05/01/2016

Rates Fringes

IRONWORKER (Reinforcing & Structural) Projects over $20,000,000.00..............$ 27.09 20.66 Projects under $20,000,000.00..............$ 26.00 21.52

LABO0189-001 07/01/2015

Rates Fringes

LABORER

Concrete Saw (Hand Held/Walk Behind)...........$ 22.55 12.46

LABO0561-003 07/01/2015

Rates Fringes

LABORER

Form Worker.................$ 22.11 13.10

LABO1214-001 07/01/2015

Rates Fringes

LABORER

Backfiller, Carpenter Tender, Common or General, Concrete Worker, Dumpman, Fence Erection..............$ 22.30 12.46 Pipelayer & Tamper (Hand Held/Walk Behind)...........$ 22.55 12.46

* UAVG-KY-0001 06/25/2014

Rates Fringes

LABORER: Grade Checker..........$ 22.81 11.96

SUKY2011-017 06/25/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 20.96 10.53

ELECTRICIAN......................$ 32.35 2.18

LABORER: Flagger................$ 18.31 8.89

OPERATOR: Boring Machine........$ 25.35 13.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .