Prebidconferenceminutes.pdf

PDF 68 KB Posted

Attached to
Downstream Cofferdam construction at Kentucky Lock Federal contract opportunity
Solicitation number
W912P5-16-B-0004
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

Pre-Bid Conference Minutes

View the file

Other files for this federal contract opportunity

Other files attached to Downstream Cofferdam construction at Kentucky Lock, newest first.
File Type Posted
Bid_Abstract-signed.pdf PDF
Bid_Opening_sign-in_sheet.pdf PDF
W912P5-16-B-0004-0006.pdf PDF
W912P5-16-B-0004_TSpecs-Am6pgs.pdf PDF
W912P5-16-B-0004_TSpecs-Am5pgs.pdf PDF
W912P5-16-B-0004-0005.pdf PDF
W912P5-16-B-0004-0004.pdf PDF
W912P5-16-B-0004_TSpecs-Am4pgs.pdf PDF
W912P5-16-B-0004_DGN_Files_Am4.7z 7Z file
W912P5-16-B-0004_Plans-Am4Shts.pdf PDF
W912P5-16-B-0004_Plans-Am3Shts.pdf PDF
W912P5-16-B-0004-0003.pdf PDF
W912P5-16-B-0004-DDR-Am3.pdf PDF
W912P5-16-B-0004_DGN_Files_Am3.7z 7Z file
W912P5-16-B-0004_TSpecs-Am3pgs.pdf PDF
W912P5-16-B-0004_TSpecs-Am2pgs.pdf PDF
W912P5-16-B-0004_Plans-Am2Shts.pdf PDF
W912P5-16-B-0004-0002.pdf PDF
W912P5-16-B-0004_AppA-Am2.pdf PDF
W912P5-16-B-0004_DGN_Files.7z 7Z file
Prebidconferencepresentationslides.ppt PPT presentation
Prebidconferenceattendancelist.pdf PDF
W912P5-16-B-0004-0001.pdf PDF
Foreign_National_Pre-Bid_Meeting_Request_Form.pdf PDF
W912P5-16-B-0004_TSpecs.pdf PDF
W912P5-16-B-0004_Plans.pdf PDF
W912P5-16-B-0004.pdf PDF
Pre-Bid_Meeting_and_Site_Visit_Request_Form.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Conference Minutes (see presentation slides for details of information presented)

Solicitation Number: W912P5-16-B-0004

Kentucky Lock Addition Downstream Cofferdam Pre-Bid Conference, Grand Rivers

Senior Community Center, Grand Rivers, KY

June 30, 2016

See sign-in sheet for list of attendees

0905-0910 Introductions of Government Representatives/Housekeeping Items discussed—Tony Ellis, Resident Engineer

0910-0935 Solicitation Documents Overviewed—Isaac Taylor, Contract Specialist

0935-1055 Technical Aspects of Plans & Specifications Overviewed

Project Unique Components Overviewed – Don Getty, Project Manager

Concrete Segmental Wall—Barney Schulte, Technical Lead

Site Characteristics—Tony Ellis

Underwater Excavation (table top discussion) –Mike Arles, Geologist

Q&A session—The contract specialist emphasized during his presentation that all questions and answers are not binding unless specifically addressed in writing via solicitation amendment. The Government assumes no responsibility for any understanding or representations made by any of its officers, agents or employees, unless included in the solicitation, the specifications, or related documents. Multiple questions were raised by Industry and the Government attempted to address all questions raised with informal responses. The official responses will be documented via solicitation amendment.

1055-1110 Site Tour Logistics Discussed/Safety Briefed/Security Briefed and

Registrants Checked-In

1110-1230 Site tour including 20 minute lock discharge demonstration/Conclusion