This is a Questions and Answers (Q&A) document addressing contractor inquiries regarding a dry ice delivery contract at a government facility (CCAD).

Container and Delivery Requirements: The contractor must furnish three ultra-cold-temperature-engineered containers with a minimum capacity of 240 pounds of dry ice and dimensions of 42" x 28" x 35.2" (or 27½ x 39 7/16 x 43), to be stationed at DCRF, Building 8 (P62B4 T-700 Compressor Shop), and Building 49 (P61B1 Rotary Wing 1/1st floor in 1st booth). The delivery vehicle may remain inside CCAD for the entire route after the driver obtains proper clearance; no separate escorts are required. Invoicing and Verification: Payment is based on actual accepted pounds delivered, verified by supplier scale tickets rather than government scales or packaged net weight. Any quantity changes to Attachment 2 must be coordinated through the Contracting Officer's Representative (COR); contractors must not fulfill direct shop floor requests. Pricing and Access: Offerors cannot quote different per-pound prices for block, slab/block, and pellet CLINs—all pricing must be unified. The COR can provide temporary escorts for approved substitute drivers without DBIDS/CAC access, though CCAD requests contractors obtain required access as soon as reasonably possible; only one COR is currently available. Invoicing Schedule and Containers: Contractors may submit invoices weekly or monthly through WAWF, with the government preferring submission as soon as possible. No additional amendment or Q&A will be issued regarding final container requirements; the government requests containers suitable for long-term staging in south Texas weather conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Q&A 2 states that some delivery points will require contractor-furnished containers.

How many containers are required, at which delivery points, and what minimum capacity or specifications must each container meet?

- 3 containters required:

- DCRF

- Bldg. 8: P62B4 (T-700 Compressor Shop)

- Bldg. 49: P61B1 (Rotary Wing 1 / 1st floor in 1st booth)

- Min cap: 240Lbs of dry ice. 42” x 28” x 35.2”

- Or 27 ½ x 39 7/16 x 43

- These are sizes we have received in the past. Doesnt have to be exact. As long as

240Lbs (4 – 60LBs fit)

- Engineered to handle ultra-cold temperatures

2. Will the contractor invoice based on the actual accepted pounds delivered, or will payment be based on the estimated annual CLIN quantities?

actual accepted pounds

3. How will the government verify the accepted weight at delivery—for example, packaged net weight, supplier scale tickets, or a government scale?

- supplier tickets

4. Attachment 2 lists 12 stops and 15 shop entries. May the delivery vehicle remain inside CCAD while completing the entire route, or are separate security clearances or escorts required for any controlled delivery areas?

- delivery vehicle can remain inside CCAD. No escort required once driver obtains proper clearance

5. If a shop requests a quantity different from Attachment 2, will the change be coordinated in advance through the COR, and will the contractor be paid for the actual additional quantity delivered?

- any and all changes will be coordinated via COR. At no time shall contractor fulfill a request made directly by shop floor personal.

6. May offerors quote different per-pound prices for the block, slab/block, and pellet CLINs, provided that all transportation, handling, unloading, and related costs are included in the applicable unit prices?

- no

7. Must all primary and backup drivers possess both DBIDS and CAC access before performing deliveries, or can the COR provide a temporary escort for an approved substitute driver?

- COR can provide temporary escort. Theres only ONE COR available at this time. CCAD requests all contractors make every effort to obtain all required access as soon as reasonably possible

8. Will the government issue another amendment or Q&A response identifying the final contractor-furnished container requirements before quotations are due?

- no. Govt only request best containers for long term staging in south Texas weather conditions

9. May the contractor submit invoices through WAWF after each scheduled delivery, weekly for accepted deliveries, monthly, or is another invoicing schedule required?

- weekly or monthly is fine, the sooner the better