About this file

This document contains questions and answers regarding a solicitation for one Baileigh 112-ton c-frame hydraulic press and one Beckwood elastomeric forming kit installation and on-site training. The solicitation requires the contractor to provide and install a Baileigh 112-ton c-frame press with a custom Beckwood elastomeric forming kit that meets specific forming area, daylight, and tonnage requirements. The contractor will be responsible for all aspects of delivery, installation, setup, and testing at the NASCC facility, including transporting the equipment onsite, connecting it to electrical service, installing the tooling, filling it with hydraulic fluid, and conducting test runs. The solicitation allows for consideration of manufacturers other than Baileigh if their equipment meets or exceeds the stated performance characteristics.

View the file

Other files

File Type Posted
FINAL SOW 16 MARCH 2023.docx DOCX document
W912NW23Q0016 0005.pdf PDF
FINAL SOW 16 MARCH 2023.docx DOCX document
CHANGE IN REVISED SOW 14 FEB 2023.docx DOCX document
W912NW-23-Q-0016 0004.pdf PDF
FINAL REVISED SOW 19 JAN 2023 112t Press 5.docx DOCX document
QUESTIONS AND ANSWERS 6.docx DOCX document
W912NW-23-Q-0016 0003.pdf PDF
QUESTIONS AND ANSWERS 4.docx DOCX document
W912NW-23-Q-0016 0002.pdf PDF
W912NW-23-Q-0016 0001.pdf PDF
W912NW-23-Q-0016.pdf PDF
REDACTED Limiting-Competition-under-SAT_ACC.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

112 MACHINE PRESS

1. The bid says Baileigh C-Frame Press Brake and also says Beckwood Elastomeric sheet metal forming kit. We are a Baileigh distributor and we do not deal with Beckwood. I am not sure what you really requesting. Please advise.

The original intent was for a Baileigh press with Beckwood’ s tooling made custom for that press.

2. The contractor shall provide one (1) brand name Baileigh Industrial CFP-112HD 112- ton Elastomeric forming press with brand name Beckwood commissioned Elastomeric sheet metal forming Kit in accordance with the Statement of Work (SOW) contained herein. Who will be responsible for rigging, and we need clarification on the installation as well.

The contractor shall be responsible for everything including rigging. This is to be a turn-key project with minimal activity on CCAD’s part. “Installation” includes connecting the electrical service from a disconnect box within 10’ of the equipment’s location. The equipment needs to be anchored to the floor, filled with hydraulic fluid, the tooling needs to be installed, and test runs made.

3. What services do they need in installation?

The contractor shall be responsible for getting the equipment shipped to NASCC, removed from the freight truck/trailer, transported into the building, and adjusted to its final installation spot. The equipment needs to be hooked up to electricity, tooling installed, hydraulic fluid filled, and tested.

4. Will you accept only Baileigh?

The Government will consider other manufacturers if the proposed system meets or exceeds the performance characteristics: forming area, daylight, and tonnage.