REDACTED Limiting-Competition-under-SAT_ACC.docx
DOCX document 45 KB Posted
- Solicitation number
- W912NW-23-Q-0016
About this file
This memorandum documents a justification for limiting competition under the simplified acquisition threshold for a federal contract opportunity. The Army Contracting Command - Redstone Arsenal - Corpus Christi Army Depot seeks to award a sole source contract for one Baileigh 112-ton c-frame hydraulic press and one Beckwood elastomeric forming kit installation and on-site training. The estimated value of the contract is $150,000 with a four month delivery time. Market research was conducted from April 2021 to October 2022 and determined these specific brand name items were necessary to meet safety, capacity, and compatibility requirements. The justification cites FAR provisions allowing sole source awards for brand name items under $150,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL SOW 16 MARCH 2023.docx | DOCX document | |
| W912NW23Q0016 0005.pdf | ||
| FINAL SOW 16 MARCH 2023.docx | DOCX document | |
| CHANGE IN REVISED SOW 14 FEB 2023.docx | DOCX document | |
| W912NW-23-Q-0016 0004.pdf | ||
| FINAL REVISED SOW 19 JAN 2023 112t Press 5.docx | DOCX document | |
| QUESTIONS AND ANSWERS 6.docx | DOCX document | |
| W912NW-23-Q-0016 0003.pdf | ||
| QUESTIONS AND ANSWERS 4.docx | DOCX document | |
| W912NW-23-Q-0016 0002.pdf | ||
| QUESTIONS AND ANSWERS2 (answered).docx | DOCX document | |
| W912NW-23-Q-0016 0001.pdf | ||
| W912NW-23-Q-0016.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control No: W45N7V126000EL
Memorandum for Record – Limiting Competition at or below the Simplified Acquisition Threshold
1. Contracting Activity: Army Contracting Command – Redstone Arsenal – Corpus Christi Army Depot, Contracting Office (CCAM-ALC).
2. Description of Action:
Nature: New Requirement
| Contract Vehicle: | Purchase Order Number to be determined. |
| Blanket Purchase Agreement (BPA) Number _______________ | |
| Order/BPA# _______ against FSS Contract #_____ _________ | |
| Order #___________ against Multiple Award IDIQ Contract Name or #______________ |
Order #_______ against a single award IDC Contract Modification # _______ to existing PO/TO/DO/Call Order #________________
Pricing/Contract Type: Fixed Price Time & Materials/Labor Hours Cost Reimbursable Hybrid
Funds: Operations & Maintenance, Army (OMA) Other Funds: Army Working Capital Funds FY: 2023
Name of Proposed Contractor(s) and Address:
JMC Equipment 300 Delaware Avenue
STE 210
Wilmington, Delaware 19801-6601
JPW Industries Inc.
427 New Sanford Road La Vergne, Tennessee 37086-4184
Elite Products Group Inc.
10967 Paw Paw Drive Holland, Michigan 49424-8600
Brand Name Buy: Yes No
3. Description of Services or Supplies: One Brand name Baileigh 112-ton c-frame hydraulic press, and One Brand name Beckwood elastomeric forming kit installation and on-site training.
| CLINs |
| Description |
| QTY |
| Unit Price |
| Extended Price |
112 Ton C-Frame Hydraulic Press
| 0002 |
| Installation & Training |
| 1 |
| $ |
| $ |
| 0003 |
| Shipping |
| 1 |
| $ |
| $ |
Total
Estimate Delivery Date: 4-month lead time Total Value: $
4. Authority:
FAR 13.106-1(b)(1): For purchases not exceeding the simplified acquisition threshold (SAT), only one source reasonably available, urgency, exclusive licensing agreements, brand name, or industrial mobilization.
Or
FAR 8.405-6(a)(1)(i)(B) and 8.405-6(b)(1)Brand Name FAR 8.405-6(a)(1)(i)(A) Urgency FAR 8.405-6(a)(1)(i)(B) Only One Source is Capable FAR 8.405-6(a)(1)(i)(C) Logical Follow-on
Or
FAR 16.505(b)(2)(i)(B) Only One Awardee is Capable FAR 16.505(a)(4) Brand Name FAR 16.505(b)(2)(i)(A) Urgency FAR 16.505(b)(2)(i)(C) Logical Follow-on FAR 16.505(b)(2)(i)(D) Minimum Guarantee
5. Reasons for Authority Cited: There are two (2) brand name justifications. One brand name is for a Baileigh Industrial CFP-112HD 112-ton C-frame hydraulic press to support the Directorate of Manufacturing Sheet Metal Shop. This particular press satisfies the requirements from safety engineering: ideal safety features: closed on 3 sides, light curtain front safety interlock, 2 hand remote operation pedestal. The CFP-112HD also satisfies facility, and production engineering in terms of floor footprint, weight, pressing tonnage, and bed size. Additionally, as far as the sustainability, the CFP-112HD is standard Commercial Off the Shelf press, and Baileigh Industrial is a high-volume brand with many distributors including direct-to-consumer, so CCAD should not have problems with obtaining repair parts in the future. The second brand name item is a custom designed Beckwood elastomeric forming kit (“tooling”) to accompany a 112-ton C-frame hydraulic press to support the Directorate of Manufacturing Sheet Metal Shop. Beckwood offers ideal safety features, capacity, thoughtful design to rotate forming surfaces and eject worn blocks using the power of the press and is designed specifically to fit in the Baileigh CFP-112HD press.
6. Publicizing Contract Actions: For FAR Part 13 actions, the public display and synopsis requirements of FAR 5.101 and FAR 5.203 do not apply due to the $ threshold, apply and will be followed, or do not apply due to an exception at 5.202.
Requirement to post justification in accordance with FAR 8.405-6(b)(3), FAR 13.105(c), or FAR 16.505(a)(4)(iii)(A) Action is NOT a brand name restriction and is under $150K, no posting required Action is a brand name restriction, under $25K, no posting required Action is a brand name restriction, over $25K. It will be redacted and posted with the solicitation.
Action is a brand name restriction over $25K but will not be posted due to exception:
| FAR 6.305(f) |
| FAR 8.405-6(b)(3)(iii)(A) |
FAR 8.405-6(b)(3)(iii)(B)
| FAR 8.405-6(b)(3)(iii)(C) |
| FAR 16.505(a)(4)(iii(C) |
7. Market Research: Market research was conducted by Paul – Anthony Benavidez, Equipment Engineer and Terry Clark, Contract Specialist from April 30, 2021 – October 18, 2022.
Personal knowledge in procuring supplies of this type and how knowledge was obtained: On April 5, 2021, Mr. Benavidez met on shop floor to discuss functionality and safety features with Arturo Gomez, Sheetmetal acting supervisor, and John Smith, Safety Engineer. Arturo may not have extensive knowledge of commercial marketplace, but he does have knowledge of elastomeric metal forming.
The results of recent market research review for similar or identical supplies/services. Identify research and date performed: Mr. Benavidez conducted a broad search for hydraulic presses with the main characteristics of flat plates for tooling attachment, enclosed on 3 sides, light curtain safety interlock, and 2 handed operation only led to one machine, however several normal Online retailers sell it.
Review of Government and/or commercial databases for relevant information: Mr. Benavidez conducted other online sources and searched the following: GSA, FedMall, and FEDLOG, 4/26/2021 - Available in GSA Advantage! $57,148.22 (Online Source), 4/26/2021 - Available in FedMall, $68,737.88 "on sale through 13/31/2021"(Online Source) and 4/26/2021 - Check if available in FEDLOG, not available(Online Source).
Discuss other types of Market Research (not mentioned above) and date performed: On 18 October 2022 the Contract Specialist performed market research on the search engine Google and found some small companies that can provide this part as shown on the following link:
https://www.google.com/search?q=112+ton+c-frame+hydraulic+press&source=hp&ei=fftOY5LYA7bV5NoPkfO4oAI&iflsig=AJiK0e8AAAAAY08JjS_eVc0Qay-r8IMENtj7y7HTyvzL&ved=0ahUKEwjSiqTnvur6AhW2KlkFHZE5DiQQ4dUDCA8&oq=112+ton+c-frame+hydraulic+press&gs_lcp=Cgdnd3Mtd2l6EAwyBQghEKABMgUIIRCgATIFCCEQoAEyBQghEKsCMgUIIRCrAlAAWABg5itoAHAAeACAAaQBiAGkAZIBAzAuMZgBAKABAqABAQ&sclient=gws-wiz
8. Other Facts: N/A
9. Technical/Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Kelman Forest Chief Industrial Engineering Division
10. Contracting Officer Certification/Approval:
I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable based upon price analysis.
I certify that this justification is accurate and complete to the best of my knowledge and belief, and that completing this purchase as a sole source is in the best interest of the Government. Additionally, I approve this justification to limit competition subject to the availability of funds and provided that the services or supplies herein described have otherwise been authorized for acquisition.
Danny Ortiz Contracting Officer Version – February 2017 image5.png image2.png image6.png image7.png image3.png image8.png image9.png image1.png image10.png image11.png